Power supply testing system and method

By using the real-time simulation system and power cross-link simulation model in the aircraft power supply test system to adjust the power quality and load of the power amplifier, the problem of limited test results in the existing technology is solved, and a power supply system closer to the real aircraft is achieved. Power distribution verification improves design and testing levels and test flight efficiency.

CN115407226BActive Publication Date: 2024-10-11SHANGHAI KELIANG INFORMATION ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210907863.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-29
Publication Date
2024-10-11
Estimated Expiration
2042-07-29

AI Technical Summary

Technical Problem

Existing aircraft power supply testing methods are limited in test effect, breadth and depth, and cannot effectively verify the difference between the power supply system and the power supply and distribution of the real aircraft, resulting in potential problems not being exposed until the aircraft final assembly or test flight stage.

Method used

Provide a power supply test system, including a real-time simulation system, a power supply and distribution system, a power system test bench, a power system test bench and a host computer system. The real-time simulation system and the power amplifier are connected through optical fibers, and the power cross-link simulation model is run and adjusted. Power amplifier power quality and loading to simulate the power supply characteristics of a real aircraft.

Benefits of technology

It has improved the power system design and test verification level, making the test results closer to the real aircraft, reducing power system failures during aircraft test flights, discovering problems in advance and accelerating the model certification process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115407226B_ABST
    Figure CN115407226B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of test verification, and discloses a power supply test system and method, including: a real-time simulation system, a power supply and distribution system, a power supply system test bench and a power consumption system test bench; the power supply and distribution system includes a first power amplifier and a second power amplifier; the real-time simulation system runs a power cross-linking simulation model, collects the power quality of the power supply system test bench and the load of the power consumption system test bench; the power cross-linking simulation model obtains a first control factor for adjusting the second power amplifier according to the power quality, and the adjusted second power amplifier provides the power consumption system test bench with a voltage source having the same power quality as the power supply system test bench; the power cross-linking simulation model obtains a second control factor for adjusting the first power amplifier according to the load, and the adjusted load is the same as the load of the power consumption system test bench, thereby expanding the test range and test depth of the power supply test and achieving the purpose of making the test effect closer to the real aircraft.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of test verification technology, and in particular to a power supply test system and method. Background Art

[0002] In order to adapt to the development needs of modern aircraft power systems and meet the requirements of power distribution, system control, system safety protection and energy efficiency management of the new generation of aircraft power systems, it is necessary not only to adopt system design and verification methods based on models and simulations within the power system, but also to conduct power hardware-in-the-loop simulation tests with a wider range, stronger real-time performance and higher degree of simulation with each power-consuming system to promote the accelerated iteration of power system design and more comprehensive verification of power system integration laboratories.

[0003] In the aircraft power system test bench, the power system itself uses a large number of real parts, while the electrical equipment of other systems are all simulated loads, which are different from the load characteristics of real parts. As a result, the degree of verification of the power supply and distribution of the real aircraft by the power system test is limited, and potential problems need to be left until the aircraft assembly stage or even the test flight stage to be exposed. Therefore, the existing aircraft power test methods have the problem of limited test effects, breadth and depth of the test. Summary of the invention

[0004] The purpose of the present invention is to solve the above problems and provide a power supply testing system and method, which expands the test range and test depth of the power supply test and achieves the purpose of making the test effect closer to the real aircraft.

[0005] To solve the above problems, an embodiment of the present application provides a power supply testing system, which includes: a real-time simulation system, a power supply and distribution system, a power supply system test bench, a power consumption system test bench and a host computer system; wherein the power supply and distribution system includes: a first power amplifier and a second power amplifier; the power supply system test bench is the power supply end of the first power amplifier, and the power consumption system test bench is the power consumption end of the second power amplifier; the real-time simulation system is connected to the first power amplifier and the second power amplifier through an optical fiber; the real-time simulation system is used to run a power cross-linking simulation model, collect the power quality of the power supply system test bench and the load of the power consumption system test bench; wherein the power cross-linking simulation model is used to obtain a first control factor for adjusting the power quality of the second power amplifier according to the power quality of the power supply system test bench, and the adjusted second power amplifier provides the power consumption system test bench with a voltage source consistent with the power quality of the power supply system test bench; the power cross-linking simulation model is also used to obtain a second control factor for adjusting the load of the first power amplifier according to the load of the power consumption system test bench, and the adjusted load of the first power amplifier is the same as the load of the power consumption system test bench. The host computer system is connected to the real-time simulation system through an Ethernet switch; wherein the host computer system is used to manage the power supply test system and develop a power cross-linking simulation model.

[0006] To solve the above problems, an embodiment of the present application provides a power supply testing method, which is applied to the above-mentioned power supply testing system, and the method includes: collecting the power quality of the power supply system test bench and the load of the power consumption system test bench; obtaining a first control factor through a power cross-linking simulation model and the power quality of the power supply system test bench, and adjusting the power quality of the second power amplifier according to the first control factor, so that the second power amplifier provides the power consumption system test bench with a voltage source consistent with the power quality of the power supply system test bench; obtaining a second control factor through a power cross-linking simulation model and the load of the power consumption system test bench, and adjusting the load of the first power amplifier according to the second control factor, wherein the adjusted load of the first power amplifier is the same as the load of the power consumption system test bench.

[0007] The power supply testing system and method provided in the embodiment of the present application connect the real-time simulation system with the first power amplifier and the second power amplifier through optical fiber, replacing the direct connection method with copper cable, thereby solving the problem that the power supply quality between long-distance test benches is different from that of the real aircraft due to the direct connection with copper cable. The power quality of the power system test bench and the load of the power consumption system test bench obtained by the real-time simulation system are processed through the running power cross-linking simulation model to obtain the second control factor and the first control factor for adjusting the first power amplifier and the second power amplifier, and the adjusted second power amplifier provides the power consumption system test bench with a voltage source consistent with the power quality of the power system test bench, and the adjusted load of the first power amplifier is the same as the load of the power consumption system test bench, thereby avoiding the difference in power supply characteristics between the power system test bench and the power consumption system test bench due to the long-distance connection, solving the problem of the long physical distance between the test benches, improving the level of power supply system design and test verification, and achieving the purpose of making the test effect closer to the real aircraft.

[0008] In addition, the simulation system includes a real-time simulation machine and an FPGA simulation machine; the real-time simulation machine is connected to the FPGA simulation machine via a PCIE bus, and the FPGA simulation machine is connected to the first power amplifier and the second power amplifier via optical fiber; wherein the FPGA simulation machine is used for data transmission with the first power amplifier and the second power amplifier, realizing high-frequency data transmission between the real-time simulation system and the first power amplifier and the second power amplifier.

[0009] In addition, the host computer system includes: a test management host and a model development management host; the test management host is used to collect and display the power quality of the power system test bench and the load of the power consumption system test bench; the model development management host is used to adjust the parameters of the power cross-linking simulation model, and can adjust the model parameters during the power supply test process according to actual needs.

[0010] In addition, the power supply and distribution system also includes a distribution panel box; the distribution panel box is connected to the second power amplifier, and the distribution panel box is used to independently supply power to each electrical device in the power system test bench, thereby realizing independent power supply to each electrical device.

[0011] In addition, the number of power system test benches is N, and the number of the second power amplifiers is M; wherein N and M are both integers greater than or equal to 1, and M=N. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] One or more embodiments are exemplarily described by pictures in the corresponding drawings, and these exemplified descriptions do not constitute limitations on the embodiments. Elements with the same reference numerals in the drawings represent similar elements, and unless otherwise stated, the figures in the drawings do not constitute proportional limitations.

[0013] Figure 1 is a structural schematic diagram of a power supply testing system provided in one embodiment of the present application;

[0014] Figure 2 is a structural schematic diagram of a power supply testing system provided by another embodiment of the present application;

[0015] Figure 3 This is a flow chart of a power supply testing method provided in yet another embodiment of the present application. DETAILED DESCRIPTION

[0016] As can be seen from the background technology, in traditional aircraft power supply testing, there are problems such as the test effect, test breadth and depth are all limited.

[0017] After analysis, it was found that the main reason for the above problems is that the power equipment of other power system test benches are all simulated loads, which are different from the real load effects. As a result, the power supply and distribution process of the power system test bench for the real aircraft is different from the actual situation. If the power supply and distribution lines between the aircraft's power system test bench and other power system test benches are connected, the comprehensive power supply and distribution test of the entire aircraft can be realized, which greatly improves the effect and depth of the power supply and distribution test of the aircraft power system.

[0018] However, the power supply system test bench and each power system test bench are built in an independent location, and there is a certain physical distance between each system test bench. If they are connected by conventional means such as copper cables, the cable length between the test benches is much longer than the length of the actual aircraft cable. Therefore, it will cause differences in the power supply characteristics of the power supply, making it difficult to achieve the verification level of a real aircraft power supply and distribution experiment.

[0019] To solve the above problems, an embodiment of the present application provides a power supply testing system, including: a real-time simulation system, a power supply and distribution system, a power supply system test bench, a power consumption system test bench and a host computer system; wherein the power supply and distribution system includes: a first power amplifier and a second power amplifier; the power supply system test bench is the power supply end of the first power amplifier, and the power consumption system test bench is the power consumption end of the second power amplifier; the real-time simulation system is connected to the first power amplifier and the second power amplifier through an optical fiber; the real-time simulation system is used to run a power cross-linking simulation model, collect the power quality of the power supply system test bench and the load of the power consumption system test bench; wherein the power cross-linking simulation model is used to obtain a first control factor for adjusting the power quality of the second power amplifier according to the power quality of the power supply system test bench, and the adjusted second power amplifier provides the power consumption system test bench with a voltage source consistent with the power quality of the power supply system test bench; the power cross-linking simulation model is also used to obtain a second control factor for adjusting the load of the first power amplifier according to the load of the power consumption system test bench, and the load of the adjusted first power amplifier is the same as the load of the power consumption system test bench. The host computer system is connected to the real-time simulation system through an Ethernet switch; wherein the host computer system is used to manage the power supply test system and develop a power cross-linking simulation model.

[0020] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, each embodiment of the present application will be described in detail below in conjunction with the accompanying drawings. However, it will be appreciated by those skilled in the art that in each embodiment of the present application, many technical details are proposed in order to enable the reader to better understand the present application. However, even without these technical details and various changes and modifications based on the following embodiments, the technical scheme claimed in the present application can also be implemented.

[0021] An embodiment of the present application relates to a power supply testing system, such as Figure 1 As shown, it specifically includes: a real-time simulation system 101, a power supply and distribution system 102, a power system test bench 103, a power consumption system test bench 104 and a host computer system 105, wherein the power supply and distribution system 102 includes a first power amplifier 1021 and a second power amplifier 1022, the power system test bench 103 is the power supply end of the first power amplifier 1021, and the power consumption system test bench 104 is the power consumption end of the second power amplifier 1022.

[0022] Specifically, the power system test bench 103 includes a plurality of power system devices, and the power system devices are used to supply power to the first power amplifier 1021 ; the power consumption system test bench 104 includes a plurality of power consumption devices.

[0023] Specifically, the power supply and distribution system 102 includes a first power amplifier 1021 and at least one second power amplifier 1022. The number of second power amplifiers 1022 is determined by the number of power system test benches participating in the power supply test, and each second power amplifier 1021 provides a simulated voltage source for a power system test bench. The power supply and distribution system 102 also includes: a distribution panel box, each second power amplifier 1022 is equipped with a distribution panel box directly connected by a cable, and the distribution panel box is used to separately power each electrical equipment in the power system test bench 104.

[0024] In the embodiment of the present application, through a custom-developed distribution panel box, the electrical equipment of each power system test bench can be independently controlled to be connected and disconnected, so that the test can be quickly adjusted according to the test requirements.

[0025] Specifically, the real-time simulation system 101 is connected to the first power amplifier 1021 and the second power amplifier 1022 through an optical fiber; the real-time simulation system 101 is used to run the power cross-linking simulation model, collect the power quality of the power system test bench 103 and the load of the power system test bench 104; wherein, the power cross-linking simulation model is used to obtain the first control factor for adjusting the power quality of the second power amplifier 1022 according to the power quality of the power system test bench 103, and the adjusted second power amplifier 1022 provides the power system test bench 104 with a voltage source consistent with the power quality of the power system test bench 103; the power cross-linking simulation model is also used to obtain the second control factor for adjusting the load of the first power amplifier 1021 according to the load of the power system test bench 104, and the adjusted load of the first power amplifier 1021 is the same as the load of the power system test bench 104. wherein, the load is the power consumption of each power device in the power system test bench.

[0026] In one example, the real-time simulation system 101 includes a real-time simulation machine and an FPGA (Field Programmable Gate Array) simulation machine. The real-time simulation machine and the FPGA simulation machine are connected via a PCIE (Peripheral Component Interconnect Express) bus for transmitting data during the real-time simulation process. The FPGA simulation machine is connected to a first power amplifier and a second power amplifier via a direct optical fiber connection. The FPGA simulation machine is used to collect the power quality of the power supply end (power system test bench) of the first power amplifier and collect the load of the power consumption end (power consumption system test bench) of the second power amplifier.

[0027] Specifically, the host computer system 105 exchanges data with the real-time simulation system 101 through an Ethernet switch, and the host computer system 105 is used to manage the power supply test system and develop a power cross-linking simulation model. The host computer system is composed of a test management host and a model development management host. The test management host is used to collect and display the power quality of the power system test bench 103 and the load of the power consumption system test bench 104; the model development management host is used to adjust the parameters of the power cross-linking simulation model.

[0028] In an embodiment of the present application, the test management host can also be used to design and manage test cases for power supply testing; the model development management host also has model development management functions, which can realize the compilation, downloading, running, stopping / exiting, simulation process management, online adjustment of parameters and signal monitoring of the power cross-linking simulation model.

[0029] In an embodiment of the present application, through real-time detection and control of the first power amplifier, the second power amplifier and the power cross-linking simulation model, power interconnection between the power supply system test bench and each power consumption system test bench is achieved, solving the problem of the test benches being physically far apart; through the optical fiber signal connection between the first power amplifier and the second power amplifier and the FPGA real-time simulator, the direct connection method of copper cable is replaced, solving the problem that the power supply quality between long-distance test benches is different from that of a real aircraft due to the direct connection of copper cable; through the FPGA real-time simulator and the power cross-linking simulation model, extremely low-latency signal acquisition and processing are achieved, and the simulation step size can be controlled within tens of microseconds, so that the FPGA simulator can perform higher-frequency data acquisition and output with the first power amplifier and the second power amplifier.

[0030] The power supply test system provided in the embodiment of the present application does not limit the number of power system test benches, and the corresponding power system test benches can be added or reduced according to actual needs. It can also replace the functions of the power supply system test bench and the power system test bench by adding simulation models of the power supply system and various power systems, and building corresponding analog / digital signal communication connections consistent with the real aircraft, so as to achieve multi-system joint power / control hardware-in-the-loop testing with a wider test range, test results closer to the real aircraft, and a deeper degree of verification.

[0031] To make the above power supply test system clearer, refer to Figure 2 The above power supply test system is described in detail:

[0032] In one example, a power supply test system includes: a test management host, a model development management host, an Ethernet switch, a real-time simulator, an FPGA simulator, a first power unit, N second power units, N distribution panels, N power system test benches, and 1 power system test bench, wherein the power system test bench is composed of M power system devices, and each power system test bench is composed of K power devices, and N, M, and K are all integers greater than or equal to 1. The real-time simulator is connected to the test management host and the model development management host through the Ethernet switch; the real-time simulator and the FPGA simulator are connected through a high-speed serial bus; the FPGA simulator is connected to the first power amplifier and each second power amplifier through an optical fiber; the first power amplifier and each power system device are connected through a copper cable; the second power amplifier and the distribution panel are connected through a copper cable; and each power device in the power system test bench is connected through a copper cable.

[0033] An embodiment of the present application also provides a power supply testing method, which is applied to the above-mentioned power supply testing system, and the method includes: collecting the power quality of the power supply system test bench and the load of the power consumption system test bench; obtaining a first control factor through a power cross-linking simulation model and the power quality of the power supply system test bench, and adjusting the power quality of the second power amplifier according to the first control factor, so that the second power amplifier provides the power consumption system test bench with a voltage source consistent with the power quality of the power supply system test bench; obtaining a second control factor through a power cross-linking simulation model and the load of the power consumption system test bench, and adjusting the load of the first power amplifier according to the second control factor, wherein the adjusted load of the first power amplifier is the same as the load of the power consumption system test bench.

[0034] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, each embodiment of the present application will be described in detail below in conjunction with the accompanying drawings. However, it will be appreciated by those skilled in the art that in each embodiment of the present application, many technical details are proposed in order to enable the reader to better understand the present application. However, even without these technical details and various changes and modifications based on the following embodiments, the technical scheme claimed in the present application can also be implemented.

[0035] The following is a detailed description of the implementation details of the power supply test method in this embodiment. The following content is only for the convenience of understanding the implementation details of this solution and is not necessary for implementing this solution. Figure 3 As shown, the following steps may be included:

[0036] Step 301: Collect the power quality of the power system test bench and the load of the power consumption system test bench.

[0037] In one example, the power quality of the power supply end (power system test bench) of the first power amplifier and the load of the power consumption end (power consumption system test bench) of the second power amplifier are collected.

[0038] Step 302: obtaining a first control factor through a power cross-linking simulation model and the power quality of the power system test bench, and adjusting the power quality of the second power amplifier according to the first control factor, so that the second power amplifier provides a voltage source with the same power quality as the power system test bench for the power consumption system test bench;

[0039] In one example, a real-time simulation system inputs the power quality of a power system test bench into a running power cross-linking simulation model to obtain a first control factor, and adjusts the power quality of a second power amplifier in real time by means of harmonic injection according to the first control factor. The second power amplifier with adjusted power quality can provide a voltage source with consistent power quality with the power system test bench for the power consumption system test bench.

[0040] Step 303: obtaining a second control factor through the power cross-linking simulation model and the load of the power system test bench, and adjusting the load of the first power amplifier according to the second control factor, wherein the adjusted load of the first power amplifier is the same as the load of the power system test bench.

[0041] It should be noted that the order of the operations in the above step 302 and step 303 is not fixed, and they can be executed simultaneously, or the operation in step 303 can be executed first and then the operation in step 302.

[0042] In one example, a real-time simulation system inputs the load of a power system test bench into a running power cross-linking simulation model to obtain a second control factor, and adjusts the load of a first power amplifier according to the second control factor, wherein the adjusted load of the first power amplifier is the same as the load of the power system test bench.

[0043] The power supply testing method provided in the embodiment of the present application monitors and controls the first power amplifier and the second power amplifier through the real-time operation of the power cross-linking simulation model, thereby providing each power system test bench with a voltage source consistent with the power supply quality of the power system test bench, and providing the power system test bench with a collective simulated load consistent with the actual load of each power system test bench, thereby avoiding the difference in power supply characteristics between the power system test bench and the power system test bench due to the long-distance connection, solving the problem of the long physical distance between the test benches, improving the level of power system design and test verification, and realizing power supply and distribution integration test verification close to that of a real aircraft, bringing forward problems that could only be exposed in the aircraft assembly and manufacturing stage to the design stage and laboratory test stage, and at the same time effectively reducing power system-related faults during aircraft flight tests, improving flight test efficiency, and ensuring the progress of model certification.

[0044] It is not difficult to find that this embodiment is a method embodiment corresponding to the power supply test system embodiment, and this embodiment can be implemented in conjunction with the above embodiment. The relevant technical details mentioned in the above embodiment are still valid in this embodiment, and in order to reduce repetition, they are not repeated here. Accordingly, the relevant technical details mentioned in this embodiment can also be applied in the above embodiment.

[0045] The step division of the above methods is only for the purpose of clear description. When implemented, they can be combined into one step or some steps can be split and decomposed into multiple steps. As long as they include the same logical relationship, they are all within the scope of protection of this patent; adding insignificant modifications to the algorithm or process or introducing insignificant designs without changing the core design of the algorithm and process are all within the scope of protection of this patent.

[0046] It is worth mentioning that all modules involved in the above implementation of the present application are logic modules. In practical applications, a logic unit can be a physical unit, a part of a physical unit, or a combination of multiple physical units. In addition, in order to highlight the innovative part of the present application, the present implementation does not introduce units that are not closely related to solving the technical problems proposed by the present application, but this does not mean that there are no other units in the present implementation.

[0047] Those skilled in the art can understand that all or part of the steps in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a program, and the program is stored in a storage medium, including a number of instructions to enable a device (which can be a single-chip microcomputer, chip, etc.) or a processor to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.

[0048] The above embodiments are provided for ordinary technicians in the field to implement and use the present application. Ordinary technicians in the field can make various modifications or changes to the above embodiments without departing from the inventive concept of the present application. Therefore, the protection scope of the present application is not limited to the above embodiments, but should conform to the maximum scope of the innovative features mentioned in the claims.

Claims

1. A power supply testing method, characterized in that: The method is applied to a power supply test system, which includes: a real-time simulation system, a power supply and distribution system, a power supply system test bench, a power consumption system test bench and a host computer system; wherein the power supply and distribution system includes: a first power amplifier and a second power amplifier; the power supply system test bench is the power supply end of the first power amplifier, and the power consumption system test bench is the power consumption end of the second power amplifier; the real-time simulation system is connected to the first power amplifier and the second power amplifier through an optical fiber; the real-time simulation system is used to run a power cross-linking simulation model, collect the power quality of the power supply system test bench and the load of the power consumption system test bench; wherein the power cross-linking simulation model is used to collect the power quality of the power supply system test bench and the load of the power consumption system test bench according to the The power quality of the power system test bench is used to obtain a first control factor for adjusting the power quality of the second power amplifier, and the adjusted second power amplifier provides the power system test bench with a voltage source consistent with the power quality of the power system test bench; the power cross-linking simulation model is also used to obtain a second control factor for adjusting the load of the first power amplifier according to the load of the power system test bench, and the adjusted load of the first power amplifier is the same as the load of the power system test bench; the host computer system is connected to the real-time simulation system through an Ethernet switch; wherein the host computer system is used to manage the power supply test system and develop the power cross-linking simulation model, and the method comprises: Collecting the power quality of the power system test bench and the load of the power consumption system test bench; The first control factor is obtained through the power cross-linking simulation model and the power quality of the power system test bench, and the power quality of the second power amplifier is adjusted according to the first control factor, so that the second power amplifier provides the power consumption system test bench with a voltage source consistent with the power quality of the power system test bench; The second control factor is obtained through the power cross-linking simulation model and the load of the power system test bench, and the load of the first power amplifier is adjusted according to the second control factor, wherein the adjusted load of the first power amplifier is the same as the load of the power system test bench.

2. The power supply testing method according to claim 1, characterized in that: The real-time simulation system includes a real-time simulation machine and an FPGA simulation machine; The real-time emulator is connected to the FPGA emulator via a PCIE bus, and the FPGA emulator is connected to the first power amplifier and the second power amplifier via optical fiber; wherein the FPGA emulator is used for data transmission with the first power amplifier and the second power amplifier.

3. The power supply testing method according to claim 1, characterized in that: The host computer system includes: a test management host and a model development management host; The test management host is used to collect and display the power quality of the power system test bench and the load of the power consumption system test bench; The model development management host is used to adjust the parameters of the power cross-linking simulation model.

4. The power supply testing method according to claim 1, characterized in that: The power supply and distribution system also includes a distribution panel box; The distribution panel box is connected to the second power amplifier, and the distribution panel box is used to independently supply power to each electrical device in the power system test bench.

5. The power supply testing method according to any one of claims 1 to 4, characterized in that: The number of the power system test benches is N, and the number of the second power amplifiers is M; wherein N and M are both integers greater than or equal to 1, and M=N.

6. The power supply testing method according to claim 1, characterized in that: The adjusting the power quality of the second power amplifier according to the first control factor includes: According to the first control factor, the power quality of the second power amplifier is adjusted by harmonic injection.