Pre-forging optimization method based on metal flow velocity field
Through the preforging optimization method based on the metal flow velocity field, the problem of preforging dissatisfaction in forging processing is solved, quantitative optimization and accurate analysis are achieved, design efficiency and forming quality are improved, and cost and time are reduced.
Patent Information
- Application Number
- CN202211398291.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-09
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-11-09
AI Technical Summary
In forging processing, pre-forging parts often encounter problems of filling in the design, resulting in the shape of the final forging that does not meet the requirements, affecting the forming quality, and the experience-based optimization method extends the design cycle and increases costs.
Using the preforging optimization method based on the metal flow velocity field, the metal flow velocity field is calculated through simulation, the final forging is divided into multiple areas, the mass of each area is quantitatively calculated, and the shape of the preforging is optimized according to the filling conditions, increasing or decreasing the mass To match the volume of the final forging, improve the forming quality.
It effectively improves the design efficiency of preforged parts, saves design costs and processing time, ensures that preforged parts are filled in the final forging die, avoids trial and error processes, and improves the forming quality.
Smart Images

Figure CN115881250B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of forging and pressing, and in particular to a pre-forging optimization method based on a metal flow velocity field. Background Art
[0002] In forging, the final forging designed according to the target part has a complex geometry and is difficult to be forged from the initial billet in one go. Therefore, pre-forgings are designed during the forming process and are formed by continuous forging of one or more pre-forgings. A properly designed pre-forging can bridge the initial billet and the final forging, improving quality problems caused by direct processing, such as incomplete filling, severe deformation, and metal folding; it can also improve the force of the die during the final forging, reduce wear, and increase the service life of the die.
[0003] The most common problem in preform design is that the preforging is partially not filled in the final forging die. This problem will cause the overall shape of the final forging to fail to meet the requirements, thus affecting the forming quality of the final forging, and ultimately making the final forging forming process unsatisfactory and unable to meet the needs of part processing, resulting in forging scrap and billet waste. Therefore, when designing preforgings, it is necessary to optimize the shape of the preforgings. The optimization method of the shape of the preforgings is limited to perceptual empirical judgment, and it is impossible to quantitatively judge from a rational perspective based on the filling results that the mass position and size should be increased when optimizing the shape of the preforgings, so as to efficiently and accurately solve the problem of not filling.
[0004] Unreasonable pre-forging shape and detail design will lead to the failure of the final forging process, and ultimately affect the quality of the entire forging. The empirical pre-forging optimization method will extend the die design cycle and increase the design cost. Therefore, how to effectively optimize the pre-forgings and improve the forming quality of the final forgings is an urgent problem that needs to be solved. Summary of the invention
[0005] To solve the above problems, the purpose of the present invention is to provide a pre-forging optimization method based on metal flow velocity field, which can effectively optimize the pre-forgings, thereby improving the forming quality of the final forgings and reducing costs and processing time.
[0006] To achieve the above object, the present invention adopts the following technical solution:
[0007] A pre-forging optimization method based on metal flow velocity field comprises the following steps:
[0008] (1) Design the initial pre-forging and final forging according to the shape of the target part, simulate the forging process of the initial pre-forging, and analyze the metal flow velocity field during the forging process;
[0009] (2) Dividing the final forging into multiple regions according to the metal flow velocity field;
[0010] (3) Design the shape of the pre-forging according to the regional volume, calculate the mass of the pre-forging in each region, and make the mass of the corresponding region in the pre-forging match the volume of the final forging;
[0011] The mass of the pre-forging area is calculated as: M i =ρV pi +M bi , where M i is the mass of the preforging in the i-th region; ρ is the density of the material; V pi is the volume of the final forging in the i-th region; M bi is the mass of the burr in the i-th region;
[0012] (4) The pre-forgings are optimized according to the calculated pre-forging mass in each area, and the forging forming process is simulated for the optimized pre-forgings. The mass is increased or decreased accordingly according to the areas where the positions are not filled or filled in advance during the forging forming process, and the final pre-forgings are obtained after the pre-forgings are sifted again.
[0013] Furthermore, the metal flow velocity field includes the flow direction of metal flow and the flow velocity of metal flow; several dividing lines are set according to the flow direction and flow velocity of metal flow, the starting point of the dividing line is the intersection point of the flow directions of multiple metal flows, and the flow velocity of metal flow in the area through which the dividing line passes is 0; several dividing lines divide the final forging into multiple areas.
[0014] Furthermore, the mass is increased or decreased accordingly according to the area where the forging process is not filled or filled in advance: when it is not filled, the forging is continued after reaching the standard set underpressure value to obtain the actual full underpressure value; when it is filled in advance, the underpressure value recorded at the time of filling is the actual full underpressure value;
[0015] The mass that should be increased or decreased is ΔM = ρS + |L r -L s |; where ΔM is the increased or decreased mass, ρ is the density of the material, S is the corresponding area, and L s The standard undervoltage value is set, L r is the actual full-charge undervoltage value; when (L r -L s ) is negative, it is not full, and the corresponding area should increase the mass ΔM; when (L r -L s ) is positive, it is filled in advance and the corresponding area should be reduced in mass ΔM.
[0016] The present invention optimizes the initial shape of the preforging by utilizing the metal flow velocity field in the actual forging process, quantitatively calculates the required mass of each region, and accurately analyzes the position and size of the mass that should be increased when the preforging is not fully filled in the final forging by forging, and the position and size of the mass that should be reduced when the preforging is filled in the final forging in advance, thereby avoiding the trial and error process of repeatedly changing the shape of the preforging, striving to achieve the process standard that the preforging as a whole fills the final forging die cavity when the standard design underpressure is achieved, thereby improving the design efficiency of the preforging, and saving design costs and processing time. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the method flow of the present invention.
[0018] Figure 2 It is a dividing line set according to the velocity field of metal flow in the present invention.
[0019] Figure 3 This is a schematic diagram of setting a dividing line on the final forging according to the present invention.
[0020] Figure 4 It is a schematic diagram of the present invention which is not filled.
[0021] Figure 5 This is a schematic diagram of area calculation according to the present invention. DETAILED DESCRIPTION
[0022] like Figure 1 As shown, the present embodiment provides a pre-forging optimization method based on the metal flow velocity field, which can effectively improve the design efficiency of pre-forging forming by analyzing the metal flow direction during the forging process, dividing the metal flow segmentation line, and calculating the increase / decrease and position of the pre-forging mass according to the filling condition; the method comprises the following steps:
[0023] (1) According to the shape of the target part, the initial pre-forging and the final forging are designed, the forging process of the initial pre-forging is simulated and calculated, and the metal flow velocity field during the process is analyzed; specifically, numerical simulation software is used to simulate the forging process, and this embodiment uses Deform software; the data processing module in the software can be used to analyze the metal flow velocity field, and the metal flow velocity field includes the metal flow direction and the metal flow velocity.
[0024] (2) The final forging is divided into multiple areas according to the velocity field of the metal flow; specifically, a number of dividing lines are set according to the flow direction and flow velocity of the metal flow, and the starting point of the dividing line is the intersection point of the flow directions of multiple metal flows. The flow velocity of the metal flow in the area where the dividing line passes is basically 0. Multiple dividing lines are divided according to the required flow direction and flow velocity.
[0025] (3) Design the shape of the pre-forging according to the regional volume, calculate the mass of the pre-forging in each region, and make the mass of the corresponding region in the pre-forging match the volume of the final forging;
[0026] The mass of the pre-forging area is calculated as: M i =ρV pi +M bi , where M i is the mass of the preforging in the i-th region; ρ is the density of the material; V pi is the volume of the final forging in the i-th region; M bi is the mass of the burr in the i-th region.
[0027] (4) Optimizing the pre-forgings according to the calculated pre-forging mass in each area, simulating the forging process for the optimized pre-forgings, increasing or decreasing the mass accordingly according to the areas that are not filled or filled in advance during the forging process, and optimizing the pre-forgings again to obtain the final pre-forgings.
[0028] When it is not full, continue forging after reaching the standard set underpressure value to obtain the actual full underpressure value; when it is filled in advance, the underpressure value recorded at the time of filling is the actual full underpressure value.
[0029] The mass that should be increased or decreased is ΔM = ρS + |L r -L s |; where ΔM is the increased or decreased mass, ρ is the density of the material, S is the corresponding area, and L s The standard undervoltage value is set, L r is the actual full-charge undervoltage value; when (L r -L s ) is negative, it is not full, and the corresponding area should increase the mass ΔM; when (L r -L s ) is positive, it is filled in advance and the corresponding area should be reduced in mass ΔM.
[0030] Combined with the above-obtained position and size of the pre-forged part to be increased, its mass and position to be increased can be accurately and quantitatively obtained, effectively improving the forming and filling process.
[0031] like Figure 2 to Figure 5 As shown, Figure 3 The part model shown in is used as an example to implement this embodiment. Figure 2 In order to analyze and visualize the metal flow of the forming process after the billet is formed in the preform, four dividing lines are set according to the metal flow velocity field to divide the final forging model into 8 areas. Figure 2 Mark 1 to 8 in the middle.
[0032] The shape of the blank is optimized according to the size of each area. For example, in area 2, which has a larger volume, the corresponding volume of the blank in area 2 can be appropriately increased.
[0033] After the initial optimization of the billet shape, the billet may still be underfilled when the forging forming simulation is performed again in the preform. Figure 4 Position 9 in the middle, position 9 belongs to Figure 2 The mass of area 2 is therefore added to the volume of area 2.
[0034] Standard underpressure value L of the preform in the final forging mold cavity s hour, Figure 4 Position 9 is not full. At this time, the mold continues to be pressed down in the digital simulation software until position 9 is fully filled. At this time, the actual underpressure position is L r , the difference between the two is L s -L r , using graphics software, the area S corresponding to the distraction area 2 is as follows Figure 5 As shown, using the formula ΔM=ρS+|L r -L s |The mass of metal that needs to be added to this part can be calculated.
[0035] This embodiment utilizes the metal flow velocity field of the actual forging process to optimize the initial shape of the preforging, quantitatively calculates the required mass of each area, and accurately analyzes the position and size of the preforging mass that should be increased when the preforging is not fully filled in the final forging by forging, and the position and size of the preforging mass that should be reduced when the preforging is filled in the final forging in advance by forging, thereby avoiding the trial and error process of repeatedly changing the shape of the preforging, and striving to achieve the process standard that the preforging fills the final forging die cavity as a whole when the standard design underpressure is achieved, thereby improving the design efficiency of the preforging, and saving design costs and processing time.
[0036] The above description is only a preferred implementation manner of the present invention, but the protection scope of the present invention is not limited thereto, and any modification and replacement based on the technical solution and inventive concept provided by the present invention should be included in the protection scope of the present invention.
Claims
1. A pre-forging optimization method based on metal flow velocity field, characterized in that The steps include: (1) Design the initial pre-forging and final forging according to the shape of the target part, simulate the forging process of the initial pre-forging, and analyze the metal flow velocity field during the forging process; (2) Dividing the final forging into multiple regions according to the metal flow velocity field; The metal flow velocity field includes the flow direction of the metal flow and the flow velocity of the metal flow; a plurality of dividing lines are set according to the flow direction and the flow velocity of the metal flow, the starting point of the dividing line is the intersection point of the flow directions of the plurality of metal flows, and the flow velocity of the metal flow in the area where the dividing line passes is 0; the plurality of dividing lines divide the final forging into a plurality of areas; (3) Design the shape of the pre-forging according to the regional volume, calculate the mass of the pre-forging in each region, and make the mass of the corresponding region in the pre-forging match the volume of the final forging; The mass of the pre-forging area is calculated as: M i =ρV pi +M bi , where M i is the mass of the preforging in the i-th region; ρ is the density of the material; V pi is the volume of the final forging in the i-th region; M bi is the mass of the burr in the i-th region; (4) optimizing the pre-forging according to the calculated pre-forging mass of each area, simulating the forging forming process of the optimized pre-forging, increasing or decreasing the mass of the area where the unfilled or prematurely filled position is located during the forging forming process, and obtaining the final pre-forging after the pre-forging is carried out again; According to the area where the forging process is not filled or filled in advance, the mass is increased or decreased accordingly: when it is not filled, the forging is continued after reaching the standard set underpressure value to obtain the actual full underpressure value; when it is filled in advance, the underpressure value recorded at the time of filling is the actual full underpressure value; The mass that should be increased or decreased is ΔM = ρS + |L r -L s |; where ΔM is the increased or decreased mass, ρ is the density of the material, S is the corresponding area, and L s The standard undervoltage value is set, L r is the actual full-charge undervoltage value; when (L r -L s ) is negative, it is not full, and the corresponding area should increase the mass ΔM; When (L r -L s ) is positive, it is filled in advance and the corresponding area should be reduced in mass ΔM.