By using a BIM-based method to refine the positioning diagram of roof grid foundations, and by combining on-site measurements with BIM technology to simulate construction, the problem of inaccurate positioning in traditional roof grid foundation construction was solved. This method achieved precise placement of the grid foundation, improved construction quality and aesthetics, and reduced costs.

CN116029032BActive Publication Date: 2025-12-09NORTHWEST ENGINEERING CORPORATION LIMITED
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202310062716.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-01-18
Publication Date
2025-12-09
Estimated Expiration
2043-01-18

AI Technical Summary

Technical Problem

Traditional roof grid foundation construction makes it difficult to achieve high-quality standards for roof tile layout, affecting the overall appearance and increasing the labor burden and costs for workers.

Method used

A BIM-based method for refining the positioning diagram of the roof grid foundation was adopted. Through on-site measurement, CAD drawing adjustment, BIM roof tile layout design refinement, and secondary refinement of the grid foundation, the grid foundation was ensured to be accurately positioned in the middle of the tiles. Control lines and BIM technology were used to simulate the construction process and solve the positioning problem during construction.

Benefits of technology

It achieved precise positioning of the roof grid foundation, avoided the need for tile cutting, improved the overall appearance, met the project's high-quality standards, and reduced construction costs and labor burden for workers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116029032B_ABST
    Figure CN116029032B_ABST
Patent Text Reader

Abstract

The application belongs to the technical field of building construction, and discloses a roofing grid foundation positioning drawing deepening method based on BIM, which comprises the following steps: performing actual measurement and quantity survey on all wall bodies on the roofing through control lines laid on site; adjusting the roofing CAD drawing based on the on-site measured data; performing BIM roofing brick arrangement drawing deepening design based on the adjusted roofing CAD drawing; performing secondary deepening of the roofing grid foundation positioning drawing based on the BIM roofing brick arrangement deepening drawing; confirming whether the deepened roofing grid foundation positioning drawing is reasonable; and exporting the final confirmed reasonable roofing grid foundation positioning drawing. The application can effectively solve the problem of traditional roofing grid foundation construction positioning, ensure that the grid foundation is accurately located in the middle of the ceramic tile, and improve the overall visual effect of the roofing and the high-quality standard requirement of the project.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The application belongs to the technical field of building construction, and particularly relates to a roof grid foundation positioning map deepening method based on BIM. BACKGROUND

[0002] With the rapid development of the real estate industry and the continuous standardization of relevant policies, the future development of the construction industry is obviously differentiated. With the increasingly fierce market competition in the construction industry, construction enterprises are facing enormous survival and development pressure, and enterprises will develop or retreat.

[0003] At present, market competition is increasingly fierce, and building engineering has shown diversified development. Modern building construction is becoming more and more complex. The traditional roof grid foundation construction sequence is to first plant a roof panel on the roof panel, then pour concrete, and finally arrange ceramic tiles. If this method is used for construction, because the roof grid foundation is constructed first and the number is large, and the grid foundation needs to be considered to be located in the middle of the ceramic tile during the later brick arrangement process, it is difficult to achieve the above requirements for the on-site roof ceramic tile arrangement, which will lead to a large number of brick cutting on the roof, seriously affecting the overall visual effect, and cannot meet the high-quality standard requirements of the project, and also increases the labor burden of workers and increases the cost input. Therefore, the traditional construction technology cannot meet the building requirements, and it is necessary to use new technology BIM (Building Information Modeling) to deepen the building information model technology. SUMMARY

[0004] The purpose of the present application is to provide a roof grid foundation positioning map deepening method based on BIM, which ensures that the grid foundation is accurately located in the middle of the ceramic tile, improves the overall visual effect of the roof, and meets the high-quality standard requirements of the project.

[0005] The technical scheme adopted by the present application is a roof grid foundation positioning map deepening method based on BIM, comprising the following steps:

[0006] S1, measuring and surveying all walls on the roof by the control line laid on site;

[0007] S2, adjusting the roof CAD drawing based on the on-site measured data;

[0008] S3, deepening the design of the BIM roof tile arrangement drawing based on the adjusted roof CAD drawing;

[0009] S4, positioning the roof grid foundation based on the BIM roof tile arrangement deepening drawing Figure Two ;

[0010] S5, confirming whether the deepened roof grid foundation positioning map is reasonable;

[0011] S6, export final confirmation reasonable roof grid foundation positioning map.

[0012] Further, in the S1, all wall bodies on the roof are measured by the control line laid on site, the control line should be marked on the inner side of the parapet, and the mark line should be introduced again on the roof after the corresponding process of the roof is completed to make it consistent with the original line.

[0013] Further, in the S1, all wall bodies on the roof are measured by the control line laid on site, for the longer wall body, at least three places should be measured to meet the measurement requirements.

[0014] Further, for the longer wall body, the three places that should be measured at least are the two ports and the middle part.

[0015] Further, in the S2, the CAD drawing is adjusted based on the measured data on site, if it is found that the adjustment value of the roof wall line is too large, the corresponding part should be marked, after all wall line sizes are reasonably adjusted, return to the construction site, and the size of the marked part is measured again to ensure the authenticity of the data.

[0016] Further, in the S3, based on the adjusted roof CAD drawing, the BIM roof brick arrangement drawing is deepened, and the deepening design principle is: first, confirm the thickness of the parapet and the stair wall body, based on the thickness of the parapet, the distance between the ceramic tile and the wall body can be accurately reserved; second, the brick joint is uniform and consistent, which can be adjusted and controlled, the partition joint is 20mm and the interval is not more than 6m, and the brick arrangement should be arranged horizontally and vertically from the stair wall body.

[0017] Further, the accurate reservation of the distance between the ceramic tile and the wall body is the thickness of the wall body plus a filling thickness of 3cm.

[0018] Further, in the S4, based on the BIM roof brick deepening drawing, the roof grid foundation positioning Figure Two Further, in the S4, based on the BIM roof brick deepening drawing, the roof grid foundation positioning

[0019] Further, in the S5, whether the deepened roof grid foundation positioning map is reasonable is confirmed, the roof related professional and technical personnel and the grid manufacturer are discussed to confirm whether the deepened roof grid foundation positioning map is reasonable, and the deepening deficiency and improvement opinions are put forward, until the relevant units reach a unified opinion, and finally the deepening of the roof grid foundation positioning map is completed.

[0020] The beneficial effects of the application are:

[0021] 1.The present application solves the problem of roof grid foundation positioning by proposing the concept of control lines, which are horizontal and vertical multiple black solid lines laid on the roof panel, can measure the actual size of all walls on the roof, and is an important reference to realize the consistency of BIM deepening base map and field entity, making the roof grid foundation deepening more accurate.

[0022] 2.The present application changes the traditional construction idea and puts the construction problem in advance, simulates the roof brick through BIM technology in advance, and adjusts the positioning of the original design grid foundation map of the roof based on the brick arrangement, solves all problems encountered in the above simulation process in advance, and finally constructs based on the BIM roof grid foundation positioning map, which can effectively solve the problems of grid foundation construction in advance, large quantity and positioning, finally makes the grid foundation accurately located in the middle of the ceramic tile, avoids the phenomenon of cutting and rework, improves the overall visual effect of the roof, and meets the high quality standard requirements of the project. BRIEF DESCRIPTION OF DRAWINGS

[0023] Figure One It is the overall flowchart of the present application;

[0024] Figure Two It is the BIM three-dimensional structure diagram of the roof of the present application;

[0025] Figure Three It is the BIM plane structure diagram of the roof of the present application;

[0026] Figure Four It is the local position adjustment diagram A of the roof grid foundation of the present application;

[0027] Figure Five It is the local position adjustment diagram B of the roof grid foundation of the present application;

[0028] Figure Six It is the final version of the roof BIM deepening grid foundation positioning map of the present application. DETAILED DESCRIPTION

[0029] In order to make the purpose, technical scheme and advantages of the present application more clear, specific, complete and clear, the technical scheme of the present application will be described below in conjunction with the drawings.

[0030] Please refer to Figure One The present application provides a BIM-based roof grid foundation positioning map deepening method, which comprises the following steps:

[0031] S1, measure all walls on the roof through the control lines laid on site

[0032] All walls on the roof are measured by the control line laid on site. For longer walls, at least three points, i.e. two ports and the middle part, should be measured to meet the measurement requirements. In a specific embodiment, all walls on the roof are measured by the control line laid on site. The control line is a black solid line laid on the roof panel in multiple horizontal and vertical lines, which can measure the actual size of all walls on the roof. At the same time, the control line should be marked on the inner side of the parapet. After the corresponding process of the roof is completed, the mark line should be introduced again on the roof to make it consistent with the original line. The purpose is that all sizes of the BIM deepening design brick arrangement drawing are based on this control line. Therefore, by introducing the control line, the BIM deepening design can be effectively associated with the site implementation, and the high quality standard requirements of the project can be met.

[0033] During the measurement, the minimum value is found by left and right swinging the steel ruler. The left and right swinging of the steel ruler can effectively avoid the inaccuracy of the data caused by the fact that the ruler is not straight, which in turn affects the accuracy of the deepening design of the roof brick arrangement drawing. Secondly, for longer walls, at least three points, i.e. two ports and the middle part, should be measured, the purpose of which is to find the shortest distance of the control line from the wall edge. As long as the tile arrangement on the shortest distance can be controlled, the effective arrangement of all wall edge tiles can be ensured, and the phenomenon of cutting tiles will not occur.

[0034] S2, adjusting the roof CAD drawing based on the on-site measured data

[0035] Based on the on-site measured data, the roof CAD drawing is adjusted. If it is found that the adjustment value of the roof wall line is too large, the corresponding part should be marked. After all the wall line sizes are reasonably adjusted, return to the construction site and re-measure the size of the marked part to ensure the authenticity of the data. In a specific embodiment, the roof CAD drawing is adjusted according to the data returned from the on-site measurement. During the adjustment process, if it is found that the adjustment size of the wall line is too large, the corresponding part should be marked. After all the wall line sizes are reasonably optimized, the roof construction site should be returned, and the size of all marked parts should be re-measured. Finally, the size of the wall line of the roof CAD drawing from the control line is consistent with the actual measured value on site, which ensures the correlation and accuracy of the on-site measured data and the subsequent BIM deepening design.

[0036] S3, BIM roof brick arrangement drawing deepening design based on the adjusted roof CAD drawing

[0037] Please refer to Figure Two, based on the adjusted roof CAD drawings to carry out BIM roof brick laying deepening design, the deepening design principle is: first, confirm the daughter wall and stair wall thickness, based on the thickness of the practice layer, the accurate size of the ceramic tile is reserved from the wall edge, the thickness of the wall practice layer plus 3cm of filling thickness; second, the brick joint is uniform and consistent, the separation joint is 20mm and the interval is not more than 6m, the brick laying should start from the stair wall and be arranged horizontally and vertically. In a specific embodiment, based on the adjusted roof CAD drawings, the adjusted CAD drawings are imported into Revit software for three-dimensional modeling and brick laying deepening design. Since the wall construction on the roof belongs to post-construction, therefore, before the roof brick laying deepening design, the thickness of the daughter wall and stair wall should be confirmed, based on the thickness of the practice layer, the accurate size of the ceramic tile is reserved from the wall edge, to ensure the effective construction of the wall and the roof brick laying, in this embodiment, the thickness of the practice layer is reserved by adding 3cm of extruded board filling thickness. Secondly, some matters should be paid attention to during the BIM roof brick laying process:

[0038] 1. The brick joint is uniform and consistent, which can be adjusted to 9-11mm. Adjustment is also an important part of BIM deepening design, which is often realized by adjusting the ceramic tile in the region by 1mm, and it should be noted that two adjacent extreme difference adjustment areas, such as area one is 11mm and area two is 9mm, should not be placed together.

[0039] 2. The separation joint is 20mm and the interval is not more than 6m, which is the requirement of the relevant specification.

[0040] 3. The brick laying should start from the stair wall and be arranged horizontally and vertically. The selection of stair wall to start laying is mainly to consider that the stair wall is long and high, and the ceramic tile laying problem should be solved in advance to avoid using more materials for repair in the later period; horizontal and vertical arrangement is adopted, that is, horizontal and vertical cross single row arrangement is made at the stair wall.

[0041] The brick laying only needs to ensure that most of the daughter wall, long wall and stair wall ceramic tile laying meets the requirements, and for the small short wall that does not meet the requirements, the insulation board is used for repair in the later period.

[0042] S4, based on the BIM roof brick laying deepening drawing to carry out the roof grid foundation positioning Figure Two Second deepening

[0043] Please refer to Figures Three to Five , based on the BIM roof brick laying deepening drawing to carry out the roof grid foundation positioning Figure TwoSecond deepening, the second deepening is carried out on the original design roof grid foundation base map, the roof grid foundation base is accurately located in the middle of the ceramic tile, and the position relationship of the second deepening roof grid foundation base can be quickly marked out through the control line. In a specific embodiment, the original design roof grid foundation positioning map is imported into the Revit software and combined with the BIM roof tile deepening map to carry out the second deepening of the roof grid foundation positioning map, the roof grid foundation is 400*400mm and 200*400mm, Figure Four The grid foundation size is 400*400mm, the horizontal and vertical directions of the original design grid foundation are adjusted by 50mm and 40mm respectively, so that it is located in the middle of the ceramic tile; Figure Five The grid foundation size is 200*400mm, the horizontal and vertical directions of the original design grid foundation are adjusted by 35mm and 30mm respectively, so that it is located in the middle of the ceramic tile.

[0044] Through the BIM roof tile deepening map, the positions of all roof grid foundations can be quickly adjusted, so that they are accurately located in the middle of the ceramic tile, meet the high-quality standard requirements, and the position relationship of the second deepening roof grid foundation can be quickly marked out through the control line.

[0045] S5, confirming whether the deepened roof grid foundation positioning map is reasonable

[0046] Discuss and confirm with the roof-related professional and technical personnel and the grid manufacturer whether the deepening of the roof grid foundation positioning map is reasonable, and put forward the deepening deficiency and improvement opinion, until the relevant units reach a unified opinion, and finally complete the deepening of the roof grid foundation positioning map. In a specific embodiment, through the above-mentioned roof grid foundation positioning deepening map, the general contractor unit leads the discussion and confirmation of whether the deepened roof grid foundation positioning map is reasonable by the professional and technical personnel of the roof units, and the deficiency and improvement opinion of each unit is further deepened until the relevant units reach a unified opinion, and finally the deepening work of the roof grid foundation positioning map is completed.

[0047] S6, export the finally confirmed reasonable roof grid foundation positioning map

[0048] In a specific embodiment, please refer to Figure Six , export the final version of the roof grid foundation positioning map through the Revit software,

[0049] The contents not described in detail in the specification of the application belong to the known technology of those skilled in the art.

Claims

1. A BIM-based roof grid base positioning drawing deepening method, characterized in that, It comprises the following steps: S1, measuring and surveying all walls on the roof by laying control lines on site; The control lines are horizontal and vertical black solid lines laid on the roof panel, used to measure the actual size of all walls on the roof, at the same time, the control lines must be marked on the inner side of the parapet, and the mark line must be re-introduced on the roof after the corresponding process of the roof is completed to make it consistent with the original line; S2, adjusting the roof CAD drawing based on the on-site measured data; If it is found that the adjustment value of the roof wall line is too large, the corresponding part must be marked, and after all the wall line sizes are reasonably adjusted, return to the construction site to re-measure the size of the marked part to ensure the authenticity of the data; S3, deepening the design of BIM roof brick arrangement drawing based on the adjusted roof CAD drawing; The deepening design principle is: first, confirm the thickness of the parapet and stair wall, based on which the distance between the ceramic tile and the wall edge can be accurately reserved; second, the brick joint is uniform and consistent, with a size of 9-11mm, the partition joint is 20mm and the distance is not more than 6m, and the brick arrangement should be arranged horizontally and vertically from the stair wall; S4, secondary deepening of the roof grid foundation positioning drawing based on the deepening drawing of BIM roof brick arrangement; Adjust the original design of the roof grid foundation drawing to make the roof grid foundation accurately located in the middle of the ceramic tile, and the position relationship after the secondary deepening of the roof grid foundation is quickly marked by the control line; S5, confirming whether the deepened roof grid foundation positioning drawing is reasonable; S6, exporting the final confirmed reasonable roof grid foundation positioning drawing.

2. The BIM-based roof-grate-base-positioning-diagram deepening method according to claim 1, characterized in that, In S1, the control lines laid on site are used to measure and survey all walls on the roof. For longer walls, at least three places should be measured to meet the measurement requirements.

3. The BIM-based roof-grate-base positioning-diagram deepening method according to claim 2, wherein, For the longer walls, the three places that should be measured at least are the two ports and the middle part.

4. The BIM-based roof-grate-base positioning-diagram deepening method of claim 1, wherein, The accurate reservation of the distance between the ceramic tile and the wall edge is the thickness of the wall layer plus a filling thickness of 3cm.

5. The BIM-based roof-grate-base-positioning-diagram deepening method of claim 1, wherein, In S5, whether the deepened roof grid foundation positioning drawing is reasonable is confirmed, the roof grid foundation positioning drawing is discussed and confirmed with relevant professional and technical personnel and grid manufacturers, and suggestions for deepening deficiency and improvement are put forward until the relevant units reach a unified opinion, and finally the deepening of the roof grid foundation positioning drawing is completed.

Citation Information

Patent Citations

  • BIM-based virtual construction roof deepening construction method