A preheating atmosphere protection experimental furnace
By setting up multiple preheating chambers and a servo motor-driven preheating cylinder in the high-temperature test furnace, static heating of the protective gas was achieved, solving the temperature fluctuation problem caused by direct heating of the protective gas, reducing energy consumption and improving the accuracy of test results.
Patent Information
- Application Number
- CN202211444028.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-18
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2042-11-18
AI Technical Summary
Existing high-temperature test furnaces, when purged with protective gas, directly heat the gas, causing temperature fluctuations that affect the accuracy of test results and have high energy consumption.
A preheating atmosphere protection experimental furnace is adopted. By setting multiple preheating chambers in the preheating cylinder and using a servo motor to drive the preheating cylinder to rotate, the protective gas is gradually heated under static conditions. The combination of electric heating and waste heat heating reduces energy consumption.
This method effectively preheats the protective gas, reduces heating energy consumption, minimizes temperature fluctuations, and improves the accuracy of test results.
Smart Images

Figure CN115717829B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of metal mechanical property testing equipment, specifically a preheating atmosphere-protected experimental furnace. Background Technology
[0002] High-temperature testing furnaces are frequently used in high-temperature corrosion tests of metallic materials under specific environments. To simulate these environments, a protective gas is introduced into the furnace for atmosphere protection. This protective gas is typically at room temperature. Directly introducing it into the furnace will inevitably affect the internal temperature, causing fluctuations and ultimately resulting in test results that do not accurately characterize the corrosion performance of the metallic material under specific high-temperature conditions.
[0003] To address this issue, existing technologies include preheating the protective gas to match the temperature inside the high-temperature testing furnace, thus ensuring the sample remains at the test temperature. For example, a forced-draft atmosphere furnace disclosed in 201410737225.5 has an inlet channel at the top of the furnace body, with a preheating chamber containing a heating device. The heating device uses a spiral electric heating tube, which preheats the gas as it passes through. While this method uses an external heating device to preheat the protective gas, the constant flow of the gas necessitates a high-power heating device to reach the same temperature as the high-temperature testing furnace, resulting in excessive energy consumption. A tubular atmosphere furnace disclosed in 201820043823.6 does not use an external heating device but instead uses a protective gas inlet coil inside the furnace body to preheat the gas within the coil using heat from the furnace. However, it still introduces room-temperature protective gas into the furnace, which can easily cause temperature fluctuations, hindering the elimination of test result deviations. Summary of the Invention
[0004] The present invention aims to provide a preheating atmosphere protection experimental furnace, which effectively preheats the protective gas entering the furnace body and effectively reduces preheating energy consumption.
[0005] To solve the above technical problems, the specific solution adopted by the present invention is as follows: a preheating atmosphere protection experimental furnace, including a furnace body, a gas source and a preheating device for preheating the protective gas in the gas source. The preheating device includes a base and a preheating cylinder rotatably mounted on the base. The base is divided into an air inlet, a preheating position and an exhaust position in sequence along the circumference. The preheating cylinder is provided with multiple preheating chambers, and any preheating chamber can pass through the air inlet, the preheating position and the exhaust position in sequence during the rotation of the preheating cylinder.
[0006] The air inlet position is equipped with a protective gas inlet connector connected to the gas source, and the air outlet position is equipped with a protective gas exhaust connector connected to the furnace body. Both the protective gas inlet connector and the protective gas exhaust connector are used to cooperate with the protective gas inlet and outlet holes set on the preheating chamber, so that when the preheating chamber is rotated to the air inlet position, it is connected to the gas source for air intake, and when the preheating chamber is rotated to the air outlet position, it is connected to the furnace body for air exhaust.
[0007] Two electrode connectors are provided in the preheating position adjacent to the exhaust position. The two electrode connectors are used to cooperate with the electric heating elements respectively set in the preheating chamber. When the preheating chamber rotates to the preheating position adjacent to the exhaust position, the electrode connectors are connected to the corresponding electric heating elements for heating.
[0008] Preferably, a servo motor is provided in the middle of the base, and the output shaft of the servo motor is inserted into and connected to the shaft hole opened at the bottom of the preheating cylinder.
[0009] Preferably, the top of the preheating chamber is open, and a piston is provided in the preheating chamber. The outer edge of the piston is in a sealing sliding fit with the inner wall of the preheating chamber, and a counterweight is also provided on the piston to maintain the pressure of the protective gas in the preheating chamber.
[0010] Preferably, both the protective gas inlet connector and the protective gas outlet connector include a tubular first connector body with a closed upper end and an open lower end. The upper end of the first connector body is arc-shaped and used to mate with the protective gas inlet / outlet port. The lower outer wall of the first connector body is in a sealed sliding fit with a first insertion hole opened on the chassis. The lower inner wall of the first connector body is in a sealed sliding fit with a first gas guide tube fixed in the first insertion hole. The first gas guide tube corresponding to the protective gas inlet connector is connected to the protective gas inlet interface through a protective gas inlet passage opened in the base. The first gas guide tube corresponding to the protective gas outlet connector is connected to the protective gas outlet interface through a protective gas outlet passage opened in the base. Multiple first connecting holes are provided through the upper circumference. A first gas collecting groove is provided on the inner wall of the first connector body, intersecting with the first connecting holes. Multiple first gas passages are also provided inside the first connector body. The lower end of the first gas passage is connected to the first gas collecting groove, and the upper end extends through the top of the first connector body. A first connector spring is provided on the outer sleeve of the first gas guide tube to push the first connector body towards the preheating cylinder. The first connector spring is used to push the upper end of the first connector body into the protective gas inlet and outlet hole to connect the corresponding first gas guide tube and the preheating chamber. A first cover plate is provided in the preheating chamber at the position of the protective gas inlet and outlet hole. The first cover plate is pressed tightly against the bottom of the preheating chamber by the first sealing spring and blocks the protective gas inlet and outlet hole.
[0011] Preferably, the first connector body is provided with a roller, and a support guide rail is provided at the bottom of the preheating cylinder for the roller to roll and cooperate. The support guide rail has a notch so that the first connector spring can push the upper end of the first connector body into the protective gas inlet and outlet hole after the roller rolls into the notch. The side of the notch corresponding to the front of the movement direction of the preheating cylinder is a ramp surface for the roller to roll back onto the support guide rail.
[0012] Preferably, the first connector body is connected to two rollers by a support rod, and the two rollers are located on the front and rear sides of the first connector body relative to the direction of movement of the preheating cylinder; two support guide rails are correspondingly provided on the preheating cylinder, and the two support guide rails are located on both sides of the protective gas inlet and outlet holes.
[0013] Preferably, the two electrode connectors are electrically connected to the power supply, and the electrode connectors are slidably disposed in the third socket opened on the base. The third socket is also provided with a third connector spring for pushing the electrode connectors toward the preheating cylinder. The electric heating element has two conductive terminals, which are fixed to the bottom of the preheating cavity and have wiring holes at the bottom of the preheating cavity for exposing the conductive terminals. The wiring holes allow the electrode connectors to connect with the corresponding conductive terminals under the pushing force of the third connector spring.
[0014] Preferably, there are multiple preheating positions. The preheating chamber is also equipped with a coil for preheating the protective gas introduced by the gas source using the waste heat of the protective gas discharged from the furnace body. Each coil has a waste heat gas inlet and a waste heat gas outlet distributed towards the base. The preheating position adjacent to the outlet is equipped with a waste heat gas inlet connector connected to the furnace body. The waste heat gas inlet connector is used to connect with the corresponding waste heat gas inlet after the preheating chamber is rotated to the preheating position adjacent to the outlet. The preheating position adjacent to the inlet is equipped with a waste heat gas outlet connector connected to the exhaust gas treatment mechanism. The waste heat gas outlet connector is used to connect with the corresponding waste heat gas outlet after the preheating chamber is rotated to the preheating position adjacent to the inlet. All preheating positions are equipped with waste heat gas intermediate connectors. The waste heat gas intermediate connectors between two adjacent preheating positions are interconnected to connect the coils corresponding to the preheating chambers in all preheating positions in series.
[0015] Preferably, the waste heat gas inlet connector, waste heat gas outlet connector, and waste heat gas intermediate connector all include a tubular second connector body with a closed upper end and an open lower end. The upper end of the second connector body is arc-shaped and used to mate with the corresponding waste heat gas inlet or outlet. The lower outer wall of the second connector body is in a sealed sliding fit with a second insertion hole on the chassis, and the lower inner wall of the second connector body is in a sealed sliding fit with a second air guide tube fixed in the second insertion hole. The second air guide tube corresponding to the waste heat gas inlet connector connects to the waste heat gas inlet channel on the base. The furnace body is connected, and the second gas guide pipe corresponding to the waste heat gas exhaust joint is connected to the tail gas treatment mechanism through the waste heat gas exhaust channel opened on the base. The second gas guide pipes corresponding to the adjacent waste heat gas intermediate joints are connected through the waste heat gas connecting channel opened on the base. Multiple second connecting holes are opened through the upper circumference of the second gas guide pipe. A second gas collecting groove is opened on the inner wall of the second joint body, which is intersected with the second connecting holes. Multiple second gas channels are also provided on the top of the second joint body. The lower end of the second gas channel is connected to the second gas collecting groove, and the upper end is opened through the top of the second joint body.
[0016] A second connector spring is provided on the outer sleeve of the second gas guide pipe to push the second connector body toward the preheating cylinder. The second connector spring is used to push the upper end of the second connector body into the corresponding waste heat gas inlet or waste heat gas outlet to connect all the coils in the preheating position to the furnace body. A second cover plate is provided at the positions of the waste heat gas inlet and waste heat gas outlet in the preheating cavity. The second cover plate is pressed tightly against the bottom of the preheating cavity by the second sealing spring and blocks the corresponding waste heat gas inlet and waste heat gas outlet.
[0017] Preferably, the protective gas inlet connector and the protective gas exhaust connector are located on circle A, which is distributed on the top surface of the base. The two electrode connectors are located on circle B, which is distributed on the top surface of the base. The waste heat gas inlet connector, the waste heat gas exhaust connector, and all the waste heat gas intermediate connectors are located on circle C, which is distributed on the top surface of the base. Circles A, B, and C are all centered on the output shaft of the servo motor, and the radii of circles A, B, and C are all different. Beneficial effects
[0018] The preheating cylinder of the present invention has multiple preheating chambers. By rotating the preheating cylinder, multiple preheaters move sequentially to the inlet, preheating and exhaust positions, thereby separating the heating of the protective gas from the inlet and exhaust processes, realizing static heating of the protective gas in the preheating chamber. Compared with the conventional preheating method of heating the protective gas in a flowing state, the present invention can use electric heating elements with lower power to meet the heating requirements and significantly reduce the preheating energy consumption.
[0019] In a preferred embodiment of the present invention, multiple preheating positions are provided, and the protective gas continuously discharged from the furnace is forced to flow through the preheating chambers in all preheating positions and generate a heating effect, thereby making full use of the heat of the protective gas continuously discharged from the furnace and having the same temperature as the furnace, and further reducing preheating energy consumption. Attached Figure Description
[0020] Figure 1 This is a schematic diagram of the structure of Embodiment 1 of the present invention;
[0021] Figure 2 This is a schematic diagram of the split structure of the preheating device in Example 1;
[0022] Figure 3 This is a longitudinal sectional view of the preheating device portion in Example 1;
[0023] Figure 4 This is a cross-sectional view of the protective gas inlet connector in Example 1.
[0024] Figure 5 for Figure 4 A schematic diagram showing the state after the preheating cylinder rotates, causing the protective gas inlet connector to coincide with the protective gas inlet / outlet port.
[0025] Figure 6 This is a cross-sectional view of the waste heat gas inlet / exhaust gas outlet section in Example 1.
[0026] Figure 7 This is a cross-sectional view of the two waste heat gas intermediate joints in Example 1.
[0027] Figure 8 This is a cross-sectional view of the two electrode connectors in Example 1;
[0028] Figure 9 This is a cross-sectional view of the protective gas inlet connector portion in Embodiment 2 of the present invention;
[0029] Figure 10 for Figure 9 A schematic diagram of the side view structure;
[0030] Figure 11 for Figure 9 A schematic diagram showing the state after the protective gas inlet connector and the protective gas inlet / outlet hole coincide when the preheating cylinder rotates.
[0031] The diagram shows the following components: 1. Furnace body; 2. Protective gas exhaust port; 3. Base; 4. Protective gas inlet port; 5. Preheating cylinder; 6. Upper retaining ring; 7. Preheating chamber; 8. Waste heat gas intermediate connector; 9. Preheating position; 10. Waste heat gas exhaust port; 11. Protective gas inlet connector; 12. Inlet position; 13. Output shaft; 14. Exhaust position; 15. Protective gas exhaust port; 16. Ring rail; 17. Waste heat gas inlet connector; 18. Electrode connector; 19. Coil; 20. Piston; 21. Lower retaining ring; 22. Electric heating element; 23. Servo motor; 24. First gas collection chamber; 25. First end gas hole; 26. First cover plate; 27. Protective gas inlet and outlet holes; 28. First sealing spring; 29. Spring cylinder seat; 30. First gas passage; 31. First connecting hole; 32. First gas collecting groove; 33. 34. First connector body; 35. First insertion hole; 36. First connector spring; 37. First air guide tube; 38. Protective gas inlet channel; 39. Spring retaining ring; 40. Second sealing spring; 41. Second cover plate; 42. Waste heat gas inlet hole; 43. Waste heat gas exhaust hole; 44. Second end air hole; 45. Second gas collection chamber; 46. Second air passage; 47. Second connecting hole; 48. Second gas collecting groove; 49. Second insertion hole; 50. Second connector spring; 51. Second air guide tube; 52. Waste heat gas inlet channel; 53. Waste heat gas connecting channel; 54. Conductive terminal; 55. Connecting hole; 56. Third insertion hole; 57. Third connector spring; 58. Support rail; 59. Notch; 60. Climbing slope; 61. Roller; 62. Support rod; 63. Waste heat gas exhaust channel. Detailed Implementation
[0032] The preheating atmosphere protection experimental furnace of the present invention will be described below through two embodiments. Embodiment 1 illustrates the overall structural features of the present invention, while Embodiment 2 is a further improvement based on Embodiment 1, and only the structure of the improved part will be described:
[0033] Example 1
[0034] like Figure 1 As shown, this embodiment of a preheating atmosphere-protected experimental furnace is mainly used for performance testing of metal samples. It mainly includes a tubular furnace body 1, a gas source (not shown) for introducing protective gas into the furnace body 1, and a preheating device for preheating the protective gas before introducing it into the furnace body 1. Both the furnace body 1 and the gas source are conventional technologies in the art. The furnace body 1 is equipped with a heating system for heating to a set test temperature. The left end of the furnace body 1 is for introducing protective gas, and the right end is for discharging protective gas. The gas source is a conventional steel cylinder containing high-pressure protective gas. The protective gas enters the furnace body 1 after being regulated by a flow valve.
[0035] Unlike existing technologies that preheat dynamic protective gases, this embodiment uses multiple preheating chambers 7. After the protective gas in these chambers is preheated, it is discharged into the furnace body 1 for atmosphere protection, thus achieving static preheating of the protective gas. This reduces unnecessary heating energy consumption while ensuring the protective gas temperature. The preheating device in this embodiment includes a base 3 and a preheating cylinder 5 rotatably mounted on the base 3. Figure 1 and Figure 2 , 3 As shown, the base 3 is circular, and its top surface is divided into four identical sector-shaped areas, which are sequentially divided clockwise into one air intake position 12, two preheating positions 9, and one exhaust position 14, for a total of four execution positions. The base 3 has a groove in its center, inside which a servo motor 23 is installed. The output shaft 13 of the servo motor 23 is vertically upward and located at the center of the base 3. The preheating cylinder 5 is cylindrical, with a shaft hole at the center of its bottom surface. After the output shaft 13 is inserted into the shaft hole, it drives the preheating cylinder 5 to rotate via a conventional keyway transmission mechanism. To ensure the smooth rotation of the preheating cylinder 5 and reduce friction, a ring rail 16 is concentrically provided on the outer edge of the top of the base 3, while a sliding groove is provided on the outer edge of the bottom surface of the preheating cylinder 5 for sliding engagement with the ring rail 16. Corresponding to the four execution positions on the base 3, the preheating cylinder 5 is evenly spaced with four circular preheating chambers 7. All preheating chambers 7, driven by the servo motor 23, rotate with the preheating cylinder 5 along with the base 3, sequentially passing through the air inlet 12, two preheating positions 9, and the exhaust position 14. The air inlet 12 connects to the gas source to fill with protective gas, the preheating chambers 7 are heated and preheated, and the protective gas is exhausted to the furnace body 1 through the exhaust position 14 for atmosphere protection experiments. Specifically:
[0036] The bottom of the preheating cylinder 5 is provided with a protective gas inlet / outlet hole 27 corresponding to the bottom of any preheating chamber 7. The protective gas inlet / outlet hole 27 allows room temperature protective gas from the gas source to enter the corresponding preheating chamber 7 and allows the preheated protective gas to be discharged from the preheating chamber 7 to the furnace body 1. The inlet position 12 and the outlet position 14 are respectively provided with a protective gas inlet connector 11 and a protective gas outlet connector 15. The protective gas inlet connector 11 and the protective gas outlet connector 15 are located on a circle A with the center of the output shaft 13 on the top surface of the base 3. This allows the protective gas inlet / outlet hole 27 to rotate to the protective gas inlet connector 11 and the protective gas outlet connector 15 as the preheating cylinder 5 rotates, and to cooperate with the protective gas inlet connector 11 and the protective gas outlet connector 15 to perform inlet and outlet operations.
[0037] The structure of the protective gas inlet connector 11 is as follows: Figure 4As shown, the protective gas inlet connector 11 mainly includes a cylindrical first connector body 33. A first insertion hole 34 for sliding engagement of the first connector body 33 is provided on the top surface of the base 3 at the inlet position 12. The top of the first connector body 33 is hemispherical to align with the protective gas inlet / outlet hole 27. The lower middle outer wall of the first connector body 33 is in a sealed sliding engagement with the first insertion hole 34. The lower middle part of the first connector body 33 has an internal cavity and an open bottom. A first gas guide tube 36 is provided in the first insertion hole 34. The lower end of the first gas guide tube 36 is sealed and fixed to the bottom of the first insertion hole 34, and the upper end is inserted from bottom to top into the internal cavity of the first connector body 33. The outer wall of the first gas guide tube 36 is in a sealed sliding engagement with the inner wall of the internal cavity of the first connector body 33. A protective gas inlet 37, connected to the first gas guide pipe 36, is provided inside the base 3 at the lower end of the first gas guide pipe 36. One end of the protective gas inlet 37 extends outward and penetrates the outside of the base 3 to form a protective gas inlet interface 4, which is connected to a gas source. The other end of the protective gas inlet 37 extends inward to connect with the first gas guide pipe 36, so as to introduce the protective gas from the gas source into the first gas guide pipe 36. A plurality of first connecting holes 31 are provided at even intervals along the circumference of the upper part of the first gas guide pipe 36. An annular first gas collecting groove 32 is provided on the inner side wall of the cavity inside the first connector body 33. The inner edge of the first gas collecting groove 32 is open so that when the first connector body 33 slides to a specific position, the first gas collecting groove 32 can connect with the first gas guide pipe 36 through all the first connecting holes 31. The first connector body 33 is also provided with a plurality of vertically distributed first air passages 30. The lower end of the first air passage 30 is connected to the first gas collecting groove 32, and the upper end is collected by the first gas gathering chamber 24 provided in the first connector body 33 and then connected to the outside through a plurality of first end air holes 25 above the first gas gathering chamber 24. Through the above gas passage arrangement, the protective gas in the gas source can be discharged from the top of the first connector body 33 in sequence through the protective gas inlet port 4, the protective gas inlet passage 37, the first gas guide pipe 36, the first connecting hole 31-first gas collecting groove 32, the first air passage 30, the first gas gathering chamber 24 and the first end air holes 25.
[0038] Figure 4In the preheating chamber 7, a spring cylinder seat 29 is provided at the bottom corresponding to the protective gas inlet / outlet hole 27. The lower end of the spring cylinder seat 29 is fixed to the bottom wall of the preheating chamber 7, and the upper end has a hole corresponding to the protective gas inlet / outlet hole 27. A first cover plate 26 is provided on the protective gas inlet / outlet hole 27. A first sealing spring 28 is provided between the first cover plate 26 and the spring cylinder seat 29. The first sealing spring 28 is in a compressed state to press the first cover plate 26 tightly against the protective gas inlet / outlet hole 27 for sealing. In addition, a first connector spring 35 is provided on the outer periphery of the first gas guide tube 36. The lower end of the first connector spring 35 is fixed to the bottom of the first insertion hole 34, and the upper end is fixed to the bottom of the first connector body 33. The first connector spring 35 is also in a compressed state, so that the first connector body 33 is in a limited position by the bottom of the preheating cylinder 5 on the top of the first connector body 33. Figure 4 The state shown is as follows. At this time, the first gas collecting groove 32 and the first connecting hole 31 are interlocked, and the first gas collecting groove 32 is located below the first connecting hole 31. When the preheating cylinder 5 is driven to rotate by the servo motor 23, causing the protective gas inlet / outlet hole 27 to rotate to coincide with the first connector body 33, the upper end of the first connector body 33, under the pushing force of the first connector spring 35, pushes the first cover plate 26 to continuously overcome the pushing force of the first sealing spring 28 and move upward, so that the first connector body 33 is inserted into the protective gas inlet / outlet hole 27, achieving the desired state. Figure 5 The state shown is as follows. At this time, because the diameter of the protective gas inlet / outlet hole 27 is smaller than the radius of the upper end of the first connector body 33, the spherical surface of the hemisphere at the upper end of the first connector body 33 is stuck in the protective gas inlet / outlet hole 27 and forms a limit. In this limited state, the first gas collecting groove 32 and the first connecting hole 31 coincide and correspond, so that the protective gas discharged from the gas source can be discharged from the upper end of the first connector body 33 to the preheating chamber 7 through the aforementioned path. After the protective gas is introduced into the preheating chamber 7, the first connector body 33 can be moved down below the lower end face of the preheating cylinder 5 by rotating the preheating cylinder 5 and squeezing it through the protective gas inlet / outlet hole 27. On the one hand, the first connector body 33 is resealed; on the other hand, the first cover plate 26 in the preheating chamber 7 is also reset under the action of the first sealing spring 28 and the protective gas pressure in the preheating chamber 7, so that the preheating chamber 7 enters the preheating position 9 in a closed state for heating and preheating.
[0039] To maintain the pressure of the protective gas entering the preheating chamber 7, so that it can be automatically discharged into the furnace body 1 through the protective gas exhaust connector 15 at the exhaust port 14, such as... Figure 3As shown, the preheating chamber 7 in this embodiment is designed with an open top, and a piston 20 with a counterweight is provided in the preheating chamber 7. The outer periphery of the piston 20 is sealed and slidably fitted with the inner wall of the preheating chamber 7, so that during the air intake process of the preheating chamber 7, the high-pressure protective gas pushes the piston 20 to slide to the top of the preheating chamber 7, maintaining the high-pressure state of the protective gas in the preheating chamber 7; and during the air exhaust process of the preheating chamber 7, the protective gas in the preheating chamber 7 can be automatically discharged under its own pressure and the gravity pressure of the counterweight, so that the way protective gas is introduced into the furnace body 1 in this embodiment is similar to that of the conventional method. The only difference is that in this embodiment, the flow regulating valve is set on the pipeline between the furnace body 1 and the protective gas exhaust connector 15, rather than directly on the pipeline between the furnace body 1 and the gas source. An upper retaining ring 6 is provided at the top of the inner wall of the preheating chamber 7. The upper retaining ring 6 limits the piston 20 from being pushed out by the pressure passage in the preheating chamber 7. A lower retaining ring 21 is also provided at the bottom of the inner wall of the preheating chamber 7 to prevent the piston 20 from sliding directly to the bottom surface of the preheating chamber 7 under the action of the counterweight and squeezing the related components there. In addition, the counterweight on the piston 20 in this embodiment increases the weight of the preheating cylinder 5. When the preheating cylinder 5 rotates to withdraw the protective gas inlet connector 11 from the protective gas inlet / outlet hole 27, it can prevent the protective gas inlet connector 11 from pushing the preheating cylinder 5 upward.
[0040] In this embodiment, the protective gas exhaust connector 15 and the protective gas inlet connector 11 have similar structures and are completely identical in structure. The only difference is that a protective gas exhaust channel (not shown in the figure) is provided inside the base 3 at the location corresponding to the protective gas exhaust connector 15, instead of a protective gas inlet channel 37. One end of the protective gas exhaust channel extends outward and penetrates the outer periphery of the base 3 to form a shape like... Figure 2 The protective gas exhaust port 2 shown is connected to the furnace body 1 via a regulating valve. The other end of the protective gas exhaust channel extends inward and connects to the first gas guide pipe 36 in the protective gas exhaust connector 15. During implementation, when the preheating chamber 7 rotates with the preheating cylinder 5, after being filled and preheated by the protective gas inlet connector 11 and entering the exhaust position 14, the first connector body 33 in the protective gas exhaust connector 15 is still inserted into the preheating chamber 7 through the protective gas inlet / outlet hole 27, allowing the protective gas in the preheating chamber 7 to be discharged into the furnace body 1 via the regulating valve for gas protection. After the protective gas in the preheating chamber 7 is discharged, the protective gas exhaust connector 15 is forced out of the protective gas inlet / outlet hole 27 by rotating the preheating cylinder 5.
[0041] The above describes the structure and function of the air intake position 12 and the exhaust position 14 in this embodiment. The following describes the structure and function of the two preheating positions 9: In this embodiment, the protective gas in the preheating chamber 7 located in the preheating position 9 has two preheating methods. Both heating methods achieve static heating of the protective gas in the preheating chamber 7, which significantly reduces heating energy consumption compared to dynamic heating. Specifically:
[0042] One preheating method is heating by an electric heating element 22. For example... Figure 3 As shown, the electric heating element 22 is located below the lower baffle ring 21 in the preheating chamber 7, and all preheating chambers 7 are equipped with electric heating elements 22. All preheating chambers 7 are only heated when the preheating cylinder 5 rotates to the preheating position 9 closest to the exhaust position 14. Figure 2 The preheating position 9 is located on the right side. The electric heating element 22 in the preheating chamber 7 is powered on and operates, so that the protective gas in the preheating chamber 7 is heated to the temperature corresponding to the temperature inside the furnace body 1, thus completing the preheating of the protective gas. Then, after the preheating chamber 7 rotates with the preheating cylinder 5 to the exhaust position 14, the protective gas of the corresponding temperature is introduced into the furnace body 1.
[0043] To achieve the above effect, in Figure 2 Two electrode connectors 18 are provided in the right-side preheating position 9. Power is supplied to the electric heating element 22, which moves into the preheating chamber 7 of the right-side preheating position 9, through these two electrode connectors 18. The two electrode connectors 18 are located on a circle C centered on the output shaft 13 on the top surface of the base 3, and the radius of circle C is smaller than that of circle A, thus preventing the electrode connectors 18 from inserting into the protective gas inlet / outlet holes 27 during the rotation of the preheating cylinder 5. Figure 8 As shown, the two electrode connectors 18 are slidably fitted into the third insertion holes 56 on the base 3. A third connector spring 57 is also provided in the third insertion hole 56 to push the electrode connectors 18 toward the preheating cylinder 5. Conductive wires are connected to the bottom of each electrode connector 18, and the two conductive wires pass through the base 3 and are electrically connected to the two poles of a power source (not shown in the figure). The electric heating element 22 has two corresponding conductive terminals 54, both of which are fixed to the bottom of the preheating cavity 7. A connection hole 55 is provided at the bottom of the preheating cavity 7 corresponding to the conductive terminals 54. Thus, after the preheating cavity 7 rotates with the preheating cylinder 5 to the right preheating position 9, it is as follows... Figure 8 The electrode connector 18 is pushed into the wiring hole 55 by the thrust of the third connector spring 57 and electrically connected to the two wire terminals respectively, so that the protective gas in the preheating chamber 7 is heated by the electric heating element 22.
[0044] Another preheating method is to use the waste heat from the exhaust gas discharged from furnace 1 for heating. For example... Figure 3As shown, a coil 19 is provided on the outer periphery of each preheating chamber 7 in the preheating cylinder 5. When the exhaust gas discharged from the furnace body 1 is introduced into the coil 19, it heats the protective gas in the corresponding preheating chamber 7, thus cooperating with the electric heating element 22 to preheat the protective gas. To facilitate the flow of waste heat gas within the coil 19, each coil 19 has a waste heat gas inlet 41 and a waste heat gas outlet 42. The waste heat gas discharged from the furnace body 1 enters the coil 19 through the waste heat gas inlet 41 and flows along the coil 19, finally exiting through the waste heat gas outlet 42. To ensure that the preheating chambers 7 in both preheating positions 9 can be preheated by waste heat gas and to maximize the utilization of the heat from the waste heat gas, in this embodiment... Figure 2 The right preheating position 9 is equipped with a waste heat gas inlet connector 17, and the left preheating position 9 is equipped with a waste heat gas exhaust connector 10. Intermediate waste heat gas connectors 8 are connected to each other on both preheating positions 9, thereby connecting the coils 19 corresponding to the two preheating chambers 7 in series to the furnace body 1, allowing the exhaust gas discharged from the furnace body 1 to flow through the coils 19 corresponding to the two preheating chambers 7. It should be noted that the waste heat gas inlet connector 17, the waste heat gas exhaust connector 10, and the intermediate waste heat gas connector 8 are located on a circle B centered on the output shaft 13 on the top surface of the base 3. The radius of circle B is smaller than that of circle A but larger than that of circle C, thus preventing the connectors from being mixed up during the rotation of the preheating cylinder 5.
[0045] like Figure 6 and Figure 7As shown, the waste heat gas inlet connector 17 / waste heat gas outlet connector 10 / waste heat gas intermediate connector 8 are similar in structure and insertion principle to the aforementioned protective gas inlet connector 11 / protective gas outlet connector 15. Each of the waste heat gas inlet connector 17 / waste heat gas outlet connector 10 / waste heat gas intermediate connector 8 includes a second connector body 48 similar to the first connector body 33. The upper end of the second connector body 48 is hemispherical and is used to mate with the corresponding waste heat gas inlet port 41 or waste heat gas outlet port 42. A second insertion hole 49 is provided on the base 3 for sliding engagement with the lower middle part of the second connector body 48. A second air guide tube 51 is fixedly installed in the second insertion hole 49, and the upper end of the second air guide tube 51 is in a sealed sliding engagement with the internal cavity of the second connector body 48. The second gas guide pipe 51 corresponding to the waste heat gas inlet connector 17 is connected to the right side of the furnace body 1 through the waste heat gas inlet channel 52 opened on the base 3. The inner end of the waste heat gas inlet channel 52 is connected to the second gas guide pipe 51, and the outer end penetrates the outer wall of the base 3 to form a waste heat gas inlet (not shown in the figure) and is connected to the furnace body 1. The second gas guide pipe 51 corresponding to the waste heat gas exhaust connector 10 is connected to the exhaust gas treatment mechanism through the waste heat gas exhaust channel 63 opened on the base 3. The inner end of the waste heat gas exhaust channel 63 is connected to the second gas guide pipe 51, and the outer end penetrates the outer wall of the base 3 to form a waste heat gas exhaust port (not shown in the figure) and is connected to the exhaust gas treatment mechanism. The second gas guide pipe 51 corresponding to the waste heat gas intermediate connector 8 is connected through the waste heat gas connecting channel 53 opened on the base 3.
[0046] Multiple second connecting holes 46 are formed through the upper circumference of the second air guide pipe 51. Second air collecting grooves 47, intersecting with the second connecting holes 46, are formed on the inner wall of the second connector body 48. Multiple second air passages 45 are also provided at the top of the second connector body 48. The lower end of each second air passage 45 is connected to the second air collecting groove 47, and the upper end passes through the second air chamber 44 and the second end air hole 43 before penetrating the top of the second connector body 48. A second connector spring 50 is fitted around the outer circumference of the second air guide pipe 51. The lower end of the second connector spring 50 abuts against the bottom of the second insertion hole 49, and the upper end abuts against the second connector body 48, used to push the second connector body 48 towards the preheating cylinder 5. A second cover plate 40 is provided at both the waste heat gas inlet 41 and the waste heat gas outlet 42. The cover plate is pressed down by the second sealing spring 39 located in the coil 19 to seal the waste heat gas inlet 41 and the waste heat gas outlet 42. A spring retaining ring 38 is provided in the coil 19 to support the second sealing spring 39.
[0047] With the above structure, after the two preheating chambers 7 are positioned in the preheating position 9 along with the preheating cylinder 5, the waste heat gas inlet connector 17 and the waste heat gas intermediate connector 8 in the right preheating position 9 are respectively inserted into the waste heat gas inlet hole 41 and the waste heat gas exhaust hole 42 of the corresponding preheating chamber 7, and the waste heat gas exhaust connector 10 and the waste heat gas intermediate connector 8 in the right preheating position 9 are respectively inserted into the waste heat gas exhaust hole 42 and the waste heat gas inlet hole 41 of the corresponding preheating chamber 7. This realizes the series connection between the coil 19 corresponding to the preheating chamber 7 in the two preheating positions 9 and the exhaust on the right side of the furnace body 1, making full use of the exhaust heat energy of the furnace body 1. To further improve the utilization rate of exhaust heat energy of furnace body 1, in other embodiments of the present invention, more preheating positions 9 and a corresponding number of preheating chambers 7 can be set. The preheating positions 9 at both ends are respectively equipped with the same waste heat gas inlet connector 17, waste heat gas exhaust connector 10 and waste heat gas intermediate connector 8 as in this embodiment. The remaining preheating positions 9 are respectively equipped with two waste heat gas intermediate connectors 8, and the two adjacent waste heat gas intermediate connectors 8 are the same to realize the series connection of coils 19. This allows the exhaust gas from furnace body 1 to be fully heated until it is cooled to room temperature before being discharged to the tail gas treatment mechanism. This not only makes efficient use of heat energy, but also simplifies the subsequent tail gas treatment mechanism, reduces its heat resistance requirements, and reduces costs.
[0048] Finally, to improve automation and facilitate implementation, the servo motor 23 in this embodiment is connected to a controller. The controller controls the servo motor 23 to periodically rotate the preheating cylinder 5 by 90° at intervals. The interval is preset so that the protective gas in the preheating chamber 7 of the preheating position 9 is just discharged. In addition, a temperature sensor is also installed in the preheating chamber 7. The temperature sensor and the power supply are both connected to the controller. When the temperature sensor detects that the temperature in the preheating chamber 7 has risen to room temperature, the power supply is cut off. At this time, even if the two electrode connectors 18 are still connected to the electric heating element 22 in the preheating position 9, it will not continue to heat up, thus avoiding energy waste.
[0049] Example 2
[0050] The improvement of this embodiment over embodiment 1 lies in the protective gas inlet connector 11, the protective gas exhaust connector 15, the waste heat gas inlet connector 17, the waste heat gas exhaust connector 10, and the waste heat gas intermediate connector 8. Taking the protective gas inlet connector 11 as an example, as follows... Figure 9 and Figure 10As shown, the first connector body 33 is provided with two inclined support rods 62, each with a roller 61 at its upper end. The upper edge of the roller 61 is higher than the first connector body 33, and the bottom of the preheating cylinder 5 is provided with a support rail 58 for the corresponding roller 61 to roll into contact. Thus, during the rotation of the preheating cylinder 5, this embodiment can replace the sliding contact between the top of the first connector body 33 and the bottom surface of the preheating cylinder 5 with the rolling contact between the roller 61 and the support rail 58, reducing the friction of the preheating cylinder 5 rotation and improving the service life of the first connector body 33.
[0051] The support guide rail 58 has a notch 59. The distance between the notch 59 and the protective gas inlet / outlet hole 27 is set such that when the protective gas inlet / outlet hole 27 rotates to correspond to the position of the first connector body 33, and the first connector spring 35 pushes the first connector body 33 up to insert into the protective gas inlet / outlet hole 27, both rollers 61 roll into the notch 59. This avoids the problem that the first connector cannot be smoothly inserted into the protective gas inlet / outlet hole 27 due to the upper limit of the support guide rail 58 for the rollers 61. The side of the notch 59 corresponding to the front of the preheating cylinder 5 in the direction of movement is a ramp 60 for the rollers 61 to roll back onto the support guide rail 58, thus allowing the rollers 61 to roll back onto the ramp 60. Figure 11 As the preheating chamber 7 is filled with gas, the servo motor 23 drives the preheating cylinder 5 to rotate and pushes the first connector body 33 out of the protective gas inlet / outlet hole 27. During this process, the first connector body 33 is subjected not only to the downward thrust generated between its upper hemisphere and the protective gas inlet / outlet hole 27, but also to the downward thrust generated between the two rollers 61 and the corresponding ramp 60. This reduces the squeezing force received by the first connector body 33 during its removal process compared to Embodiment 1, further improving its service life. Furthermore, in this embodiment, the two rollers 61 are located not only on the front and rear sides of the first connector body 33 relative to the direction of movement of the preheating cylinder 5, but also on both sides of the protective gas inlet / outlet hole 27. This makes the support structure for the first connector body 33 more stable, further enhancing its service life. It should be noted that, due to obstructed viewpoints, for ease of explanation... Figure 9 and 11 Only the support rail 58 and corresponding notch 59 and ramp 60 corresponding to the rear roller 61 are shown. The support rail 58 and corresponding notch 59 and ramp 60 corresponding to the front roller 61 have the same structure, but are staggered in position. Both rollers 61 fall into the corresponding notch 59 when the first connector body 33 is inserted into the protective gas inlet / outlet hole 27, and both engage with the corresponding ramp 60 when the first connector body is removed from the protective gas inlet / outlet hole 27.
[0052] Similar to the protective gas inlet connector 11, the protective gas exhaust connector 15, waste heat gas inlet connector 17, waste heat gas exhaust connector 10, and waste heat gas intermediate connector 8 in this embodiment are all equipped with rollers 61 of the same structure to improve the overall stability of the equipment.
Claims
1. A preheating atmosphere protection experimental furnace, comprising a furnace body (1), a gas source, and a preheating device for preheating the protective gas in the gas source, characterized in that: The preheating device includes a base (3) and a preheating cylinder (5) rotatably mounted on the base (3). The base (3) is divided into an air inlet (12), a preheating position (9) and an exhaust position (14) along the circumferential direction. The preheating cylinder (5) is provided with multiple preheating chambers (7), and any preheating chamber (7) can pass through the air inlet (12), the preheating position (9) and the exhaust position (14) in sequence during the rotation of the preheating cylinder (5). The air inlet position (12) is provided with a protective gas inlet connector (11) connected to the gas source, and the exhaust position (14) is provided with a protective gas exhaust connector (15) connected to the furnace body (1). The protective gas inlet connector (11) and the protective gas exhaust connector (15) are both used to cooperate with the protective gas inlet and outlet holes (27) provided on the preheating chamber (7) so that when the preheating chamber (7) is rotated to the air inlet position (12), it is connected to the gas source for air intake, and when the preheating chamber (7) is rotated to the exhaust position (14), it is connected to the furnace body (1) for exhaust. Two electrode connectors (18) are provided in the preheating position (9) adjacent to the exhaust position (14). The two electrode connectors (18) are used to cooperate with the electric heating elements (22) respectively set in the preheating chamber (7) so that when the preheating chamber (7) is rotated to the preheating position (9) adjacent to the exhaust position (14), the electrode connectors (18) are connected to the corresponding electric heating elements (22) for heating. Both the protective gas inlet connector (11) and the protective gas outlet connector (15) include a tubular first connector body (33) with a closed upper end and an open lower end. The upper end of the first connector body (33) is arc-shaped and used to connect with the protective gas inlet / outlet port (27). The lower outer wall of the first connector body (33) is sealed and slidably fitted with the first insertion hole (34) opened on the chassis. The lower inner wall of the first connector body (33) is sealed and slidably fitted with the first gas guide tube (36) fixed in the first insertion hole (34). The first gas guide tube (36) corresponding to the protective gas inlet connector (11) is connected to the protective gas inlet interface (4) through the protective gas inlet channel (37) opened in the base (3). The first gas guide tube (36) corresponding to the protective gas outlet connector (15) is connected to the protective gas outlet interface (2) through the protective gas outlet channel opened in the base (3). Multiple gas guide tubes are opened through the upper circumference of the first gas guide tube (36). A first connecting hole (31) is provided. A first gas collecting groove (32) is provided on the inner wall of the first connector body (33) and intersects with the first connecting hole (31). A plurality of first gas passages (30) are also provided inside the first connector body (33). The lower end of the first gas passage (30) is connected to the first gas collecting groove (32), and the upper end passes through the top of the first connector body (33). A first connector spring (35) is provided on the outer sleeve of the first gas guide pipe (36) to push the first connector body (33) toward the preheating cylinder (5). The first connector spring (35) is used to push the upper end of the first connector body (33) into the protective gas inlet and outlet hole (27) to connect the corresponding first gas guide pipe (36) and the preheating chamber (7). A first cover plate (26) is provided in the preheating chamber (7) at the position of the protective gas inlet and outlet hole (27). The first cover plate (26) is pressed tightly against the bottom of the preheating chamber (7) by the first sealing spring (28) and seals the protective gas inlet and outlet hole (27). There are multiple preheating positions (9). The preheating chamber (7) is also equipped with a coil (19) for preheating the protective gas introduced by the gas source by using the residual heat of the protective gas discharged from the furnace body (1). Each coil (19) has a residual heat gas inlet hole (41) and a residual heat gas exhaust hole (42) distributed towards the base (3). The preheating position (9) adjacent to the exhaust position (14) is equipped with a residual heat gas inlet connector (17) connected to the furnace body (1). The residual heat gas inlet connector (17) is used to connect with the corresponding residual heat gas after the preheating chamber (7) is rotated to the preheating position (9) adjacent to the exhaust position (14). The hot gas inlet (41) is connected, and the preheating position (9) adjacent to the inlet position (12) is provided with a waste heat gas exhaust connector (10) connected to the exhaust gas treatment mechanism. The waste heat gas exhaust connector (10) is used to connect with the corresponding waste heat gas exhaust port (42) after the preheating chamber (7) is rotated to the preheating position (9) adjacent to the inlet position (12). All preheating positions (9) are provided with waste heat gas intermediate connectors (8). The waste heat gas intermediate connectors (8) between two adjacent preheating positions (9) are interconnected to connect the coils (19) corresponding to the preheating chambers (7) in all preheating positions (9) in series.
2. The preheating atmosphere protected laboratory furnace according to claim 1, characterized in that: A servo motor (23) is provided in the middle of the base (3). The output shaft (13) of the servo motor (23) is inserted into the shaft hole at the bottom of the preheating cylinder (5) and connected for transmission.
3. The preheating atmosphere protected laboratory furnace according to claim 1, characterized in that: The top of the preheating chamber (7) is open. A piston (20) is provided in the preheating chamber (7). The outer edge of the piston (20) is sealed and slidingly fitted with the inner wall of the preheating chamber (7). A counterweight is also provided on the piston (20) to maintain the pressure of the protective gas in the preheating chamber (7).
4. The preheating atmosphere protected laboratory furnace according to claim 1, characterized in that: The first connector body (33) is provided with a roller (61), and a support guide rail (58) is provided at the bottom of the preheating cylinder (5) for the roller (61) to roll and cooperate. The support guide rail (58) has a notch (59) so that the first connector spring (35) can push the upper end of the first connector body (33) into the protective gas inlet and outlet hole (27) after the roller (61) rolls into the notch (59). The side of the notch (59) corresponding to the front of the movement direction of the preheating cylinder (5) is a ramp (60) for the roller (61) to roll back onto the support guide rail (58).
5. The preheating atmosphere protected laboratory furnace according to claim 4, characterized in that: Two rollers (61) are connected to the first connector body (33) by a support rod (62). The two rollers (61) are located on the front and rear sides of the first connector body (33) relative to the movement direction of the preheating cylinder (5). Two support rails (58) are provided on the preheating cylinder (5). The two support rails (58) are located on both sides of the protective gas inlet and outlet hole (27).
6. The preheating atmosphere protected laboratory furnace according to claim 1, characterized in that: Two electrode connectors (18) are electrically connected to the power supply respectively. The electrode connectors (18) are slidably disposed in the third socket (56) opened on the base (3). The third socket (56) is also provided with a third connector spring (57) for pushing the electrode connectors (18) toward the preheating cylinder (5). The electric heating element (22) has two conductive terminals (54). The conductive terminals (54) are fixed at the bottom of the preheating cavity (7) and a wiring hole (55) is opened at the bottom of the preheating cavity (7) for the conductive terminals (54) to be exposed. The wiring hole (55) allows the electrode connectors (18) to connect with the corresponding conductive terminals (54) under the pushing force of the third connector spring (57).
7. The preheating atmosphere protected laboratory furnace according to claim 1, characterized in that: The waste heat gas inlet connector (17), waste heat gas outlet connector (10), and waste heat gas intermediate connector (8) all include a tubular second connector body (48) with a closed upper end and an open lower end. The upper end of the second connector body (48) is arc-shaped and used to connect with the corresponding waste heat gas inlet port (41) or waste heat gas outlet port (42). The lower outer wall of the second connector body (48) is sealed and slides in fit with the second insertion hole (49) opened on the chassis. The lower inner wall of the second connector body (48) is fixed in the second insertion hole (49) with the second gas guide tube. (51) Sealed sliding fit, the second gas guide pipe (51) corresponding to the waste heat gas inlet connector (17) is connected to the furnace body (1) through the waste heat gas inlet channel (52) opened on the base (3), the second gas guide pipe (51) corresponding to the waste heat gas exhaust connector (10) is connected to the tail gas treatment mechanism through the waste heat gas exhaust channel (63) opened on the base (3), the second gas guide pipe (51) corresponding to the adjacent waste heat gas intermediate connector (8) is connected through the waste heat gas connecting channel (53) opened on the base (3), the second gas guide pipe ( 51) Multiple second connecting holes (46) are provided through the upper circumference. A second gas collecting groove (47) is provided on the inner wall of the second connector body (48) and intersects with the second connecting holes (46). Multiple second air passages (45) are also provided on the top of the second connector body (48). The lower end of the second air passage (45) is connected to the second gas collecting groove (47), and the upper end is provided through the top of the second connector body (48). A second connector spring (50) is provided on the outer sleeve of the second air guide pipe (51) for pushing the second connector body (48) toward the preheating cylinder (5). The connector spring (50) is used to push the upper end of the second connector body (48) into the corresponding waste heat gas inlet (41) or waste heat gas outlet (42) to connect all the coils (19) in the preheating position to the furnace body (1). The preheating chamber (7) is provided with a second cover plate (40) at the positions of the waste heat gas inlet (41) and the waste heat gas outlet (42). The second cover plate (40) is pressed tightly against the bottom of the preheating chamber (7) by the second sealing spring (39) and blocks the corresponding waste heat gas inlet (41) and waste heat gas outlet (42).
8. The preheating atmosphere protected laboratory furnace according to claim 1, characterized in that: The protective gas inlet connector (11) and the protective gas exhaust connector (15) are located on circle A on the top surface of the base (3). The two electrode connectors (18) are located on circle B on the top surface of the base (3). The waste heat gas inlet connector (17), the waste heat gas exhaust connector (10), and all the waste heat gas intermediate connectors (8) are located on circle C on the top surface of the base (3). Circles A, B, and C are all centered on the output shaft (13) of the servo motor (23), and the radii of circles A, B, and C are all different.
Citation Information
Patent Citations
Forced-exhaust atmosphere furnace
CN105890361A
Tubular atmosphere stove
CN207936759U
Protective gas preheating method and device for 3D printing
CN106111989A
Forced atmosphere furnace
CN203432359U
Efficient preheating device for hydrogen production
CN212481678U
