Method and device for increasing the extension length of horizontal wells in hydrate layers by synergistically using multiple factors
By coordinating the booster pipeline and hydraulic parameters, the problem of limited extension length of the horizontal well of the natural gas hydrate reservoir in the sea area is solved, a safe and efficient drilling process is achieved, and the development efficiency and environmental protection of natural gas hydrate resources are improved.
Patent Information
- Application Number
- CN202211168054.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2022-08-23
- Filing Date
- 2022-09-23
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2042-09-23
AI Technical Summary
The extension length of the horizontal well of the natural gas hydrate reservoir in the sea area is limited by the weak cementing characteristics and narrow safe pressure window characteristics, resulting in complex situations such as well surges and well leakage, and lack of safe and efficient drilling methods, which affects the development of natural gas hydrate reservoirs.
By coordinating the fluid density and displacement in the booster pipeline, the dosage of hydrate generation inhibitors, hydraulic parameters (drilling fluid density, displacement, mechanical drilling speed and drilling fluid inlet temperature), the design and circulation drilling of drilling fluid are optimized. Process, real-time monitoring and adjustment of bottom well pressure and temperature to achieve limit extension of horizontal wells.
The limit extension length of the hydrate reservoir horizontal well is significantly improved, ensuring the safe and efficient development of natural gas hydrate resources, reducing drilling costs, and improving environmental protection and safety.
Smart Images

Figure CN115419389B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method and a device for improving the extension length of a hydrate layer horizontal well in a coordinated manner by multiple factors, and belongs to the technical field of offshore natural gas hydrate reservoir drilling. Background Art
[0002] Carbon emission restrictions and energy structure transformation have promoted the rapid development of clean energy. Natural gas hydrates, as a clean energy, have attracted widespread attention due to their huge reserves. Among them, the amount of natural gas hydrate resources in the sea area accounts for about 99% of the total resources, and has broad prospects for exploitation. The second depressurization test of natural gas hydrates in the South my country Sea shows that horizontal wells can significantly improve gas production efficiency in the exploitation of natural gas hydrate reservoirs, and the extension length of horizontal wells is a key factor affecting the production output. However, the natural gas hydrates in the sea area are shallowly buried, and the reservoirs have obvious weak cementation characteristics and narrow safety pressure window characteristics, so the extension length of horizontal wells is severely limited. This is mainly because the annular pressure loss increases with the extension of the horizontal well, and the friction of the drill bit and the invasion of drilling fluids can easily lead to the decomposition of hydrates around the well and reduce the mechanical strength of the reservoir. In addition, the hydrate-containing cuttings after the drill bit is broken decompose in the annular space to produce gas, which will cause the bottom hole pressure to drop. The combined influence of the above factors leads to the drilling of horizontal wells in hydrate reservoirs, which is very prone to complex situations such as well kicks and well leakage, and it is difficult to meet the horizontal well length requirements under the designed production. At present, there is a lack of a safe and efficient drilling method to increase the limit extension length of horizontal wells in hydrate reservoirs, which is a key technical difficulty restricting the safe and efficient development of offshore natural gas hydrate deposits. Therefore, it is urgent to develop a safe and efficient drilling method to increase the limit extension length of horizontal wells in hydrate reservoirs. Summary of the invention
[0003] In view of the shortcomings of the prior art, the present invention provides a method and device for synergistically improving the extension length of horizontal wells in hydrate layers by using multiple factors. The ultimate extension length of horizontal wells in hydrate reservoirs is improved by synergistically regulating the density and displacement of the fluid in the booster pipeline, the amount of hydrate formation inhibitor, and hydraulic parameters (drilling fluid displacement, density, mechanical drilling speed, and drilling fluid inlet temperature). The method of the present invention can optimize the ultimate extension length of horizontal wells in real time, and provide technical guarantee for safe and efficient drilling of hydrate reservoirs and meeting the extension length of horizontal wells under production design requirements.
[0004] Terminology Note:
[0005] APWD: Annular Pressure Measurement While Drilling.
[0006] The present invention adopts the following technical solutions:
[0007] A method for increasing the extension length of a hydrate layer horizontal well by synergistically using multiple factors comprises the following steps:
[0008] (1) Optimization design of drilling hydraulic parameters: Based on the geological and reservoir parameters of the target natural gas hydrate reservoir, the hydraulic parameter combination of drilling fluid density, displacement, mechanical penetration rate, drilling fluid inlet temperature, and fluid density and displacement in the booster pipeline are designed under the condition of riser drilling;
[0009] (2) Closed-loop drilling: According to the hydraulic parameter combination designed in step (1) and the fluid density and displacement in the booster pipeline, the drilling fluid is injected from the drill pipe and returned from the annulus of the riser section;
[0010] (3) Real-time monitoring and correction: The bottom hole pressure and temperature are monitored and obtained in real time through APWD, and the annular temperature and pressure calculation model is corrected in real time based on the obtained real-time bottom hole temperature and pressure data;
[0011] (4) Intelligent control and optimization: Based on the annular temperature and pressure calculation model corrected in step (3), the booster pipeline displacement and fluid density, hydrate inhibitor dosage, and hydraulic parameters are automatically and collaboratively controlled with the goal of keeping the bottom hole pressure within a safe window between the formation pore pressure and the fracture pressure;
[0012] (5) Repeat steps (3) and (4) to continue the drilling cycle until the drilling is completed.
[0013] The maximum extension length of the horizontal well in the present invention refers to the maximum extension length of the open hole section.
[0014] Preferably, in step (1), the design of the initial hydraulic parameters and the fluid density and displacement in the booster pipeline needs to satisfy the following relationship:
[0015] 1) Drilling fluid density ρ li Design scope
[0016] max(ρ p ,ρ e ,ρ c )≤ρ l ≤ρ f (1)
[0017] In the formula, ρ p is the equivalent density of formation pore pressure, kg / m 3 ρ c is the equivalent density of formation collapse pressure, kg / m 3 ρ l is the equivalent drilling fluid density, kg / m 3 ρ f is the equivalent density of formation fracture pressure, kg / m 3 ρ e is the hydrate reservoir phase equilibrium pressure equivalent density, kg / m 3;
[0018] ρ l =ρ m +ρ pa =ρ li E m +ρ g E g +ρ s E s +ρ pa , where ρ li is the density of the drilling fluid in the drill pipe, i.e., the density of the drilling fluid injected from the wellhead drill pipe in step (1), kg / m 3 , according to ρ l Range determination li The range of pa is the annular pressure loss equivalent density, kg / m 3 ρ m is the drilling fluid density in the annulus of the casing section or the open hole section, kg / m 3 ; E g is the volume fraction of the annular air phase, dimensionless; E m is the volume fraction of the annular liquid phase, dimensionless; E s is the volume fraction of the solid phase in the annulus, dimensionless; ρ s is the annulus solid phase density, kg / m 3 ρ g is the density of the annular air phase, kg / m 3 ;
[0019] 2) Design range of drilling fluid displacement Q
[0020] Q min <Q<Q max (2)
[0021] In the formula, Q min is the minimum drilling fluid displacement, m 3 / s;Q max is the maximum drilling fluid displacement, m 3 / s; Q is the drilling fluid displacement, m 3 / s;
[0022] Among them, the minimum drilling fluid displacement Q min Mainly affected by rock carrying, under the condition of deepwater hydrate formation riser drilling, the drilling fluid displacement in the riser annulus is usually regulated by the booster pipeline. The displacement calculation formula in the riser annulus after regulation is:
[0023] Q ra =Q+Q za (3)
[0024] Where Q ra is the annular displacement of the riser section, m3 / s;Q za is the drilling fluid displacement in the booster pipeline, m 3 / s, the drilling fluid displacement range in the booster pipeline is Q zamin ≤Q za ≤Q zamax , Q zamin is the minimum displacement in the booster pipeline, m 3 / s,Q zamin =Q zmin -Q min , Q zmin is the minimum displacement required for the riser section to carry rock, m 3 / s;Q zamax The maximum displacement allowed by the booster line pump, that is, the displacement when the rated pressure is reached, m 3 / s;
[0025] The calculation formula of the drilling fluid density in the annulus of the riser section after regulation is:
[0026]
[0027] Where ρ ra is the drilling fluid density in the riser annulus, kg / m 3 ρ za is the fluid density in the booster pipeline, kg / m 3 , i.e. the fluid density in the booster pipeline described in step (1), is in the range of: ρ sea ≤ρ za ≤ρ max , ρ sea is the density of seawater, kg / m 3 ρ max The density of drilling fluid corresponding to the maximum weighted dosage condition reserved on the drilling platform, kg / m 3 ;
[0028] Therefore, the minimum drilling fluid displacement depends on the drilling fluid displacement required for the annulus below the mudline to carry rock. The minimum drilling fluid displacement calculation formula is:
[0029]
[0030] Where, d w is the borehole diameter, m; d po is the outer diameter of the drill pipe, m; v a is the drilling fluid return velocity in the annulus of the casing section or the open hole section, m / s;
[0031] The maximum drilling fluid displacement depends on the formation fracture pressure and the rated pump pressure:
[0032] Q max =min(Q pmax ,Qrmax ) (6)
[0033]
[0034] In the formula, Q pmax is the maximum displacement allowed by the formation fracture pressure, m 3 / s;Q rmax is the maximum displacement allowed by the rated pump pressure, m 3 / s; d is the flow section diameter, m; p f is the formation fracture pressure, Pa; p h is the drilling fluid column pressure in the annulus of the casing section or the open hole section, Pa; ρ m is the drilling fluid density in the annulus of the casing section or the open hole section, kg / m 3 ; f is the friction coefficient of the casing section annulus or the open hole section annulus, dimensionless; s is the drilling fluid flow length, m;
[0035] In terms of the flow rate adjustment of the riser section, the minimum flow rate Q required for the annular rock carrying of the riser section is calculated according to formula (5). zmin , that is, the square of the open hole section vertical well in formula (5) Replaced by the square of the inner diameter of the riser section That's it;
[0036] Q zmin <Q ra <Q zmax (8)
[0037] In the formula, Q zmin is the minimum rock-carrying displacement of the annulus of the riser section, m 3 / s;Q zmax is the maximum rock-carrying capacity of the annulus of the riser section, m 3 / s,Q zmax =Q zamax +Q max ;
[0038] The drilling fluid displacement range in the booster pipeline is Q zamin ≤Q za ≤Q zamax , Q zamin is the minimum displacement in the booster pipeline, m 3 / s,Q zamin =Q zmin -Q min , Q zmin is the minimum displacement required for the riser section to carry rock, m 3 / s;Q zamax The maximum displacement allowed by the booster line pump, that is, the displacement when the rated pressure is reached, m 3 / s;Q zais the drilling fluid displacement in the booster pipeline, m 3 / s.
[0039] The design of mechanical drilling speed is based on the drilling operation time and the cuttings content in the drilling fluid. Its design range can be expressed as:
[0040] ROP min ≤ROP≤ROP max (9)
[0041] Where, ROP is the mechanical drilling rate; min is the minimum mechanical drilling speed, m / h; its calculation formula is:
[0042] ROP min =L / t max (10)
[0043] L is the designed length of the horizontal well, m; t max is the maximum allowed drilling operation time, h;
[0044] ROP max is the maximum mechanical drilling speed, m / h; its calculation formula is:
[0045]
[0046] ρ li is the density of drilling fluid in the drill pipe, kg / m 3 ;t a is the cuttings return time, h; A a is the cross-sectional area of the annulus of the open hole section, casing section or riser section, m 2 ;H l is the borehole depth, m; H a is the height of the cuttings bed, m, such as Figure 1 As shown; θ is the angle, °, such as Figure 1 As shown; pa is the annular pressure loss equivalent density, kg / m 3 , r w is the wellbore radius, m;
[0047] Limitation of Annular Pressure Loss on Drilling Fluid Density and Displacement Design
[0048]
[0049] p p ≤Δp a +p esd ≤p f
[0050] In the formula, Δp dm is the surface pipeline pressure loss, Pa; Δppi is the drill pipe pressure loss, Pa; Δp b is the drill bit pressure loss, Pa; Δp a is the annular pressure loss, Pa; p r is the pump pressure, Pa; p p is the formation pore pressure, Pa; p f is the formation fracture pressure, Pa; p esd is the static pressure of the annulus fluid, Pa; D is the equivalent diameter of the annulus, m;
[0051] The design of drilling fluid inlet temperature is based on the reservoir hydrate phase equilibrium temperature, and its design range can be expressed as:
[0052] T pf ≤T ed (13)
[0053] Where, T pf Bottom hole drilling fluid temperature, K; T ed is the hydrate reservoir phase equilibrium temperature, K; based on the bottom hole drilling fluid temperature T pf The drilling fluid inlet temperature T can be determined by the heat transfer formula (14) (15) in , T co ≤T in ≤T en , T co The lowest temperature that the tank cooling system can provide, K; T en is the ambient temperature, K;
[0054] The calculation models for the temperature inside the drill pipe and the annulus temperature are:
[0055]
[0056]
[0057] In the formula, c m is the specific heat capacity of drilling fluid, J / (kg·K); r pi is the inner diameter of the drill pipe, m; T a T is the annulus temperature of the open hole section, casing section or riser section, K; p is the drilling fluid temperature in the drill pipe, K (the drilling fluid inlet temperature refers to the initial drilling fluid temperature pumped into the drill pipe from the drilling platform, and the drilling fluid temperature in the drill pipe is T p It is the temperature of the drilling fluid when it circulates to a certain position on the drill pipe. After the heat exchange process from the wellhead to this position, the temperature changes; the annular temperature T a It is the temperature of the drilling fluid when it flows through the drill pipe, is ejected from the drill bit, and then returns along the annulus of the open hole section, the annulus of the casing, and the annulus of the riser, and returns to a certain position); v zgis the flow rate of drilling fluid in the drill pipe, m / s; h p is the total heat transfer coefficient in the drill pipe, W / (m·K); A p is the internal cross-sectional area of the drill pipe, m 2 ; A a is the cross-sectional area of the annulus, m 2 ;h a is the total heat transfer coefficient in the annulus, W / (m·K); T f is the formation temperature, K; r po is the outer diameter of the drill pipe, m; r a is the radius of the annulus of the open hole section, casing section or riser section, m; t is the time, s; z is the distance from the bottom of the well, m; m h is the hydrate decomposition rate in hydrate-containing cuttings, kg / s; ΔH is the hydrate decomposition heat, kJ / mol.
[0058] Preferably, in step (2), the advantages of using closed-loop drilling with a riser are that on the one hand, the drilling fluid can be recycled, reducing drilling costs; on the other hand, the drilling fluid displacement and drilling fluid density in the riser section can be controlled by adjusting the displacement of the booster pipeline, which is beneficial to carrying rock and adjusting the bottom hole pressure.
[0059] According to the hydrate phase equilibrium conditions, hydrate-containing cuttings basically do not decompose in the annulus of the formation section, and only decompose in the annulus of the riser (specifically, decomposition occurs in the annulus from about 600m below sea level to the sea level). Therefore, there is no need to consider the effect of the decomposition of hydrate-containing cuttings on the bottom hole pressure in riser-free drilling. The present invention is a closed-loop circulation drilling with a riser, which can control the bottom hole pressure by controlling the hydrate decomposition gas production rate in the hydrate-containing cuttings in the riser annulus, thereby extending the maximum extension length of the horizontal well. Specifically, the starting decomposition position and decomposition rate of the hydrate cuttings are controlled by controlling the amount of hydrate inhibitor added;
[0060] In open-circuit circulation drilling, that is, drilling without a riser, the drilling fluid is directly discharged into the seawater after returning from the annulus of the formation section to the seabed mud line, and there is no need to consider the rock carrying problem of the riser section; while in the present invention, the drilling fluid in the annulus of the formation section with a riser returns to the seabed mud line and enters the annulus of the riser section with a larger inner diameter. The sudden increase in the inner diameter requires a larger drilling fluid displacement (i.e., a larger drilling fluid return speed) to carry rock. However, due to the obvious narrow safety pressure window of the hydrate layer (the narrow pressure window refers to the very small difference between the formation fracture pressure and the formation pore pressure), excessive drilling fluid displacement will cause a sharp increase in the pressure loss of the formation section annulus, which is very likely to cause underground accidents such as leakage of the hydrate layer. Therefore, small-displacement drilling is usually adopted, and the rock carrying problem of the annulus of the riser section is solved by removing the rock from the annulus at the seabed mud line. The problem is solved by adding a booster pipeline to increase the displacement in the riser. The present invention can also control the bottom hole pressure by changing the displacement of the booster pipeline and the fluid density in the booster pipeline. On the basis of ensuring the displacement required for rock carrying in the annulus of the riser section, the decomposition time of hydrate-containing cuttings in the annulus of the riser section can be controlled by adjusting the size of the booster pipeline displacement, thereby controlling the bottom hole pressure (the pressure loss in the annulus of the riser section caused by the change in the displacement of the annulus of the riser section is very small, and the influence on the bottom hole pressure can usually be ignored); the adjustment of the fluid density in the booster pipeline can change the average density of the fluid in the annulus of the riser section, so that the average density of the fluid in the annulus of the riser section changes within a certain range, thereby forming a double gradient of the annulus of the riser section and the annulus of the formation section, thereby realizing the control of the bottom hole pressure.
[0061] Preferably, in step (3), the specific process of correction is:
[0062] ①According to the real-time bottom hole temperature T obtained by APWD monitoring zs The bottom hole temperature T obtained by theoretical calculation js (T js is just the temperature of a point (bottom hole temperature), while T in formula (14) p and T in formula (15) a represent the drilling fluid temperature in the drill pipe and the drilling fluid temperature in the annulus, respectively. That is, the temperature obtained by differential iterative calculation of formula (14) and formula (15) is the temperature of the entire wellbore profile. At the bottom of the well, T p and T a The calculated bottom hole temperature is expressed as T js The measured bottom hole temperature is expressed as T zs ) to compare and calibrate the total heat transfer coefficient h in the drill pipe in the temperature calculation model of formulas (14) and (15). p and the total heat transfer coefficient in the annulus h a , so that the theoretically calculated bottom hole temperature T js The real-time bottom hole temperature T zs Consistency;
[0063] ②According to the real-time bottom hole pressure P obtained by APWD monitoring zs The bottom hole pressure P obtained by theoretical calculation js (P js is just the bottom hole pressure at one point, and P in formula (16) a represents the annular pressure, that is, the pressure obtained by formula (16) after differential iterative calculation is the pressure of the entire wellbore annulus, and the bottom hole pressure P calculated at the bottom of the well a Represented as P js , the measured bottom hole pressure P a Represented as P zs ) is compared to correct the friction coefficient f in formula (16) so that the bottom hole pressure P obtained by theoretical calculation is js The measured bottom hole real-time pressure P zs Consistency;
[0064] The annulus pressure calculation model is:
[0065]
[0066] In the formula, v s is the solid phase velocity in the annulus, m / s; v g is the annular gas phase velocity, m / s; θ is the well inclination, °; P a is the annular pressure, Pa; g is the gravitational acceleration, m / s 2 ;
[0067] This step is a positive calculation process when calculating the bottom hole temperature and pressure according to the model during calibration, that is, if h is known, p 、h a and f to calculate the bottom hole temperature and pressure; the correction process is a reverse calculation process. zs According to formula (14) and (15), h is calculated p 、h a , known pressure P zs According to formula (16), f is calculated. After correction, only h p 、h a The three parameters f and f change.
[0068] Preferably, in step (4), the calculation is segmented and optimized, and the designed hydraulic parameters are used to calculate the bottom hole temperature and pressure when drilling a certain section (usually 1m per section is taken during calculation). After the drilling of this section is completed, the annular temperature and pressure calculation model is corrected according to step (3) using the measured bottom hole temperature and pressure of this section, and then the corrected model is used to calculate the bottom hole temperature and pressure of the next section. If the calculated bottom hole pressure is less than the formation pore pressure or greater than the formation fracture pressure, intelligent control and optimization are performed; if the calculated bottom hole pressure is greater than the formation pore pressure and less than the formation fracture pressure, intelligent control and optimization are not required.
[0069] In the present invention, the process of regulating the displacement of the booster pipeline, the density of the fluid in the pipeline, the amount of hydrate formation inhibitor, and the hydraulic parameters according to the bottom hole temperature and pressure is as follows:
[0070] The booster pipeline displacement can be calculated using formulas (2)-(7);
[0071] In terms of bottom hole pressure regulation in the riser section, when the rock-carrying fluid is injected into the riser using a booster pipeline, the density of the injected fluid can be adjusted in real time according to the bottom hole pressure, thereby forming a double gradient in the riser section and the formation section, which is conducive to solving the problem of narrow formation safety pressure window faced when drilling in hydrate formations;
[0072] The formula for calculating the fluid density of the riser annulus required according to the bottom hole pressure is:
[0073]
[0074] In the formula, p wf is the bottom hole pressure, Pa; H1 is the vertical depth of the formation section, m; H2 is the vertical depth of the riser section, m, solve for the fluid density ρ ra ;
[0075] At a certain mechanical drilling speed and displacement, the density of the formation fluid is determined. The fluid density in the annulus of the riser section can be controlled by regulating the fluid density and displacement in the booster pipeline. Since the bottom hole pressure = annulus pressure loss + static liquid column pressure of the annulus of the riser section + static liquid column pressure of the fluid in the annulus of the formation section, the bottom hole pressure can be controlled by regulating the fluid density in the annulus of the riser section when the annulus pressure loss and the static liquid column pressure of the fluid in the annulus of the formation section remain basically unchanged. In addition, due to its phase equilibrium characteristics, marine hydrate reservoirs are usually found in deep-water shallow areas with a water depth of more than 1000m and a burial depth of less than 400m. The proportion of the annulus of the riser section is relatively large (more than 1000m) and the proportion of the annulus of the formation section is relatively small (less than 400m). Therefore, the fluid density of the annulus of the riser section can be controlled within the safety window range by a small adjustment, that is, the bottom hole pressure is controlled within the range of the formation pore pressure and the formation fracture pressure.
[0076] In terms of the amount of hydrate inhibitor added, the phase equilibrium formula used to determine whether the hydrate in the cuttings is decomposed is:
[0077]
[0078] Where P e is the phase equilibrium pressure of hydrate at a certain annular temperature, Pa; 24 is the translation coefficient, obtained according to the phase equilibrium characteristics of natural gas hydrate in the sea area; X is the mass fraction of salt hydrate inhibitor in the drilling fluid, %, and the mass fraction range of hydrate inhibitor is 0≤X≤3(%);
[0079] Compare the calculated phase equilibrium temperature with the annular temperature at that location. If P e >P a The hydrate in the cuttings decomposes, and the decomposition gas production rate is calculated as follows:
[0080] m g =k d M g A s (P e -P a ) (19)
[0081]
[0082] In the formula, m g is the gas production rate of hydrate decomposition, kg / s; k d is the intrinsic reaction rate, mol / (m 2 ·Pa·s), k d0 is the intrinsic reaction rate constant, taken as 36000, mol / (m 2 ·Pa·s); ΔE is the activation energy, J / mol; A s is the hydrate decomposition surface area per unit volume of porous media, m -1 ;M g is the molar mass of the gas, kg / mol; M w is the molar mass of water, kg / mol; N h is the hydrate number, which is taken as 6.0 and is dimensionless;
[0083] According to formula (18), the phase equilibrium temperature of hydrate cuttings in the annulus of the waterproof pipe section under a certain hydrate formation inhibitor addition amount (mass fraction X) can be calculated, and then the gas production rate of hydrate decomposition can be calculated according to formula (19). At the same time, formulas (14), (15) and (16) can also calculate the quantitative effects of hydrate decomposition endothermicity on the annulus temperature of the waterproof pipe section and the gas produced by hydrate decomposition on the annulus pressure in the process of temperature field and pressure field calculation.
[0084] In terms of hydraulic parameter control, the drilling fluid density, drilling fluid displacement, mechanical drilling speed and drilling fluid inlet temperature are controlled according to the bottom hole pressure within the design parameter range of formulas (1), (2), (9) and (13).
[0085] The specific control process of fluid density and displacement in the booster pipeline, hydrate formation inhibitor dosage, and hydraulic parameters is discussed below in different situations:
[0086] 1) If the predicted bottom hole pressure P is calculated js The value of the density of the annular space of the riser after adjusting the fluid density and displacement of the booster line is calculated according to formula (3) and formula (4). If the density value calculated by formula (17) is reached within the control range of the fluid density and displacement of the booster line, it is not necessary to adjust the amount of hydrate inhibitor and hydraulic parameters. If the maximum value of the fluid density and displacement of the booster line is reached but the density value calculated by formula (17) is still not reached, then the density value calculated by formula (17) is calculated according to the bottom hole pressure requirement. The residual amount of hydrate inhibitor that needs to be reduced under the condition of known bottom hole pressure and temperature is calculated by formulas (14), (15), (16), (18) and (19). If the bottom hole pressure is within the safety window after adjusting the amount of hydrate inhibitor, there is no need to adjust the hydraulic parameters. If the bottom hole pressure is still not within the safety window after the amount of hydrate inhibitor is reduced to 0, the hydraulic parameters such as drilling fluid density, displacement, mechanical drilling speed and drilling fluid temperature are further adjusted. The drilling fluid density is adjusted upward according to formula (1), the drilling fluid displacement is adjusted upward according to formula (2), the mechanical drilling speed is adjusted upward according to formula (9), and the drilling fluid temperature is adjusted downward according to formula (13) until the bottom hole pressure is within the safety window. If the bottom hole pressure is still not within the safety window after the fluid density and displacement in the booster line, the hydrate inhibitor dosage and hydraulic parameters are adjusted to the critical value, the horizontal well extension length reaches the limit.
[0087] 2) If the predicted bottom hole pressure P is calculated jsIt will be greater than the formation fracture pressure, indicating that the drilling will cause leakage according to the original booster pipeline displacement, booster pipeline fluid density, hydrate formation inhibitor dosage and hydraulic parameters. First, the required riser annulus drilling fluid density is calculated according to formula (17). Then, according to formula (3) and formula (4), it is calculated whether the riser annulus fluid density after adjusting the booster pipeline fluid density and displacement can meet the requirements. If the density value calculated by formula (17) is reached within the booster pipeline fluid density and displacement control range, there is no need to adjust the hydrate formation inhibitor dosage and hydraulic parameters. If the minimum value of the booster pipeline fluid density and displacement control range is reached but the density value calculated by formula (17) is still not reached, then according to the bottom hole pressure requirement margin, Formulas (14), (15), (16), (18), and (19) are used to calculate the amount of hydrate inhibitor that needs to be added under the condition of known bottom hole pressure and temperature. If the bottom hole pressure is within the safety window after adjusting the amount of hydrate inhibitor, there is no need to adjust the hydraulic parameters. If the bottom hole pressure is still not within the safety window after the hydrate inhibitor is increased to the maximum value, the hydraulic parameters such as drilling fluid density, displacement, mechanical drilling speed and drilling fluid temperature are further adjusted. The drilling fluid density is adjusted downward according to formula (1), the drilling fluid displacement is adjusted downward according to formula (2), the mechanical drilling speed is adjusted downward according to formula (9), and the drilling fluid temperature is adjusted upward according to formula (13) until the bottom hole pressure is within the safety window. If the bottom hole pressure is still not within the safety window after the fluid density and displacement in the booster line, the hydrate inhibitor addition and the hydraulic parameters are adjusted to the critical value, the horizontal well extension length reaches the limit.
[0088] According to the present invention, the increase in the booster line displacement can increase the fluid return velocity in the riser. After the booster line is opened, the increase in flow friction in the riser is very low, and the impact on the bottom hole pressure is small. Only the favorable effect on rock carrying after the booster line is opened can be considered; and the change in fluid density in the booster line will cause a large change in fluid density in the riser section, forming a double gradient between the riser section and the formation section, which is beneficial to regulating the bottom hole pressure.
[0089] According to the present invention, the intelligent adjustment of hydraulic parameters includes drilling fluid density, drilling fluid inlet temperature, drilling fluid displacement, and mechanical drilling speed.
[0090] A device for increasing the extension length of a hydrate layer horizontal well by synergistically using multiple factors, including a drilling system, a drilling fluid circulation control system, a data transmission and processing system, and a pressurized pipeline system;
[0091] The drilling system includes a drilling platform, a riser, a drill pipe, a drill collar, a drill bit, a casing, and a cement ring. The upper end of the drill pipe is connected to the drilling platform, and the lower end is connected to the drill collar. The end of the drill collar is connected to the drill bit. The seawater section drill pipe is inside the riser to form a riser section annulus. The formation section drill pipe and drill collar are inside the casing to form a casing section annulus. The cement ring is located outside the formation section casing.
[0092] The drilling fluid circulation control system includes a drilling fluid base fluid storage tank, a drilling fluid mixer, a seawater storage tank A, a drilling fluid additive storage tank, and a pump providing power, wherein the drilling fluid base fluid storage tank and the seawater storage tank A can adjust the temperature inside the tank (the interior of the drilling fluid storage tank and the seawater storage tank A are divided into an upper and lower layer by a sealed partition, the lower layer is a temperature control layer, and the temperature of the upper drilling fluid or seawater is regulated by heat transfer), and the outlet pumps of the drilling fluid base fluid storage tank and the seawater storage tank A are equipped with flow meters and control valves for measuring the flow of the fluid and controlling the switch of the storage tank; the inlet of the drilling fluid mixer is connected to the drilling fluid base fluid storage tank, the seawater storage tank A, and the drilling fluid additive storage tank, and the outlet of the drilling fluid mixer is connected to the drilling fluid injection pipeline; the drilling fluid additive storage tank is divided into a plurality of chambers for respectively containing drilling fluid weighting agents, hydrate formation inhibitors, etc., which are sent into the drilling fluid mixer for mixing according to the ratio;
[0093] The booster pipeline system includes a booster pipeline, a seawater storage tank B, and a drilling fluid additive storage tank. The upper end of the booster pipeline is connected to the pump outlet of the seawater storage tank B, and the lower end is connected to the riser inlet near the mud line. The booster pipeline displacement and fluid density can be adjusted (the fluid density is controlled by adding drilling fluid additives such as a weighting agent, and the weighting agent is located in the drilling fluid additive storage tank);
[0094] Seawater storage tank A and seawater storage tank B directly draw seawater through seawater suction pipelines;
[0095] The data transmission and processing system includes an annular pressure measurement tool APWD while drilling, a signal optical cable, a computer, an instruction system, and an instruction execution unit. APWD is used to measure the bottom hole temperature and pressure while drilling. It is configured in the drill collar closest to the drill bit and is connected to the computer through a signal optical cable. After receiving the information while drilling, the computer processes it and transmits the calculation results to the instruction execution unit. The instruction execution unit includes a drilling fluid base fluid storage tank, a seawater storage tank A, a seawater storage tank B, a drilling fluid mixer, and a drilling fluid additive storage tank. After receiving the calculation result instruction, the pumping volume is adjusted.
[0096] The structure of the booster pipeline of the present invention is not complicated. It is just a coated steel pipe connected to the platform drilling fluid pump or other seawater pump, with the upper end connected to the pump and the lower end connected to the bottom of the riser. The main purpose is to help the riser section carry rocks. For stability, part of the booster pipeline will be attached to the buckle on the side of the riser at a certain water depth.
[0097] The working process of a device for increasing the limit extension length of horizontal wells in hydrate reservoir drilling by multi-factor coordinated regulation is as follows:
[0098] During circulation drilling, the outlet pumps of seawater storage tank A and drilling fluid base fluid storage tank are turned on, and the drilling fluid is evenly mixed in the drilling fluid mixer and then pumped into the drill pipe. The drilling fluid flows through the drill pipe and drill collar to reach the drill bit, and then breaks the rock with the assistance of jets, and returns along the annulus, flows through the annulus of the open hole section, the annulus of the casing section, and the annulus of the riser section, and returns to the mud purification treatment system of the drilling platform; at the same time, the downhole annulus pressure measurement tool APWD transmits the real-time monitored bottom hole temperature and pressure data to the computer through the signal optical cable, and the computer converts the optical cable transmission information into bottom hole temperature and pressure data in real time, and completes model correction, intelligent control and optimization according to the real-time data, and then sends the operations to be executed to each instruction execution unit through the instruction system.
[0099] When the predicted bottom hole pressure is not within the safety window, the computer calculates the fluid density and displacement amplitude in the booster pipeline that need to be regulated, the amount of hydrate formation inhibitor added and the hydraulic parameter adjustment amplitude in sequence, and issues a fluid density regulation command in the booster pipeline through the command system, and then issues a booster pipeline displacement regulation command to the pump; at the same time, a hydrate formation inhibitor addition regulation command is issued to the drilling fluid base fluid storage tank; at the same time, drilling fluid density, displacement and drilling fluid temperature regulation commands are issued to the seawater pump A and the pump of the base fluid storage tank, and a mechanical drilling speed regulation command is issued to the drilling platform.
[0100] For any details not provided in the present invention, please refer to the prior art.
[0101] The beneficial effects of the present invention are:
[0102] 1. The method for improving the maximum extension length of horizontal wells in hydrate reservoirs through multi-factor coordinated regulation of the present invention can greatly improve the maximum extension length of horizontal wells in hydrate reservoirs through intelligent real-time regulation of multiple factors such as the displacement and density of the booster pipeline, the amount of hydrate formation inhibitor, and hydraulic parameters (drilling fluid density, displacement, temperature, and mechanical drilling speed), thereby providing technical support for the efficient development of horizontal wells of natural gas hydrate resources and the safe and efficient drilling of horizontal wells in hydrate formations.
[0103] 2. The control method of the present invention has a simple calculation process, scientific and reasonable operation steps, and low requirements for related equipment of the drilling platform. It can recycle drilling fluid to reduce drilling costs, while avoiding the return of drilling fluid to the seabed mud line and polluting the marine environment. It can effectively improve the environmental protection, safety and efficiency of horizontal well drilling in hydrate formations, and provide theoretical support and method reference for horizontal well drilling in natural gas hydrate formations in offshore areas. BRIEF DESCRIPTION OF THE DRAWINGS
[0104] Figure 1 It is a schematic diagram of the cross-sectional structure of a horizontal drilling well;
[0105] Figure 2 It is a schematic diagram of the structure of the device for improving the extension length of the horizontal well of the hydrate layer by synergistically using multiple factors according to the present invention;
[0106] In the figure, 1-drilling platform, 2-waterproof riser, 3-drill pipe, 4-waterproof riser section annulus, 5-boosting pipeline, 6-cement ring, 7-casing, 8-casing section annulus, 9-drill collar, 10-drill bit, 11-computer, 12-instruction system, 13, 23, 20-pump, 14, 19, 24-flow meter, 15-seawater storage tank A, 16-seawater storage tank B, 17-seawater suction pipeline A, 18-seawater suction pipeline B, 21-drilling fluid additive storage tank, 22-drilling fluid mixer, 25-drilling fluid base fluid storage tank, 26, 27-drilling fluid additive / hydrate formation inhibitor delivery pipeline;
[0107] Figure 2 In the figure, the dotted line represents intelligent transmission or control, the solid line represents pipeline connection, area ① represents the hydrate cuttings decomposition area in the annulus when no hydrate formation inhibitor is added; area ② represents the hydrate cuttings decomposition area in the annulus after the hydrate formation inhibitor is added. DETAILED DESCRIPTION
[0108] In order to make the technical problems, technical solutions and advantages to be solved by the present invention more clear, they will be described in detail with reference to the accompanying drawings and specific embodiments, but are not limited to these. Anything not fully described in the present invention shall be based on conventional techniques in the art.
[0109] Embodiment 1:
[0110] A method for increasing the extension length of a hydrate layer horizontal well by synergistically using multiple factors comprises the following steps:
[0111] (1) Optimization design of drilling hydraulic parameters: Based on the geological and reservoir parameters of the target natural gas hydrate reservoir, the hydraulic parameter combination of drilling fluid density, displacement, mechanical penetration rate, drilling fluid inlet temperature, and fluid density and displacement in the booster pipeline are designed under the condition of riser drilling;
[0112] (2) Closed-loop drilling: According to the hydraulic parameter combination designed in step (1) and the fluid density and displacement in the booster pipeline, the drilling fluid is injected from the drill pipe and returned from the annulus of the riser section;
[0113] (3) Real-time monitoring and correction: The bottom hole pressure and temperature are monitored and obtained in real time through APWD, and the annular temperature and pressure calculation model is corrected in real time based on the obtained real-time bottom hole temperature and pressure data;
[0114] (4) Intelligent control and optimization: Based on the annular temperature and pressure calculation model corrected in step (3), the booster pipeline displacement and fluid density, hydrate inhibitor dosage, and hydraulic parameters are automatically and collaboratively controlled with the goal of keeping the bottom hole pressure within a safe window between the formation pore pressure and the fracture pressure;
[0115] (5) Repeat steps (3) and (4) to continue the drilling cycle until the drilling is completed.
[0116] Embodiment 2:
[0117] A method for increasing the extension length of a horizontal well in a hydrate layer by synergistically using multiple factors is as described in Example 1, except that in step (1), the design of the initial hydraulic parameters and the fluid density and displacement in the booster pipeline needs to satisfy the following relationship:
[0118] 1) Drilling fluid density ρ li Design scope
[0119] max(ρ p ,ρ e ,ρ c )≤ρ l ≤ρ f (1)
[0120] In the formula, ρ p is the equivalent density of formation pore pressure, kg / m 3 ρ c is the equivalent density of formation collapse pressure, kg / m 3 ρ l is the equivalent drilling fluid density, kg / m 3 ρ f is the equivalent density of formation fracture pressure, kg / m 3 ρ e is the hydrate reservoir phase equilibrium pressure equivalent density, kg / m 3 ;
[0121] ρ l =ρ m +ρ pa =ρ li E m +ρ g E g +ρ s E s +ρ pa , where ρ li is the density of the drilling fluid in the drill pipe, i.e., the density of the drilling fluid injected from the wellhead drill pipe in step (1), kg / m 3 , according to ρ l Range determination li The range of pais the annular pressure loss equivalent density, kg / m 3 ρ m is the drilling fluid density in the annulus of the casing section or the open hole section, kg / m 3 ; E g is the volume fraction of the annular air phase, dimensionless; E m is the volume fraction of the annular liquid phase, dimensionless; E s is the volume fraction of the solid phase in the annulus, dimensionless; ρ s is the annulus solid phase density, kg / m 3 ρ g is the density of the annular air phase, kg / m 3 ;
[0122] 2) Design range of drilling fluid displacement Q
[0123] Q min <Q<Q max (2)
[0124] In the formula, Q min is the minimum drilling fluid displacement, m 3 / s;Q max is the maximum drilling fluid displacement, m 3 / s; Q is the drilling fluid displacement, m 3 / s;
[0125] Among them, the minimum drilling fluid displacement Q min Mainly affected by rock carrying, under the condition of deepwater hydrate formation riser drilling, the drilling fluid displacement in the riser annulus is usually regulated by the booster pipeline. The displacement calculation formula in the riser annulus after regulation is:
[0126] Q ra =Q+Q za (3)
[0127] Where Q ra is the annular displacement of the riser section, m 3 / s;Q za is the drilling fluid displacement in the booster pipeline, m 3 / s, the drilling fluid displacement range in the booster pipeline is Q zamin ≤Q za ≤Q zamax , Q zamin is the minimum displacement in the booster pipeline, m 3 / s,Q zamin =Q zmin -Q min , Q zmin is the minimum displacement required for the riser section to carry rock, m 3 / s;Q zamax The maximum displacement allowed by the booster line pump, that is, the displacement when the rated pressure is reached, m3 / s;
[0128] The calculation formula of the drilling fluid density in the annulus of the riser section after regulation is:
[0129]
[0130] Where ρ ra is the drilling fluid density in the riser annulus, kg / m 3 ρ za is the fluid density in the booster pipeline, kg / m 3 , i.e. the fluid density in the booster pipeline described in step (1), is in the range of: ρ sea ≤ρ za ≤ρ max , ρ sea is the density of seawater, kg / m 3 ρ max The density of drilling fluid corresponding to the maximum weighted dosage condition reserved on the drilling platform, kg / m 3 ;
[0131] Therefore, the minimum drilling fluid displacement depends on the drilling fluid displacement required for the annulus below the mudline to carry rock. The minimum drilling fluid displacement calculation formula is:
[0132]
[0133] Where, d w is the borehole diameter, m; d po is the outer diameter of the drill pipe, m; v a is the drilling fluid return velocity in the annulus of the casing section or the open hole section, m / s;
[0134] The maximum drilling fluid displacement depends on the formation fracture pressure and the rated pump pressure:
[0135] Q max =min(Q pmax ,Q rmax ) (6)
[0136]
[0137] In the formula, Q pmax is the maximum displacement allowed by the formation fracture pressure, m 3 / s;Q rmax is the maximum displacement allowed by the rated pump pressure, m 3 / s; d is the flow section diameter, m; p f is the formation fracture pressure, Pa; p h is the drilling fluid column pressure in the annulus of the casing section or the open hole section, Pa; ρ m is the drilling fluid density in the annulus of the casing section or the open hole section, kg / m3 ; f is the friction coefficient of the casing section annulus or the open hole section annulus, dimensionless; s is the drilling fluid flow length, m;
[0138] In terms of the flow rate adjustment of the riser section, the minimum flow rate Q required for the annular rock carrying of the riser section is calculated according to formula (5). zmin , that is, the square of the open hole section vertical well in formula (5) Replaced by the square of the inner diameter of the riser section That's it;
[0139] Q zmin <Q ra <Q zmax (8)
[0140] In the formula, Q zmin is the minimum rock-carrying displacement of the annulus of the riser section, m 3 / s;Q zmax is the maximum rock-carrying capacity of the annulus of the riser section, m 3 / s,Q zmax =Q zamax +Q max ;
[0141] The drilling fluid displacement range in the booster pipeline is Q zamin ≤Q za ≤Q zamax , Q zamin is the minimum displacement in the booster pipeline, m 3 / s,Q zamin =Q zmin -Q min , Q zmin is the minimum displacement required for the riser section to carry rock, m 3 / s;Q zamax The maximum displacement allowed by the booster line pump, that is, the displacement when the rated pressure is reached, m 3 / s;Q za is the drilling fluid displacement in the booster pipeline, m 3 / s.
[0142] The design of mechanical drilling speed is based on the drilling operation time and the cuttings content in the drilling fluid. Its design range can be expressed as:
[0143] ROP min ≤ROP≤ROP max (9)
[0144] Where, ROP is the mechanical drilling rate; min is the minimum mechanical drilling speed, m / h; its calculation formula is:
[0145] ROP min =L / t max(10)
[0146] L is the designed length of the horizontal well, m; t max is the maximum allowed drilling operation time, h;
[0147] ROP max is the maximum mechanical drilling speed, m / h; its calculation formula is:
[0148]
[0149] ρ li is the density of drilling fluid in the drill pipe, kg / m 3 ;t a is the cuttings return time, h; A a is the cross-sectional area of the annulus of the open hole section, casing section or riser section, m 2 ;H l is the borehole depth, m; H a is the height of the cuttings bed, m, such as Figure 1 As shown; θ is the angle, °, such as Figure 1 As shown; pa is the annular pressure loss equivalent density, kg / m 3 , r w is the wellbore radius, m;
[0150] Limitation of Annular Pressure Loss on Drilling Fluid Density and Displacement Design
[0151]
[0152] p p ≤Δp a +p esd ≤p f
[0153] In the formula, Δp dm is the surface pipeline pressure loss, Pa; Δp pi is the drill pipe pressure loss, Pa; Δp b is the drill bit pressure loss, Pa; Δp a is the annular pressure loss, Pa; p r is the pump pressure, Pa; p p is the formation pore pressure, Pa; p f is the formation fracture pressure, Pa; p esd is the static pressure of the annulus fluid, Pa; D is the equivalent diameter of the annulus, m;
[0154] The design of drilling fluid inlet temperature is based on the reservoir hydrate phase equilibrium temperature, and its design range can be expressed as:
[0155] T pf ≤T ed (13)
[0156] Where, T pf Bottom hole drilling fluid temperature, K; T ed is the hydrate reservoir phase equilibrium temperature, K; based on the bottom hole drilling fluid temperature T pf The drilling fluid inlet temperature T can be determined by the heat transfer formula (14) (15) in , T co ≤T in ≤T en , T co The lowest temperature that the tank cooling system can provide, K; T en is the ambient temperature, K;
[0157] The calculation models for the temperature inside the drill pipe and the annulus temperature are:
[0158]
[0159]
[0160] In the formula, c m is the specific heat capacity of drilling fluid, J / (kg·K); r pi is the inner diameter of the drill pipe, m; T a T is the annulus temperature of the open hole section, casing section or riser section, K; p is the drilling fluid temperature in the drill pipe, K (the drilling fluid inlet temperature refers to the initial drilling fluid temperature pumped into the drill pipe from the drilling platform, and the drilling fluid temperature in the drill pipe is T p It is the temperature of the drilling fluid when it circulates to a certain position on the drill pipe. After the heat exchange process from the wellhead to this position, the temperature changes; the annular temperature T a It is the temperature of the drilling fluid when it flows through the drill pipe, is ejected from the drill bit, and then returns along the annulus of the open hole section, the annulus of the casing, and the annulus of the riser, and returns to a certain position); v zg is the flow rate of drilling fluid in the drill pipe, m / s; h p is the total heat transfer coefficient in the drill pipe, W / (m·K); A p is the internal cross-sectional area of the drill pipe, m 2 ; A a is the cross-sectional area of the annulus, m 2 ;h a is the total heat transfer coefficient in the annulus, W / (m·K); T f is the formation temperature, K; r po is the outer diameter of the drill pipe, m; r a is the radius of the annulus of the open hole section, casing section or riser section, m; t is the time, s; z is the distance from the bottom of the well, m; m h is the hydrate decomposition rate in hydrate-bearing cuttings, mol / s; ΔH is the hydrate decomposition heat, kJ / mol.
[0161] Embodiment 3:
[0162] A method for synergistically improving the extension length of a horizontal well in a hydrate layer by multiple factors is as described in Example 2, except that in step (3), the specific process of correction is:
[0163] ①According to the real-time bottom hole temperature T obtained by APWD monitoring zs The bottom hole temperature T obtained by theoretical calculation js (T js is just the temperature of a point (bottom hole temperature), while T in formula (14) p and T in formula (15) a represent the drilling fluid temperature in the drill pipe and the drilling fluid temperature in the annulus, respectively. That is, the temperature obtained by differential iterative calculation of formula (14) and formula (15) is the temperature of the entire wellbore profile. At the bottom of the well, T p and T a The calculated bottom hole temperature is expressed as T js The measured bottom hole temperature is expressed as T zs ) to compare and calibrate the total heat transfer coefficient h in the drill pipe in the temperature calculation model of formulas (14) and (15). p and the total heat transfer coefficient in the annulus h a , so that the theoretically calculated bottom hole temperature T js The real-time bottom hole temperature T zs Consistency;
[0164] ②According to the real-time bottom hole pressure P obtained by APWD monitoring zs The bottom hole pressure P obtained by theoretical calculation js (P js is just the bottom hole pressure at one point, and P in formula (16) a represents the annular pressure, that is, the pressure obtained by formula (16) after differential iterative calculation is the pressure of the entire wellbore annulus, and the bottom hole pressure P calculated at the bottom of the well a Represented as P js , the measured bottom hole pressure P a Represented as P zs ) is compared to correct the friction coefficient f in formula (16) so that the bottom hole pressure P obtained by theoretical calculation is js The measured bottom hole real-time pressure P zs Consistency;
[0165] The annulus pressure calculation model is:
[0166]
[0167] In the formula, v sis the solid phase velocity in the annulus, m / s; v g is the annular gas phase velocity, m / s; θ is the well inclination, °; P a is the annular pressure, Pa; g is the gravitational acceleration, m / s 2 ;
[0168] This step is a positive calculation process when calculating the bottom hole temperature and pressure according to the model during calibration, that is, if h is known, p 、h a and f to calculate the bottom hole temperature and pressure; the correction process is a reverse calculation process. zs According to formula (14) and (15), h is calculated p 、h a , known pressure P zs According to formula (16), f is calculated. After correction, only h p 、h a The three parameters f and f change.
[0169] Embodiment 4:
[0170] A method for increasing the extension length of a horizontal well in a hydrate layer by synergizing multiple factors, as described in Example 3, except that in step (4), the calculation is performed in sections for regulation and optimization, and the bottom hole temperature and pressure when drilling a certain section (usually 1 m per section) are calculated using the designed hydraulic parameters. After the drilling of the section is completed, the annular temperature and pressure calculation model is corrected using the bottom hole temperature and pressure of the section measured in step (3), and the bottom hole temperature and pressure of the next section are calculated using the corrected model. If the calculated bottom hole pressure is less than the formation pore pressure or greater than the formation fracture pressure, intelligent regulation and optimization are performed; if the calculated bottom hole pressure is greater than the formation pore pressure and less than the formation fracture pressure, intelligent regulation and optimization are not required.
[0171] In the present invention, the process of regulating the displacement of the booster pipeline, the density of the fluid in the pipeline, the amount of hydrate formation inhibitor, and the hydraulic parameters according to the bottom hole temperature and pressure is as follows:
[0172] The booster pipeline displacement can be calculated using formulas (2)-(7);
[0173] In terms of bottom hole pressure regulation in the riser section, when the rock-carrying fluid is injected into the riser using a booster pipeline, the density of the injected fluid can be adjusted in real time according to the bottom hole pressure, thereby forming a double gradient in the riser section and the formation section, which is conducive to solving the problem of narrow formation safety pressure window faced when drilling in hydrate formations;
[0174] The formula for calculating the fluid density of the riser annulus required according to the bottom hole pressure is:
[0175]
[0176] In the formula, p wf is the bottom hole pressure, Pa; H1 is the vertical depth of the formation section, m; H2 is the vertical depth of the riser section, m, solve for the fluid density ρ ra ;
[0177] At a certain mechanical drilling speed and displacement, the density of the formation fluid is determined. The fluid density in the annulus of the riser section can be controlled by regulating the fluid density and displacement in the booster pipeline. Since the bottom hole pressure = annulus pressure loss + static liquid column pressure of the annulus of the riser section + static liquid column pressure of the fluid in the annulus of the formation section, the bottom hole pressure can be controlled by regulating the fluid density in the annulus of the riser section when the annulus pressure loss and the static liquid column pressure of the fluid in the annulus of the formation section remain basically unchanged. In addition, due to its phase equilibrium characteristics, marine hydrate reservoirs are usually found in deep-water shallow areas with a water depth of more than 1000m and a burial depth of less than 400m. The proportion of the annulus of the riser section is relatively large (more than 1000m) and the proportion of the annulus of the formation section is relatively small (less than 400m). Therefore, the fluid density of the annulus of the riser section can be controlled within the safety window range by a small adjustment, that is, the bottom hole pressure is controlled within the range of the formation pore pressure and the formation fracture pressure.
[0178] In terms of the amount of hydrate inhibitor added, the phase equilibrium formula used to determine whether the hydrate in the cuttings is decomposed is:
[0179]
[0180] Where P e is the phase equilibrium pressure of hydrate at a certain annular temperature, Pa; 24 is the translation coefficient, obtained according to the phase equilibrium characteristics of natural gas hydrate in the sea area; X is the mass fraction of salt hydrate inhibitor in the drilling fluid, %, and the mass fraction range of hydrate inhibitor is 0≤X≤3(%);
[0181] Compare the calculated phase equilibrium temperature with the annular temperature at that location. If P e >P a The hydrate in the cuttings decomposes, and the decomposition gas production rate is calculated as follows:
[0182] m g =k d M g A s (P e -P a ) (19)
[0183]
[0184] In the formula, m g is the gas production rate of hydrate decomposition, kg / s; k dis the intrinsic reaction rate, mol / (m 2 ·Pa·s), k d0 is the intrinsic reaction rate constant, taken as 36000, mol / (m 2 ·Pa·s); ΔE is the activation energy, J / mol; A s is the hydrate decomposition surface area per unit volume of porous media, m -1 ;M g is the molar mass of the gas, kg / mol; M w is the molar mass of water, kg / mol; N h is the hydrate number, which is taken as 6.0 and is dimensionless;
[0185] According to formula (18), the phase equilibrium temperature of hydrate cuttings in the annulus of the waterproof pipe section under a certain hydrate formation inhibitor addition amount (mass fraction X) can be calculated, and then the gas production rate of hydrate decomposition can be calculated according to formula (19). At the same time, formulas (14), (15) and (16) can also calculate the quantitative effects of hydrate decomposition endothermicity on the annulus temperature of the waterproof pipe section and the gas produced by hydrate decomposition on the annulus pressure in the process of temperature field and pressure field calculation.
[0186] In terms of hydraulic parameter control, the drilling fluid density, drilling fluid displacement, mechanical drilling speed and drilling fluid inlet temperature are controlled according to the bottom hole pressure within the design parameter range of formulas (1), (2), (9) and (13).
[0187] The specific control process of fluid density and displacement in the booster pipeline, hydrate formation inhibitor dosage, and hydraulic parameters is discussed below in different situations:
[0188] 1) If the predicted bottom hole pressure P is calculated jsThe pressure will be smaller than the formation pore pressure, indicating that overflow or well kick will occur when drilling according to the original booster line displacement, booster line fluid density, hydrate inhibitor dosage and hydraulic parameters. First, the required riser annulus drilling fluid density is calculated according to formula (17). Then, according to formulas (3) and (4), it is calculated whether the riser annulus fluid density after adjusting the booster line fluid density and displacement can meet the requirements. If the density value calculated by formula (17) is reached within the booster line fluid density and displacement control range, there is no need to adjust the hydrate inhibitor dosage and hydraulic parameters. If the maximum value of the booster line fluid density and displacement control range is reached but the density value calculated by formula (17) is still not reached, then according to the bottom hole pressure requirement, the pressure in the riser annulus fluid density is adjusted to the required value. The residual amount of hydrate inhibitor that needs to be reduced under the condition of known bottom hole pressure and temperature is calculated by formulas (14), (15), (16), (18) and (19). If the bottom hole pressure is within the safety window after adjusting the amount of hydrate inhibitor, there is no need to adjust the hydraulic parameters. If the bottom hole pressure is still not within the safety window after the amount of hydrate inhibitor is reduced to 0, the hydraulic parameters such as drilling fluid density, displacement, mechanical drilling speed and drilling fluid temperature are further adjusted. The drilling fluid density is adjusted upward according to formula (1), the drilling fluid displacement is adjusted upward according to formula (2), the mechanical drilling speed is adjusted upward according to formula (9), and the drilling fluid temperature is adjusted downward according to formula (13) until the bottom hole pressure is within the safety window. If the bottom hole pressure is still not within the safety window after the fluid density and displacement in the booster line, the hydrate inhibitor dosage and hydraulic parameters are adjusted to the critical value, the horizontal well extension length reaches the limit.
[0189] 2) If the predicted bottom hole pressure P is calculated jsIt will be greater than the formation fracture pressure, indicating that the drilling will cause leakage according to the original booster pipeline displacement, booster pipeline fluid density, hydrate formation inhibitor dosage and hydraulic parameters. First, the required riser annulus drilling fluid density is calculated according to formula (17). Then, according to formula (3) and formula (4), it is calculated whether the riser annulus fluid density can meet the requirement after adjusting the booster pipeline fluid density and displacement. If the density value calculated by formula (17) is reached within the booster pipeline fluid density and displacement control range, there is no need to adjust the hydrate formation inhibitor dosage and hydraulic parameters. If the minimum value of the booster pipeline fluid density and displacement control range is reached but the density value calculated by formula (17) is still not reached, then according to the bottom hole pressure requirement margin, Formulas (14), (15), (16), (18), and (19) are used to calculate the amount of hydrate inhibitor that needs to be added under the condition of known bottom hole pressure and temperature. If the bottom hole pressure is within the safety window after adjusting the amount of hydrate inhibitor, there is no need to adjust the hydraulic parameters. If the bottom hole pressure is still not within the safety window after the hydrate inhibitor is increased to the maximum value, the hydraulic parameters such as drilling fluid density, displacement, mechanical drilling speed and drilling fluid temperature are further adjusted. The drilling fluid density is adjusted downward according to formula (1), the drilling fluid displacement is adjusted downward according to formula (2), the mechanical drilling speed is adjusted downward according to formula (9), and the drilling fluid temperature is adjusted upward according to formula (13) until the bottom hole pressure is within the safety window. If the bottom hole pressure is still not within the safety window after the fluid density and displacement in the booster line, the hydrate inhibitor addition and the hydraulic parameters are adjusted to the critical value, the horizontal well extension length reaches the limit.
[0190] According to the present invention, the increase in the booster line displacement can increase the fluid return velocity in the riser. After the booster line is opened, the increase in flow friction in the riser is very low, and the impact on the bottom hole pressure is small. Only the favorable effect on rock carrying after the booster line is opened can be considered; and the change in fluid density in the booster line will cause a large change in fluid density in the riser section, forming a double gradient between the riser section and the formation section, which is beneficial to regulating the bottom hole pressure.
[0191] Embodiment 5:
[0192] A device for increasing the extension length of horizontal wells in hydrate layers by synergistically using multiple factors, such as Figure 2 As shown, it includes a drilling system, a drilling fluid circulation control system, a data transmission and processing system, and a booster pipeline system;
[0193] The drilling system includes a drilling platform 1, a riser 2, a drill pipe 3, a drill collar 9, a drill bit 10, a casing 7, and a cement ring 6; the upper end of the drill pipe 3 is connected to the drilling platform 1, and the lower end is connected to the drill collar 9, and the end of the drill collar 9 is connected to the drill bit 10. The seawater section drill pipe is inside the riser 2 to form a riser section annulus 4; the formation section drill pipe and drill collar are inside the casing to form a casing section annulus 8; the cement ring 6 is located outside the formation section casing;
[0194] The drilling fluid circulation control system includes a drilling fluid base fluid storage tank 25, a drilling fluid mixer 22, a seawater storage tank A15, a drilling fluid additive storage tank 21, and a pump (such as pumps 13 and 23) for providing power, wherein the drilling fluid base fluid storage tank 25 and the seawater storage tank A15 can adjust the temperature inside the tank (the interior of the drilling fluid storage tank and the seawater storage tank A are divided into two layers, the lower layer is a temperature control layer, and the temperature of the upper drilling fluid or seawater is regulated by heat transfer). The outlet pumps are all equipped with flow meters and control valves (such as flow meters 14 and 24) for measuring the flow of fluid and controlling the switch of the storage tank; the inlet of the drilling fluid mixer 22 is connected to the drilling fluid base fluid storage tank 25, the seawater storage tank A15, and the drilling fluid additive storage tank 21, and the outlet of the drilling fluid mixer 22 is connected to the drilling fluid injection pipeline; the drilling fluid additive storage tank is divided into a plurality of chambers for respectively containing drilling fluid weighting agents, hydrate formation inhibitors, etc., which are sent to the drilling fluid mixer for mixing according to the ratio;
[0195] The booster pipeline system includes a booster pipeline 5, a seawater storage tank B16, and a drilling fluid additive storage tank 21. The upper end of the booster pipeline 5 is connected to the outlet of the seawater storage tank B through a pump 20 and a flow meter 19, and the lower end is connected to the inlet of the riser near the mud line. The booster pipeline displacement and fluid density can be adjusted (the fluid density is controlled by adding drilling fluid additives such as a weighting agent, and the weighting agent is located in the drilling fluid additive storage tank);
[0196] Seawater storage tank A15 and seawater storage tank B16 directly draw seawater through seawater suction pipeline A17 and seawater suction pipeline B18 respectively;
[0197] The data transmission and processing system includes an annular pressure measurement tool APWD while drilling, a signal optical cable, a computer 11, an instruction system 12, and an instruction execution unit. APWD is used to measure the bottom hole temperature and pressure while drilling. It is configured in the drill collar closest to the drill bit and is connected to the computer 11 through a signal optical cable. After receiving the information while drilling, the computer 11 processes it and transmits the calculation result to the instruction execution unit. The instruction execution unit includes a drilling fluid base fluid storage tank, a seawater storage tank A, a seawater storage tank B, a drilling fluid mixer and a drilling fluid additive storage tank. After receiving the calculation result instruction, the pumping volume is adjusted.
[0198] The structure of the booster pipeline of the present invention is not complicated. It is just a coated steel pipe on the outside of the platform drilling fluid pump or other seawater pump, with the upper end connected to the pump and the lower end connected to the bottom of the riser. The main purpose is to help the riser section carry rocks. For stability, part of the booster pipeline will be attached to the buckle on the side of the riser at a certain water depth.
[0199] Embodiment 6:
[0200] A working method of a device for increasing the extension length of a hydrate layer horizontal well by synergistically using multiple factors is as follows:
[0201] During circulation drilling, the outlet pumps (13, 23) of the seawater storage tank A15 and the drilling fluid base fluid storage tank are turned on, and the drilling fluid is evenly mixed in the drilling fluid mixer and then pumped into the drill pipe. The drilling fluid flows through the drill pipe and the drill collar to reach the drill bit, and then breaks the rock with the assistance of jets, and returns along the annulus, flows through the annulus of the open hole section, the annulus of the casing section, and the annulus of the riser section, and returns to the mud purification treatment system of the drilling platform; at the same time, the drilling annulus pressure measurement tool APWD transmits the real-time monitored bottom hole temperature and pressure data to the computer through the signal optical cable, and the computer converts the optical cable transmission information into bottom hole temperature and pressure data in real time, and completes model correction, intelligent control and optimization according to the real-time data, and then sends the operations to be executed to each instruction execution unit through the instruction system.
[0202] When the predicted bottom hole pressure is not within the safety window range, the computer sequentially calculates the fluid density and displacement amplitude in the boosting pipeline that need to be regulated, the amount of hydrate inhibitor added and the hydraulic parameter adjustment amplitude, and issues a fluid density regulation command in the boosting pipeline through the command system, and then issues a boosting pipeline displacement regulation command to pump 20; at the same time, a hydrate inhibitor addition regulation command is issued to the drilling fluid base fluid storage tank, where 26 and 27 are the drilling fluid additive / hydrate inhibitor delivery pipelines; at the same time, drilling fluid density, displacement and drilling fluid temperature regulation commands are issued to the seawater pump A and the pump of the base fluid storage tank, and a mechanical drilling speed regulation command is issued to the drilling platform 1.
[0203] The above is a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for increasing the extension length of a horizontal well in a hydrate layer by synergistically using multiple factors, characterized in that: The steps include: (1) Optimization design of drilling hydraulic parameters: Based on the geological and reservoir parameters of the target natural gas hydrate reservoir, the hydraulic parameter combination of drilling fluid density, displacement, mechanical penetration rate, drilling fluid inlet temperature, and fluid density and displacement in the booster pipeline are designed under the condition of riser drilling; (2) Closed-loop drilling: According to the hydraulic parameter combination designed in step (1) and the fluid density and displacement in the booster pipeline, the drilling fluid is injected from the drill pipe and returned from the annulus of the riser section; (3) Real-time monitoring and correction: The bottom hole pressure and temperature are monitored and obtained in real time through APWD, and the annular temperature and pressure calculation model is corrected in real time based on the obtained real-time bottom hole temperature and pressure data; (4) Intelligent control and optimization: Based on the annular temperature and pressure calculation model corrected in step (3), the booster pipeline displacement and fluid density, hydrate inhibitor dosage, and hydraulic parameters are automatically and collaboratively controlled with the goal of keeping the bottom hole pressure within a safe window between the formation pore pressure and the fracture pressure; (5) Repeating steps (3) and (4) to continue cyclic drilling until the drilling is completed; In step (1), the initial hydraulic parameters and the fluid density and displacement in the booster pipeline are designed to satisfy the following relationship: 1) Drilling fluid density ρ li Design scope max(r p ,r e ,r c )≤ρ l ≤ρ f (1) In the formula, ρ p is the equivalent density of formation pore pressure, kg / m 3 ; ρ c is the equivalent density of formation collapse pressure, kg / m 3 ; ρ l is the equivalent drilling fluid density, kg / m 3 ; ρ f is the equivalent density of formation fracture pressure, kg / m 3 ρ e is the hydrate reservoir phase equilibrium pressure equivalent density, kg / m 3 ; ρ l =ρ m +ρ pa =ρ li E m +ρ g E g +ρ s E s +ρ pa , where ρ li is the density of drilling fluid in the drill pipe; ρ pa is the annular pressure loss equivalent density, kg / m 3 ρ m is the drilling fluid density in the annulus of the casing section or the open hole section, kg / m 3 ; E g is the volume fraction of the annular air phase, dimensionless; E m is the volume fraction of the annular liquid phase, dimensionless; E s is the volume fraction of the solid phase in the annulus, dimensionless; ρ s is the annulus solid phase density, kg / m 3 ; ρ g is the density of the annular air phase, kg / m 3 ; 2) Design range of drilling fluid displacement Q Q min <Q<Q max (2) In the formula, Q min is the minimum drilling fluid displacement, m 3 / s;Q max is the maximum drilling fluid displacement, m 3 / s; Q is the drilling fluid displacement, m 3 / s; Among them, the minimum drilling fluid displacement Q min Affected by rock carrying, under the condition of deepwater hydrate formation riser drilling, the drilling fluid displacement in the riser annulus is regulated by the booster pipeline. The calculation formula of the displacement in the riser annulus after regulation is: Q ra =Q+Q za (3) Where Q ra is the annular displacement of the riser section, m 3 / s;Q za is the drilling fluid displacement in the booster pipeline, m 3 / s, the drilling fluid displacement range in the booster pipeline is Q zamin ≤Q za ≤Q zamax , Q zamin is the minimum displacement in the booster pipeline, m 3 / s,Q zamin =Q zmin -Q min , Q zmin is the minimum displacement required for the riser section to carry rock, m 3 / s;Q zamax The maximum displacement allowed by the booster line pump, that is, the displacement when the rated pressure is reached, m 3 / s; The calculation formula of the drilling fluid density in the annulus of the riser section after regulation is: Where ρ ra is the drilling fluid density in the riser annulus, kg / m 3 ρ za is the fluid density in the booster pipeline, kg / m 3 , whose range is: sea ≤ρ za ≤ρ max , ρ sea is the density of seawater, kg / m 3 ρ max The density of drilling fluid corresponding to the maximum weighted dosage condition reserved on the drilling platform, kg / m 3 ; The minimum drilling fluid displacement depends on the drilling fluid displacement required for the annulus below the mudline to carry rock. The minimum drilling fluid displacement calculation formula is: Where, d w is the borehole diameter, m; d po is the outer diameter of the drill pipe, m; v a is the drilling fluid return velocity in the annulus of the casing section or the open hole section, m / s; The maximum drilling fluid displacement depends on the formation fracture pressure and the rated pump pressure: Q max =min(Q pmax ,Q rmax ) (6) In the formula, Q pmax is the maximum displacement allowed by the formation fracture pressure, m 3 / s;Q rmax is the maximum displacement allowed by the rated pump pressure, m 3 / s; d is the flow section diameter, m; p f is the formation fracture pressure, Pa; p h is the drilling fluid column pressure in the annulus of the casing section or the open hole section, Pa; ρ m is the drilling fluid density in the annulus of the casing section or the open hole section, kg / m 3 ; f is the friction coefficient of the casing section annulus or the open hole section annulus, dimensionless; s is the drilling fluid flow length, m; In terms of the flow rate adjustment of the riser section, the minimum flow rate Q required for the annular rock carrying of the riser section is calculated according to formula (5). zmin ; Q zmin <Q ra <Q zmax (8) In the formula, Q zmin is the minimum rock-carrying displacement of the annulus of the riser section, m 3 / s;Q zmax is the maximum rock-carrying capacity of the annulus of the riser section, m 3 / s,Q zmax =Q zamax +Q max ; The design of mechanical drilling speed is based on the drilling operation time and the cuttings content in the drilling fluid. Its design range is expressed as: ROP min ≤ROP≤ROP max (9) Where, ROP is the mechanical drilling rate; min is the minimum mechanical drilling speed, m / h; its calculation formula is: ROP min =L / t max (10) L is the designed length of the horizontal well, m; t max is the maximum allowed drilling operation time, h; ROP max is the maximum mechanical drilling speed, m / h; its calculation formula is: ρ li is the density of drilling fluid in the drill pipe, kg / m 3 ;t a is the cuttings return time, h; A a is the cross-sectional area of the annulus of the open hole section, casing section or riser section, m 2 ;H l is the borehole depth, m; H a is the height of the cuttings bed, m; θ is the angle, °; ρ pa is the annular pressure loss equivalent density, kg / m 3 , r w is the wellbore radius, m; Limitation of Annular Pressure Loss on Drilling Fluid Density and Displacement Design p p ≤Δp a +p esd ≤p f In the formula, Δp dm is the surface pipeline pressure loss, Pa; Δp pi is the drill pipe pressure loss, Pa; Δp b is the drill bit pressure loss, Pa; Δp a is the annular pressure loss, Pa; p r is the pump pressure, Pa; p p is the formation pore pressure, Pa; p f is the formation fracture pressure, Pa; p esd is the static pressure of the annulus fluid, Pa; D is the equivalent diameter of the annulus, m; The design range of drilling fluid inlet temperature is expressed as: T pf ≤T ed (13) Where, T pf Bottom hole drilling fluid temperature, K; T ed is the hydrate reservoir phase equilibrium temperature, K; based on the bottom hole drilling fluid temperature T pf The drilling fluid inlet temperature T is determined by the heat transfer formula (14) (15) in , T co ≤T in ≤T en , T co The lowest temperature that the tank cooling system can provide, K; T en is the ambient temperature, K; The calculation models for the temperature inside the drill pipe and the annulus temperature are: In the formula, c m is the specific heat capacity of drilling fluid, J / (kg·K); r pi is the inner diameter of the drill pipe, m; T a T is the temperature of the open hole annulus, casing annulus or riser annulus, K; p is the drilling fluid temperature in the drill pipe, K; v zg is the flow rate of drilling fluid in the drill pipe, m / s; h p is the total heat transfer coefficient in the drill pipe, W / (m·K); A p is the internal cross-sectional area of the drill pipe, m 2 ; A a is the cross-sectional area of the annulus, m 2 ;h a is the total heat transfer coefficient in the annulus, W / (m·K); T f is the formation temperature, K; r po is the outer diameter of the drill pipe, m; r a is the radius of the annulus of the open hole section, casing section or riser section, m; t is the time, s; z is the distance from the bottom of the well, m; m h is the hydrate decomposition rate in hydrate-containing cuttings, kg / s; ΔH is the hydrate decomposition heat, kJ / mol.
2. The method for increasing the extension length of a hydrate layer horizontal well by synergistically using multiple factors according to claim 1, characterized in that: In step (3), the specific process of correction is: ①According to the real-time bottom hole temperature T obtained by APWD monitoring zs The bottom hole temperature T obtained by theoretical calculation js Compare and correct the total heat transfer coefficient h in the drill pipe in the temperature calculation model p and the total heat transfer coefficient in the annulus h a , so that the theoretically calculated bottom hole temperature T js The real-time bottom hole temperature T zs Consistency; ②According to the real-time bottom hole pressure P obtained by APWD monitoring zs The bottom hole pressure P obtained by theoretical calculation js By comparison, the friction coefficient f in the pressure calculation model is corrected, so that the bottom hole pressure P obtained by theoretical calculation is js The measured bottom hole real-time pressure P zs Consistency; The annulus pressure calculation model is: In the formula, v s is the solid phase velocity in the annulus, m / s; v g is the annular gas phase velocity, m / s; θ is the well inclination, °; P a is the annular pressure, Pa; g is the gravitational acceleration, m / s 2 .
3. The method for increasing the extension length of a hydrate layer horizontal well by synergistically using multiple factors according to claim 2, characterized in that: In step (4), the calculation is segmented control and optimization. The designed hydraulic parameters are used to calculate the bottom hole temperature and pressure when drilling a certain section. After the drilling of this section is completed, the annular temperature and pressure calculation model is corrected according to step (3) using the measured bottom hole temperature and pressure of this section, and then the corrected model is used to calculate the bottom hole temperature and pressure of the next section. If the calculated bottom hole pressure is less than the formation pore pressure or greater than the formation fracture pressure, intelligent control and optimization are performed; if the calculated bottom hole pressure is greater than the formation pore pressure and less than the formation fracture pressure, no intelligent control and optimization is required.
4. The method for increasing the extension length of a hydrate layer horizontal well by synergistically using multiple factors according to claim 3 is characterized in that: In step (4), the formula for calculating the required fluid density of the riser annulus according to the bottom hole pressure is: In the formula, p wf is the bottom hole pressure, Pa; H1 is the vertical depth of the formation section, m; H2 is the vertical depth of the riser section, m, solve for the fluid density ρ ra ; The phase equilibrium formula used to determine whether the hydrate in the cuttings is decomposed is: Where P e is the phase equilibrium pressure of hydrate at a certain annular temperature, Pa; 24 is the translation coefficient; X is the mass fraction of salt hydrate inhibitor in the drilling fluid, %, and the mass fraction range of hydrate inhibitor is 0≤X≤3(%); Compare the calculated phase equilibrium temperature with the annular temperature at that location. If P e >P a The hydrate in the cuttings decomposes, and the decomposition gas production rate is calculated as follows: m g =k d M g A s (P e -P a ) (19) In the formula, m g is the gas production rate of hydrate decomposition, kg / s; k d is the intrinsic reaction rate, mol / (m 2 ·Pa·s), k d0 is the intrinsic reaction rate constant, taken as 36000, mol / (m 2 ·Pa·s); ΔE is the activation energy, J / mol; A s is the hydrate decomposition surface area per unit volume of porous media, m -1 ; M g is the molar mass of the gas, kg / mol; M w is the molar mass of water, kg / mol; N h is the hydrate number, which is taken as 6.0 and is dimensionless.