Balanced liquid level well killing method for shallow super-heavy oil SAGD wells

By injecting cooling water into the SAGD well to establish a low-temperature liquid level and increase seepage resistance, it solves the problem of long time for well workover and drainage and pressure reduction, and achieves the effects of simplifying well killing operations and improving oil well production time.

CN115405274BActive Publication Date: 2024-10-01PETROCHINA CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110584443.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-05-27
Publication Date
2024-10-01
Estimated Expiration
2041-05-27

AI Technical Summary

Technical Problem

In the later stages of SAGD well development, well workover, draining and depressurization takes a long time and well killing is difficult, resulting in oil well production hours being affected.

Method used

By injecting cooling water at 20°C to 25°C, the low-temperature liquid level between wells is established, the seepage resistance is increased, the steam is blocked, the steam chamber pressure is balanced, the drainage and pressure reduction time is shortened, and solid-free kill fluid is used after well simmering. Kill the well.

Benefits of technology

It shortens the time for workover, drainage and pressure reduction, simplifies well killing operations, reduces risks and costs, and improves oil well production time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115405274B_ABST
    Figure CN115405274B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of well repair operation supporting methods, and is a balanced liquid level well killing method suitable for shallow super-heavy oil SAGD wells, which stops steam in a steam injection well, and after the production well discharges hot liquid, water is injected into the production well to establish a low-temperature liquid level between the steam injection well and the production well, and the inter-well formation is cooled by cooling water to increase the seepage resistance, on the one hand, to block steam and prevent steam from entering the wellbore and destroying the performance of the well killing fluid, and on the other hand, by increasing the inter-well seepage resistance, a part of the steam chamber pressure is balanced to reduce the drainage and pressure reduction time. The balanced liquid level well killing method for shallow super-heavy oil SAGD wells of the present invention can shorten the drainage and pressure reduction time of well repair in the middle and late stages of SAGD development, the well killing operation is simple, it is convenient to carry out well repair operations, the risk factor is small, the cost is low, and the production time rate of the oil well is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of well repair operation supporting methods, and is a balanced liquid level well killing method suitable for shallow super-heavy oil SAGD wells. Background Art

[0002] In order to continuously tap the development potential of heavy oil, Xinjiang Oilfield has adopted a diversified development method for heavy oil reservoirs. So far, steam drive development methods such as VHSD (vertical well-horizontal well steam drive), HHSD (horizontal well-horizontal well steam drive), and SAGD (steam assisted gravity drainage) have been gradually promoted industrially. These development methods can obtain higher recovery rates than steam huff-and-puff development, but due to continuous steam injection development, the volume of the underground steam chamber will continue to expand, which brings difficulties to the inspection and maintenance of oil wells. When an oil well fails, the existing technology is to first drain the fluid to reduce the pressure, and then empty the steam chamber pressure before carrying out the next step of maintenance. However, with the continuous production of crude oil, the underground steam chamber has expanded and expanded, and the volume is huge, resulting in longer and longer drainage and cooling time, up to more than half a year. The discharged fluid is usually a high-temperature steam-liquid mixed phase. In the early stage, there was a lack of research on the timing and method of well killing. During the well killing process, steam invasion is prone to occur, which destroys the performance of the well killing fluid, causing well killing failure, resulting in repeated drainage and well killing. Well repair operations cannot be carried out safely and timely, seriously affecting the production time of the oil well. Summary of the invention

[0003] The present invention provides a balanced liquid level well killing method suitable for shallow super-heavy oil SAGD wells, which overcomes the deficiencies of the above-mentioned prior art and can effectively solve the problems of long time for well repair, drainage and pressure reduction and difficulty in well killing in the middle and late stages of SAGD development.

[0004] The technical scheme of the present invention is realized by the following measures: a balanced liquid level well-killing method suitable for shallow super-heavy oil SAGD wells, which is carried out according to the following method: step 1, the steam injection well is stopped, the hot liquid is discharged from the production well, the hot liquid between the steam injection well and the production well is emptied, and according to the existing well-known one-to-one correspondence relationship of saturated steam pressure and the casing pressure change trend, the liquid discharge is stopped when the liquid phase at the bottom of the production well is converted into the steam phase; step 2, cooling water with a temperature of 20°C to 25°C is injected from the casing of the production well to the bottom of the production well, and the cooling water is injected into the formation through the bottom of the production well to occupy the space left by the discharged hot liquid, and the well of the steam injection well and the production well is established. The low-temperature liquid level between wells is used to cool the formation between wells by cooling water to increase the seepage resistance. On the one hand, it blocks steam and prevents steam from entering the wellbore and destroying the performance of the well-killing fluid. On the other hand, by increasing the seepage resistance between wells, it balances part of the steam chamber pressure and reduces the drainage and pressure reduction time; Step three, after the cooling water injection is completed, reverse circulation pressure measurement is carried out, the well is shut down for 24 hours, and the changes in the bottom hole temperature and casing pressure of the production well are observed. The temperature of the first three points of the horizontal section cannot rise above the safe operating temperature of each block within 24 hours of shutting down, and the casing pressure at the wellhead does not rise by more than 0.1MPa. After the return circulation pressure measurement determines that the final wellhead residual pressure is a safe residual pressure, a solid-free well-killing fluid is used to carry out well killing.

[0005] Method for determining safe operating temperature of the block: It is determined based on the temperature resistance of the well-killing fluid and the viscosity-temperature properties of the formation fluid. The temperature resistance of the well-killing fluid and the lack of fluidity of the crude oil must be met at the same time.

[0006] Method for determining safe working pressure: 1.4g / cm 3 The above solid-free killing fluid has a strong pungent odor, which affects the safety of on-site operations. Therefore, the upper limit of the killing fluid density is determined to be 1.4g / cm 3 , the wellhead safety residual pressure is calculated based on this density and well depth.

[0007] The following are further optimizations and / or improvements to the above technical solutions:

[0008] The injection volume of the cooling water is calculated as follows: injection volume = (liquid level width between the steam injection well and the production well × injection height) / 2 × horizontal section production length L × porosity.

[0009] In the above step three, if the temperature of the first three points of the downhole horizontal section and the wellhead casing pressure recovery value during the well soaking process exceed the safety operation requirements, repeat steps two and three until the temperature of the first three points of the downhole horizontal section and the wellhead casing pressure recovery value during the well soaking process do not exceed the safety operation requirements, and then use solid-free well-killing fluid to implement well killing.

[0010] The temperature of the first three points of the horizontal section downhole refers to the temperature from the pump inlet to point A of the horizontal section. Point A and point B refer to the two end points of the predetermined empirical trajectory during drilling. The top of the horizontal well is the vertical well section, the second part is the inclination section, the inclination section well trajectory turns from vertical to horizontal, and the last is the horizontal section. Point A is usually located at the entrance to the horizontal section, and point B is usually located at the end of the horizontal section. This is common knowledge in the field.

[0011] The balanced liquid level well killing method for shallow super-heavy oil SAGD wells of the present invention can shorten the time for well repair, fluid drainage and pressure reduction in the middle and late stages of SAGD development, is simple in well killing operation, is convenient for well repair operations, has a small risk factor, is relatively low in cost, and improves the production time rate of the oil well. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Attached Figure 1 Schematic diagram of the distribution of steam injection wells and production wells in SAGD wells.

[0013] Attached Figure 2 Schematic diagram of the volumetric model for calculating water injection volume. DETAILED DESCRIPTION

[0014] The present invention is not limited by the following embodiments, and specific implementation methods can be determined based on the technical solution of the present invention and actual conditions.

[0015] The present invention will be further described below in conjunction with embodiments:

[0016] Example 1: Figure 1 As shown, the balanced liquid level well-killing method for shallow super-heavy oil SAGD wells is performed as follows: Step 1, the steam injection well is stopped, the production well discharges the hot liquid, and the hot liquid between the steam injection well and the production well is emptied. According to the one-to-one correspondence between the saturated steam pressure and the casing pressure change trend, the liquid discharge is stopped when the liquid phase at the bottom of the production well is converted into the steam phase; Step 2, cooling water with a temperature of 20°C to 25°C is injected from the casing of the production well to the bottom of the production well, and the cooling water is injected into the formation through the bottom of the production well to occupy the space left by the discharged hot liquid, and a low-temperature liquid level (such as Figure 1 Liquid pool), using cooling water to cool the inter-well formation and increase the seepage resistance, on the one hand, to block the steam and prevent it from entering the wellbore and destroying the performance of the well-killing fluid, on the other hand, by increasing the seepage resistance between wells, a part of the steam chamber pressure is balanced and the drainage and pressure reduction time is reduced; step three, after the cooling water injection is completed, reverse circulation pressure measurement is performed, the well is shut down for 24 hours, and the changes in the bottom hole temperature and casing pressure of the production well are observed. The temperature of the first three points of the horizontal section cannot rise above the safe operating temperature of each block within 24 hours of the well shut down, and the casing pressure at the wellhead shall not rise by more than 0.1MPa. After the return circulation pressure measurement determines that the final wellhead residual pressure is a safe residual pressure, a solid-free well-killing fluid is used to implement well killing.

[0017] In Example 1, in step three, if the temperature of the first three points of the downhole horizontal section and the wellhead casing pressure recovery value during the well soaking process exceed the safety operation requirements, steps two and three are repeated until the temperature of the first three points of the downhole horizontal section and the wellhead casing pressure recovery value during the well soaking process do not exceed the safety operation requirements, and then solid-free well-killing fluid is used to implement well killing.

[0018] according to Figure 2 The calculation model of the cooling water injection volume is as follows: injection volume = (liquid surface width between the steam injection well and the production well × injection height) / 2 × horizontal section production length L × porosity. The horizontal section production length L is Figure 2 Middle L2.

[0019] When designing the well network, the height between well I and well P is 5 meters, which is a conventional technical means in this field. For this height between wells, when calculating the injection volume, the injection height is 2 meters.

[0020] The bottom hole pressure of the production well ≈ steam chamber pressure + inter-well liquid column pressure - inter-well seepage resistance. The key to the success of the well killing method of the present invention is that the pressure of the well killing fluid column can balance the bottom hole pressure. Since the height between the I well (steam injection well) and the P well (production well) is 5 meters, the liquid column pressure between the wells can be ignored. Therefore, the way to reduce the bottom hole pressure is to reduce the steam chamber pressure, which is the commonly used method of draining liquid to reduce pressure, and to increase the seepage resistance between wells. The most important factor affecting the inter-well seepage resistance of super-heavy oil is temperature. During normal production of SAGD, the temperature between the I and P wells is about 200°C, and the fluidity between the wells is good. Therefore, the balanced liquid level well killing method must first discharge the high-temperature fluid between the wells. When the fluid is discharged to the bottom of the production well as a vapor phase, cooling water of the temperature is injected into the bottom of the well and the formation, so that the cooling water occupies the formation pores, which can greatly reduce the temperature between the wells and the bottom of the well.

[0021] The well-killing method of the present invention changes the permeability between the I and P wells, increases the seepage resistance, realizes the division of the I and P well pressure systems, and weakens the influence of the steam chamber pressure on the well repair by blocking steam, reducing temperature, and increasing viscosity. The characteristics of the well-killing method of the present invention are that the steam chamber pressure is not completely emptied, and the fluid properties and seepage resistance of the oil reservoir are utilized to continuously inject water into the bottom of the well by using a pump tanker to establish a liquid level between the wells to balance a part of the steam chamber pressure, shorten the liquid discharge cycle, and effectively prevent the steam in the steam chamber from directly entering the bottom of the production well, control the bottom temperature, protect the performance of the well-killing fluid, and create favorable conditions for early well killing.

[0022] The method described in Example 1 was applied to the SAGD area of ​​Fengcheng Oilfield, and clean water at 20°C was used as cooling water for field trials. Through field implementation comparison, as shown in Table 1, the density of the well-killing fluid used during well-killing was generally smaller than that of the wells whose water injection volume did not reach the theoretical calculated value. The low density of the well-killing fluid indicates that the theoretical calculated value has a relatively strong use guidance.

[0023] During the on-site implementation, a pump tanker truck is used for water injection, which has the advantages of a large displacement adjustment range, relatively low clean water temperature, and strong heat exchange capacity.

[0024] After the balanced liquid level well-pressing method of the present invention was used for well-pressing in the SAGD area of ​​Fengcheng Oilfield, a total of 50 well repair operations of various types have been completed. Among them, 13 wells were inspected for pumps, and the average production time was 24 days, which was 27 days shorter than the average production time of drainage in the past. After the repair of the heavy 32 SAGD test area, the oil production level was increased from 34t / d to 93t / d, an increase of 8,800t, and a reduction of 1,600t in oil loss due to drainage. 25 vertical wells were completed for auxiliary connection and vertical well pumping, and 12 SAGD steam injection wells replaced the four-way and internal test gates; the drainage time was shortened by more than 50%, which greatly shortened the lying well straightening cycle and improved the production time rate of the oil wells. And the cost is low and the risk factor is small.

[0025] The above technical features constitute the embodiments of the present invention, which have strong adaptability and implementation effect. Non-essential technical features can be added or reduced according to actual needs to meet the requirements of different situations.

[0026]

Claims

1. A balanced liquid level well killing method suitable for shallow super-heavy oil SAGD wells, characterized in that The following method is used: Step 1: stop steam injection well, discharge hot liquid from production well, empty hot liquid between steam injection well and production well, and stop discharging liquid when liquid phase at bottom of production well is converted into steam phase; Step 2: inject cooling water with temperature of 20°C to 25°C from production well casing to bottom of production well, inject cooling water into formation through bottom of production well, occupy space left by discharged hot liquid, establish low-temperature liquid level between steam injection well and production well, and cool formation between wells with cooling water; Step 3: after cooling water injection, reverse circulation pressure measurement, well soaking for 24 hours, observe bottom temperature and casing pressure change of production well, temperature of first three points of horizontal section within 24 hours of well soaking cannot exceed safe operating temperature of each block, casing pressure at wellhead shall not exceed 0.1MPa, after reverse circulation pressure measurement determines that final wellhead residual pressure is safe residual pressure, use solid-free well killing fluid to kill well; The calculation formula for the injection volume of cooling water is: injection volume = (liquid surface width between the steam injection well and the production well × injection height) / 2 × horizontal section production length L × porosity; In step three, if the temperature of the first three points of the downhole horizontal section and the wellhead casing pressure recovery value during the well soaking process exceed the safety operation requirements, steps two and three are repeated until the temperature of the first three points of the downhole horizontal section and the wellhead casing pressure recovery value during the well soaking process do not exceed the safety operation requirements, and then solid-free well-killing fluid is used to implement well killing.