Self-lifting heavy-load construction platform and construction method thereof

By adopting a self-lifting heavy-duty construction platform and using standard sections to build support columns and lift components to achieve main beam lifting, the existing construction platform has solved the problems of large steel volume and large installation and demolition workload, and improved the stability and safety of the construction platform, and reduced the steel volume and installation positioning requirements.

CN115506563BActive Publication Date: 2025-04-29乾日安全科技(北京)有限公司
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202211221950.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-08
Publication Date
2025-04-29
Estimated Expiration
2042-10-08

AI Technical Summary

Technical Problem

In the construction or bridge construction, existing construction platforms have problems such as large amount of steel, large amount of installation and demolition work, labor-intensive, need to rely on the building structure, provide temporary support but cannot be constructed, large amount of steel, high installation and positioning requirements, and high demolition difficulty.

Method used

It adopts a self-lifting heavy-duty construction platform, including support columns, main beams, auxiliary beams, support plates, lifting components and formwork components. The support column is built with standard sections, and the lifting components realize the lifting of the main beam, the formwork components support the building formwork, and the support plates and auxiliary beams form construction platforms to improve stability and safety.

Benefits of technology

It improves the stability and safety of the construction platform, reduces the dependence of construction platform construction on buildings, reduces the amount of steel used and installation positioning requirements, simplifies the demolition process, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115506563B_ABST
    Figure CN115506563B_ABST
Patent Text Reader

Abstract

The present application relates to a self-lifting heavy-load construction platform and a construction method thereof, and relates to the technical field of construction platforms, which includes support columns, at least two groups of which are provided, each group of which is provided with two said support columns; a main beam connected between two said support columns in the same group; a plurality of auxiliary beams connected between adjacent main beams; a plurality of support plates connected to the auxiliary beams to form a support platform; a lifting assembly connected to the top of the support column to lift the main beam; a formwork assembly connected to the auxiliary beam to support the formwork. The present application has the effects of easy disassembly and assembly to shorten the construction period, high safety and stability, and no need to be attached to a building.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of construction platforms, and in particular to a self-lifting heavy-load construction platform and a construction method thereof. Background Art

[0002] During the construction of buildings or bridges, a construction platform is required because the construction site is a certain distance from the ground; during the construction of buildings or bridges, high formwork operations are often required; commonly, high formwork operations use full-frame, lattice columns, beams, or a combination of lattice columns and beams to build construction platforms. Regarding the above-mentioned related technologies, there are defects such as full-frame construction platforms that require a large amount of steel, a large amount of installation and disassembly work, and labor-intensive; beam-type construction platforms need to be attached to the building structure and have high requirements for the building structure; lattice column-type construction platforms only provide temporary support but cannot provide a construction work surface; lattice columns and beams are used in combination, which requires a large amount of steel, has high installation and positioning requirements, and is difficult to dismantle. Summary of the invention

[0003] In order to solve the above-mentioned defects, the present application provides a self-lifting heavy-load construction platform and a construction method thereof.

[0004] In the first aspect, the present application provides a self-lifting heavy-load construction platform, which adopts the following technical solution: it includes: support columns, which are provided in at least two groups, each group is provided with two support columns; a main beam, which is connected between the two support columns in the same group; a plurality of auxiliary beams, which are connected between adjacent main beams; a plurality of support plates, which are provided and connected to the auxiliary beams to form a support platform; a lifting assembly, which is connected to the top of the support column and is used to lift the main beam; and a formwork assembly, which is connected to the auxiliary beam and is used to support the formwork.

[0005] By adopting the above technical solution, the support columns are constructed using standard sections, and the lifting components are used to lift the main beam, thereby improving the stability of the construction platform. At the same time, the construction platform does not need to be built on the building; the setting of the formwork assembly realizes the support of the building formwork, and the support plate and the auxiliary beam are used in combination to provide a construction platform for the staff, thereby improving the safety of construction.

[0006] Preferably, the lifting assembly includes: a fixed rod, fixedly connected to the top of the support column; a connecting rod, fixedly connected to both ends of the lower surface of the main beam in the length direction; an electric hoist, fixedly connected to the fixed rod and detachably connected to the connecting rod.

[0007] By adopting the above technical solution, the hook of the electric hoist is hooked on the connecting rod. At this time, the electric hoist is started, and the electric hoist drives the fixed rod to rise, thereby realizing the lifting of the main beam. When the supporting platform needs to be disassembled, the setting of the electric hoist makes it easy for the staff to disassemble the supporting platform, thereby achieving the effect of facilitating the use of the staff.

[0008] Preferably, a first connecting member for connecting the main beam and the auxiliary beam is provided between them, and the first connecting member includes: a connecting plate, fixedly connected to the upper surface of the main beam; two clamping plates are provided, and the two clamping plates are parallel and vertically fixedly connected to the upper surface of the support plate; the connecting part of the auxiliary beam is inserted between the two clamping plates.

[0009] By adopting the above technical solution, the connecting part of the auxiliary beam is inserted between the two clamping plates during use. At this time, a pin is used to penetrate the connecting part of the clamping plate and the auxiliary beam, thereby realizing the connection of the auxiliary beam, achieving the effect of facilitating use by the staff.

[0010] Preferably, the sub-beam is connected to a protective assembly, which includes: a triangular truss, the bottom end of which is fixedly connected to a mounting plate, the mounting plate being clamped outside the clamping plate and connected to the clamping plate; the top end of the triangular truss is connected to the top end of the sub-beam; a walkway plate, horizontally arranged, connected to the top end of the triangular truss, and coplanar with the top end of the sub-beam; and a protective plate, vertically arranged, connected to the side of the walkway plate facing away from the sub-beam.

[0011] By adopting the above technical solution, the setting of the triangular truss is used in conjunction with the first connecting piece, which makes it easier for workers to fix it; the use of walkway boards and protective plates in conjunction improves the safety of construction and transforms high-support formwork into "low-support formwork" operations.

[0012] Preferably, the mold frame assembly includes: an adjustment plate, fixedly connected to the upper surface of the sub-beam and distributed along the length direction of the sub-beam; an adjustment rod, vertically arranged, passing through the adjustment plate and threadedly connected to the adjustment plate; and a keel support, fixedly connected to the top of the adjustment rod.

[0013] By adopting the above technical solution, the distance between the dragon sleeve and the sub-beam is adjusted by rotating the adjusting rod, thereby supporting the building formwork, and supporting special-shaped formwork and horizontal formwork at the same time, which is easy to adjust and support different building formworks. At the same time, the keel support is used to be inserted into the formwork keel to improve the stability of the support.

[0014] Preferably, a locking ring is sleeved on the circumferential outer wall of the adjusting rod, and the locking ring is located between the adjusting plate and the keel support.

[0015] By adopting the above technical solution, after adjusting the height of the keel support, the locking ring is rotated, and when the locking ring is pressed against the adjustment plate, the height of the keel support is locked.

[0016] In the second aspect, the present application provides a construction method of a self-lifting heavy-load construction platform, which adopts the following technical solution:

[0017] The construction method of the self-lifting heavy-load construction platform comprises the following steps:

[0018] S1. Foundation construction;

[0019] S2, support column construction;

[0020] S3. Main beam erection: Use electric hoist to lift the main beam and connect it with the supporting column;

[0021] S4, installation of sub-beam and support plate;

[0022] S5. Installation of protective components;

[0023] S6. Install the mold frame assembly.

[0024] By adopting the above technical solution, the setting of the electric hoist can facilitate the staff to lift the main beam, thereby reducing the workload of the staff; at the same time, the setting of the support column, main beam and auxiliary beam can facilitate the staff to design different forms and specifications for different buildings to meet the structural requirements of different heights and different spans.

[0025] Preferably, in step S1, during foundation construction, different foundation construction methods are determined according to different construction locations; when the support column installation location has a foundation or a concrete floor, the bearing capacity is checked, and if the requirements are met, the support column is fixed by an anchor connection method; when there is no foundation at the support column installation location, a new foundation is designed; when there is a basement at the support column installation location, the floor slab is reinforced before the foundation is established.

[0026] By adopting the above technical solution, the foundation construction method is determined according to different construction environments, and the construction period is shortened and the construction cost is reduced as much as possible while meeting the bearing capacity requirements.

[0027] Preferably, in step S2, during the construction of the support columns, different methods are adopted according to the platform design specifications; when two groups of support columns are provided, the tops of the support columns all adopt the standard sections of the side column tops; when multiple groups of support columns are provided, the two groups of support columns at both ends of the length direction of the supporting platform adopt the standard sections of the side column tops, and the remaining support columns use the standard sections of the middle column tops.

[0028] By adopting the above technical solution, the setting of support columns can meet the needs of construction platforms with different spans.

[0029] Preferably, in step S3, when the main beam is lifted by an electric hoist, when the lifting height is less than 6 meters, a group of lifting components is arranged at the top of each support column; when the lifting distance is greater than 6 meters, two groups of lifting components are arranged at the top of each support column to realize alternating lifting of the main beam.

[0030] By adopting the above technical solution, the setting of the lifting components can meet the needs of construction platforms at different heights.

[0031] In summary, the present application includes at least one of the following beneficial technical effects:

[0032] 1. The support columns are constructed with standard sections, and the lifting components are used to lift the main beams, thereby improving the stability of the construction platform. At the same time, the construction platform does not need to be attached to the building for construction; the setting of the formwork components supports the building formwork, and the support plates and auxiliary beams are used together to provide a construction platform for the workers, improving the safety of construction;

[0033] 2. The triangular truss is used in conjunction with the first connecting piece to facilitate the workers to fix it; the walkway board and the protective plate are used in conjunction to improve the safety of construction and turn the high formwork into a "low formwork" operation;

[0034] 3. Determine the foundation construction method according to different construction environments, and shorten the construction period and reduce construction costs as much as possible while meeting the bearing capacity requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 It is an overall schematic diagram of an embodiment of the present application;

[0036] Figure 2 It is a schematic diagram showing some parts of the connected components;

[0037] Figure 3 It is a schematic diagram showing some parts of the protection assembly;

[0038] Figure 4 This is a schematic diagram showing some parts of the mold base assembly.

[0039] In the figure, 1. supporting column; 11. standard section of column body; 12. standard section of column top; 121. standard section of middle column top; 122. standard section of side column top; 2. main beam; 3. secondary beam; 4. supporting plate; 5. lifting assembly; 51. fixing rod; 52. connecting rod; 53. electric hoist; 6. formwork assembly; 61. adjusting plate; 62. adjusting rod; 621. locking ring; 63. keel support; 7. first connecting piece; 71. connecting plate; 72. clamping plate; 8. protective assembly; 81. triangular truss; 811. mounting plate; 82. walkway plate; 83. protective plate. DETAILED DESCRIPTION

[0040] The following is combined with Figure 1-4 This application is described in further detail.

[0041] The embodiment of the present application discloses a self-elevating heavy-load construction platform.

[0042] refer to Figure 1 The self-lifting heavy-load construction platform includes a support column 1, a main beam 2, a secondary beam 3, a support plate 4, a lifting assembly 5 and a formwork assembly 6.

[0043] refer to Figure 2 and Figure 3 , at least two groups of support columns 1 are provided, and each group is provided with two support columns 1; the support column 1 includes a column body standard section 11 and a column top standard section 12, and the column top standard section 12 includes a middle column column top standard section 121 and a side column column top standard section 122; the column top standard section 12 is located above the column body standard section 11, and during construction, the column body standard section 11 and the column top standard section 12 are both vertically arranged; the connecting ears of the middle column column top standard section 121 are located at the four corners of the circumferential frame of the middle column column top standard section 121, and the side column column top standard section 122 is located at the center of the circumferential frame of the side column column top standard section 122; when two groups of support columns 1 are provided, the column tops of the support columns 1 all use the side column column top standard section 122; when two or more groups of support columns 1 are provided, the column tops of the two groups of support columns 1 at both ends of the length direction of the construction platform use the side column column top standard section 122, and the column tops of the other support columns 1 use the middle column column top standard section 121. The arrangement of the support column 1 can facilitate the workers to set up construction platforms of different sizes according to different span requirements.

[0044] The main beam 2 is connected between the two supporting columns 1 in the same group. Specifically, the main beam 2 is spliced ​​by Bailey plates. The same main beam 2 is composed of two groups of parallel Bailey plates, and a connecting truss is fixed between the parallel Bailey plates. The connecting ears of the main beam 2 are connected to the connecting ears of the column top standard section 12, and specifically, a pin shaft can be used for connection.

[0045] refer to Figure 1 and Figure 3 , the sub-beam 3 is connected between two adjacent main beams 2, and the sub-beam 3 is located above the main beam 2. The sub-beam 3 is assembled by Bailey plates, and a connecting truss is fixed between the sub-beams 3 that are parallel to each other; a first connecting member 7 for connecting the sub-beam 3 with the main beam 2 is provided between the sub-beam 3 and the main beam 2, and the first connecting member 7 includes a connecting plate 71 and a clamping plate 72, and the connecting plate 71 is fixedly connected to the upper surface of the main beam 2, and two clamping plates 72 are vertically fixed on the upper surface of each connecting plate 71, and the two clamping plates 72 are parallel to each other, and the connecting part of the sub-beam 3 is clamped between the two clamping plates 72; during installation, a pin is used to penetrate the connecting part of the clamping plate 72 and the sub-beam 3 to connect them; a plurality of support plates 4 are provided, and the support plates 4 are connected to the sub-beam 3, and the support plates 4 are erected above the lower chord of the sub-beam 3 to form a support platform. If there are multiple groups of support columns 1, a joint plate is provided between adjacent platforms.

[0046] refer to Figure 1 and Figure 2The lifting assembly 5 is connected to the top of the supporting column 1 and is used to lift the main beam 2. The lifting assembly 5 includes a fixed rod 51, a connecting rod 52 and an electric hoist 53; the fixed rod 51 is fixedly connected to the top of the supporting column 1, and the connecting rod 52 is fixedly connected to the two ends of the length direction of the lower surface of the main beam 2; the electric hoist 53 is fixedly connected to the fixed rod 51 and is detachably connected to the connecting rod 52; specifically, when two groups of supporting columns 1 are provided, the fixed rod 51 is fixedly connected to both sides of the upper surface of the supporting column 1, that is, both sides of the connecting ears of the column top standard section 12, and the fixed rods 51 on both sides are connected to the electric hoists 53, and the hooks of the two electric hoists 53 are hooked at both ends of the connecting rod 52 to realize the lifting of the main beam 2; when multiple groups of supporting columns 1 are provided, when the supporting column 1 located in the middle is connected to the lifting assembly 5, the fixed rod 51 is fixedly connected to the center position of the upper surface of the middle column column top standard section 121, that is, between the connecting ears of the column top standard section 12. When the electric hoist 53 is used to lift the main beam 2, when the lifting height is less than 6 meters, a lifting component 5 is set at the top of each support column 1. When the lifting distance is greater than 6 meters, two groups of lifting components 5 are set at the top of each support column 1 to achieve alternating lifting of the main beam 2.

[0047] The supporting column 1, the main beam 2, the auxiliary beam 3 and the supporting plate 4 are used together and assembled by standard parts, which meet the requirements of buildings of different heights and spans. At the same time, a large-area working platform is formed to meet the use of large-space construction structures; at the same time, it is convenient for the disassembly and assembly of the construction platform.

[0048] refer to Figure 1 and Figure 4 The formwork assembly 6 includes an adjustment plate 61, an adjustment rod 62 and a keel support 63. The adjustment plate 61 is fixedly connected to the upper surface of the sub-beam 3 and is equidistantly distributed along the length direction of the sub-beam 3. The adjustment rod 62 is vertically arranged, and the adjustment rod 62 passes through the adjustment plate 61 and is threadedly connected to the adjustment plate 61. The keel support 63 is fixedly connected to the top of the adjustment rod 62, and the keel support 63 is a U-shaped support, and the keel support 63 is used to support the building formwork. The outer wall of the adjustment rod 62 is provided with a locking ring 621, and the locking ring 621 is located between the adjustment plate 61 and the keel support 63.

[0049] refer to Figure 2 The construction platform is provided with a protection assembly 8 in the circumferential direction, and the protection assembly 8 is connected to the secondary beam 3; the protection assembly 8 includes a triangular truss 81, a walkway plate 82 and a protection plate 83; the bottom end of the triangular truss 81 is fixedly connected with a mounting plate 811, the mounting plate 811 is clamped outside the clamping plate 72 and connected to the clamping plate 72, and the top end of the triangular truss 81 is connected to the top end of the secondary beam 3; the walkway plate 82 is arranged horizontally, and the walkway plate 82 is connected to the top end of the triangular truss 81 and is coplanar with the top end of the secondary beam 3; the protection plate 83 is arranged vertically, and the protection plate 83 is connected to the side of the walkway plate 82 away from the secondary beam 3. The bottom end of the triangular truss 81 perpendicular to the secondary beam 3 is fixedly connected to the lower chord of the secondary beam 3, and the top end is connected to the upper chord of the secondary beam 3.

[0050] The setting of the protection component 8 changes the high-support formwork operation into a "low-support formwork" operation, which has the safety of low-support formwork operation and reduces the risk of high-altitude operation. At the same time, the setting of the protection component 8 does not affect the ground operation, thereby achieving the simultaneous implementation of ground operation and high-altitude operation, which has the effect of shortening the construction period.

[0051] The implementation principle of a self-lifting heavy-load construction platform in an embodiment of the present application is as follows: the support column 1 is constructed using standard sections, the lifting assembly 5 realizes the lifting of the main beam 2, thereby improving the stability of the construction platform, and at the same time the construction platform does not need to be built on a building; the setting of the formwork assembly 6 realizes the support of the building formwork, and at the same time the support plate 4 and the auxiliary beam 3 are used in combination to provide a construction platform for the staff, thereby improving the safety of the construction.

[0052] The embodiment of the present application also discloses a construction method of a self-lifting heavy-load construction platform.

[0053] The following steps are included: S1, foundation construction; during foundation construction, different foundation construction methods are determined according to different construction locations; when there is a foundation or a concrete floor at the installation location of the support column 1, the bearing capacity is checked, and if it meets the requirements, the support column 1 is fixed by a ground anchor connection method; when there is no foundation at the installation location of the support column 1, a new foundation is designed; when there is a basement at the installation location of the support column 1, the floor slab is reinforced before the foundation is established;

[0054] S2, construction of support columns 1; when constructing support columns 1, different methods are used according to the platform design specifications; when there are two groups of support columns 1, the tops of the support columns 1 all use the side column top standard section 122; when there are multiple groups of support columns 1, the two groups of support columns 1 at both ends of the length direction of the supporting platform use the side column top standard section 122, and the remaining support columns 1 use the middle column top standard section 121;

[0055] S3, erecting the main beam 2; using the electric hoist 53 to lift the main beam 2, and connecting the main beam 2 to the support column 1; when the electric hoist 53 is used to lift the main beam 2, when the lifting height is less than 6 meters, a set of lifting components 5 is set at the top of each support column 1; when the lifting distance is greater than 6 meters, two sets of lifting components 5 are set at the top of each support column 1 to achieve alternating lifting of the main beam 2;

[0056] S4, installation of sub-beam 3 and support plate 4;

[0057] S5, installation of protection component 8;

[0058] S6. Install the mold frame assembly 6.

[0059] The embodiments of this specific implementation method are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore, all equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A self-lifting heavy-load construction platform, characterized in that: include: The support columns (1) are provided in at least two groups, each group being provided with two support columns (1); the main beam (2) is connected between the two support columns (1) in the same group; a plurality of auxiliary beams (3) are provided and connected between adjacent main beams (2); a plurality of support plates (4) are provided and connected with the auxiliary beams (3) to form a support platform; a lifting assembly (5) is connected to the top of the support column (1) and is used to lift the main beam (2); a formwork assembly (6) is connected with the auxiliary beam (3) and is used to support the formwork; the formwork assembly (6) comprises: an adjustment plate (61) fixedly connected to the upper surface of the auxiliary beam (3) and distributed along the length direction of the auxiliary beam (3); an adjustment rod (62) vertically arranged and passing through the adjustment rod (61). The plate (61) is threadedly connected to the adjusting plate (61); the keel support (63) is fixedly connected to the top of the adjusting rod (62); the circumferential outer wall of the adjusting rod (62) is provided with a locking ring (621), and the locking ring (621) is located between the adjusting plate (61) and the keel support (63); the auxiliary beam (3) is located above the main beam (2), the auxiliary beam (3) is assembled from Bailey plates, and a connecting truss is fixed between the auxiliary beams (3) parallel to each other; a plurality of support plates (4) are provided, and the support plates (4) are connected to the auxiliary beams (3), and the support plates (4) are erected above the lower chord of the auxiliary beam (3) to form a support platform; the support plates (4) and the auxiliary beams (3) are used in combination to provide a construction platform for the workers.

2. The self-elevating heavy-load construction platform according to claim 1 is characterized in that: The lifting assembly (5) comprises: A fixing rod (51) fixedly connected to the top of the supporting column (1); Connecting rods (52) are fixedly connected to both ends of the lower surface of the main beam (2) in the length direction; The electric hoist (53) is fixedly connected to the fixing rod (51) and detachably connected to the connecting rod (52).

3. The self-elevating heavy-load construction platform according to claim 1 is characterized in that: A first connecting member (7) for connecting the main beam (2) and the auxiliary beam (3) is provided between them, and the first connecting member (7) comprises: a connecting plate (71) fixedly connected to the upper surface of the main beam (2); Two clamping plates (72) are provided, and the two clamping plates (72) are parallel and vertically fixedly connected to the upper surface of the support plate (4); the connecting portion of the auxiliary beam (3) is inserted between the two clamping plates (72).

4. The self-elevating heavy-load construction platform according to claim 3 is characterized by: The secondary beam (3) is connected to a protection assembly (8), and the protection assembly (8) comprises: The triangular truss (81) has a mounting plate (811) fixedly connected to its bottom end, the mounting plate (811) is clamped outside the clamping plate (72) and connected to the clamping plate (72); the top end of the triangular truss (81) is connected to the top end of the auxiliary beam (3); The walkway plate (82) is horizontally arranged, connected to the top of the triangular truss (81), and coplanar with the top of the secondary beam (3); The protection plate (83) is vertically arranged and connected to the side of the walkway plate (82) facing away from the auxiliary beam (3).

5. A construction method of a self-lifting heavy-load construction platform, applicable to a self-lifting heavy-load construction platform according to any one of claims 1 to 4, characterized in that: The following steps are involved: S1. Foundation construction; S2, support column (1) construction; S3, erecting the main beam (2); using an electric hoist (53) to lift the main beam (2), and connecting the main beam (2) to the support column (1); S4, installing the auxiliary beam (3) and the supporting plate (4); S5, installation of protection components (8); S6. Install the mold frame assembly (6).

6. The construction method of a self-elevating heavy-load construction platform according to claim 5, characterized in that: In step S1, during foundation construction, different foundation construction methods are determined according to different construction locations; when the support column (1) is installed at a location with a foundation or a concrete floor, the bearing capacity is checked, and if the requirements are met, the support column (1) is fixed by a ground anchor connection method; when the support column (1) is installed at a location with no foundation, a new foundation is designed; when the support column (1) is installed at a basement, the floor slab is reinforced before the foundation is established.

7. The construction method of a self-elevating heavy-load construction platform according to claim 5, characterized in that: In step S2, when the support columns (1) are constructed, different methods are adopted according to the platform design specifications; when two groups of support columns (1) are provided, the tops of the support columns (1) all adopt the side column top standard section (122); when multiple groups of support columns (1) are provided, the two groups of support columns (1) at both ends of the length direction of the supporting platform adopt the side column top standard section (122), and the remaining support columns (1) adopt the middle column top standard section (121).

8. The construction method of a self-elevating heavy-load construction platform according to claim 5, characterized in that: In step S3, when the main beam (2) is lifted using an electric hoist (53), when the lifting height is less than 6 meters, a group of lifting components (5) is arranged at the top of each support column (1); when the lifting distance is greater than 6 meters, two groups of lifting components (5) are arranged at the top of each support column (1) to achieve alternating lifting of the main beam (2).

Citation Information

Patent Citations

  • Novel scaffold

    CN109208886A

  • Assembled combination operation frame

    CN208563924U

  • Self-lifting heavy-load construction platform

    CN218714838U