Rear integral lifting and attachment device for limited bearing capacity structure and construction method thereof

By designing a rear-mounted overall lifting and attachment device with a limited load bearing capacity structure, the problem of insufficient load transmission during the overall lifting of steel structure corridors is solved, the reliability and safety of the upgrade structure are ensured, and the requirements for overall lifting of steel corridors are met.

CN115977408BActive Publication Date: 2025-04-11CHINA CONSTR FOURTH ENG DIV CORP LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211738565.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-31
Publication Date
2025-04-11
Estimated Expiration
2042-12-31

AI Technical Summary

Technical Problem

In the overall lifting construction of steel structure corridors, the load transmission during the improvement of the existing technology has failed to effectively consider the lifting structure during construction, resulting in insufficient bearing capacity and safety hazards.

Method used

A rear-mounted overall lifting attachment device with a limited load-bearing structure is designed, including components such as first reinforcement rods, wall-through screws, second reinforcement rods, and lifting platform. Through the synergy of these components, the bearing capacity of the lifting structure meets the requirements of the lifting platform.

Benefits of technology

This device not only meets the requirements of the overall lifting of steel corridors, but also ensures the reliability and safety of the improvement structure and reduces safety hazards during construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115977408B_ABST
    Figure CN115977408B_ABST
Patent Text Reader

Abstract

The present invention discloses a post-mounted integral lifting and attachment device of a limited bearing capacity structure and a construction method thereof, wherein at least one first reinforcing rod comprises a first end fixedly connected to a first building surface and a second end fixedly connected to a second building surface, and at least one through-wall screw has one end connected to the second end of the first reinforcing rod; at least one second reinforcing rod comprises a third end fixedly connected to the other end of the through-wall screw and a fourth end fixedly connected to a roof section steel corridor; a column is vertically fixed to the roof section steel corridor, and at least one inclined tie rod has two ends fixedly connected to the top of the column and the roof section steel corridor respectively; a horizontal suspension beam is horizontally fixedly connected to the top of the column and the end of the inclined tie rod, one end of the inclined support is fixedly connected to the horizontal suspension beam, and the other end is fixedly connected to the roof section steel corridor, and a hydraulic lifter is arranged at the front end of the horizontal suspension beam away from the roof section steel corridor. The present invention simultaneously meets the requirements of the overall hoisting of the ground section steel corridor and the bearing capacity of the lifting structure to which the lifting platform is attached.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of house construction with a steel structure corridor, and in particular to a rear-mounted integral lifting and attachment device of a limited bearing capacity structure and a construction method thereof. Background Art

[0002] As modern urban construction continues to develop with the trend of the times, the functions of various commercial buildings and complexes are becoming more and more diversified, the structures are becoming more complex, and the design requirements of owners are becoming higher and higher. In order to achieve the integrity of the appearance of the complex building, more and more owners require the addition of steel structure corridors between buildings, so as to achieve an overall beautiful complex building. The construction of the steel structure corridor between towers, taking into account various factors, often uses a lifting platform for overall lifting construction. In order to ensure the stability of the lifting platform, the lifting platform often needs to be attached to the lifting structure of the main structure. The stability of the lifting structure determines the stability of the lifting platform, thereby ensuring the stability of the overall lifting construction of the steel structure corridor.

[0003] Because the design unit only meets the load of the steel corridor in the service stage when designing the steel structure corridor, and does not consider the transfer load during the lifting construction, which is different from the final use stage. The concrete structure of the steel structure corridor can provide structural anchoring, but its reinforcement ratio, stirrup ratio and force form often do not meet the post-anchoring requirements of the lifting structure. The concrete structure that can provide structural anchoring cannot meet the requirements of post-anchoring, and there are safety hazards when the steel structure corridor is lifted as a whole. The existing technology only considers that the design of the lifting platform meets the requirements of the overall hoisting of the steel corridor, and does not consider whether the bearing capacity of the lifting structure to which the lifting platform is attached can meet the requirements of the lifting platform and the measures taken if the requirements are not met. During the implementation of the overall lifting construction method of the steel structure corridor, the lifting force of the steel structure corridor is often finally transferred to the main structure through the lifting platform. For the original main structure, only the load of the steel structure corridor in the service stage was considered during the design, and the load transfer during the lifting construction process was not considered. The reinforcement ratio and force form of the post-anchoring concrete structure of the lifting platform of the steel structure corridor often do not meet the post-anchoring requirements of the lifting structure.

[0004] The above information disclosed in this Background section is only for enhancement of understanding of the background of the invention and therefore it may contain information that does not form the prior art that is already known to a person of ordinary skill in the art. Summary of the invention

[0005] The purpose of the present invention is to provide a post-installed integral lifting attachment device for a limited bearing capacity structure and a construction method thereof, which not only meets the requirements for the overall lifting of the steel corridor, but also makes the bearing capacity of the lifting structure to which the lifting platform is attached meet the requirements of the lifting platform, so that the reliability of the lifting structure can be ensured during the overall lifting construction of the steel structure corridor, thereby ensuring the safety of the steel structure corridor during the overall lifting process.

[0006] In order to achieve the above object, the present invention provides the following technical solutions:

[0007] A rear-mounted integral lifting and attachment device of a limited bearing capacity structure of the present invention comprises:

[0008] First building surface;

[0009] a second building surface, which is arranged to be spaced apart from the first building surface;

[0010] A roof section steel corridor adjacent to the second building surface;

[0011] An attachment structure comprising,

[0012] at least one first reinforcement rod, comprising a first end fixedly connected to the first building surface and a second end fixedly connected to the second building surface,

[0013] at least one through-wall screw, one end of which is connected to the second end of the first reinforcing rod;

[0014] At least one second reinforcing rod, comprising a third end fixedly connected to the other end of the through-wall screw and a fourth end fixedly connected to the steel corridor of the roof section;

[0015] A lifting platform comprising:

[0016] Columns, which are vertically fixed to the roof section steel corridor,

[0017] At least one inclined tie rod, two ends of which are respectively fixedly connected to the top of the column and the roof section steel corridor;

[0018] A horizontal suspension beam is horizontally fixedly connected to the top of the column and the end of the inclined tie rod.

[0019] The inclined support has one end fixedly connected to the horizontal suspension beam and the other end fixedly connected to the steel corridor of the roof section.

[0020] A hydraulic lifter is arranged at the front end of the horizontal suspension beam away from the steel corridor of the roof section, and a steel strand for lifting heavy objects is passed through the middle of the hydraulic lifter;

[0021] A guide frame is arranged at the front end of the horizontal suspension beam and is located between the hydraulic lifter and the roof section steel corridor to guide the steel strand.

[0022] In the rear-mounted integral lifting and attachment device for a limited bearing capacity structure, at least two first reinforcement rods are cross-fixed between the first building surface and the second building surface.

[0023] In a preferred embodiment of the post-installed integral lifting and attachment device for a limited bearing capacity structure, the first building surface and the second building surface are respectively embedded with steel plates, the first reinforcement rod connects the first building surface and the second building surface via the steel plates, and the second reinforcement rod connects the second building surface via the steel plates.

[0024] In the rear integral lifting and attachment device of a limited bearing capacity structure, the first building surface and the second building surface are respectively provided with drilling holes for implanting chemical reagents for fixing, and the chemical screw is connected to the drilling holes through gaskets and nuts to fix the steel plate embedding plate.

[0025] In the rear-mounted integral lifting and attachment device of the limited bearing capacity structure, the roof section steel corridor is a corridor truss structure.

[0026] In the post-installed integral lifting and attachment device of the limited bearing capacity structure, the through-wall screw is a tension screw that is pulled in the second building surface, and the tension screw is bolted via a gasket and a nut.

[0027] In the rear-mounted integral lifting and attachment device of a limited load-bearing capacity structure, a pair of parallel vertical stiffening plates are vertically fixed on the upper surface of the horizontal suspension beam, a pair of horizontal stiffening plates vertically connect the vertical stiffening plates and the upper surface, and a pair of parallel vertical stiffening plates and a pair of horizontal stiffening plates enclose the hydraulic lifter.

[0028] In the rear integral lifting and attachment device of the limited bearing capacity structure, the two inclined rods are arranged obliquely relative to the roof section steel corridor and the two inclined rods and the roof section steel corridor form a triangular structure, and the two inclined rods and the columns form a triangular structure.

[0029] In the rear-mounted integral lifting and attachment device for a limited bearing capacity structure, the first building surface is parallel to the second building surface, and the two second reinforcement rods are arranged in parallel.

[0030] The construction method of the rear integral lifting and attachment device using the limited bearing capacity structure comprises the following steps:

[0031] The first end of at least one first reinforcing rod is fixedly connected to the first building surface, the second end relative to the first end is fixedly connected to the second building surface, one end of at least one through-wall screw is connected to the second end of the first reinforcing rod, the third end of at least one second reinforcing rod is fixedly connected to the other end of the through-wall screw, the fourth end of the second reinforcing rod is fixedly connected to the roof section steel corridor, and the through-wall screw bears tensile stress;

[0032] The columns are vertically fixed to the roof section steel corridor, at least one inclined tie rod has two ends fixedly connected to the top of the column and the roof section steel corridor respectively, the horizontal suspension beam is horizontally fixedly connected to the top of the column and the end of the inclined tie rod, one end of the inclined support is fixedly connected to the horizontal suspension beam, and the other end is fixedly connected to the roof section steel corridor, and the columns, the inclined tie rod and the roof section steel corridor form a triangular structure;

[0033] The hydraulic lifter is vertically fixed to the front end of the horizontal suspension beam away from the roof section steel corridor. A steel strand for lifting heavy objects passes through the middle of the hydraulic lifter. A guide is installed at the front end of the horizontal suspension beam and is located between the hydraulic lifter and the roof section steel corridor to guide the steel strand.

[0034] In the above technical scheme, the present invention provides a rear integral lifting and attachment device of a limited bearing capacity structure, which has the following beneficial effects: the device uses the roof section steel corridor as the basic structure of the lifting platform, has good stability, and is easy to dock after lifting. After docking, it is not necessary to dismantle the assembled end trusses, only some temporary reinforcement structures need to be dismantled, and both erection and dismantling are convenient. After the end trusses at both ends of the high-altitude corridor truss are used as the basic structure of the lifting platform, the middle part of the high-altitude corridor truss can be lifted as a whole through the lifting platform after the assembly on the ground is completed. The construction work is mainly concentrated on the ground, which can reduce the amount of high-altitude work to a minimum, has little impact on the construction of other specialties, and can be constructed in parallel on multiple work surfaces. In addition, the end trusses at both ends of the corridor truss are removed, and only the middle part of the high-altitude corridor truss needs to be lifted during the lifting process, which reduces the total lifting weight and reduces the difficulty of lifting, which is beneficial to construction. When dismantling the lifting platform, it is only necessary to dismantle the temporary facilities added to the end trusses, and retain the end trusses that have been erected, which reduces the workload of dismantling and is beneficial to construction cost control. The present invention fully anchors the lifting structure and its reinforcement rods to the main structure to ensure that the force of the lifting structure is within the load range that the main structure can bear, thereby ensuring the safety of the overall lifting of the steel structure corridor. When the present invention lifts a heavy steel corridor and the force of the lifting platform cannot be met, the reinforcement rods can be used to greatly increase the tensile strength of the lifting platform, thereby ensuring the stability and safety of the lifting platform, which not only meets the requirements for the overall hoisting of the ground section steel corridor, but also makes the bearing capacity of the lifting structure to which the lifting platform is attached meet the requirements of the lifting platform. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0036] Figure 1A schematic structural diagram of a rear-mounted integral lifting and attachment device of a limited load-bearing capacity structure provided in an embodiment of the present invention.

[0037] Figure 2 A schematic top view of a rear integral lifting and attachment device of a limited load-bearing capacity structure provided in an embodiment of the present invention.

[0038] Figure 3 A schematic diagram of chemical bolt drilling and anchoring of a rear integral lifting and attachment device of a limited bearing capacity structure provided in an embodiment of the present invention.

[0039] Figure 4 A schematic diagram of the through-wall bolt anchoring of a rear integral lifting and attachment device of a limited bearing capacity structure provided in an embodiment of the present invention.

[0040] Figure 5 A schematic diagram of a hydraulic lifter perforation diagram of a rear integral lifting and attachment device of a limited load-bearing capacity structure provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0042] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0043] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0044] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0045] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0046] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0047] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0048] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings.

[0049] See also Figure 1-5 As shown, in one embodiment, a rear integral lifting and attachment device of a limited bearing capacity structure of the present invention comprises:

[0050] First building surface 1;

[0051] A second building surface 7, which is arranged to be spaced apart from the first building surface 1;

[0052] A roof section steel corridor 13, which is adjacent to the second building surface 7;

[0053] An attachment structure comprising,

[0054] at least one first reinforcing rod 6, comprising a first end fixedly connected to the first building surface 1 and a second end fixedly connected to the second building surface 7,

[0055] At least one through-wall screw 9, one end of which is connected to the second end of the first reinforcing rod 6;

[0056] At least one second reinforcing rod 12, comprising a third end fixedly connected to the other end of the through-wall screw 9 and a fourth end fixedly connected to the roof section steel corridor 13;

[0057] A lifting platform comprising:

[0058] The columns 15 are vertically fixed to the roof section steel corridor 13.

[0059] At least one inclined tie rod 14, two ends of which are respectively fixedly connected to the top of the column 15 and the roof section steel corridor 13;

[0060] The horizontal suspension beam 17 is horizontally fixedly connected to the top of the column 15 and the end of the inclined rod 14.

[0061] The inclined support 16 has one end fixedly connected to the horizontal suspension beam 17 and the other end fixedly connected to the roof section steel corridor 13.

[0062] A hydraulic lifter 19 is provided at the front end of the horizontal suspension beam 17 away from the roof section steel corridor 13, and a steel strand 22 for lifting heavy objects is passed through the middle of the hydraulic lifter 19;

[0063] A guide frame 20 is disposed at the front end of the horizontal suspension beam 17 and is located between the hydraulic lifter 19 and the roof section steel corridor 13 to guide the steel strands 22 .

[0064] In a preferred embodiment of the rear integral lifting and attachment device for a limited bearing capacity structure, at least two first reinforcement rods 6 are cross-fixed between the first building surface 1 and the second building surface 7 .

[0065] In a preferred embodiment of the post-mounted integral lifting and attachment device for a limited bearing capacity structure, the first building surface 1 and the second building surface 7 are respectively embedded with steel plate embedded plates 3, the first reinforcement rod 6 connects the first building surface 1 and the second building surface 7 via the steel plate embedded plates 3, and the second reinforcement rod 12 connects the second building surface 7 via the steel plate embedded plates 3.

[0066] In a preferred embodiment of the post-mounted integral lifting and attachment device for a limited bearing capacity structure, the first building surface 1 and the second building surface 7 are respectively provided with drilling holes 5 for implanting chemical reagents for fixing, and the chemical screw 2 is connected to the drilling holes 5 through gaskets and nuts to fix the steel plate embedding plate 3.

[0067] In a preferred embodiment of the rear-mounted integral lifting and attachment device for a limited bearing capacity structure, the roof section steel corridor 13 is a corridor truss structure.

[0068] In a preferred embodiment of the post-installed integral lifting and attachment device for a limited bearing capacity structure, the through-wall screw 9 is a tension screw for tensioning in the second building surface 7, and the tension screw is bolted via a gasket and a nut.

[0069] In a preferred embodiment of the rear-mounted integral lifting and attachment device of the limited load-bearing capacity structure, a pair of parallel vertical stiffening plates 23 are vertically fixed on the upper surface of the horizontal suspension beam 17, a pair of horizontal stiffening plates 24 vertically connect the vertical stiffening plates 23 and the upper surface, and a pair of parallel vertical stiffening plates 23 and a pair of horizontal stiffening plates 24 enclose the hydraulic lifter 19.

[0070] In a preferred embodiment of the rear-mounted integral lifting and attachment device of the limited bearing capacity structure, the two inclined rods 14 are arranged obliquely relative to the roof section steel corridor 13 and the two inclined rods 14 and the roof section steel corridor 13 form a triangular structure, and the two inclined rods 14 and the columns 15 form a triangular structure.

[0071] In a preferred embodiment of the rear integral lifting and attachment device for a limited bearing capacity structure, the first building surface 1 is parallel to the second building surface 7, and the two second reinforcement rods 12 are arranged in parallel.

[0072] In one embodiment, the rear integral lifting and attachment device of the limited bearing capacity structure includes a lifting platform, a high-altitude corridor truss, and a rear integral lifting and attachment structure. The lifting platform is composed of a horizontal suspension beam 17, an inclined support 16, a column 15, and a diagonal tie rod 14, and has good bearing capacity and stability. The high-altitude corridor truss transmits the force to the rear integral lifting and attachment structure through a temporarily detachable second reinforcement rod 12, ensuring the stability of the lifting platform and the high-altitude corridor truss. The attachment structure is anchored according to the force model analysis and multiple lifting structures to ensure the stability of the lifting structure.

[0073] In one embodiment, chemical bolts are used to anchor the steel plate embedded plate 3 on the first building surface 1 and the second building surface 7 of the reinforced concrete structure, the steel plate embedded plate 3 is welded and fixed to the end of the first reinforcing rod 6 of the I-beam, the top of the first reinforcing rod 6 of the I-beam is welded and fixed to the front end steel plate embedded plate 3, through-wall bolts are bolted through the reinforced concrete structure and the steel plate embedded plate 3 on both sides of the reinforced concrete structure, and the steel plate embedded plate 3 is welded and fixed to the first reinforcing rod 6 of the I-beam.

[0074] In one embodiment, the second reinforcement rod 12 is welded and fixed to the roof section steel corridor 13, the roof section steel corridor 13 is welded and fixed to the end of the diagonal rod 14, the roof section steel corridor 13 is welded and fixed to the end of the column 15, the roof section steel corridor 13 is welded and fixed to the end of the diagonal support 16, the horizontal suspension beam 17 is welded and fixed to the top of the column 15, the horizontal suspension beam 17 is welded and fixed to the top of the diagonal support 16, and the horizontal suspension beam 17 is welded and fixed to the top of the diagonal rod 14.

[0075] In one embodiment, the chemical screw 2 is fixed to the main structure by drilling a hole 5 on the reinforced concrete structure and implanting a chemical reagent; the chemical screw 2 is fixed to the perforated steel plate embedding plate 3 by a gasket and a nut.

[0076] In one embodiment, the through-wall bolts are fixed by bolts through the through-wall screw rods 9, the reinforced concrete structure and the steel plate embedded plates 3 on both sides of the reinforced concrete structure.

[0077] In one embodiment, a hydraulic lifter 19 is provided on the circular hole at the front end of the horizontal suspension beam 17, a guide frame 20 is provided on the rear side of the hydraulic lifter 19, the hydraulic lifter 19 is welded to the horizontal suspension beam 17 through a fixed welding plate, and a steel wire rope 22 for lifting heavy objects is passed through the middle of the hydraulic lifter 19.

[0078] Each lifting platform, lifting structure and reinforcement measures of the device are fully connected to the main structure, so that the lifting force exerted on the lifting platform is fully transmitted to the main structure, ensuring the problems of the lifting platform and its reinforcement measures, thereby ensuring the safety of the lifting process of the steel structure corridor.

[0079] In one embodiment, the steel plate embedded plate 3 on the first building surface 1 is fixed by welding to the first reinforcing rod 6, the first reinforcing rod 6 is connected to the second steel plate embedded plate 8 on the second building surface 7, the second steel plate embedded plate 8 is connected and fixed by the through-wall screw 9 of the tension screw, the second building surface 7 and the through-wall nut 10 and the third steel plate embedded plate 11 on the opposite side, the third steel plate embedded plate 11 is fixed by welding to the second reinforcing rod 12, the second reinforcing rod 12 is welded and fixed to the roof section steel corridor 13, the roof section steel corridor 13 is welded and fixed to the end of the diagonal rod 14, the roof section steel corridor 13 is welded and fixed to the end of the column 15, the roof section steel corridor 13 is welded and fixed to the end of the diagonal support 16, the horizontal suspension beam 17 is welded and fixed to the top of the column 15, the horizontal suspension beam 17 is welded and fixed to the top of the diagonal support 16, and the horizontal suspension beam 17 is welded and fixed to the top of the diagonal rod 14. A hydraulic lifter 19 is provided on the circular hole 18 at the front end of the horizontal suspension beam 17, a guide frame 20 is provided at the rear side of the hydraulic lifter 19, the hydraulic lifter 19 is welded to the horizontal suspension beam 17 through a fixed welding plate 21, and a steel strand 22 for lifting heavy objects is passed through the middle of the hydraulic lifter 19. Figure 1 and 3 As shown, the chemical screw 2 is fixed to the main structure by drilling a hole 5 in the building and implanting a chemical reagent; the chemical screw 2 is fixed to the perforated steel plate burying plate 3 by a chemical bolt gasket 25 and a chemical nut 4. Figure 4 As shown, the through-wall screw 9 is pulled on the second building surface 7, and the second steel plate embedded plate 8 and the third steel plate embedded plate 11 are bolted through the second building surface 7, the through-wall screw 9, the through-wall bolt gasket 26 and the through-wall nut 10. Figure 5 As shown, a vertical stiffening plate 23 is welded to the horizontal suspension beam 17 , a horizontal stiffening plate 24 is welded to the vertical stiffening plate 23 , and circular holes 18 are reserved in the vertical stiffening plate 23 and the horizontal stiffening plate 24 .

[0080] A construction method using the rear integral lifting and attachment device of the limited bearing capacity structure comprises the following steps:

[0081] The first end of at least one first reinforcing rod 6 is fixedly connected to the first building surface 1, and the second end relative to the first end is fixedly connected to the second building surface 7, one end of at least one through-wall screw 9 is connected to the second end of the first reinforcing rod 6, the third end of at least one second reinforcing rod 12 is fixedly connected to the other end of the through-wall screw 9, and the fourth end of the second reinforcing rod 12 is fixedly connected to the roof section steel corridor 13, and the through-wall screw 9 bears tensile stress;

[0082] The columns 15 are vertically fixed to the roof section steel corridor 13, at least one inclined tie rod 14 has two ends fixedly connected to the top of the columns 15 and the roof section steel corridor 13, respectively, a horizontal suspension beam 17 is horizontally fixedly connected to the top of the columns 15 and the end of the inclined tie rod 14, one end of the inclined support 16 is fixedly connected to the horizontal suspension beam 17, and the other end is fixedly connected to the roof section steel corridor 13, the columns 15, the inclined tie rod 14 and the roof section steel corridor 13 form a triangular structure;

[0083] The hydraulic lifter 19 is vertically fixed to the front end of the horizontal suspension beam 17 away from the roof section steel corridor 13. A steel strand 22 for lifting heavy objects passes through the middle of the hydraulic lifter 19. A guide frame 20 is arranged at the front end of the horizontal suspension beam 17 and is located between the hydraulic lifter 19 and the roof section steel corridor 13 to guide the steel strand 22.

[0084] Finally, it should be noted that the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without making any creative work are within the scope of protection of the present application.

[0085] The above description is only by way of illustration of certain exemplary embodiments of the present invention. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.

Claims

1. A rear integral lifting and attachment device for a limited bearing capacity structure, characterized in that: It includes: First building surface; a second building surface, which is arranged to be spaced apart from the first building surface; A roof section steel corridor adjacent to the second building surface; An attachment structure comprising, at least one first reinforcement rod, comprising a first end fixedly connected to the first building surface and a second end fixedly connected to the second building surface, at least one through-wall screw, one end of which is connected to the second end of the first reinforcing rod; At least one second reinforcing rod, comprising a third end fixedly connected to the other end of the through-wall screw and a fourth end fixedly connected to the steel corridor of the roof section; A lifting platform comprising: Columns, which are vertically fixed to the roof section steel corridor, At least one inclined tie rod, two ends of which are respectively fixedly connected to the top of the column and the roof section steel corridor; A horizontal suspension beam is horizontally fixedly connected to the top of the column and the end of the inclined tie rod. The inclined support has one end fixedly connected to the horizontal suspension beam and the other end fixedly connected to the steel corridor of the roof section. A hydraulic lifter is arranged at the front end of the horizontal suspension beam away from the steel corridor of the roof section, and a steel strand for lifting heavy objects is passed through the middle of the hydraulic lifter; A guide frame is arranged at the front end of the horizontal suspension beam and is located between the hydraulic lifter and the roof section steel corridor to guide the steel strand.

2. The rear integral lifting and attachment device of a limited bearing capacity structure according to claim 1, characterized in that: The two first reinforcement rods are cross-fixed between the first building surface and the second building surface.

3. The rear integral lifting and attachment device of a limited bearing capacity structure according to claim 1, characterized in that: The first building surface and the second building surface are respectively embedded with steel plates, the first reinforcing rod connects the first building surface and the second building surface via the steel plates, and the second reinforcing rod connects the second building surface via the steel plates.

4. The rear integral lifting and attachment device of a limited bearing capacity structure according to claim 3, characterized in that: The first building surface and the second building surface are respectively provided with drilling holes for implanting chemical reagents for fixing, and chemical screws are connected to the drilling holes through gaskets and nuts to fix the steel plate embedding plate.

5. The rear integral lifting and attachment device of a limited bearing capacity structure according to claim 1, characterized in that: The steel corridor on the roof section is a corridor truss structure.

6. The rear integral lifting and attachment device of a limited bearing capacity structure according to claim 1, characterized in that: The through-wall screw is a tension screw that is pulled in the second building surface, and the tension screw is bolted via a gasket and a nut.

7. The rear integral lifting and attachment device of a limited bearing capacity structure according to claim 1, characterized in that: A pair of parallel vertical stiffening plates are vertically fixed on the upper surface of the horizontal suspension beam, a pair of horizontal stiffening plates vertically connect the vertical stiffening plates and the upper surface, and a pair of parallel vertical stiffening plates and a pair of horizontal stiffening plates enclose the hydraulic lifter.

8. The rear integral lifting and attachment device of a limited bearing capacity structure according to claim 1, characterized in that: The two inclined rods are arranged obliquely relative to the roof section steel corridor, and the two inclined rods and the roof section steel corridor form a triangular structure, and the two inclined rods and the columns form a triangular structure.

9. The rear integral lifting and attachment device of a limited bearing capacity structure according to claim 1, characterized in that: The first building surface is parallel to the second building surface, and the two second reinforcement rods are arranged in parallel.

10. A construction method using a rear integral lifting and attachment device of a limited bearing capacity structure according to any one of claims 1 to 9, characterized in that: It includes the following steps, The first end of the first reinforcing rod is fixedly connected to the first building surface, the second end relative to the first end is fixedly connected to the second building surface, one end of the through-wall screw is connected to the second end of the first reinforcing rod, the third end of the second reinforcing rod is fixedly connected to the other end of the through-wall screw, the fourth end of the second reinforcing rod is fixedly connected to the roof section steel corridor, and the through-wall screw bears tensile stress; The columns are vertically fixed to the roof section steel corridor, the two ends of the diagonal tie rods are respectively fixedly connected to the top of the columns and the roof section steel corridor, the horizontal suspension beam is horizontally fixedly connected to the top of the columns and the ends of the diagonal tie rods, one end of the diagonal support is fixedly connected to the horizontal suspension beam, and the other end is fixedly connected to the roof section steel corridor, and the columns, the diagonal tie rods and the roof section steel corridor form a triangular structure; The hydraulic lifter is vertically fixed to the front end of the horizontal suspension beam away from the roof section steel corridor. A steel strand for lifting heavy objects passes through the middle of the hydraulic lifter. A guide is installed at the front end of the horizontal suspension beam and is located between the hydraulic lifter and the roof section steel corridor to guide the steel strand.

Citation Information

Patent Citations

  • Load transfer device and construction method for steel joint gallery lifting through same

    CN107060070A

  • Extra -large -size steel truss vestibule high altitude integral hoisting system

    CN206205463U