Electronic equipment maintenance process control method based on product ebom and database

By establishing a maintenance feature and process database based on product EBOM and database, maintenance material requirements and process specifications are generated, solving the problems of high management difficulty and high cost in the maintenance of electronic equipment, realizing refined material management and standardized information, and improving maintenance efficiency.

CN115794887BActive Publication Date: 2026-01-02SOUTHWEST CHINA RES INST OF ELECTRONICS EQUIP
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211536138.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-02
Publication Date
2026-01-02
Estimated Expiration
2042-12-02

AI Technical Summary

Technical Problem

The maintenance process of electronic equipment products is difficult to manage, requiring a large investment of manpower, management, time and material costs. Inaccurate information transmission also leads to increased costs.

Method used

The electronic equipment maintenance process control method based on product EBOM and database establishes a maintenance feature database and a process database, combines the test and identification results, outputs maintenance material requirements and handling measures, generates maintenance process specifications, and achieves refined material management and standardized information.

Benefits of technology

It enables precise management of maintenance materials, reduces manpower and management costs, improves the efficiency of the maintenance process and the accuracy of information, and lowers the overall cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115794887B_ABST
    Figure CN115794887B_ABST
Patent Text Reader

Abstract

The application discloses an electronic equipment maintenance process control method based on product EBOM and a database, and relates to the field of electronic equipment maintenance. First, a maintenance feature database and a maintenance process database are established. Then, the detection and identification results of a product to be maintained are taken as input, combined with the information of the maintenance feature database, and through data processing activity 1, the maintenance material requirements are output and pushed to an ERP system. Through data processing activity 2, the maintenance processing measures and the initialized maintenance process procedures are output and pushed to an MES system. The application can realize the standardization and structuring of maintenance process information, the fine management of maintenance materials, the self-matching of maintenance measures, and the assistance of process personnel in the design of maintenance process procedures. Compared with the traditional maintenance process, the application realizes the accurate and effective management of the materials and information generated in the maintenance process, and improves the maintenance efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the field of electronic equipment maintenance, in particular to an electronic equipment maintenance process control method based on product EBOM and database. BACKGROUND

[0002] The statements in this section merely provide background information related to the present disclosure and can not constitute the prior art.

[0003] In the field of electronic equipment, the maintenance process of a product can be divided into four stages: technical material preparation, detection identification, repair, and debugging; among them, the detection identification stage is the process of judging the state of the product, and the result of detection identification is the basis for process personnel to design process procedures; the repair stage is the process of disposing the product in real object, which needs to be combined with product design drawings and carried out under the guidance of process procedures.

[0004] Due to the characteristics of multi-variety and small batch of electronic equipment products, and the complex working environment, the individual conditions of the products to be maintained are complex and different, resulting in great difficulty in managing the maintenance process of the products; in the maintenance process of electronic equipment products, the recording and transmission of information, the control of materials, and the design of process procedures all depend on human activities, and a large amount of human and management costs are needed to control the maintenance process, and the maintenance material information transmitted manually is inaccurate and lagging, resulting in an increase in time and material costs. SUMMARY

[0005] The present application aims to solve the problems of great difficulty in managing the maintenance process of products, high human and management costs, and high time and material costs in the current maintenance process of electronic equipment products, and provides an electronic equipment maintenance process control method based on product EBOM and database, which realizes fine management of maintenance materials, standardization and structuring of maintenance process information, and through data processing, recommends suitable treatment measures according to the detection identification result, generates maintenance process procedures, assists process personnel in maintenance process design, improves the performance of maintenance process management, reduces the costs required in the maintenance process, and solves the above problems.

[0006] The technical scheme of the present application is as follows:

[0007] The electronic equipment maintenance process control method based on product EBOM and database comprises:

[0008] Step S1: establishing a maintenance feature database and a maintenance process database;

[0009] Step S2: The detection and identification results of the product to be repaired are input, combined with the repair feature database information, and the repair material requirements are output through data processing activity 1 and pushed to the ERP system.

[0010] Step S3: The detection and identification results of the product to be repaired are input, combined with the repair process database, and the repair processing measures and initialized repair process procedures are output through data processing activity 2 and pushed to the MES system.

[0011] Further, the repair feature database is composed of repair feature elements;

[0012] The repair feature element contains four attributes, namely "problem phenomenon", "damage degree", "treatment intention" and "treatment method";

[0013] The repair process database is composed of repair process elements;

[0014] The repair feature element contains three attributes, namely "process", "step" and "action".

[0015] Further, the "problem phenomenon" defines the specific performance of the material problem;

[0016] The "damage degree" defines the degree of a certain material problem;

[0017] The "treatment intention" defines the disposal method of the problem material;

[0018] The "treatment method" defines the specific treatment measures for the material problem;

[0019] The "process" is defined according to the industry habits followed by the organization, representing the skilled personnel, site, equipment and facilities required for performing repair operations;

[0020] The "step" is the decomposition and sorting of all repair operations required for a certain process, reflecting the order and specific content of the operation;

[0021] The "action" is the decomposition and sorting of the specific repair operation in the step, reflecting the specific action of the repair operation.

[0022] Further, the data processing activity 1 includes:

[0023] Step S21: Generate product initial repair BOM;

[0024] Step S22: Assign values to the attributes of the product initial repair BOM;

[0025] Step S23: Convert the product initial repair BOM into a repair BOM.

[0026] Further, the step S21 comprises:

[0027] The EBOM data of the product is copied, and five attributes, i.e. "belonging level", "problem phenomenon", "damage degree", "treatment intention" and "treatment method", are added to each node of the EBOM structure tree;

[0028] The four attributes, i.e. "problem phenomenon", "damage degree", "treatment intention" and "treatment method", are defined in the same way as the attributes of the maintenance feature element.

[0029] Further, the step S22 comprises:

[0030] Step S221: The four newly added attributes, i.e. "problem phenomenon", "damage degree", "treatment intention" and "treatment method", of the initial maintenance BOM are associated with the maintenance feature database, and the attribute contents can be directly extracted from the maintenance feature database;

[0031] Step S222: The corresponding maintenance feature element is screened out by reading and screening the two attributes, i.e. "problem phenomenon" and "damage degree", of the maintenance feature database, and the four attributes, i.e. "problem phenomenon", "damage degree", "treatment intention" and "treatment method", of the initial maintenance BOM node are assigned values according to the attribute contents of the maintenance feature element;

[0032] Step S223: After the assignment, the attribute content of "belonging level" of the initial maintenance BOM is filled in according to the rules.

[0033] Further, the rules in the step S223 comprise:

[0034] The assigned BOM node is a node directly constituting the initial maintenance BOM structure tree, and the content of "belonging level" is filled in as "this level";

[0035] The assigned BOM node is a node indirectly constituting the initial maintenance BOM structure tree, and the content of "belonging level" is filled in as "child level".

[0036] Further, the step S23 comprises:

[0037] According to the attributes of the initial maintenance BOM node, the quantity attribute of the initial maintenance BOM representing the quantity of materials is modified according to the rules;

[0038] After the modification of the quantity attribute of the initial maintenance BOM node according to the rules is completed, the maintenance BOM is outputted;

[0039] The rules comprise:

[0040] When the maintenance initial BOM node "treatment intention" attribute is "replace", the attribute representing the node quantity maintains the original value.

[0041] When the maintenance initial BOM node "treatment intention" attribute is "repair" or not assigned, the attribute value representing the node quantity is changed to 0.

[0042] Further, the data processing activity two comprises:

[0043] Step S31: generating a maintenance material requirement list.

[0044] Step S32: maintenance process procedure output.

[0045] Further, the step S31 comprises:

[0046] Extracting the node quantity attribute of the nodes in the maintenance BOM which is not 0 node information, outputting the specifications and quantities of the materials, and generating a maintenance material requirement list;

[0047] Step S32 comprises:

[0048] Based on the content of the "treatment method" attribute of the maintenance BOM node, the corresponding maintenance process element in the maintenance process database is associated, the maintenance process element associated with the maintenance BOM is integrated and output as a maintenance process procedure;

[0049] Wherein, the integration rule is as follows:

[0050] All the "belonging level" attributes of the maintenance BOM nodes are "this level", and the maintenance process elements associated therewith are integrated into a maintenance process procedure and output;

[0051] The "belonging level" attribute of the maintenance BOM node is "child level", and the maintenance process element associated therewith is output as a maintenance process procedure.

[0052] Compared with the prior art, the beneficial effects of the present application are:

[0053] The electronic equipment maintenance process control method based on product EBOM and database comprises the following steps: S1, establishing a maintenance feature database and a maintenance process database; S2, taking the detection and identification result of a product to be maintained as input, combining the maintenance feature database information, outputting maintenance material requirements through data processing activity 1, and pushing to an ERP system; and S3, taking the detection and identification result of the product to be maintained as input, combining the maintenance process database, outputting maintenance processing measures and initialized maintenance process procedures through data processing activity 2, and pushing to an MES system. Based on product EBOM, the method realizes digitization, standardization and structuring of maintenance process information through development and maintenance of the maintenance feature database and the maintenance process database and innovative data processing mode, can finely manage maintenance required materials, is beneficial to improving the inventory management level of an enterprise, realizes output of process files based on knowledge, and reduces the workload of process personnel. The new method provides a management idea for maintenance business, is beneficial to cost reduction and efficiency improvement. BRIEF DESCRIPTION OF DRAWINGS

[0054] Figure 1 It is a flowchart of the electronic equipment maintenance process control method based on product EBOM and database;

[0055] Figure 2 It is a maintenance feature element attribute schematic diagram;

[0056] Figure 3 It is a maintenance process element attribute schematic diagram;

[0057] Figure 4 It is a data processing activity 1 step schematic diagram;

[0058] Figure 5 It is a data processing activity 2 step schematic diagram;

[0059] Figure 6 It is a maintenance feature database, a maintenance process database, and an associated relationship example schematic diagram;

[0060] Figure 7 It is a product EBOM conversion into an initial maintenance BOM example schematic diagram;

[0061] Figure 8 It is a data processing activity 1 step S22 example schematic diagram;

[0062] Figure 9 It is a product maintenance BOM example schematic diagram;

[0063] Figure 10 It is a maintenance material requirement example schematic diagram;

[0064] Figure 11is a schematic diagram of a repair process example. DETAILED DESCRIPTION

[0065] It should be noted that the relational terms herein, such as first and second, and the like, are used solely to distinguish one from another entity or action, without necessarily requiring or implying any such actual relationship or order between such entities or actions. Moreover, the terms "comprises", "comprising", or any other variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but can include other elements not expressly listed or inherent to such process, method, article, or apparatus. An element proceeded by "comprises... a" does not, without more constraints, exclude the existence of additional identical elements in the process, method, article, or apparatus that comprises the element.

[0066] The features and advantages of the present application will be further described in the following embodiments.

[0067] Embodiment One

[0068] Due to the characteristics of multi-variety and small batch of electronic equipment products, and the complex working environment, the individual conditions of the products to be repaired are complex and different, resulting in great difficulty in managing the repair process of the products; in the repair process of electronic equipment products, the recording and transmission of information, the control of materials, and the design of process procedures all depend on human activities, and a large amount of human and management costs are required to control the repair process. Moreover, the repair material information transmitted by manual transmission is inaccurate and lagging, resulting in an increase in time and material costs.

[0069] In the field of electronic equipment, the engineering bill of material (EBOM) of a product integrates the components, files and their relationships of the product together, directly guides the production and assembly process of the product, and gradually realizes the digitization and informatization of the production process of the product.

[0070] As a part of the whole life cycle management of a product, the repair process can also develop towards digitization and informatization based on the mode of bill of material; based on this, the embodiment provides a repair process control method, through the implementation of the method, the fine management of repair materials can be realized, the repair process information can be standardized and structured, and through the data processing mode, the applicable treatment measures are recommended according to the detection and identification results, the repair process procedures are generated, the repair process design of the process personnel is assisted, the performance of the repair process management is improved, and the costs required by the repair process are reduced.

[0071] Therefore, the embodiment aims at the above problems, and proposes an electronic equipment maintenance process control method based on product EBOM and a database, so as to realize fine management of maintenance materials, standardization and structuring of maintenance process information, recommend applicable processing measures according to the detection and identification results, generate maintenance process procedures, assist process personnel in maintenance process design, improve the performance of maintenance process management, and reduce the costs required in the maintenance process.

[0072] Referring to Figure 1 , the electronic equipment maintenance process control method based on product EBOM and a database specifically comprises the following steps:

[0073] Step S1: Establishing a maintenance feature database and a maintenance process database;

[0074] Step S2: Taking the detection and identification results of the product to be maintained as input, combining the maintenance feature database information, and outputting maintenance material requirements through data processing activity 1, and pushing to an ERP system, so as to realize fine management of maintenance materials;

[0075] Step S3: Taking the detection and identification results of the product to be maintained as input, combining the maintenance process database, outputting maintenance processing measures and initialized maintenance process procedures through data processing activity 2, pushing to an MES system, realizing guidance on the maintenance operation process, and finally achieving the purpose of controlling the maintenance process.

[0076] In the embodiment, specifically, the maintenance feature database is composed of maintenance feature elements;

[0077] The maintenance feature element contains four attributes, namely, “problem phenomenon”, “damage degree”, “processing intention”, and “processing method”;

[0078] The maintenance process database is composed of maintenance process elements; it should be noted that the maintenance process element is based on the maintenance knowledge of an organization, and details the “processing method” in the maintenance feature element, and reflects the sequence of maintenance processing and the requirements of man, machine, material, method, environment, and measurement;

[0079] The maintenance feature element contains three attributes, namely, “process”, “step”, and “action”.

[0080] In the embodiment, specifically, the specific definitions of the attributes are as follows:

[0081] The “problem phenomenon” defines the specific performance of the material problem; for example, the damaged coating film layer on the surface of the material, the scratch on the surface of the film layer is defined as “coating scratch”, and the local shedding of the film layer is defined as “coating local shedding”;

[0082] The "damage degree" defines the degree of a certain embodiment problem; the severity of the problem is defined as "mild", "moderate" and "severe" according to the maintenance experience of the organization; the "damage degree" is strongly correlated with the "problem phenomenon", for example, when the "problem phenomenon" is "coating scratch", the degree of the problem can be defined from two dimensions of scratch depth and scratch distribution: when the scratch has no scratch feeling and the distribution area is less than 5% of the overall area, it is defined as "mild"; when the scratch has no scratch feeling and the distribution area is greater than 5% of the overall area, or the scratch has scratch feeling and the distribution area is less than 5% of the overall area, it is defined as "moderate"; when the scratch has scratch feeling and the distribution area is greater than 5% of the overall area, it is defined as "severe". If the damage degree of a certain problem cannot be defined, the content can be empty;

[0083] The "treatment intention" defines the disposal method of the problem material; when the material problem can be solved by rework and repair, it is defined as "repairable", and when the material problem cannot be solved by rework and repair and must be replaced by new material, it is defined as "replacement";

[0084] The "treatment method" is defined as a specific treatment measure for the material problem, which is an embodiment of the maintenance knowledge of the organization, for example, when the coating film on the surface of the material is damaged, the treatment method can be defined as "surface local touch-up" or "grinding to remove the original film layer and re-spraying after cleaning", and the specific treatment method is matched with the "problem phenomenon" and "damage degree" attributes;

[0085] The "process" is defined according to the industry habits followed by the organization, representing the skilled personnel, site, equipment and facilities required to perform maintenance operations, such as "mechanical assembly" and "electrical assembly";

[0086] The "work step" is a decomposition and sequencing of all maintenance operations required to be completed in a certain process, which embodies the order and specific content of the operation;

[0087] The "action" is a decomposition and sequencing of a specific maintenance operation in a work step, which embodies the specific action of the maintenance operation.

[0088] In this embodiment, specifically, the data processing activity one takes the EBOM of the product as input and outputs the maintenance BOM of the product, including the following three steps:

[0089] Step S21: generating an initial maintenance BOM of the product;

[0090] Step S22: assigning values to the attributes of the initial maintenance BOM of the product;

[0091] Step S23: converting the initial maintenance BOM of the product into a maintenance BOM.

[0092] In this embodiment, specifically, the step S21 includes:

[0093] Copy the EBOM data of the product, and add five attributes to each node of the EBOM structure tree, which are "ownership level", "problem phenomenon", "damage degree", "treatment intention" and "treatment method";

[0094] Among them, the four attributes of "problem phenomenon", "damage degree", "treatment intention" and "treatment method" have the same attribute definition as the maintenance feature element.

[0095] In this embodiment, specifically, the step S22 comprises:

[0096] Step S221: Establish the association between the four newly added attributes of the product initial maintenance BOM, i.e. "problem phenomenon", "damage degree", "treatment intention" and "treatment method", and the maintenance feature database, and the attribute content can be directly extracted from the maintenance feature database;

[0097] Step S222: Through the detection and identification activities, the corresponding maintenance feature elements are screened out in the way of reading and screening the two attributes of "problem phenomenon" and "damage degree" of the maintenance feature database, and the contents of each attribute of the maintenance feature element are used to assign values to the four attributes of the initial maintenance BOM node, i.e. "problem phenomenon", "damage degree", "treatment intention" and "treatment method";

[0098] Step S223: After the assignment is completed, fill in the attribute content of "ownership level" of the product initial maintenance BOM according to the rules.

[0099] In this embodiment, specifically, the rules in the step S223 comprise:

[0100] The assigned BOM node is the node directly constituting the initial maintenance BOM structure tree, and the content of "ownership level" is filled in as "this level";

[0101] The assigned BOM node is the node indirectly constituting the initial maintenance BOM structure tree, and the content of "ownership level" is filled in as "child level".

[0102] In this embodiment, specifically, the step S23 comprises:

[0103] According to the attributes of the initial maintenance BOM node, modify the quantity attribute of the initial maintenance BOM representing the quantity of materials according to the rules;

[0104] After the change of the quantity of the initial maintenance BOM node is completed according to the rules, the maintenance BOM is outputted;

[0105] Among them, the rules include:

[0106] When the "treatment intention" attribute of the maintenance initial BOM node is "to be replaced", the attribute representing the number of nodes is maintained as the original value.

[0107] When the "treatment intention" attribute of the maintenance initial BOM node is "to be repaired" or not assigned, the attribute value representing the number of nodes is changed to 0.

[0108] In this embodiment, specifically, the data processing activity two is to generate a maintenance material requirement list and a maintenance process procedure based on the maintenance BOM, including the following two steps:

[0109] Step S31: generating a maintenance material requirement list.

[0110] Step S32: maintenance process procedure output.

[0111] In this embodiment, specifically, the step S31 includes:

[0112] Extracting the node information with the number of nodes attribute in the maintenance BOM being not 0 nodes, outputting the specifications and quantities of materials, and generating a "maintenance material requirement list"; it should be noted that this list is the materials required for the maintenance product, and the organization can prepare the materials based on it;

[0113] Step S32 includes:

[0114] Based on the content of the "treatment method" attribute of the maintenance BOM node, associating the corresponding maintenance process element in the maintenance process database, integrating and outputting the maintenance process element associated with the maintenance BOM as a maintenance process procedure;

[0115] The integration rule is as follows:

[0116] All the "belonging level" attributes of the maintenance BOM nodes are "this level", and the associated maintenance process elements are integrated into a maintenance process procedure and outputted;

[0117] The "belonging level" attribute of the maintenance BOM node is "child level", and the associated maintenance process element is outputted as a maintenance process procedure.

[0118] The process personnel can adjust the maintenance process procedure to generate a final product maintenance process to guide the product maintenance process.

[0119] Embodiment two

[0120] An electronic equipment maintenance process control method based on product EBOM and knowledge database driving, including a maintenance feature database, a maintenance process database, a data processing activity one, and a data processing activity two.

[0121] The maintenance feature database is composed of maintenance feature elements, and the attributes of the maintenance feature elements are as follows Figure 2 .

[0122] The maintenance process database consists of maintenance process elements, and the attributes of these maintenance process elements are as follows: Figure 3 .

[0123] Data processing activity consists of three steps, such as Figure 4 .

[0124] Data processing activity two consists of two steps, such as Figure 5 .

[0125] In this embodiment, the method is used to control the maintenance process of product A.

[0126] First, establish a maintenance feature database and a maintenance process database, and then establish the relationship between the feature elements of the two databases, such as... Figure 6 .

[0127] Copy the EBOM of product A, and add five maintenance attributes to the EBOM node: "Attribution Level," "Problem Description," "Damage Severity," "Handling Intent," and "Handling Method." This will convert the EBOM of product A into the initial maintenance BOM for product A. Figure 7 .

[0128] The four maintenance attributes of the initial maintenance BOM node, namely "problem phenomenon", "damage level", "handling intention" and "handling method", are associated with the maintenance feature database. The maintenance attribute content can be directly extracted from the maintenance feature database.

[0129] In this example, the detection and identification results of product A are as follows: First, there is a scratch on the outer surface of the box, and the scratch feels rough to the touch; second, the casing of the integrated chip on the power board is deformed.

[0130] Based on the results of these two tests and identifications, the maintenance attributes of the "box" and "integrated chip" nodes in the initial maintenance BOM of product A are assigned values.

[0131] like Figure 8 As shown, the process first involves reading and filtering the "problem phenomenon" and "damage level" attributes from the maintenance feature library to determine the correspondence between the "box" node and "maintenance feature element ②", and between the "integrated chip" node and "maintenance feature element ④". Then, the maintenance attributes of the "box" and "integrated chip" nodes in the initial maintenance BOM are assigned values ​​based on the attributes of "maintenance feature element ②" and "maintenance feature element ④". Following the rules, the "attribution level" of the maintenance attribute for the "box" is defined as "this level", and the "attribution level" of the maintenance attribute for the "integrated chip" is defined as "child level".

[0132] According to the rules, change the "Material Quantity" attribute of each node in the initial maintenance BOM of product A to transform the initial maintenance BOM of product A into a maintenance BOM.

[0133] As Figure 9 , the maintenance attribute of the node is "maintainable" or has no content, and the "material quantity" is defined as 0; the maintenance attribute of the node is "replaceable", and the "material quantity" remains unchanged.

[0134] Based on the maintenance BOM of product A, a "product A maintenance material requirement list" is generated, as Figure 10 , which is provided to the ERP system of the organization for the preparation of maintenance materials.

[0135] Based on the maintenance BOM of product A, two maintenance processes of product A are generated, as Figure 11 , which are provided to the process personnel of the organization and can be used to guide the maintenance process of product A after adjustment.

[0136] The maintenance process controlled by the method can not only finely manage the materials required for maintenance, which is conducive to improving the inventory management level of the enterprise, but also realize the output of knowledge-based process documents, reduce the workload of process personnel, and is conducive to cost reduction and efficiency improvement.

[0137] The above-described embodiments only express the specific implementation of the present application, and the description is more specific and detailed, but it cannot be understood as a limitation on the protection scope of the present application. It should be noted that for ordinary skilled persons in the art, without departing from the technical concept of the present application, a number of modifications and improvements can be made, which are within the protection scope of the present application.

[0138] This background section is provided to generally present the context of the present application, the work of the current named inventors, the work described in this background section to the extent described in this section, and neither expressly nor implicitly acknowledged as prior art of the present application.

Claims

1. A method for electronic equipment repair process control based on product EBOM and database, characterized in that, The application relates to a method for establishing a maintenance feature database and a maintenance process database, and a method for generating a maintenance BOM (Bill of Material) and a maintenance process procedure. The method comprises the following steps: Step S1: establishing a maintenance feature database and a maintenance process database; Step S2: taking the detection and identification result of a product to be maintained as input, combining the maintenance feature database information, and outputting a maintenance material requirement through data processing activity 1, and pushing the maintenance material requirement to an ERP system; Step S3: taking the detection and identification result of a product to be maintained as input, combining the maintenance process database, and outputting a maintenance processing measure and an initialized maintenance process procedure through data processing activity 2, and pushing the maintenance processing measure and the initialized maintenance process procedure to an MES system; The maintenance feature database is composed of maintenance feature elements; The maintenance feature element comprises four attributes, namely "problem phenomenon", "damage degree", "processing intention" and "processing method"; the "processing intention" attribute comprises "repairable" and "replacement required"; The maintenance process database is composed of maintenance process elements; The maintenance feature element comprises three attributes, namely "process", "work step" and "action"; The data processing activity 1 comprises the following steps: Step S21: generating a product initial maintenance BOM; Step S22: assigning values to the attributes of the product initial maintenance BOM; Step S23: converting the product initial maintenance BOM into a maintenance BOM; The step S22 comprises the following steps: Step S221: establishing the association between the four new attributes "problem phenomenon", "damage degree", "processing intention" and "processing method" of the product initial maintenance BOM and the maintenance feature database, and the attribute contents can be directly extracted from the maintenance feature database; Step S222: through detection and identification activity, the corresponding maintenance feature element is screened out in the mode of reading and screening the "problem phenomenon" and "damage degree" attributes of the maintenance feature database, and the contents of the attributes of the maintenance feature element are used to assign values to the four attributes "problem phenomenon", "damage degree", "processing intention" and "processing method" of the initial maintenance BOM node; Step S223: after the value assignment is completed, the attribute content of the "belonging level" of the product maintenance initial BOM is filled according to the rules; The data processing activity 2 comprises the following steps: Step S31: generating a maintenance material requirement table; Step S32: maintenance process procedure output; The step S32 comprises the following steps:

2. The product EBOM and database based electronic equipment repair process control method of claim 1, wherein, Based on the content of the "processing method" attribute of the maintenance BOM node, the corresponding maintenance process element in the maintenance process database is associated, and the maintenance process element associated with the maintenance BOM is integrated and output as a maintenance process procedure. The "problem phenomenon" defines the specific performance of a material problem; The "damage degree" defines the degree of a certain material problem; The "processing intention" defines the disposal mode of a problem material; The "processing method" defines the specific processing measure for a material problem; The "process" is defined according to the industry habit followed by an organization, and represents the skilled personnel, site and equipment facilities required for executing a maintenance operation; The "work step" is a decomposition and sequencing of all maintenance operations required to be completed in a process, and embodies the sequence and specific content of the operations; 3. The product EBOM and database based electronic equipment repair process control method of claim 1, wherein, The "action" is a decomposition and sequencing of specific maintenance operations in a work step, and embodies the specific action of the maintenance operation. The step S21 comprises the following steps: Copy the EBOM data of the product and add five attributes to each node of the EBOM structure tree, namely "ownership level", "problem phenomenon", "damage degree", "treatment intention" and "treatment method"; Among them, the four attributes of "problem phenomenon", "damage degree", "treatment intention" and "treatment method" are the same as the attribute definition of the maintenance feature element.

4. The product EBOM and database based electronic equipment repair process control method of claim 1, wherein, The rules in the step S223 include: The BOM node to be assigned is a node directly constituting the initial maintenance BOM structure tree, and the content of "ownership level" is filled as "this level"; The BOM node to be assigned is a node indirectly constituting the initial maintenance BOM structure tree, and the content of "ownership level" is filled as "child level".

5. The product EBOM and database based electronic equipment repair process control method of claim 1, wherein, The step S23 includes: According to the attributes of the initial maintenance BOM node, the maintenance initial BOM quantity attribute representing the material quantity is modified according to the rules; After the change of the maintenance initial BOM node quantity is completed according to the rules, the maintenance BOM is output; Among them, the rules include: When the "treatment intention" attribute of the maintenance initial BOM node is "need to replace", the attribute representing the node quantity remains unchanged; When the "treatment intention" attribute of the maintenance initial BOM node is "repairable" or not assigned, the attribute value of the attribute representing the node quantity is changed to 0.

6. The product EBOM and database based electronic equipment repair process control method of claim 1, wherein, The step S31 includes: Extract the node information of the maintenance BOM whose quantity attribute is not 0, output the specifications and quantities of the materials, and generate a "maintenance material requirement list"; Among them, the integration rules are as follows: The "ownership level" attribute of all maintenance BOM nodes is "this level", and the associated maintenance process element is integrated into a maintenance process specification and output; The "ownership level" attribute of the maintenance BOM node is "child level", and the associated maintenance process element is output as a separate maintenance process specification.

Citation Information

Patent Citations

  • General fault detecting and maintenance method for equipment

    CN103617576A

  • Method, device and equipment for processing faults of subway system, and storage medium

    CN111222754A