A shield tunnel structure

By integrating the vacuum tube with the tunnel lining, the problem of tunnel cross-section enlargement in vacuum pipeline tunnel structures is solved, achieving space saving and reduced engineering costs, while improving the stability and safety of the tunnel.

CN115492611BActive Publication Date: 2024-11-12CHINA RAILWAY ENG CONSULTING GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211104990.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-09
Publication Date
2024-11-12
Estimated Expiration
2042-09-09

AI Technical Summary

Technical Problem

In existing high-speed vacuum pipeline tunnel structures, the separation of the vacuum tube from the tunnel lining leads to an enlarged tunnel cross-section, increasing project costs and space requirements.

Method used

The structure adopts a design that integrates vacuum tubes with the tunnel lining. Positioning and reinforcement devices ensure that the vacuum tubes are tightly fitted to the tunnel lining, forming an integral load-bearing structure, reducing the tunnel cross-section and saving space.

Benefits of technology

This reduces the tunnel cross-section, lowers project investment, and simultaneously improves the tunnel's stability and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115492611B_ABST
    Figure CN115492611B_ABST
Patent Text Reader

Abstract

The present invention provides a shield tunnel structure. It includes: a plurality of shield segments, a tunnel secondary lining, a vacuum tube and a plurality of positioning devices; the plurality of shield segments are connected to each other in the axial direction and the circumferential direction to form a circular tunnel with a preset length; the vacuum tube is arranged on the inner side of the shield segment, and a gap of a preset length is provided between the outer surface of the vacuum tube and the inner surface of the shield segment; a plurality of positioning devices for adjusting the position of the vacuum tube are arranged between the vacuum tube and the shield segment; the tunnel secondary lining is arranged in the gap between the outer surface of the vacuum tube and the inner surface of the shield segment, and the inner surface of the tunnel secondary lining is fitted and fixed to the outer surface of the vacuum tube, and the outer surface of the tunnel secondary lining is fitted and fixed to the inner surface of the shield segment. The application of the present invention can reduce the tunnel section, save space, and reduce engineering investment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of rail transit technology, and in particular to a shield tunnel structure. Background Art

[0002] In the prior art, the high-speed vacuum pipe equipment of the maglev train usually adopts a structure in which the vacuum tube is separated from the tunnel lining, and a gap is left between the vacuum tube and the tunnel lining, so that the lining is only subjected to the soil pressure and water pressure, while the internal and external pressure difference is borne by the vacuum tube, so that the tunnel section must be enlarged to place the vacuum tube and the track beam, and installation and maintenance space must be provided. Therefore, this type of tunnel structure not only requires the improvement of the strength of the vacuum tube, but also requires the expansion of the tunnel space, which increases the construction cost.

[0003] In summary, since the high-speed vacuum tunnel in the prior art has the above-mentioned defects, how to propose a better shield tunnel structure to overcome the above-mentioned defects is a problem that urgently needs to be solved in this field. Summary of the invention

[0004] In view of this, the present invention provides a shield tunnel structure, which can reduce the tunnel section, save space and reduce engineering investment.

[0005] The technical solution of the present invention is specifically achieved as follows:

[0006] A shield tunnel structure, comprising: a plurality of shield segments, a tunnel secondary lining, a vacuum tube and a plurality of positioning devices;

[0007] The plurality of shield segments are connected to each other in the axial direction and the circumferential direction to form a circular tunnel with a preset length;

[0008] The vacuum tube is arranged inside the shield segment, and a gap of a preset length is provided between the outer surface of the vacuum tube and the inner surface of the shield segment;

[0009] A plurality of positioning devices for adjusting the position of the vacuum tube are arranged between the vacuum tube and the shield segment;

[0010] The second tunnel lining is arranged in the gap between the outer surface of the vacuum tube and the inner surface of the shield segment, and the inner surface of the second tunnel lining is fitted and fixed to the outer surface of the vacuum tube, and the outer surface of the second tunnel lining is fitted and fixed to the inner surface of the shield segment.

[0011] Preferably, each of the positioning devices further includes: an embedded nut, a positioning bolt and a support cap; the embedded nut is pre-fixed in the inner surface of the shield segment; the upper end of the positioning bolt is connected to the embedded nut, and the lower end of the positioning bolt is fixedly connected to the support cap; the bottom of the support cap is fixedly connected to the outer surface of the vacuum tube.

[0012] Preferably, a plurality of reinforcement devices are provided on the outer wall of the vacuum tube.

[0013] Preferably, the reinforcing means are pegs and / or raised threads.

[0014] Preferably, a waterproof layer is provided between the shield segment and the secondary lining of the tunnel.

[0015] Preferably, an error and deformation distance is reserved inside the vacuum tube.

[0016] Preferably, each of the shield segments is an arc-shaped structure with a preset curvature, and a plurality of assembly structures are arranged around each shield segment.

[0017] Preferably, each shield segment is provided with a transverse assembly structure at both ends, for circumferential connection with the two adjacent left and right shield segments; each shield segment is provided with a longitudinal assembly structure at both ends, for axial connection with the two adjacent front and rear shield segments.

[0018] Preferably, at least one positioning hole is provided at a preset position on the inner surface of each shield segment, and the embedded nut is fixed in the positioning hole.

[0019] Preferably, the vacuum tube is made of a stainless steel plate with high airtightness.

[0020] As can be seen from the above, in the shield tunnel structure of the present invention, by reasonably designing the tunnel structure, the tunnel section can be greatly reduced, space can be saved, and project investment can be reduced. Furthermore, the bearing capacity of the secondary lining of the tunnel can be improved, and the stability and safety of the tunnel can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a cross-sectional view of a shield tunnel structure in an embodiment of the present invention.

[0022] Figure 2 It is a schematic diagram of the connection between the shield segment and the vacuum tube in an embodiment of the present invention.

[0023] Figure 3 It is a top view of the shield segment in an embodiment of the present invention.

[0024] Figure 4 for Figure 3 Schematic diagram of the cross section at the AA position in the middle. DETAILED DESCRIPTION

[0025] In order to make the technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0026] like Figures 1 to 4As shown, the present invention provides a shield tunnel structure, comprising: a plurality of shield segments 1, a tunnel secondary lining 3, a vacuum tube 2 and a plurality of positioning devices 10;

[0027] The plurality of shield segments 1 are connected to each other in the axial direction and the circumferential direction to form a circular tunnel with a preset length;

[0028] The vacuum tube 2 is arranged inside the shield segment 1, and a gap of a preset length is provided between the outer surface of the vacuum tube 2 and the inner surface of the shield segment 1;

[0029] A plurality of positioning devices 10 for adjusting the position of the vacuum tube 2 are provided between the vacuum tube 2 and the shield segment 1;

[0030] The secondary tunnel lining 3 is arranged in the gap between the outer surface of the vacuum tube 2 and the inner surface of the shield segment 1, and the inner surface of the secondary tunnel lining 3 is fitted and fixed to the outer surface of the vacuum tube 2, and the outer surface of the secondary tunnel lining 3 is fitted and fixed to the inner surface of the shield segment 1.

[0031] In the technical solution of the present invention, a tunnel secondary lining 3 is arranged between the vacuum tube 2 and the shield segment 1, thereby forming a tunnel structure in which the vacuum tube and the tunnel secondary lining are integrated, so that the vacuum tube and the tunnel secondary lining are tightly fitted without leaving a gap, thereby reducing the area of ​​the tunnel section, saving space, and reducing engineering investment; in addition, the vacuum tube and the tunnel secondary lining can be subjected to force together, thereby improving the bearing capacity of the tunnel secondary lining and improving the stability and safety of the tunnel.

[0032] In the technical solution of the present invention, a variety of implementation methods can be used to implement the above-mentioned shield tunnel structure. The technical solution of the present invention will be described in detail below by taking one of the implementation methods as an example.

[0033] For example, preferably, in a specific embodiment of the present invention, Figure 1 and Figure 2 As shown, each of the positioning devices 10 may further include: an embedded nut 11, a positioning bolt 12 and a supporting cap 13;

[0034] The embedded nut 11 is pre-fixed in the inner surface of the shield segment 1;

[0035] The upper end of the positioning bolt 12 is connected to the embedded nut 11, and the lower end of the positioning bolt 12 is fixedly connected to the support cap 13;

[0036] The bottom of the support cap 13 is fixedly connected to the outer surface of the vacuum tube 2 .

[0037] In the technical solution of the present invention, by arranging the embedded nut 11 in the shield segment 1, during the construction process, after the shield segment is constructed, the upper end of the positioning bolt 12 can be connected to the embedded nut 11 in the shield segment, and the height of the positioning bolt 12 can be adjusted through the threaded connection between the positioning bolt 12 and the embedded nut 11, so as to adjust the installation position of the vacuum tube to ensure the accurate positioning of the vacuum tube; finally, the outer wall of the vacuum tube is fixedly connected to the support cap 13 at the lower end of the positioning bolt, so that the vacuum tube can be better supported and connected and fixed by the support cap.

[0038] For another example, preferably, in a specific embodiment of the present invention, the secondary tunnel lining 3 may be made of concrete material.

[0039] In the technical solution of the present invention, after the construction of the shield segment 1, the positioning device 10 and the vacuum tube 2 is completed, concrete can be poured into the gap between the outer surface of the vacuum tube 2 and the inner surface of the shield segment 1, and the tunnel secondary lining 3 is formed after the concrete solidifies. Due to the viscosity of the concrete, the inner surface of the tunnel secondary lining 3 is tightly attached to and bonded to the outer surface of the vacuum tube, thereby realizing a tunnel structure in which the vacuum tube and the tunnel secondary lining are integrated.

[0040] In addition, preferably, in a specific embodiment of the present invention, a plurality of reinforcement devices may be provided on the outer wall of the vacuum tube 2 .

[0041] Preferably, in a specific embodiment of the present invention, Figure 2 As shown, the reinforcement device can be a stud 21 and / or a raised thread 22.

[0042] By arranging a plurality of reinforcement devices such as bolts and raised threads on the outer wall of the vacuum tube 2, the bonding force between the vacuum tube and the secondary lining of the tunnel can be improved, making the connection between the vacuum tube and the secondary lining of the tunnel more firm and reliable.

[0043] In addition, as an example, in a preferred specific embodiment of the present invention, a waterproof layer is arranged between the shield segment 1 and the tunnel secondary lining 3, and the waterproof layer can wrap the entire tunnel secondary lining to form full waterproofing, thereby preventing groundwater from entering the tunnel.

[0044] Preferably, as an example, the waterproof layer can be formed by spraying rubber asphalt waterproof material.

[0045] In addition, preferably, in a preferred specific embodiment of the present invention, the vacuum tube 2 can be made of a high-airtightness stainless steel plate, and the thickness of the stainless steel plate can be 10 to 30 mm.

[0046] In addition, as an example, in a preferred embodiment of the present invention, Figure 1As shown, the inner side of the vacuum tube may be reserved with an error and deformation distance 4. When there is an error during tunnel construction or the tunnel structure is deformed, it can be ensured that there is still enough usable space in the tunnel, so as not to affect the normal operation of the train.

[0047] In addition, as an example, in a preferred embodiment of the present invention, Figure 3 and Figure 4 As shown, each of the shield segments 1 is an arc-shaped structure with a preset curvature, and a plurality of assembly structures are arranged around each shield segment 1 .

[0048] For example, preferably, in a specific embodiment of the present invention, each shield segment 1 is provided with a transverse assembly structure 16 at both ends thereof, for circumferentially connecting the two adjacent shield segments on the left and right, thereby forming a tunnel structure with a circular cross-section; each shield segment 1 is provided with a longitudinal assembly structure 17 at both ends thereof, for axially connecting the two adjacent shield segments on the front and rear, thereby forming a tunnel with a preset length.

[0049] In addition, as an example, in a preferred specific embodiment of the present invention, each shield segment 1 may also be provided with a grouting hole 14. After the shield segment of the tunnel is constructed, grouting can be injected from the tunnel into the outer soil layer of the tunnel through the grouting hole 14, so that the slurry can fill the soil gaps, consolidate the outer soil layer, and prevent the soil from collapsing.

[0050] In addition, as an example, in a preferred embodiment of the present invention, Figure 4 As shown, at least one positioning hole 15 can be provided at a preset position on the inner surface of each shield segment 1, and the embedded nut 11 can be fixed in the positioning hole 15. By providing the positioning hole 15, it is easier to insert the positioning bolt 12 into the positioning hole and connect it with the embedded nut.

[0051] In summary, in the technical solution of the present invention, by rationally designing the structure of the tunnel and adopting the technical solution of integrating the vacuum tube and the tunnel secondary lining, the tunnel section can be greatly reduced, space can be saved, and the engineering investment can be reduced. Furthermore, since the vacuum tube and the tunnel secondary lining are integrally stressed, the bearing capacity of the tunnel secondary lining is improved, the stress environment of the secondary lining is improved, and the stability and safety of the tunnel are improved; at the same time, the vacuum environment in the vacuum pipe can be further guaranteed.

[0052] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A shield tunnel structure, characterized in that: include: Multiple shield segments, tunnel secondary lining, vacuum tubes and multiple positioning devices; The plurality of shield segments are connected to each other in the axial direction and the circumferential direction to form a circular tunnel with a preset length; The vacuum tube is arranged inside the shield segment, and a gap of a preset length is provided between the outer surface of the vacuum tube and the inner surface of the shield segment; A plurality of positioning devices for adjusting the position of the vacuum tube are arranged between the vacuum tube and the shield segment; The second tunnel lining is arranged in the gap between the outer surface of the vacuum tube and the inner surface of the shield segment, and the inner surface of the second tunnel lining is fitted and fixed to the outer surface of the vacuum tube, and the outer surface of the second tunnel lining is fitted and fixed to the inner surface of the shield segment.

2. The shield tunnel structure according to claim 1, characterized in that: Each of the positioning devices further comprises: an embedded nut, a positioning bolt and a supporting cap; The embedded nuts are pre-fixed in the inner surface of the shield segment; The upper end of the positioning bolt is connected to the embedded nut, and the lower end of the positioning bolt is fixedly connected to the support cap; The bottom of the support cap is fixedly connected to the outer surface of the vacuum tube.

3. The shield tunnel structure according to claim 1, characterized in that: A plurality of reinforcing devices are arranged on the outer wall of the vacuum tube.

4. The shield tunnel structure according to claim 3, characterized in that: The reinforcing means are studs and / or raised threads.

5. The shield tunnel structure according to claim 1, characterized in that: A waterproof layer is arranged between the shield segment and the secondary lining of the tunnel.

6. The shield tunnel structure according to claim 1, characterized in that: The inner side of the vacuum tube is reserved with an error and deformation distance.

7. The shield tunnel structure according to claim 1, characterized in that: Each of the shield segments is an arc-shaped structure with a preset curvature, and a plurality of assembly structures are arranged around each shield segment.

8. The shield tunnel structure according to claim 7, characterized in that: The left and right ends of each shield segment are respectively provided with a transverse assembly structure for circumferential connection with the two adjacent left and right shield segments; the front and rear ends of each shield segment are respectively provided with a longitudinal assembly structure for axial connection with the two adjacent front and rear shield segments.

9. The shield tunnel structure according to claim 2, characterized in that: At least one positioning hole is arranged at a preset position on the inner surface of each shield segment, and the embedded nut is fixed in the positioning hole.

10. The shield tunnel structure according to claim 1, characterized in that: The vacuum tube is made of a highly airtight stainless steel plate.