A IGBT power module final inspection test workstation and test method thereof
By designing a fully automated IGBT power module final inspection and test workstation, the problem of low IGBT module testing efficiency in the existing technology has been solved, a more efficient and flexible inspection process has been achieved, labor costs have been reduced, and inspection accuracy and equipment safety have been ensured. Integrity.
Patent Information
- Application Number
- CN202211011832.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-23
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-08-23
AI Technical Summary
The existing IGBT module testing process is inefficient and requires manual operation. The testing sequence and items cannot be flexibly adjusted, resulting in a waste of testing time and errors.
Design an IGBT power module final inspection and testing workstation, which adopts a fully automated process, including feeding, testing, cleaning and discharging mechanisms, and realizes dual-channel loading and unloading through manipulators and cylinder groups, allowing flexible adjustment of test sequences and projects, integrated installation Gauges, PIN pins, static and dynamic test bodies.
It improves the test speed and efficiency, reduces the cost of manual participation, ensures the test accuracy and flexibility, avoids damage to the IGBT module by static electricity and dust, and realizes a fully automated detection process.
Smart Images

Figure CN115488057B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of power device IGBT module packaging, and in particular to an IGBT power module final inspection test workstation and a test method thereof. Background Art
[0002] IGBT is a third-generation power electronic device that combines the high operating frequency and voltage drive of MOSFET with the low conduction loss and high operating voltage of BJT. It is currently widely used in emerging industries such as new energy vehicles, rail transit, and smart grids. It is a key component for achieving industrial automation and energy conservation and consumption reduction.
[0003] The IGBT module test process lines in the prior art all achieve semi-automatic inspection and packaging through equipment, but the flow between various test items is manually operated, the flow speed is slow and the efficiency is low, and workers will inevitably make inspection errors after working for a long time. At the same time, the entire process line is fixed and cannot be changed according to the priority of the inspection focus. When problems such as re-inspection occur, all functions still need to be inspected, and unnecessary inspection items cannot be skipped, which greatly wastes inspection time. Therefore, an IGBT power module final inspection test workstation and a testing method thereof are proposed to solve the above technical problems and improve the efficiency and functionality of the inspection line. Summary of the invention
[0004] The purpose of the present invention is to solve the above-mentioned technical problems and to provide an IGBT power module final inspection test workstation. The present invention has more efficient circulation speed, material loading and unloading and test speed, wherein the test sequence and test items can be freely adjusted according to user needs, and the test items have higher flexibility. A dual-channel loading and unloading type is adopted in the material loading and unloading and test mechanism, which speeds up the test efficiency and makes the test functions more complete. The fully automated test process replaces manual testing, which saves time and effort and reduces the cost of employment.
[0005] The technical solution adopted by the present invention to solve the above technical problems is: an IGBT power module final inspection test workstation, including a feeding mechanism, a testing mechanism, a cleaning mechanism, a discharging mechanism and a plurality of manipulators; the testing mechanism includes a safety test mechanism and a PIN needle test mechanism, which are installed at the rear side of the entire workstation and transported by manipulating the manipulator; the safety test mechanism includes a detection platform, a cylinder group and a needle bed which can be used for switching the test of the IGBT module, the cylinder group is connected to the lower part of the detection platform, and the needle bed is installed above the detection platform; the PIN needle test mechanism includes a positioning device and a laser detector, and the IGB The T module is clamped on the positioning device, the laser detector is installed above the positioning device, and the IGBT module on the positioning device is transported by mobilizing a manipulator; the feeding mechanism includes a feeding material warehouse and a recycling material warehouse, and a process tooling is provided between the feeding material warehouse and the recycling material warehouse, and the process tooling connects the feeding material warehouse and the recycling material warehouse. The feeding mechanism also includes a discharging track, and the IGBT module on the discharging track is transferred to the testing mechanism by mobilizing a manipulator; the cleaning mechanism includes a tray feeding port and a dust removal and cleaning mechanism, and the manipulator is mobilized to transfer the IGBT module on the testing mechanism to the tray feeding port, and the tray feeding port is connected to the dust removal and cleaning mechanism, and the dust removal and cleaning mechanism is connected to the discharging mechanism.
[0006] Preferably, the test mechanism further comprises a static test mechanism and a dynamic test mechanism. The IGBT module is transported between the static test mechanism, the dynamic test mechanism and other mechanisms by mobilizing a manipulator. The static test mechanism and the dynamic test mechanism are installed around the safety test mechanism. The detection platform comprises a first detection platform, a second detection platform and a safety switching track. The first detection platform and the second detection platform are both connected to the safety switching track. The IGBT module transported by mobilizing a manipulator is placed on the first detection platform and the second detection platform, and the needle bed is installed above the first detection platform. The cylinder group comprises a moving cylinder, a discharging cylinder and a detection cylinder. Cylinder, the detection cylinder is installed below the needle bed, the discharge cylinder is installed on the other side of the detection cylinder, the first detection platform and the second detection platform are both connected to the moving cylinder; the positioning device includes a flipping platform, a fixed bracket, a transverse positioning module and a longitudinal positioning module; the transverse positioning module includes a transverse track and a transverse moving motor, the transverse track and the transverse moving motor are connected, and the fixed bracket is installed on the transverse track; the longitudinal positioning module includes a longitudinal track and a longitudinal moving motor, the longitudinal track and the longitudinal moving motor are connected, the transverse track is set above the longitudinal track, the flipping platform is installed on the fixed bracket, and the flipping platform is connected to a flipping cylinder and a pressing block.
[0007] Preferably, the discharging mechanism includes a packaging box feeding end, a packaging tool and a packaging box shipping end, wherein the packaging tool includes a box cover separation mechanism, a label packaging mechanism and a tape packaging mechanism, the box cover separation mechanism, the label packaging mechanism and the tape packaging mechanism are connected in sequence, the packaging box feeding end is connected to the box cover separation mechanism, the packaging box shipping end is connected to the tape packaging mechanism, the box cover separation mechanism is connected to the dust removal and cleaning mechanism, the packaging box feeding end is provided with a loading port, and the packaging box shipping end is provided with a shipping port.
[0008] Preferably, the box cover separation mechanism includes a control structure, a vacuum suction cup, a top block and a grasping device, which are all installed on the control structure. The control structure includes a connecting block, a vertical cylinder and a grasping cylinder. The vertical cylinder is installed in the middle of the upper side of the connecting block, the vacuum suction cup and the top block are arranged on the lower side of the connecting block, the grasping device is arranged at the diagonal of the connecting block, the grasping cylinder is installed on the upper side of the connecting block, and the grasping cylinder is connected to the grasping device.
[0009] Preferably, the discharging track includes a discharging layer and a recovery layer, the discharging layer includes a first discharging layer and a second discharging layer, the first discharging layer is located below the second discharging layer, the second discharging layer is higher than the first discharging layer, the first discharging layer and the second discharging layer are provided with a discharging transverse movement cylinder, and the discharging transverse movement cylinder is fixed on the side of the discharging layer; the recovery layer includes a first recovery layer and a second recovery layer, the first recovery layer is located below the second recovery layer, the second recovery layer is higher than the first recovery layer, the first recovery layer and the second recovery layer are provided with a recovery transverse movement cylinder, and the recovery transverse movement cylinder is fixed on the side of the recovery layer.
[0010] Preferably, the PIN needle testing mechanism further comprises a light shield and a display structure; the display structure is installed on the back of the light shield, the light shield is covered on the laser detector, and the display structure is connected to the laser detector.
[0011] Preferably, the safety switching track includes an upper track and a lower track, a first hollow portion is opened on the first detection platform, and a second hollow portion is opened on the second detection platform. The first hollow portion is located in the middle of the first detection platform, and the second hollow portion is located in the middle of the second detection platform. The discharge cylinder and the detection cylinder push the IGBT module through the first hollow portion and the second hollow portion.
[0012] Preferably, the feeding mechanism, safety testing mechanism, static testing mechanism, dynamic testing mechanism, PIN needle testing mechanism, cleaning mechanism and discharging mechanism are all provided with a control panel and an NG unloading station, and the control panel includes a display screen and control buttons.
[0013] Preferably, a test method for an IGBT power module final inspection test workstation specifically comprises the following steps:
[0014] Step 1: Push the trolley with the pallet of IGBT modules into the feed bin of the feed mechanism and snap it onto the wall of the feed bin. Then push the empty trolley to the recycling bin of the feed mechanism and snap it onto the wall of the recycling bin. At this time, the pallet is located under the process tooling. The process tooling is lowered to the pallet on the trolley along with the track belt of the process tooling. The process tooling covers the pallet. The clamps on the process tooling tighten the pallet around. Then, the process tooling moves to the discharge track through the transverse track. The process tooling places the pallet on the first discharge layer or the second discharge layer of the discharge track. The pallets on the first discharge layer and the second discharge layer are grabbed by the manipulator and discharged in turn. Operation, grab the pallet to one of the mechanisms in the test mechanism to start the IGBT module performance test, the process tooling will place the pallet on the empty discharge layer, and the NG IGBT module will be mobilized by the robot to be recovered to the NG unloading station, and the process tooling will clamp the discharged pallet on the first or second recycling layer on the recycling layer and transfer it to the trolley on the recycling material warehouse. The discharge transverse cylinder on the discharge layer will push and pull back the first and second discharge layers to switch and move the discharge back and forth. The recycling transverse cylinder on the recycling layer will push and pull back the first and second recycling layers to enable them to move back and forth. After the recycling trolley is full of pallets, the worker takes the trolley out from the recycling material warehouse;
[0015] Step 2: mobilize the manipulator to place the grabbed IGBT module on the first detection platform of the safety test organization. The mobile cylinder on the first detection platform pushes the first detection platform to move to the upper track below the needle bed. At this time, the mobile cylinder on the second detection platform pushes the second detection platform to move to the lower track at the inlet and outlet. The discharge cylinder pushes up through the second hollow part to receive the second IGBT module. At the same time, the detection cylinder pushes up through the first hollow part to push the first IGBT module on the first detection platform onto the needle bed to start the discharge test. After the test is completed, the detection cylinder recycles the first IGBT module and places it on the first detection platform. The discharge cylinder also recycles the second IGBT module and places it on the second detection platform. The mobile cylinder pushes the first detection platform and the second detection platform to swap positions. The first detection platform returns to the inlet and outlet. The first IGBT module on the first detection platform is discharged to the next test organization by mobilizing the manipulator and receives the third IGBT module. The second detection platform arrives below the needle bed. The second IGBT module on the second detection platform undergoes leakage current detection under high voltage conditions. This alternating inlet and outlet and detection are repeated;
[0016] Step 3: Mobilize the manipulator to place the IGBT module on the flipping platform of the PIN needle test mechanism. The IGBT module is fixed on the flipping platform by a pressing block. At this time, the fixed bracket is moved on the horizontal track and the longitudinal track to reach the detection area through the lateral moving motor and the longitudinal moving motor. The laser detector is started and the front PIN needle position is detected. The display structure displays the detection results in real time on the back side of the light shield. When the laser detector is finished, the flipping platform is flipped by the flipping cylinder so that the other side of the IGBT module faces the laser detector. The fixed bracket is moved on the horizontal track and the longitudinal track to the detection area again by the lateral moving motor and the longitudinal moving motor. The laser detector performs a back curvature detection on it. After the detection is completed, the pressing block releases the IGBT module, and the qualified IGBT module is moved out of the detection mechanism by the manipulator or the unqualified IGBT module is placed in the NG unloading station.
[0017] Step 4: Before the static test, the manipulator is mobilized to release the IGBT module to the heating module. The IGBT module is first placed on the heating table and heated to 150 degrees. After heating, the IGBT module is subjected to a static test. After the test, the manipulator is mobilized to place the IGBT module in the cooling module for cooling. After the test, the manipulator is mobilized to remove the qualified IGBT module from the testing organization or to place the unqualified IGBT module to the NG unloading station.
[0018] Step 5: Before the dynamic test, the manipulator is mobilized to release the IGBT module to the heating module. The IGBT module is first placed on the heating table and heated to 150 degrees. After heating, the IGBT module is dynamically tested. After the test, the manipulator is mobilized to place the IGBT module in the cooling module for cooling. After the test, the manipulator is mobilized to remove the qualified IGBT module from the testing mechanism or place the unqualified IGBT module to the NG unloading station;
[0019] Step 6: The IGBT power module that has completed the test is grabbed by the manipulator and placed on the tray picking port, and the packaging box is placed on the loading port at the feeding end of the packaging box. The packaging box will be transported to the box cover separation mechanism. At this time, the vertical cylinder of the box cover separation mechanism is started to push the connecting block downward until the vacuum suction cup sucks the top suction position of the packaging box. At the same time, the top block presses the fixed block at the front end of the packaging box, and the grabbing cylinder diagonally connected to the block controls the grabbing device to buckle the inner groove at the diagonal of the packaging box. The top block fixes the fixed block of the packaging box. The fixed block and the bottom of the packaging box are the same body. The bottom of the packaging box is fixed in place, and the suction force of the vacuum suction cup and the upward grabbing force of the grabbing device lift the upper cover of the packaging box. After that, the bottom of the packaging box with the lid separated is transported to the removal The dust cleaning mechanism performs ion dust removal and simple cleaning on the bottom of the packaging box to eliminate static electricity of the packaging box. The IGBT module is loaded into the cleaned and anti-static bottom of the packaging box at the pallet feeding port. After the position of the packaging box bottom is full, the packaging box bottom is transported to the box cover separation mechanism again. The control structure releases the box cover to the packaging box bottom, and at the same time, the box cover and the box bottom are closed and fixed, and the closed packaging box is transported to the label packaging mechanism. The label packaging mechanism pastes labels on the packaging box and performs qualification inspection on the pasted labels. After the label inspection is completed, the packaging box is transported to the tape packaging mechanism for side tape packaging. Then, the packaging box reaches the packaging box shipping end and is stacked. All packaging boxes are taken out from the shipping port manually or by AGV.
[0020] Preferably, the manipulator is arranged between each test mechanism or at the inner corner where the test mechanisms are connected, and the manipulator is used to dispatch the IGBT modules on the safety test mechanism, static test mechanism, dynamic test mechanism and PIN needle test mechanism; the safety test mechanism, static test mechanism, dynamic test mechanism and PIN needle test mechanism can change or delete the test process according to the importance of the test items, and the order of steps two to five can be freely switched and combined.
[0021] The present invention has the following beneficial effects:
[0022] The present invention has more efficient material feeding and discharging and test speed, wherein the test sequence and test items can be freely adjusted according to user needs, the test items are more flexible, and dual-channel loading and unloading types are simultaneously adopted in the material feeding and discharging and test mechanism, which speeds up the test efficiency and improves the test accuracy. The fully automated test process replaces manual testing, which saves more time and effort and reduces the cost of employing personnel;
[0023] The dust removal and anti-static steps of the packaging box are added to the packaging and shipping process to avoid the problem that the IGBT module will be damaged due to electrostatic dust after testing. At the same time, the successful separation of the box cover is guaranteed to prevent the machine from getting stuck due to incomplete separation of the box cover, which requires a longer time to solve the maintenance problem. All processes can be completed without human intervention, with low human resource investment and reduced costs.
[0024] Most of the mechanisms have adopted a dual-channel approach, which greatly improves the efficiency of the operating process. For example, the feeding mechanism is equipped with a discharging transverse cylinder and a recovery transverse cylinder, which enables the manipulators of the process tooling and the subsequent processes to act on the same position, and only adjust the position of the discharging layer and the recovery layer through the discharging transverse cylinder and the recovery transverse cylinder. The safety testing mechanism can load and unload materials alternately. After one IGBT module is tested, it replaces the next IGBT module and starts testing when it is ready to unload. This greatly reduces the waiting time of the testing mechanism and improves work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0026] Figure 2 It is a structural schematic diagram of the feeding mechanism of the present invention;
[0027] Figure 3 It is a schematic diagram of the back structure of the feeding mechanism of the present invention;
[0028] Figure 4 It is a structural schematic diagram of the safety test mechanism of the present invention;
[0029] Figure 5 It is a structural schematic diagram of the detection platform of the present invention;
[0030] Figure 6 It is a schematic diagram of the bottom structure of the detection platform of the present invention;
[0031] Figure 7 It is a structural schematic diagram of the PIN needle testing mechanism of the present invention;
[0032] Figure 8 It is a schematic diagram of the back structure of the PIN needle testing mechanism of the present invention;
[0033] Fig. 9 It is a structural schematic diagram of the cleaning mechanism of the present invention;
[0034] Fig.10 The present invention Figure 1 The enlarged structural diagram of the box cover separation mechanism at A in the middle;
[0035] Fig.11It is a structural schematic diagram of the label packaging mechanism and the tape packaging mechanism of the present invention;
[0036] Fig.12 This is the front side of the IGBT module tested by the present invention ( Fig.12 top) and back ( Fig.12 Schematic diagram below.
[0037] In the figure: 1. Feeding mechanism, 11. Feeding material warehouse, 12. Recycling material warehouse, 13. Process tooling, 14. Discharging track, 141. Discharging layer, 1411. First discharging layer, 1412. Second discharging layer, 1413. Discharging transverse cylinder, 142. Recycling layer, 1421. First recycling layer, 1422. Second recycling layer, 1423. Recycling transverse cylinder, 2. Testing mechanism, 21. Safety testing mechanism, 211. Testing platform, 2111. First testing platform, 2111 1. First hollow part, 2112. Second detection platform, 21121. Second hollow part, 2113. Safety switch track, 21131. Upper track, 21132. Lower track, 212. Cylinder group, 2121. Moving cylinder, 2122. Discharging cylinder, 2123. Detection cylinder, 213. Needle bed, 22. PIN needle test mechanism, 221. Positioning device, 2211. Turning platform, 2212. Fixed bracket, 2213. Horizontal positioning module, 22131. Horizontal track, 22132, horizontal movement motor, 2214, longitudinal positioning module, 22141, longitudinal track, 22142, longitudinal movement motor, 2215, flip cylinder, 2216, block, 222, laser detector, 223, light shield, 224, display structure, 23, static test mechanism, 24, dynamic test mechanism, 3, cleaning mechanism, 31, tray feeding port, 32, dust removal and cleaning mechanism, 4, discharge mechanism, 41, packaging box feeding end, 411, loading port, 42. Packaging tooling, 421. Box cover separation mechanism, 4211. Control structure, 42111. Connecting block, 42112. Vertical cylinder, 42113. Grasping cylinder, 4212. Vacuum suction cup, 4213. Top block, 4214. Grasping device, 422. Label packaging mechanism, 423. Tape packaging mechanism, 43. Packaging box delivery end, 431. Delivery port, 5. Mobilizing robot, 6. Control panel, 61. Display screen, 62. Control button, 7. NG unloading station. DETAILED DESCRIPTION
[0038] The present invention is further described below in conjunction with the accompanying drawings and implementation modes.
[0039] like Figure 1-11As shown, the present invention is an IGBT power module final inspection test workstation, comprising a feeding mechanism 1, a testing mechanism 2, a cleaning mechanism 3, a discharging mechanism 4 and a plurality of manipulators 5; the testing mechanism 2 comprises a safety testing mechanism 21 and a PIN needle testing mechanism 22, the safety testing mechanism 21 and the PIN needle testing mechanism 22 are installed at the rear side of the entire workstation and are transported by the manipulator 5; the safety testing mechanism 21 comprises a detection platform 211, a cylinder group 212 and a needle bed 213 which can be used for switching the test of the IGBT module, the cylinder group 212 is connected to the lower part of the detection platform 211, the needle bed 213 is installed above the detection platform 211 and below the cylinder group 212 A servo motor for controlling the lifting is provided on the side. When the tested module reaches the bottom of the test frame, the detection cylinder 2123 will push the tested module upward to contact the test pin of the needle bed 213. After the test is completed, the tested module is carried back to the first detection platform 2111 or the second detection platform 2112 for unloading. The first detection platform 2111 and the second detection platform 2112 are both provided with a separate moving cylinder 2121. The two cylinders have clear division of labor and do not interfere with each other, and the work efficiency is high; the PIN needle testing mechanism 22 includes a positioning device 221 and a laser detector 222. The IGBT module is clamped on the positioning device 221, and the laser detector 222 is installed on the positioning device 221. The IGBT module on the positioning device 221 is transported by mobilizing the manipulator 5. The positioning device 221 drives the horizontal rail 22131 to control the fixed bracket 2212 to move on the X-axis through the horizontal moving motor 22132, and drives the longitudinal rail 22141 to control the fixed bracket 2212 to move on the Y-axis through the longitudinal moving motor 22142, so that the fixed bracket 2212 can be positioned at any position on the platform, thereby improving the detection flexibility. The area of the pressing block 2216 can press a corner of the IGBT module through vertical pressure, and will not block the PIN needle of the IGBT module, and will not affect the PIN needle detection; feeding mechanism 1 includes a feed warehouse 11 and a recycling warehouse 12, a process tooling 13 is arranged between the feed warehouse 11 and the recycling warehouse 12, the process tooling 13 connects the feed warehouse 11 and the recycling warehouse 12, the feed mechanism 1 also includes a discharge track 14, the IGBT module on the discharge track 14 is transferred to the test mechanism 2 by mobilizing the manipulator 5, the feed warehouse 11 and the recycling warehouse 31 can be adjusted according to the specific engineering quantity, the warehouse is provided with a warehouse frame, the warehouse frame is responsible for the installation of the control panel 6 and the routing of various lines, the back of the warehouse is provided with a baffle but the side of the warehouse is not provided with a baffle, so that the equipment can be conveniently fixed while ensuring heat dissipation safety, and the warehouse is more flexible;The cleaning mechanism 3 includes a tray material taking port 31 and a dust removal and cleaning mechanism 32. The manipulator 5 is mobilized to transfer the IGBT module on the test mechanism 2 to the tray material taking port 31. The tray material taking port 31 is connected to the dust removal and cleaning mechanism 32. The dust removal and cleaning mechanism 32 is connected to the material discharging mechanism 4. The dust removal and cleaning mechanism 32 adds dust removal and static removal steps to the packaging box in the packaging and shipping process, avoiding the problem that the IGBT module will be damaged due to static dust after testing; the laser detector 222 first detects the PIN pin on the front of the IGBT module, and the second detects the backplane curvature on the back of the IGBT module. ;
[0040] The testing mechanism also includes a static testing mechanism 23 and a dynamic testing mechanism 24. The static testing mechanism 23, the dynamic testing mechanism 24 and other mechanisms transport the IGBT module by mobilizing the manipulator 5. The static testing mechanism 23 and the dynamic testing mechanism 24 are installed around the safety testing mechanism 21; the detection platform 211 includes a first detection platform 2111, a second detection platform 2112 and a safety switching track 2113. The first detection platform 2111 and the second detection platform 2112 are both connected to the safety switching track 2113. The IGBT modules transported by the manipulator 5 are placed on the first inspection platform 2111 and the second inspection platform 2112, and the needle bed 213 is installed above the first inspection platform 2111; the cylinder group 212 includes a moving cylinder 2121, a discharging cylinder 2122 and a detection cylinder 2123, the detection cylinder 2123 is installed below the needle bed 213, and the discharging cylinder 2122 is installed on the other side of the detection cylinder 2123, and the first inspection platform 2111 and the second inspection platform 2112 are both connected to the moving cylinder 2121; The positioning device 221 includes a flip platform 2211, a fixed bracket 2212, a lateral positioning module 2213 and a longitudinal positioning module 2214; the lateral positioning module 2213 includes a lateral track 22131 and a lateral moving motor 22132, the lateral track 22131 and the lateral moving motor 22132 are connected, and the fixed bracket 2212 is installed on the lateral track 22131; the longitudinal positioning module 2214 includes a longitudinal track 22141 and a longitudinal moving motor 22142, the longitudinal track 22141 and the longitudinal moving motor 22142 are connected. The motor 22142 is connected, the transverse track 22131 is arranged above the longitudinal track 22141, the flipping platform 2211 is installed on the fixed bracket 2212, the flipping platform 2211 is connected to a flipping cylinder 2215 and a pressure block 2216, and a heating module and a cooling module are provided on the carrier for installing and mobilizing the manipulator 5. The heating module and the cooling module are arranged in front of the dynamic testing mechanism 24. Before the dynamic test, the heating module and the cooling module need to heat and cool the IGBT module for testing the heat resistance of the IGBT module.
[0041] The discharging mechanism 4 comprises a packaging box feeding end 41, a packaging tool 42 and a packaging box shipping end 43, wherein the packaging tool 42 comprises a box cover separation mechanism 421, a label packaging mechanism 422 and a tape packaging mechanism 423, the box cover separation mechanism 421, the label packaging mechanism 422 and the tape packaging mechanism 423 are connected in sequence, the packaging box feeding end 41 is connected to the box cover separation mechanism 421, the packaging box shipping end 43 is connected to the tape packaging mechanism 423, the box cover separation mechanism 421 is connected to the dust removal and cleaning mechanism 32, a loading port 411 is provided on the packaging box feeding end 41, and a shipping port 431 is provided on the packaging box shipping end 43, which ensures the success of the box cover separation, prevents the machine from getting stuck due to incomplete box cover separation, and requires a longer time to solve the maintenance problem, and all processes can be completed without human participation, with low human resource investment and reduced costs, and the dust removal and cleaning mechanism 32, the box cover separation mechanism 421, the label packaging mechanism 422 and the tape packaging mechanism 423 are connected in sequence through a conveying track.
[0042] The box cover separation mechanism 421 includes a control structure 4211, a vacuum suction cup 4212, a top block 4213 and a gripping device 4214, which are all mounted on the control structure 4211. The control structure 4211 includes a connecting block 42111, a vertical cylinder 42112 and a gripping cylinder 42113, the vertical cylinder 42112 is mounted in the middle of the upper side of the connecting block 42111, the vacuum suction cup 4212 and the top block 4213 are arranged on the lower side of the connecting block 42111, the gripping device 4214 is arranged at the diagonal of the connecting block 42111, the gripping cylinder 42113 is mounted on the upper side of the connecting block 42111, and the gripping cylinder 42113 is connected to the gripping device 4214. In specific implementation, the vacuum suction cup 4212 plays a role in improving the success rate of box cover separation and the installation of the packaging box cover. When the control knot 4211 puts the box cover back to the bottom of the box, the vertical cylinder 42112 will press down the box cover, and the vacuum suction cup 4212 will release the box cover to prevent the box cover from warping and gaps after the box cover is completed.
[0043] The discharging track 14 includes a discharging layer 141 and a recycling layer 142. The discharging layer 141 includes a first discharging layer 1411 and a second discharging layer 1412. The first discharging layer 1411 is located below the second discharging layer 1412, and the second discharging layer 1412 is higher than the first discharging layer 1411. The first discharging layer 1411 and the second discharging layer 1412 are provided with a discharging transverse displacement cylinder 1413, and the discharging transverse displacement cylinder 1413 is fixed to the side of the discharging layer 141; the recycling layer 142 includes a first recycling layer 1421 and a second recycling layer 1422. The first recycling layer 1421 is located below the second recycling layer 1422, and the second recycling layer 1422 is higher than the first recycling layer 1421. The first recycling layer 1421 and the second recycling layer 1422 are provided with a recycling transverse displacement cylinder 1423, and the recycling transverse displacement cylinder 1423 is fixed to the side of the recycling layer 142. By setting two discharging layers and a recycling layer, only When working, a process tool 13 can have enough time to recover and place the pallet, and there will be no problem of time wasting due to the process tool 13 having no time to recover the pallet due to the too fast discharge or the lack of the outgoing pallet on the discharge track 14 when the pallet is recovered. This improves the working smoothness and efficiency of the machine. The setting of the discharge transverse movement cylinder 1413 and the recovery transverse movement cylinder 1423 can make the process tool 13 and the subsequent process mobilization manipulator 5 only need to act on the same position, and only adjust the displacement of the discharge layer and the recovery layer through the discharge transverse movement cylinder 1413 and the recovery transverse movement cylinder 1423. In actual use, the discharge transverse movement cylinder 1413 and the recovery transverse movement cylinder 1423 only push and pull back the second discharge layer 1412 and the second recovery layer 1422. The mobilization manipulator 5 and the process tool 13 only need to clamp the pallet and the module at the position of the first discharge layer 1411 and the first recovery layer 1421.
[0044] The PIN needle testing mechanism 22 also includes a light shield 223 and a display structure 224; the display structure 224 is installed on the back of the light shield 223, the light shield 223 is covered on the laser detector 222, and the display structure 224 is connected to the laser detector 222. The laser generated by the laser detector 222 will affect the human eye, and excessive exposure will cause irreparable damage. In order to prevent the laser from directly hitting the human eye, a light shield 223 is installed on the non-active surface of the laser detector 222. The inner side of the light shield 223 is coated with an absorption layer to reduce the reflection inside the light shield 223 to prevent the reflected light from affecting the detection accuracy. The PIN needle detection results are mainly viewed through the display structure 224 on the back of the light shield 223 of the laser detector 222, which can prevent the laser from causing damage to the human eye.
[0045] The safety switching track 2113 includes an upper track 21131 and a lower track 21132. A first hollow portion 21111 is provided on the first detection platform 2111, and a second hollow portion 21121 is provided on the second detection platform 2112. The first hollow portion 21111 is located in the middle of the first detection platform 2111, and the second hollow portion 21121 is located in the middle of the second detection platform 2112. The discharging cylinder 2122 and the detection cylinder 2123 push the IGBT module through the first hollow portion 21111 and the second hollow portion 21121. The connection method between the first detection platform 2111 and the upper track 21131 is a normal lower track type, and the connection method between the second detection platform 2112 and the lower track 21132 is an inverted suspension type. This setting method can reduce the occupied vertical space. At the same time, the upper and lower layers of the track will not collide when loading and unloading materials alternately, thereby ensuring efficiency and maximizing space utilization.
[0046] The feeding mechanism 1, the safety testing mechanism 21, the static testing mechanism 23, the dynamic testing mechanism 24, the PIN needle testing mechanism 22, the cleaning mechanism 3 and the discharging mechanism 4 are all provided with a control panel 6 and an NG unloading station 7. The control panel 6 includes a display screen 61 and a control button 62. The NG unloading station 7 has a large accommodating area and is divided into two unloading ports, which further improves the unloading efficiency. The user can view the equipment operation status on the control panel 6 by inputting the control and setting of the equipment through the control button 62.
[0047] An IGBT power module final inspection test workstation and a test method thereof, specifically comprising the following steps:
[0048] Step 1: Push the trolley with the pallet of IGBT modules into the feed bin 11 of the feed mechanism 1 and snap it onto the wall of the feed bin 11, then push the empty trolley to the recycling bin 12 of the feed mechanism 1 and snap it onto the wall of the recycling bin 12. At this time, the pallet is located below the process tooling 13, and the process tooling 13 is lowered to the pallet on the trolley along with the track belt of the process tooling 13. The process tooling 13 covers the pallet, and the clamping parts on the process tooling 13 tighten the pallet around. Subsequently, the process tooling 13 moves to the discharge track 14 through the transverse track, and the process tooling 13 places the pallet on the first discharge layer 1411 or the second discharge layer 1412 of the discharge track 14. The pallets on the first discharge layer 1411 and the second discharge layer 1412 are grabbed by the manipulator 5 and perform the discharge operation in turn. The tray is grabbed to one of the mechanisms in the test mechanism 2 to start the IGBT module performance test. The process tooling 13 will place the tray on the empty discharge layer 141. The NG IGBT module will be mobilized by the robot 5 to be recovered to the NG unloading station 7, and the tray that has been discharged on the first recycling layer 1421 or the second recycling layer 1422 on the recycling layer 142 will be clamped and transferred to the trolley on the recycling material warehouse 12 through the process tooling 13. The discharge transverse cylinder 1413 on the discharge layer 141 will push and pull back the first discharge layer 1411 and the second discharge layer 1412 to switch and move back and forth for discharge. The recovery transverse cylinder 1423 on the recovery layer 142 will push and pull back the first recovery layer 1421 and the second recovery layer 1422 to enable them to move back and forth. After the recycling trolley is full of trays, the worker takes the trolley out from the recycling material warehouse 12;
[0049] Step 2: Move the manipulator 5 to place the captured IGBT module on the first detection platform 2111 of the safety test mechanism 21. The movable cylinder 2121 on the first detection platform 2111 pushes the first detection platform 2111 to move to the upper track 21131 below the needle bed 213. At this time, the movable cylinder 2121 on the second detection platform 2112 pushes the second detection platform 2112 to move to the lower track 21132 at the inlet and outlet. The discharge cylinder 2122 pushes up through the second hollow part 21121 to receive the second IGBT module. At the same time, the detection cylinder 2123 pushes up through the first hollow part 21111 to push the first IGBT module on the first detection platform 2111 onto the needle bed 213 to start the discharge test. After the test is completed, the detection cylinder 2123 recovers the first IGBT module and places it on the first detection platform 2111, and the discharging cylinder 2122 also recovers the second IGBT module and places it on the second detection platform 2112. The moving cylinder 2121 pushes the first detection platform 2111 and the second detection platform 2112 to exchange positions, and the first detection platform 2111 returns to the loading and unloading position. The first IGBT module on the first detection platform 2111 is unloaded to the next test mechanism 2 by the manipulator 5 and receives the third IGBT module. The second detection platform 2112 arrives below the needle bed 213, and the second IGBT module on the second detection platform 2112 is subjected to leakage current detection under high voltage conditions. The alternating loading and unloading and detection are repeated in this way;
[0050] Step 3: Move the manipulator 5 to place the IGBT module on the flip platform 2211 of the PIN needle test mechanism 22. The IGBT module is fixed on the flip platform 2211 by the pressing block 2216. At this time, the fixed bracket 2212 is moved on the horizontal track 22131 and the vertical track 22141 to reach the detection area through the horizontal moving motor 22132 and the vertical moving motor 22142. The laser detector 222 is started and detects the position of the front PIN needle. The display structure 224 displays the detection results in real time on the back side of the light shield 223. When the laser detector 222 completes the detection Finally, the flipping platform 2211 is flipped by the flipping cylinder 2215, so that the back curvature of the IGBT module faces the laser detector 222, and the fixed bracket 2212 is moved on the horizontal track 22131 and the longitudinal track 22141 to reach the detection area by the horizontal moving motor 22132 and the longitudinal moving motor 22142 again, and the laser detector 222 performs a back curvature detection on it. After the detection is completed, the pressing block 2216 releases the IGBT module, and the manipulator 5 is mobilized to move the qualified IGBT module out of the detection mechanism or place the unqualified IGBT module to the NG unloading station 7;
[0051] Step 4: Before the static test, the manipulator 5 is mobilized to release the IGBT module to the heating module, and the IGBT module is first placed on the heating table and heated to 150 degrees. After heating, the IGBT module is subjected to a static test. After the test, the manipulator 5 is mobilized to place the IGBT module in the cooling module for cooling. After the test, the manipulator 5 is mobilized to remove the qualified IGBT module from the testing mechanism or to place the unqualified IGBT module to the NG unloading station 7;
[0052] Step 5: Before the dynamic test, the manipulator 5 is mobilized to release the IGBT module to the heating module, and the IGBT module is first placed on the heating table and heated to 150 degrees. After heating, the IGBT module is dynamically tested. After the test, the manipulator 5 is mobilized to place the IGBT module in the cooling module for cooling. After the test, the manipulator 5 is mobilized to remove the qualified IGBT module from the testing mechanism or place the unqualified IGBT module to the NG unloading station 7;
[0053] Step 6: The IGBT power module that has completed the test is grabbed by the manipulator 5 and placed on the tray picking port 31, and the packaging box is placed on the loading port 411 of the packaging box feeding end 41, and the packaging box will be transported to the box cover separation mechanism 421. At this time, the vertical cylinder 42112 of the box cover separation mechanism 421 is started, and the connecting block 42111 is pushed downward until the vacuum suction cup 4212 sucks the top suction position of the packaging box. At the same time, the top block 4213 supports the fixed block at the front end of the packaging box, and the grabbing cylinder 42113 at the diagonal of the connecting block 42111 controls the grabbing device 4214 to buckle the inner groove at the diagonal of the packaging box. The top block 4213 fixes the fixed block of the packaging box, and the fixed block and the bottom of the packaging box are the same body. The bottom of the packaging box is fixed in place, and the suction force of the vacuum suction cup 4212 and the upward grabbing force of the grabbing device 4214 lift the upper cover of the packaging box. After that, The bottom of the packaging box with the box lid separated is transported to the dust removal and cleaning mechanism 32, which performs ion dust removal and simple cleaning on the bottom of the packaging box to eliminate static electricity of the packaging box. The IGBT module is loaded into the cleaned and destaticized bottom of the packaging box at the tray feeding port 31. After the position of the packaging box bottom is full, the packaging box bottom is transported again to the box lid separation mechanism 421, and the control structure 4211 releases the box lid to the packaging box bottom, and at the same time, the box lid and the box bottom are closed and fixed, and the closed packaging box is transported to the label packaging mechanism 422, and the label packaging mechanism 422 pastes labels on the packaging box and performs qualification inspection on the pasted labels. After the label inspection is completed, the packaging box is transported to the tape packaging mechanism 423 for side tape packaging, and then the packaging box reaches the packaging box shipping end 43 and is stacked, and all the packaging boxes are taken out and shipped from the shipping port 431 manually or by AGV.
[0054] The manipulator 5 is arranged between each test mechanism 2 or at the inner corner where the test mechanism 2 is connected. The manipulator 5 is used to dispatch the IGBT modules on the safety test mechanism 21, the static test mechanism 23, the dynamic test mechanism 24 and the PIN needle test mechanism 22; the safety test mechanism 21, the static test mechanism 23, the dynamic test mechanism 24 and the PIN needle test mechanism 22 can change or delete the test process according to the importance of the test items, and the order of steps 2 to 5 can be freely switched and combined.
[0055] The various embodiments in the specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0056] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A test method for an IGBT power module final inspection test workstation, characterized in that: It includes a feeding mechanism (1), a testing mechanism (2), a cleaning mechanism (3), a discharging mechanism (4) and a plurality of manipulators (5); The testing mechanism (2) comprises a safety testing mechanism (21) and a PIN needle testing mechanism (22); the safety testing mechanism (21) and the PIN needle testing mechanism (22) are installed at the rear side of the entire workstation and are transported by mobilizing a manipulator (5); The safety test mechanism (21) comprises a test platform (211) that can be used to switch and test the IGBT module, a cylinder group (212) and a needle bed (213), the cylinder group (212) is connected to the lower part of the test platform (211), and the needle bed (213) is installed above the test platform (211); The PIN needle testing mechanism (22) comprises a positioning device (221) and a laser detector (222), the IGBT module is clamped on the positioning device (221), the laser detector (222) is installed above the positioning device (221), and the IGBT module on the positioning device (221) is transported by mobilizing a manipulator (5); The feeding mechanism (1) comprises a feeding material storehouse (11) and a recycling material storehouse (12), a process tooling (13) is provided between the feeding material storehouse (11) and the recycling material storehouse (12), the process tooling (13) connecting the feeding material storehouse (11) and the recycling material storehouse (12), the feeding mechanism (1) further comprises a discharging track (14), and the IGBT module on the discharging track (14) is transferred to the testing mechanism (2) by mobilizing a manipulator (5); The cleaning mechanism (3) comprises a tray material taking port (31) and a dust removal and cleaning mechanism (32); the manipulator (5) is mobilized to transfer the IGBT module on the test mechanism (2) to the tray material taking port (31); the tray material taking port (31) is connected to the dust removal and cleaning mechanism (32); and the dust removal and cleaning mechanism (32) is connected to the discharge mechanism (4); The testing mechanism further comprises a static testing mechanism (23) and a dynamic testing mechanism (24); the static testing mechanism (23), the dynamic testing mechanism (24) and other mechanisms are used to transport the IGBT module by mobilizing a manipulator (5); the static testing mechanism (23) and the dynamic testing mechanism (24) are installed around the safety testing mechanism (21); The detection platform (211) comprises a first detection platform (2111), a second detection platform (2112) and a safety switch track (2113); the first detection platform (2111) and the second detection platform (2112) are both connected to the safety switch track (2113); an IGBT module transported by mobilizing a manipulator (5) is placed on the first detection platform (2111) and the second detection platform (2112); the needle bed (213) is installed above the first detection platform (2111); the cylinder group (212) comprises a moving cylinder (2121), a discharging cylinder (2122) and a detection cylinder (2123); the detection cylinder (2123) is installed below the needle bed (213); the discharging cylinder (2122) is installed on the other side of the detection cylinder (2123); the first detection platform (2111) and the second detection platform (2112) are both connected to the moving cylinder (2121); The positioning device (221) comprises a flipping platform (2211), a fixed bracket (2212), a transverse positioning module (2213) and a longitudinal positioning module (2214); the transverse positioning module (2213) comprises a transverse track (22131) and a transverse moving motor (22132), the transverse track (22131) and the transverse moving motor (22132) are connected, and the fixed bracket (2212) is mounted on the transverse track (22131); the longitudinal positioning module (2214) comprises a longitudinal track (22141) and a longitudinal moving motor (22142), the longitudinal track (22141) and the longitudinal moving motor (22142) are connected, the transverse track (22131) is arranged above the longitudinal track (22141), the flipping platform (2211) is mounted on the fixed bracket (2212), and the flipping platform (2211) is connected to a flipping cylinder (2215) and a pressing block (2216); The discharging mechanism (4) comprises a packaging box feeding end (41), a packaging tool (42) and a packaging box delivery end (43), wherein the packaging tool (42) comprises a box cover separation mechanism (421), a label sealing mechanism (422) and a tape sealing mechanism (423), the box cover separation mechanism (421), the label sealing mechanism (422) and the tape sealing mechanism (423) are connected in sequence, the packaging box feeding end (41) is connected to the box cover separation mechanism (421), the packaging box delivery end (43) is connected to the tape sealing mechanism (423), the box cover separation mechanism (421) is connected to the dust removal and cleaning mechanism (32), the packaging box feeding end (41) is provided with a feeding port (411), and the packaging box delivery end (43) is provided with a delivery port (431); The box cover separation mechanism (421) comprises a control structure (4211), a vacuum suction cup (4212), a top block (4213) and a gripping device (4214); the top block (4213), the vacuum suction cup (4212) and the gripping device (4214) are all mounted on the control structure (4211); the control structure (4211) comprises a connecting block (42111), a vertical cylinder (42112) and a gripping cylinder (42113). ), a vertical cylinder (42112) is installed in the middle of the upper side of the connecting block (42111), a vacuum suction cup (4212) and a top block (4213) are arranged on the lower side of the connecting block (42111), a grasping device (4214) is arranged at the diagonal of the connecting block (42111), a grasping cylinder (42113) is installed on the upper side of the connecting block (42111), and the grasping cylinder (42113) is connected to the grasping device (4214); The discharge track (14) comprises a discharge layer (141) and a recovery layer (142); the discharge layer (141) comprises a first discharge layer (1411) and a second discharge layer (1412); the first discharge layer (1411) is located below the second discharge layer (1412); the second discharge layer (1412) is higher than the first discharge layer (1411); a discharge transverse displacement cylinder (1413) is provided on the first discharge layer (1411) and the second discharge layer (1412); and the discharge transverse displacement cylinder (1413) is fixed to a side of the discharge layer (141); The recycling layer (142) comprises a first recycling layer (1421) and a second recycling layer (1422), wherein the first recycling layer (1421) is located below the second recycling layer (1422), and the second recycling layer (1422) is higher than the first recycling layer (1421), and both the first recycling layer (1421) and the second recycling layer (1422) are provided with a recycling transverse movement cylinder (1423), and the recycling transverse movement cylinder (1423) is fixed on a side of the recycling layer (142); The PIN needle testing mechanism (22) further comprises a light shield (223) and a display structure (224); The display structure (224) is installed on the back of the light shield (223), the light shield (223) is covered on the laser detector (222), and the display structure (224) is connected to the laser detector (222); The safety switch track (2113) comprises an upper track (21131) and a lower track (21132); a first hollow portion (21111) is provided on the first detection platform (2111); a second hollow portion (21121) is provided on the second detection platform (2112); the first hollow portion (21111) is located in the middle of the first detection platform (2111); the second hollow portion (21121) is located in the middle of the second detection platform (2112); the discharge cylinder (2122) and the detection cylinder (2123) push the IGBT module through the first hollow portion (21111) and the second hollow portion (21121); The feeding mechanism (1), the safety test mechanism (21), the static test mechanism (23), the dynamic test mechanism (24), the PIN needle test mechanism (22), the cleaning mechanism (3) and the discharging mechanism (4) are all provided with a control panel (6) and an NG unloading station (7), and the control panel (6) comprises a display screen (61) and control buttons (62); The test method applied to the IGBT power module final inspection test workstation specifically includes the following steps: Step 1: Push the trolley with the tray of IGBT modules into the feed bin (11) of the feed mechanism (1) and snap it onto the wall of the feed bin (11), then push the empty trolley to the recycling bin (12) of the feed mechanism (1) and snap it onto the wall of the recycling bin (12). At this time, the tray is located below the process tooling (13), and the process tooling (13) is lowered to the tray on the trolley along the track belt of the process tooling (13). 3) Covering on the pallet, the clamping parts on the process tooling (13) tighten the four sides of the pallet, and then the process tooling (13) moves to the discharge track (14) through the transverse track, and the process tooling (13) places the pallet on the first discharge layer (1411) or the second discharge layer (1412) of the discharge track (14). The pallets on the first discharge layer (1411) and the second discharge layer (1412) are grabbed by the manipulator (5) and the discharge operation is performed in turn. The pallet is grabbed by one of the mechanisms in the test mechanism (2) to start the IGBT module performance test. The process tooling (13) will place the pallet on the empty discharge layer (141). The NG IGBT module will be mobilized by the robot (5) to be recovered to the NG unloading station (7), and the process tooling (13) will grab the discharged pallet on the first recovery layer (1421) or the second recovery layer (1422) on the recovery layer (142) and transfer it to the recovery material warehouse (12). In the trolley on the upper part, the discharging transverse movement cylinder (1413) on the discharging layer (141) will push and pull back the first discharging layer (1411) and the second discharging layer (1412) to switch and move the discharging back and forth, and the recycling transverse movement cylinder (1423) on the recycling layer (142) will push and pull back the first recycling layer (1421) and the second recycling layer (1422) to enable them to move back and forth. After the recycling trolley is filled with pallets, the worker takes the trolley out from the recycling material warehouse (12); Step 2: The robot (5) is mobilized to place the captured IGBT module on the first detection platform (2111) of the safety test mechanism (21). The movable cylinder (2121) on the first detection platform (2111) pushes the first detection platform (2111) to move to the upper track (21131) below the needle bed (213). At this time, the movable cylinder (2121) on the second detection platform (2112) pushes the second detection platform (2112) to move to the lower track (21132) at the inlet and outlet. The discharge cylinder (2122) pushes up through the second hollow part (21121) to receive the second IGBT module. At the same time, the detection cylinder (2123) pushes up through the first hollow part (21111) to push the first IGBT module on the first detection platform (2111) onto the needle bed (213) to start Discharge test: after the test is completed, the detection cylinder (2123) recycles the first IGBT module and places it on the first detection platform (2111); the discharge cylinder (2122) also recycles the second IGBT module and places it on the second detection platform (2112); the moving cylinder (2121) pushes the first detection platform (2111) and the second detection platform (2112) to exchange positions; the first detection platform (2111) returns to the inlet and outlet; the first IGBT module on the first detection platform (2111) is discharged to the next test mechanism (2) by the manipulator (5) and receives the third IGBT module; the second detection platform (2112) reaches below the needle bed (213); the second IGBT module on the second detection platform (2112) is subjected to leakage current detection under high voltage conditions; and the alternating inlet and outlet and detection are repeated in this way; Step 3: The manipulator (5) is mobilized to place the IGBT module on the flip platform (2211) of the PIN needle test mechanism (22). The IGBT module is fixed on the flip platform (2211) by the pressing block (2216). At this time, the fixed bracket (2212) is moved on the horizontal track (22131) and the vertical track (22141) to reach the detection area through the horizontal movement motor (22132) and the vertical movement motor (22142). The laser detector (222) is started and the front PIN needle position is detected. The display structure (224) displays the detection result in real time on the back side of the light shield (223). When the laser detector (222) detects After completion, the flipping platform (2211) is flipped by the flipping cylinder (2215) so that the back curvature of the IGBT module faces the laser detector (222), and the fixed bracket (2212) is moved on the transverse track (22131) and the longitudinal track (22141) to reach the detection area by the transverse moving motor (22132) and the longitudinal moving motor (22142), and the laser detector (222) performs a back curvature detection on it. After the detection is completed, the pressing block (2216) releases the IGBT module, and the manipulator (5) is mobilized to move the qualified IGBT module out of the detection mechanism or place the unqualified IGBT module to the NG unloading station (7); Step 4: Before the static test, the manipulator (5) is mobilized to release the IGBT module to the heating module, and the IGBT module is first placed on the heating table and heated to 150 degrees. After heating, the IGBT module is subjected to a static test. After the test, the manipulator (5) is mobilized to place the IGBT module in the cooling module for cooling. After the test is completed, the manipulator (5) is mobilized to remove the qualified IGBT module from the testing mechanism or to place the unqualified IGBT module to the NG unloading station (7); Step 5: Before the dynamic test, the manipulator (5) is mobilized to release the IGBT module to the heating module, and the IGBT module is first placed on the heating table and heated to 150 degrees. After heating, the IGBT module is dynamically tested. After the test, the manipulator (5) is mobilized to place the IGBT module in the cooling module for cooling. After the test is completed, the manipulator (5) is mobilized to remove the qualified IGBT module from the testing mechanism or to place the unqualified IGBT module to the NG unloading station (7); Step 6: The IGBT power module that has completed the test is grabbed by the manipulator (5) and placed on the tray pick-up port (31), and the packaging box is placed on the loading port (411) of the packaging box feeding end (41). The packaging box will be transported to the box cover separation mechanism (421). At this time, the vertical cylinder (42112) of the box cover separation mechanism (421) is started to push the connection block (42111) downward until the vacuum suction cup (4212) sucks the top suction position of the packaging box. At the same time, the top block (4213) presses against the fixed block at the front end of the packaging box, and the grabbing cylinder (42113) at the diagonal of the connecting block body (42111) controls the grabbing device (4214) to buckle the inner groove at the diagonal of the packaging box. The top block (4213) fixes the fixed block of the packaging box, and the fixed block and the bottom of the packaging box are the same body. The bottom of the packaging box is fixed in place, and the suction force of the vacuum suction cup (4212) and the upward grabbing force of the grabbing device (4214) lift the upper cover of the packaging box. The bottom of the packaging box with the box cover separated is then transported to a dust removal and cleaning mechanism (32). The dust removal and cleaning mechanism (32) performs ion dust removal and simple cleaning on the bottom of the packaging box to eliminate static electricity on the packaging box. The IGBT module is loaded into the bottom of the packaging box that has been cleaned and de-staticized at the tray loading port (31). After the bottom of the packaging box is full, the bottom of the packaging box is transported to the box cover separation mechanism (421) again. The control structure (4211) releases the box cover onto the bottom of the packaging box and simultaneously covers and fixes the box cover and the bottom of the packaging box. The covered packaging box is transported to a label packaging mechanism (422). The label packaging mechanism (422) affixes a label to the packaging box and performs a qualification test on the affixed label. After the label test is completed, the packaging box is transported to a tape packaging mechanism (423) for side tape packaging. Then, the packaging box reaches the packaging box delivery end (43) and is stacked. All packaging boxes are taken out from the delivery port (431) manually or by an AGV.
2. The test method of the IGBT power module final inspection test workstation according to claim 1, characterized in that: The manipulator (5) is arranged between the various test mechanisms (2) or at the inner corner where the test mechanisms (2) are connected, and the manipulator (5) is used to dispatch the IGBT modules on the safety test mechanism (21), the static test mechanism (23), the dynamic test mechanism (24) and the PIN needle test mechanism (22); The safety test mechanism (21), the static test mechanism (23), the dynamic test mechanism (24) and the PIN test mechanism (22) can change or delete the test process according to the importance of the test items, and the order of steps 2 to 5 can be freely switched and combined.