A charging pile using a mechanical switch to complete leakage protection
By replacing semiconductor switches in charging piles, leakage protection is achieved and energy loss is reduced, and the problems of high heat generation and energy consumption of semiconductor switches are solved. Combined with the current difference and resistance value acquisition module to quickly locate the leakage position, improving the equipment security and reliability.
Patent Information
- Application Number
- CN202211159676.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-22
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2042-09-22
AI Technical Summary
The semiconductor switches in existing charging piles are prone to heat up during leakage protection, resulting in high power consumption and easy damage, making it difficult to effectively reduce energy losses.
Use mechanical switches instead of semiconductor switches. By setting mechanical switches at rectifier circuits, voltage regulation circuits and load isolation switches, the three-phase AC power supply is automatically disconnected to achieve leakage protection, and is equipped with a current difference acquisition module, a resistance acquisition module and an identification module. , quickly locate the leakage position and provide a safe power supply for detection after the mechanical switch is disconnected.
It significantly reduces the energy loss of charging piles. The mechanical switch has less heat during normal operation, which can quickly open circuits, reduces power consumption, and quickly locates the leakage position through the module, which facilitates timely repairs by personnel and improves the safety and reliability of the equipment. .
Smart Images

Figure CN115425722B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of charging piles, and in particular to a charging pile that uses a mechanical switch to implement leakage protection. Background Art
[0002] A charging station is a device used to charge loads such as electric vehicles.
[0003] The internal working principle of the relevant charging pile is that the external three-phase AC power of 380V is connected to the semiconductor switch, and then to the rectifier unit for rectification to adjust the voltage. The voltage is then boosted by the boost circuit. If it is higher than the voltage required by the load, it is stepped down and then connected to the load isolation switch. Finally, it is connected to the load battery to charge the battery.
[0004] Regarding the above-mentioned related technologies, semiconductor switches are mainly used for leakage protection of charging piles. However, in actual operation, it is found that semiconductor switches are prone to heat up, resulting in high power consumption of the charging piles, and semiconductor switches are also prone to overheating and damage after long-term use. Summary of the invention
[0005] In order to reduce the power consumption of a charging pile, the present application provides a charging pile that uses a mechanical switch to achieve leakage protection.
[0006] The present application provides a charging pile that uses a mechanical switch to implement leakage protection, which adopts the following technical solution:
[0007] A charging pile that uses a mechanical switch to achieve leakage protection includes a rectifier circuit, a voltage regulation circuit, a load isolation switch and a charging port. The rectifier circuit is used to couple with an AC power supply. A mechanical switch is coupled between the rectifier circuit and the AC power supply. The mechanical switch is used to automatically disconnect when any of the rectifier circuit, the voltage regulation circuit and the load isolation switch leaks.
[0008] By adopting the above technical solution, after leakage occurs, the mechanical switch works to quickly disconnect the circuit between the three-phase AC power supply and the rectifier to protect the circuit, and the mechanical switch generates less heat when working normally. According to actual tests, the original semiconductor switch consumes 400W of power when the total current is 400A, but the use of the mechanical switch now reduces the power consumption to less than 4W, greatly reducing energy loss and achieving significant technical progress.
[0009] Preferably, it also includes:
[0010] The alarm module is coupled to the rectifier circuit and is used to issue an alarm indication after the mechanical switch is disconnected.
[0011] By adopting the above technical solution, the alarm module can remind personnel after the mechanical switch is disconnected, so that personnel can know the situation in time.
[0012] Preferably, it also includes:
[0013] A current difference acquisition module, used to acquire current difference information between three three-phase electrical input terminals of a rectifier circuit;
[0014] A resistance value acquisition module, used to obtain resistance value information according to the current difference; and
[0015] The identification module has a leakage object information table pre-installed therein, which includes resistance values corresponding to the resistance information and common leakage objects corresponding to the resistance values. The module is used to traverse the leakage object information table according to the resistance information to obtain common leakage objects and make a response for display through a coupled display screen.
[0016] By adopting the above technical solution, personnel can quickly understand which component of the charging pile is causing the leakage after a common leakage situation occurs, which is more convenient.
[0017] Preferably, the identification module includes:
[0018] A storage unit, used for pre-storing a leakage object information table;
[0019] A table search unit is used to traverse the pre-stored leakage current information table according to the resistance value information to obtain the resistance value with the closest value;
[0020] A result judgment unit, in which a standard error value is preset, is used to obtain an actual difference value based on the resistance value and resistance information, and compare the actual difference value with the standard error value to obtain a normal result or an abnormal result;
[0021] A selection unit is used to select a common leakage object corresponding to the closest resistance value according to the normal result; and
[0022] The display unit is used to display common leakage objects.
[0023] By adopting the above technical solution, the closest resistance value can be obtained by querying the leakage object information table according to the resistance information, and the common leakage objects are obtained and displayed through the closest resistance value, so that personnel can quickly understand the leakage location, which is more convenient.
[0024] Preferably, the leakage object information table also includes phase current difference values corresponding to the current difference information, and the identification module also includes:
[0025] The re-calibration unit has a preset standard current difference value, which is used to compare the current difference information with the phase current difference value. If the difference between the two exceeds the standard current difference value, the abnormal result replaces the normal result.
[0026] By adopting the above technical solution and re-verifying the setting of the unit module, the charging pile can make a more accurate judgment on the leakage position.
[0027] Preferably, the identification module further includes:
[0028] An exception handling unit, used to create a new common leakage object and a corresponding resistance value in the leakage object information table according to the abnormal result, and make an abnormal prompt response; and
[0029] Entry unit, used to modify the names of common leakage objects.
[0030] By adopting the above technical solution, common leakage objects and corresponding resistance values can be automatically created for unknown leakage situations. When such leakage situation occurs again, a normal result will be obtained, so that personnel can quickly know the leakage object through the display unit.
[0031] And let the personnel know that there is leakage in an unknown location, so that they can conduct a comprehensive inspection of the charging pile in time, and then the personnel will complete the maintenance.
[0032] Preferably, the identification module also includes:
[0033] A statistical unit is used to count the number of occurrences of each common leakage object based on all normal results within a preset time;
[0034] A comparison unit, which is preset with a standard number of times, is used to compare the number of occurrences of each common leakage object with the standard number of times to obtain a normal installation result and an abnormal installation result;
[0035] The maintenance reminder unit is used to issue abnormal installation alarm prompts based on abnormal installation results and corresponding common leakage objects.
[0036] By adopting the above technical solution, the statistical unit, the comparison unit and the maintenance prompt unit are set up, when an object leaks electricity multiple times in a short period of time, it indicates that there is a problem with the installation or quality of the object. According to this phenomenon, personnel are instructed so that they can replace the object in time to reduce the occurrence of leakage.
[0037] Preferably, it also includes:
[0038] The safety power supply access module is used to connect the safety power supply to the rectifier circuit instead of the AC power supply after the mechanical switch is disconnected.
[0039] By adopting the above technical solution, the setting of the safety power supply can be connected to the rectifier circuit to power it after the mechanical switch is disconnected, so that personnel can quickly detect the leakage position through the current provided by the safety power supply.
[0040] In summary, the present application includes at least one of the following beneficial technical effects:
[0041] 1. By setting a mechanical switch, the circuit can be quickly disconnected, which greatly reduces the power loss of the charging pile and represents a great technological advancement;
[0042] 2. By setting up a current difference acquisition module, a resistance acquisition module and an identification module, personnel can quickly find the leakage location after a leakage problem occurs;
[0043] 3. By setting up a safe power access module, it is convenient for personnel to inspect and repair the circuit of the charging pile after abnormal results occur. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 This is an architectural diagram of Example 1 of the embodiments of the present application.
[0045] Figure 2 This is an architectural diagram of Example 2 of the embodiment of the present application.
[0046] Figure 3 This is an internal architecture diagram of the identification module of Example 2 of the embodiment of the present application.
[0047] Explanation of the accompanying drawings: 1. Rectification circuit; 2. Voltage regulation circuit; 3. Load isolation switch; 4. Charging port; 5. Mechanical switch; 6. Alarm module; 7. Current difference acquisition module; 8. Resistance acquisition module; 9. Identification module; 91. Storage unit; 92. Table search unit; 93. Result judgment unit; 94. Selection unit; 95. Display unit; 96. Re-verification unit; 97. Exception handling unit; 98. Entry unit; 99. Statistics unit; 10. Comparison unit; 11. Safety power supply access module; 12. Maintenance reminder unit. DETAILED DESCRIPTION
[0048] An embodiment of the present application discloses a charging pile that uses a mechanical switch to implement leakage protection.
[0049] Embodiment 1:
[0050] Reference Figure 1 A charging pile that uses a mechanical switch to complete leakage protection includes a rectifier circuit 1, a voltage regulation circuit 2, a load isolation switch 3 and a charging port 4. The rectifier circuit 1 is used to couple with an AC power supply, and a mechanical switch 5 is coupled between the rectifier circuit 1 and the AC power supply.
[0051] The external three-phase AC power supply is connected to the rectifier circuit 1 through the mechanical switch 5. The rectifier circuit 1 adjusts the voltage to 530V. The voltage regulating circuit 2 adjusts the duty cycle of the rectified current to perform voltage boost or voltage reduction. Since the current car battery is charged at 300V-800V, the voltage is boosted if it is lower than 530V and lowered if it is higher than 530V. It is then coupled to the load isolation switch 3 and finally coupled to the battery through the charging port 4 coupled to the load isolation switch 3 to charge the battery.
[0052] The mechanical switch 5 is used to automatically disconnect when any of the rectifier circuit 1, the voltage regulating circuit 2, the load isolation switch 3, and the charging port 4 leaks electricity. The mechanical switch 5 is a leakage protection switch. When leakage occurs in the circuit in the charging pile, it will cause deviations between the currents in the three-phase input terminals of the rectifier circuit 1, resulting in a shift in its neutral point. A voltage difference occurs between its source neutral point and the ground terminal, which causes the mechanical switch 5 to work and quickly disconnect the circuit between the three-phase AC power supply and the rectifier within tens of milliseconds. And when the mechanical switch 5 is working normally, it generates less heat. After actual testing, the original semiconductor switch consumes 400W of power when the total current is 400A, but now the use of the mechanical switch 5 reduces the power consumption to less than 4W, which is a significant technological progress.
[0053] Embodiment 2:
[0054] The difference between this embodiment and embodiment 1 is: Figure 2 In this embodiment, a charging pile that uses a mechanical switch to complete leakage protection also includes an alarm module 6, a current difference acquisition module 7, a resistance acquisition module 8, an identification module 9, a safe power supply access module 11 and an automatic circuit breaker module.
[0055] The current difference acquisition module 7 is an internal system module of an intelligent processor coupled with a current detection sensor, and is used to obtain the current difference information between the three three-phase power input terminals of the rectifier circuit 1. When a leakage occurs in one of the three-phase power of the charging pile, the current of that phase increases, and the current at the input terminal of the three-phase power will be asymmetric, resulting in a current difference. By detecting the value of each current, the current difference information can be obtained through simple calculation.
[0056] The resistance acquisition module 8 is also an internal program module of the intelligent processor, which is used to obtain resistance information based on the current difference. Since the current difference at the three-phase ends changes with the change of the resistance of the grounded object, the approximate resistance of the grounded object can be calculated through the current difference.
[0057] Reference Figure 2 and Figure 3, the identification module 9 is used to traverse the preset leakage object information table according to the resistance information to obtain common leakage objects and respond by displaying them through the coupled display screen; the identification module 9 is an internal program module of the intelligent processor. The identification module 9 also specifically includes a storage unit 91, a table search unit 92, a result judgment unit 93, a selection unit 94, a display unit 95, a re-verification unit 96, an abnormality handling unit 97, an entry unit 98, a statistical unit 99, a comparison unit 10 and a maintenance prompt unit 12.
[0058] The storage unit 91 is used to pre-store a leakage object information table, which includes resistance values corresponding to resistance information, corresponding phase current differences, and common leakage objects corresponding to resistance values. Since leakage is generally caused by grounding with conductive elements, which is generally a metal shell, the resistance values of all conductive elements in the charging pile can be counted in advance, and the phase current changes of the three-phase current caused by the grounding of these conductive elements can be simulated, and the corresponding resistance values and phase current differences are stored in the leakage object information table;
[0059] The table search unit 92 is used to traverse the pre-stored leakage object information table according to the resistance information and the current difference information, and obtain the resistance value closest to the resistance information and the phase current difference value closest to the current difference information;
[0060] The result judgment unit 93 is preset with a standard error value and a standard current difference value, and is used to obtain an actual difference value based on the resistance value and the resistance information. The specific process is: the absolute value of the number obtained by subtracting the resistance value from the resistance information is the actual difference value, and the actual difference value is compared with the standard error value. If the actual difference value is less than the standard error value, a normal result is obtained, and if it is greater than the standard error value, an abnormal result is obtained.
[0061] The re-verification unit 96 is used to compare the current difference information with the phase current difference after the result judgment unit 93 obtains a normal result. If the difference between the two does not exceed the standard current difference, the normal result is maintained; if it exceeds, the abnormal result is used to replace the normal result.
[0062] The selection unit 94 is used to select the common leakage object corresponding to the closest resistance value according to the normal result; specifically, after obtaining the normal result, it means that there is a high probability that the object corresponding to the resistance value is connected to the circuit in the charging pile, and the selection unit 94 will select the corresponding common leakage object from the leakage object information table.
[0063] The display unit 95 is used to display common leakage objects; after obtaining the corresponding common leakage objects, the display unit 95 will control the display screen to display the common leakage objects, so that people can understand which part of the charging pile is leaking.
[0064] The exception handling unit 97 creates a new common leakage object, a corresponding phase current difference and a corresponding resistance value in the leakage object information table according to the abnormal result, and responds to the abnormal prompt; specifically: after obtaining the abnormal result, the exception handling unit 97 creates a new column or row of blank tables in the leakage object information table, and fills the resistance information and current difference information corresponding to the abnormal result as the resistance value and the phase current difference into the correct position of the newly created blank table to be consistent with the resistance information and the current difference information in the original leakage object information table, and the initial name of the common leakage object after creation defaults to a space;
[0065] The input unit 98 is used to modify the name of the common leakage object; after the abnormal handling unit 97 fills in the resistance information and the current difference information, the personnel can edit the name of the common leakage object in the blank space of the newly created row or column and fill in the actual name of the leakage object after the personnel have completed the maintenance of the charging pile and eliminated the fault;
[0066] The statistical unit 99 is used to count the number of occurrences of each common leakage object according to all normal results within a preset time; specifically, the statistical unit 99 will count the number of occurrences of the common leakage objects selected by the selection unit 94 each time a normal result appears within one month, and count the number of occurrences of these common leakage objects;
[0067] The comparison unit 10 is preset with a standard number of times, which is used to compare the number of occurrences of each common leakage object with the standard number of times, and obtain normal installation results and abnormal installation results; specifically, after counting the number of occurrences of common leakage objects, the number of occurrences of each common leakage object is compared with the standard number of times. The standard number of times can be 4 times. If the number of occurrences of the common leakage object is greater than 4 times, an abnormal installation result is obtained; if it is less than 4 times, a normal installation result is obtained. It should be noted that the basis here is that if an object is often detected to have leakage, it means that there is a problem with the installation of the object, and the installation position is too close to the circuit so it is easy to contact the circuit and leak. Therefore, it needs to be repaired and reinstalled.
[0068] The maintenance prompt unit 12 makes an abnormal installation alarm prompt according to the abnormal installation result and the corresponding common leakage objects; specifically: after obtaining the abnormal installation result, according to the obtained common leakage objects, the alarm bell coupled to the intelligent processor is controlled to sound an alarm, and the common leakage objects are displayed on the display screen to facilitate personnel to understand the details.
[0069] The alarm module 6 adopts a light alarm circuit and is coupled to the rectifier circuit 1. The alarm module 6 is coupled with a start switch that controls its own on and off. The start switch is a normally open switch and is a linkage switch of the mechanical switch 5. After the mechanical switch 5 is disconnected, it is closed so that the alarm module 6 is turned on and a light alarm indication is issued.
[0070] The safety power supply access module 11 is a normally open switch, which connects the safety power supply and the rectifier circuit 1. The safety power supply is a current source below 36V. The safety power supply is also a linkage switch of the mechanical switch 5. It is used to connect the safety power supply instead of the AC power supply to the rectifier circuit 1 after the mechanical switch 5 is disconnected for voltage detection, so as to facilitate personnel to detect the leakage location.
[0071] The implementation principle of the charging pile using a mechanical switch to implement leakage protection in the embodiment of the present application is as follows: by designing a mechanical switch 5 to replace the semiconductor switch in the traditional charging pile for leakage protection, when there is a leakage problem in the circuit, the mechanical switch 5 can be opened after tens of milliseconds to achieve circuit protection. In addition, the mechanical switch 5 will not form a heat source, and the heat generation power of the mechanical switch 5 is less than 4W, which reduces a lot of useless power consumption.
[0072] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A charging pile using a mechanical switch to implement leakage protection, comprising a rectifier circuit (1), a voltage regulating circuit (2), a load isolation switch (3) and a charging port (4), wherein the rectifier circuit (1) is used to couple with an AC power source, and is characterized in that: A mechanical switch (5) is coupled between the rectifier circuit (1) and the AC power supply, and the mechanical switch (5) is used to automatically disconnect when any of the rectifier circuit (1), the voltage regulating circuit (2), and the load isolation switch (3) leaks electricity; the mechanical switch (5) performs leakage protection for the charging pile, and when a circuit leaks electricity, the mechanical switch (5) can be opened after tens of milliseconds to achieve circuit protection, and the heat generation power of the mechanical switch (5) is less than 4W; The charging pile also includes: An alarm module (6), coupled to the rectifier circuit (1), and configured to issue an alarm indication after the mechanical switch (5) is disconnected; A current difference acquisition module (7), used for acquiring current difference information between three three-phase electrical input terminals of the rectifier circuit (1); A resistance value acquisition module (8), used for obtaining resistance value information according to the current difference; The identification module (9) is pre-installed with a leakage object information table, wherein the leakage object information table includes resistance values corresponding to the resistance value information and common leakage objects corresponding to the resistance values, and is used to traverse the leakage object information table according to the resistance value information to obtain common leakage objects and make a response for display through a coupled display screen; the leakage object information table also includes phase current difference values corresponding to the current difference information, and the identification module (9) includes: a re-verification unit (96) pre-installed with a standard current difference value, and is used to compare the current difference information with the phase current difference value. If the difference between the two exceeds the standard current difference value, the abnormal result is used to replace the normal result, so that the charging pile can more accurately judge the leakage position; The safety power supply access module (11) is used to connect the safety power supply to the rectifier circuit (1) instead of the AC power supply after the mechanical switch (5) is disconnected, so as to facilitate the inspection and repair of the circuit of the charging pile after the abnormal result occurs; the safety power supply access module (11) is a normally open switch, connecting the safety power supply to the rectifier circuit (1), the safety power supply is a current source below 36V, and is linked to the mechanical switch (5) to connect the safety power supply to the rectifier circuit (1) instead of the AC power supply after the mechanical switch (5) is disconnected for voltage detection, so as to facilitate the detection of the leakage position.
2. The charging pile according to claim 1, characterized in that: The identification module (9) further comprises: A storage unit (91) for pre-storing a leakage object information table; A table search unit (92) is used to traverse the pre-stored leakage object information table according to the resistance value information to obtain the resistance value with the closest value; A result judgment unit (93) is preset with a standard error value, and is used to obtain an actual difference value based on the resistance value and the resistance information, and compare the actual difference value with the standard error value to obtain a normal result or an abnormal result; A selection unit (94) is used to select a common leakage object corresponding to the closest resistance value according to the normal result; The display unit (95) is used to display common leakage objects.
3. The charging pile according to claim 1, characterized in that: The identification module (9) further comprises: An exception processing unit (97) is used to create a new common leakage object and a corresponding resistance value in the leakage object information table according to the abnormal result, and make an abnormal prompt response; The input unit (98) is used to modify the name of the common leakage object.
4. The charging pile according to claim 3, characterized in that: The identification module (9) further comprises: A statistical unit (99), used for counting the number of occurrences of each common leakage object according to all normal results within a preset time; A comparison unit (10) is preset with a standard number of times and is used to compare the number of occurrences of each common leakage object with the standard number of times to obtain a normal installation result and an abnormal installation result; The maintenance prompt unit (12) is used to issue an abnormal installation alarm prompt based on the abnormal installation result and the corresponding common leakage object.
