Prefabricated composite energy underground continuous wall and construction method

Through the design of prefabricated stacked energy underground diaphragm walls, combined with precast concrete walls and steel structures, the problem of insufficient integration of geothermal energy utilization and underground diaphragm walls is solved, the utilization rate of geothermal energy and construction efficiency are improved, and the seismic performance is enhanced.

CN116065572BActive Publication Date: 2024-10-01CHONGQING UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211709977.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-29
Publication Date
2024-10-01
Estimated Expiration
2042-12-29

AI Technical Summary

Technical Problem

In the existing technology, the combination of geothermal energy utilization and underground diaphragm walls has insufficient structural integrity, which makes the pipelines susceptible to the deformation of the ground diaphragm walls and affects the utilization efficiency of geothermal energy.

Method used

The prefabricated stacked energy underground diaphragm wall design is adopted, including prefabricated concrete walls, steel bar arrays, inner cavity steel cages, connecting keys and heat exchange tubes. The prefabricated structures are connected through cast-in-place concrete to enhance integrity and seismic resistance, and through positioning rings and Inject rubber tubes to fix the heat exchange tubes to prevent them from shifting.

Benefits of technology

It improves the utilization rate of geothermal energy and the integrity and seismic performance of underground diaphragm walls, reduces construction time, improves project progress and efficiency, and extends the service life of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116065572B_ABST
    Figure CN116065572B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of civil engineering and energy technology, and discloses a prefabricated composite energy underground continuous wall, comprising: a prefabricated structure, cast-in-place concrete, and a heat exchange tube for exchanging geothermal energy; the prefabricated structure comprises a prefabricated concrete wall, a steel bar array arranged in the prefabricated concrete wall, and a prefabricated steel bar cage; an inner chamber with two ends open is formed inside the prefabricated concrete wall, and the inner chamber is used to arrange the heat exchange tube; connecting chambers are also provided at both ends of the prefabricated concrete wall, and adjacent prefabricated structures are connected by pouring cast-in-place concrete in the connecting chambers; and positioning holes are provided in the prefabricated concrete wall in the vertical direction. The present invention combines geothermal energy utilization technology with underground continuous wall design, so that the underground continuous wall can complete geothermal energy extraction while supporting the upper structure, reducing the use of electric energy and fossil energy, and compared with a ground source heat pump, the large-volume underground continuous wall has a larger contact area with the soil, thereby improving the utilization efficiency of geothermal energy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of civil engineering, construction and energy technology, and in particular to a prefabricated superimposed energy underground continuous wall and a construction method. Background Art

[0002] Shallow geothermal energy is a new type of clean, renewable energy with huge reserves and wide distribution. It has broad development prospects. The development and use of shallow geothermal energy is also the preferred goal of building energy conservation. Energy wall technology combines ground source heat pumps with underground continuous walls to exchange heat with the surrounding soil to extract shallow geothermal energy, which has high economic and environmental benefits.

[0003] According to the construction method, underground continuous walls are divided into prefabricated, cast-in-place and composite types. Compared with cast-in-place, prefabricated underground continuous walls have many advantages. Prefabricated underground continuous walls are produced in factories, which reduces the noise of on-site construction and is beneficial to environmental protection. Prefabricated structures are fast to construct and do not require the pouring of large volumes of concrete. However, the integrity of prefabricated structures is poor, which is not conducive to earthquake-resistant design and high-grade buildings. Cast-in-place underground continuous walls need to be poured at intervals during construction, and the next step of pouring must be carried out only after the previous structure has solidified. When the underground continuous wall is large in volume, it takes a long time for the concrete to solidify, which affects the progress of the through-construction. Compared with cast-in-place underground continuous walls, prefabricated composite underground continuous walls reduce construction time, speed up project progress, and are conducive to regular completion of projects; compared with prefabricated underground continuous walls, the composite structure has stronger integrity; currently, in the existing technology that combines the use of geothermal energy with ground-connected walls, the ground-connected walls mainly use a single cast-in-place wall or a prefabricated assembled wall, and the formed ground-connected walls lack structural integrity. When utilizing geothermal sources, pipelines are easily damaged by the deformation of the ground-connected walls, affecting the utilization of geothermal energy. Summary of the invention

[0004] The present invention provides a prefabricated composite energy underground continuous wall, which combines geothermal utilization with the construction of a ground-connected wall to improve the utilization rate of geothermal energy.

[0005] A prefabricated composite energy underground continuous wall, comprising: a prefabricated structure, cast-in-place concrete, and a heat exchange pipe for exchanging geothermal energy;

[0006] The prefabricated structure includes a prefabricated concrete wall, a steel bar array arranged in the prefabricated concrete wall, and a prefabricated steel bar cage. An inner cavity with openings at both ends is formed inside the prefabricated concrete wall. The interior of the inner cavity is used to lay heat exchange tubes. Connecting cavities are also provided at both ends of the prefabricated concrete wall. Adjacent prefabricated structures are connected by pouring cast-in-place concrete in the connecting cavity. Positioning holes are provided in the vertical direction of the prefabricated concrete wall.

[0007] The beneficial effects of adopting the above technical solution are as follows: the present invention arranges heat exchange tubes in the concrete wall of the precast structure for exchanging geothermal energy; adjacent precast concrete structures are connected by cast-in-place concrete to enhance the strength and integrity of the precast concrete structure.

[0008] Furthermore, the precast concrete wall is provided with a connecting key, which includes an outer key and an inner key, the outer key and the inner key are adaptively connected, and the top ends of the outer key and the inner key are both provided with connecting pulleys.

[0009] The beneficial effects of adopting the above technical solution are as follows: by setting connecting keys on the prefabricated concrete wall, firstly, the integrity of the prefabricated structure can be increased, and secondly, the connecting keys can be used as a reference for accurate positioning and installation during the installation process.

[0010] Furthermore, an inner cavity steel cage is arranged inside the inner cavity, and the inner cavity steel cage is combined with cast-in-place concrete to form an inner cavity column.

[0011] The beneficial effects of adopting the above technical solution are as follows: adding an inner cavity steel cage can better combine the cast-in-place concrete with the prefabricated structure and prevent delamination.

[0012] Furthermore, the steel bar array extends to the connection chamber and is combined with the cast-in-place concrete to form a connection chamber column.

[0013] The beneficial effects of adopting the above technical solution are as follows: the steel bar arrays extending from the adjacent columns of prefabricated structures are connected, and the combination with cast-in-place concrete is beneficial to improving the strength of the cast-in-place concrete, which can better resist earthquakes and deformation.

[0014] Furthermore, a plurality of limiting rings for positioning the heat exchange tubes are provided on the wall of the inner chamber.

[0015] The beneficial effects of adopting the above technical solution are as follows: the limiting ring is used to fix or position the heat exchange tube to prevent the heat exchange tube from shifting.

[0016] Furthermore, the heat exchange tubes include U-shaped tubes, W-shaped tubes and spiral tubes.

[0017] Furthermore, a glue injection tube is arranged between the outer key and the inner key.

[0018] Furthermore, a waterproof cushion layer is provided on the top surface of the precast concrete wall and the connecting key.

[0019] The beneficial effects of adopting the above technical solution are as follows: the provision of a waterproof cushion layer can prevent water from penetrating into the interior of the precast concrete wall, thereby avoiding corrosion of the internal steel bars and other metal parts.

[0020] A construction method of a prefabricated composite energy underground continuous wall, using the above technical solution, includes the following steps:

[0021] S1: Find out the engineering geological conditions of the construction site and design the location and depth of the underground continuous wall according to the project overview;

[0022] S2: Level the ground, determine the location of the underground continuous wall and excavate the guide wall;

[0023] S3: Complete the preparation work on the ground;

[0024] S3.1: Lay the prefabricated structure flat on the ground, arrange and position the heat exchange tubes in the inner chamber of the prefabricated structure;

[0025] S3.2: Insert the steel strand into the positioning hole and fix one end to the bottom of the prefabricated structure;

[0026] S4: lower the first prefabricated structure through the steel strands, with the connection ports of the heat exchange tubes facing above the ground;

[0027] S5: After the first prefabricated structure is placed, the steel strands are passed through the positioning holes of the second prefabricated structure, the heat exchange tubes are extended into the inner chamber of the second prefabricated structure and fixed, and the second prefabricated structure is lowered to the top of the first prefabricated structure, thus completing the installation of the first row of continuous walls;

[0028] S6: pre-tighten the steel strands, lower the inner cavity steel cage and cast concrete in the inner cavity;

[0029] S7: After the preparation work is completed, the steel strand is inserted into the positioning hole and one end is fixed to the bottom of the prefabricated structure, and the second row of prefabricated structures are lowered through the steel strand. During the vertical lowering process of the second row of prefabricated structures, the outer key or the inner key of the second row of prefabricated structures is respectively buckled with the inner key or the outer key of the first row of prefabricated structures;

[0030] S8: lowering the second prefabricated structure in the same manner as S7. After the second prefabricated structure of the second row of continuous walls is lowered, the heat exchange pipes in the first prefabricated structure are extended and arranged to the second prefabricated structure above it, thereby completing the installation of the second row of continuous walls.

[0031] S9: pre-tighten the steel strands in the positioning holes, and place a glue injection tube in the two connection keys between the two rows of continuous walls, pour concrete into the inner chamber of the second row of continuous walls and the connection chamber between the first and second rows of continuous walls, and finally inject water-absorbing adhesive into the two connection keys through the glue injection tube;

[0032] S10: The installation method of the third row and the rear continuous wall is the same as the installation method of the second row continuous wall.

[0033] The present invention has the following beneficial effects:

[0034] (1) The present invention combines geothermal energy utilization technology with underground continuous wall design, so that the underground continuous wall can complete geothermal energy extraction while supporting the upper structure. The extracted geothermal energy bears part of the building energy consumption, reducing the use of electricity and fossil energy. Moreover, compared with the ground source heat pump, the large volume of the underground continuous wall increases the contact area with the soil, thereby improving the utilization efficiency of the heat exchange structure for geothermal energy.

[0035] (2) The inner cavity columns formed by cast-in-place concrete improve the vertical connection performance and bending resistance of the underground continuous wall; the connecting cavity columns are tightly combined with the steel bar array, and the connecting keys on both sides are connected, which improves the horizontal tensile resistance of the underground continuous wall. The coordinated effect of the two not only enhances the integrity of the underground continuous wall, but also improves the bearing capacity of the underground continuous wall.

[0036] (3) The application of this design and construction method allows for continuous construction, using the time it takes for concrete to solidify for subsequent construction, greatly reducing the interval construction time of the cast-in-place underground continuous wall and helping to improve construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a three-dimensional schematic diagram of the prefabricated structure in the present invention;

[0038] Figure 2 It is a top view schematic diagram of the prefabricated structure in the present invention;

[0039] Figure 3 It is an elevation view of the prefabricated structure in the present invention;

[0040] Figure 4 It is a side view of the prefabricated structure of the present invention;

[0041] Figure 5 It is a top view schematic diagram of the connection relationship between the prefabricated structures of the present invention;

[0042] Figure 6 It is a schematic diagram of the steel bar arrangement structure of the underground continuous wall of the present invention;

[0043] Figure 7 Schematic diagram of the structure of the connecting key in the present invention;

[0044] Figure 8 It is a cutaway diagram of the prefabricated structure and steel bar arrangement in the present invention;

[0045] Fig. 9 This is a rendering of the prefabricated structure of the present invention after pouring concrete;

[0046] Fig.10 It is an elevation view of the arrangement of the spiral heat exchange tube in Example 1;

[0047] Fig.11 It is an elevation view of the arrangement of the W-shaped heat exchange tube in the first embodiment;

[0048] Fig.12 This is a schematic diagram of the upper structure of the prefabricated structure in Example 2;

[0049] Fig.13 This is a schematic diagram of the bottom structure of the prefabricated structure in Example 2.

[0050] In the figure: 1-prefabricated structure; 11-prefabricated concrete wall; 12-inner chamber; 13-connecting chamber; 14-connecting key; 141-outer key; 142-inner key; 143-connecting pulley; 15-rebar array; 16-prefabricated rebar cage; 17-positioning hole; 18-limiting ring; 19-waterproof cushion; 2-cast-in-place concrete; 21-inner chamber column; 211-inner chamber rebar cage; 22-connecting chamber column; 3-heat exchange tube; 4-rubber injection tube. DETAILED DESCRIPTION

[0051] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.

[0052] Embodiment 1

[0053] refer to Figures 1 to 6 , Figure 8 and Fig. 9 The present invention provides a prefabricated composite energy underground continuous wall, including: a prefabricated structure 1, cast-in-place concrete 2 and a heat exchange pipe 3 for exchanging geothermal energy.

[0054] The prefabricated structure 1 includes a prefabricated concrete wall 11, a steel bar array 15 arranged in the prefabricated concrete wall 11, and a prefabricated steel bar cage 16. The top and bottom thicknesses of the prefabricated concrete 11 are consistent, and the left and right ends are symmetrical structures. The prefabricated steel bar cage 16 is embedded in the prefabricated concrete wall 11 to increase the strength of the prefabricated structure 1. The steel bar array 15 is a plurality of parallel rough steel bars. The steel bar arrays 15 on adjacent prefabricated structures 1 are staggered to each other, which does not affect the vertical sliding of the prefabricated structure 1 during installation. The steel bar arrays 15 are welded to the prefabricated steel bar cage 16 and are arranged on the left and right sides of the prefabricated structure 1.

[0055] An inner chamber 12 with openings at both ends is formed inside the precast concrete wall 11. The inner chamber 12 is used to lay out the heat exchange tube 3. The cross-section of the inner chamber 12 is columnar, and a plurality of limit rings 18 are fixed on the wall. The limit rings 18 are evenly distributed in two rows. One is used to locate the position of the heat exchange tube 3, and the other is to provide a reference point for the installation of the precast structure 1.

[0056] An inner cavity steel cage 211 is arranged inside the inner cavity 12. The inner cavity steel cage 211 is made in advance on the ground. After the prefabricated structure 1 is installed, it is lowered into the inner cavity 12. By pouring concrete in the inner cavity 12, the inner cavity steel cage 211 is combined with the cast-in-place concrete 2 to form an inner cavity column 21. The inner cavity column 21 can stabilize the prefabricated structures 1 stacked up and down, so that the upper prefabricated structure 1 will never undergo lateral displacement, thereby ensuring the integrity of the underground continuous wall structure and increasing the bending resistance.

[0057] The left and right ends of the precast concrete wall 11 are also provided with a connecting chamber 13, and the connecting chamber 13 is a semicircular arc surface. Two identical precast concrete walls 11 are connected side by side to form a complete cylindrical connecting chamber 13. The steel bar array 15 extends into the connecting chamber 13, and the adjacent precast structures 1 can be connected by pouring cast-in-place concrete 2 in the connecting chamber 13, thereby connecting the adjacent precast structures 1 into a whole; the cylindrical connecting chamber column 22 formed by the combination of the steel bar array 15 and the cast-in-place concrete 2 in the connecting chamber 13 can not only improve the tensile strength of the adjacent precast structures 1, but also improve the vertical connectivity and bending resistance of the underground continuous wall.

[0058] The precast concrete wall 11 is provided with a positioning hole 17 in the vertical direction, and the positioning hole 17 is located at the side column of the precast concrete wall 11, that is, located in the concrete wall between the inner chamber 12 and the connecting chamber 13; the positioning hole 17 is used to pass the steel strand, one end of which is fixed to the bottom of the precast structure 1, so as to facilitate the hoisting and lowering of the precast structure 1 during installation. Secondly, the steel strand can also connect the precast structures 1 that are overlapped and connected up and down, thereby increasing the structural integrity of the underground continuous wall.

[0059] refer to Figures 5 to 7 The left and right ends of the precast concrete wall 11 are provided with connecting keys 14, and the connecting keys 14 include an outer key 141 and an inner key 142. Both the outer key 141 and the inner key 142 can be made of L-shaped steel plates. One end of the steel plate is welded to the precast steel cage 16 of the precast structure 1, and the other end extends out of the precast concrete wall 11. The two L-shaped steel plates on the same side are arranged opposite to each other, and the L-shaped steel plates on the opposite sides are arranged back to back, so that when the two adjacent precast structures 1 are connected, the inner key 142 and the outer key 141 can be adapted and buckled; the top of the outer key 141 and the inner key 142 are both provided with a connecting pulley 143. When installing two adjacent rows of precast structures 1, rolling movement can be formed through the connecting pulley 143, thereby reducing the friction between the precast structures 1 and making the installation more convenient and efficient.

[0060] refer to Figure 7A glue injection pipe 4 is arranged between the outer key 141 and the inner key 142. The glue injection pipe 4 is arranged along the top and bottom directions of the prefabricated structure 1 and is open at the bottom. After the concrete of the inner chamber 12 and the connecting chamber 13 is poured, the water-absorbing adhesive is injected through the glue injection pipe 4 to bond the two connected L-shaped steel plates together, thereby improving the water-proof property and increasing the strength of the underground continuous wall.

[0061] The top surface of the precast concrete wall 11 and the connecting key 14 is provided with a waterproof cushion layer 19 to increase the waterproof performance. The waterproof cushion layer 19 can be made of rubber gaskets to prevent water in the soil from seeping into the interior of the precast structure from the connecting gaps between the upper and lower adjacent precast structures 1, thereby extending the service life of the underground continuous wall.

[0062] The shape of the heat exchange tube 3 can be selected according to actual conditions. A U-shaped tube is commonly used. When a U-shaped heat exchange tube is used, both ends of the heat exchange tube pass through the limit ring 18, and the tube opening faces the ground. In addition, the heat exchange tube 3 can also be a spiral tube (such as Fig.10 ) or W-type tube (such as Fig.11 ), the limiting ring 18 can be removed when in use, and the binding positioning can be used instead. The heat exchange tube 3 can be selected in a segmented or integral type. The segmented type is flexible and convenient to install, but the connection joints are prone to leakage; the integral type can avoid the connection problem of the heat exchange tube 3, thereby greatly avoiding the leakage problem of the heat exchange tube 3. In addition, the integral heat exchange tube 3 can play a positioning role to ensure the accurate installation position of the prefabricated structure 1.

[0063] A construction method for a prefabricated superimposed energy underground continuous wall comprises the following steps:

[0064] S1: Find out the engineering geological conditions of the construction site and design the location and depth of the underground continuous wall according to the project overview;

[0065] S2: Level the ground, determine the location of the underground continuous wall and excavate the guide wall;

[0066] S3: Complete the preparation work on the ground;

[0067] S3.1: Lay the prefabricated structure 1 flat on the ground, arrange the heat exchange tube 3 in the inner chamber 12 of the prefabricated structure 1 and position it;

[0068] S3.2: Insert the steel strand into the positioning hole 17 and fix one end of the steel strand to the bottom of the prefabricated structure 1;

[0069] S4: lowering the first prefabricated structure 1 through the steel strands, with the connection port of the heat exchange tube 3 facing above the ground;

[0070] S5: After the first prefabricated structure 1 is placed, the steel strand is passed through the positioning hole 17 of the second prefabricated structure 1, the heat exchange tube 3 is extended to the inner chamber 12 of the second prefabricated structure 1 and fixed, and the second prefabricated structure 1 is lowered to the top of the first prefabricated structure 1, thereby completing the installation of the first row of continuous walls;

[0071] S6: pre-tighten the steel strands, lower the inner cavity steel cage 211 and cast concrete in the inner cavity 12;

[0072] S7: After the preparation work is completed, a steel strand is inserted into the positioning hole 17 and one end is fixed to the bottom of the prefabricated structure 1, and the prefabricated structure 1 of the second row is lowered through the steel strand. During the vertical lowering process of the prefabricated structure 1 of the second row, the outer key 141 or the inner key 142 of the prefabricated structure 1 of the second row is buckled with the inner key 142 or the outer key 141 of the prefabricated structure 1 of the first row respectively;

[0073] S8: lowering the second prefabricated structure 1 in the same manner as S7. After the second prefabricated structure 1 of the second row of continuous walls is lowered, the heat exchange pipes 3 in the first prefabricated structure 1 are extended and arranged to the second prefabricated structure 1 above it, thereby completing the installation of the second row of continuous walls.

[0074] S9: pre-tighten the steel strands in the positioning holes 17, and place the glue injection tube 4 in the two connecting keys 14 between the two rows of continuous walls, pour concrete into the inner chamber 12 of the second row of continuous walls and the connecting chamber 13 between the first and second rows of continuous walls, and finally inject water-absorbing adhesive into the two connecting keys 14 through the glue injection tube 4;

[0075] S10: The installation method of the third row and the rear continuous wall is the same as the installation method of the second row continuous wall.

[0076] Embodiment 2

[0077] refer to Fig.12 and Fig.13 The upper structure of the prefabricated structure 1 is Z-shaped, and the lower structure is L-shaped. The widths of the upper structure and the lower structure in the horizontal direction are consistent. This connection structure avoids the splicing seams that penetrate the prefabricated concrete wall 11 in the horizontal direction, which is beneficial to improving the overall strength of the structure.

[0078] The remaining configurations of the prefabricated structure 1 are the same as those in the first embodiment, and the construction steps are also the same as those in the first embodiment.

[0079] The above description is only a preferred embodiment of the present invention, which does not represent all possible forms of the present invention, and the protection scope of the present invention is not limited to such special statements and embodiments. According to the technical enlightenment disclosed by the present invention, various other modifications and improvements that do not deviate from the essence of the present invention are made, and these modifications and improvements are still within the protection scope of the present invention.

Claims

1. A prefabricated composite energy underground continuous wall, characterized in that: include: Prefabricated structure (1), cast-in-place concrete (2) and heat exchange pipes (3) for exchanging geothermal energy; The prefabricated structure (1) comprises a prefabricated concrete wall (11), a steel bar array (15) arranged in the prefabricated concrete wall (11), and a prefabricated steel bar cage (16); an inner chamber (12) with openings at both ends is formed inside the prefabricated concrete wall (11); the inner chamber (12) is used to arrange the heat exchange tube (3); connecting chambers (13) are also provided at both ends of the prefabricated concrete wall (11); adjacent prefabricated structures (1) are connected by pouring cast-in-place concrete (2) in the connecting chambers (13); the prefabricated concrete wall (11) is provided with positioning holes (17) in the vertical direction; The precast concrete wall (11) is provided with a connecting key (14), the connecting key (14) comprising an outer key (141) and an inner key (142), the outer key (141) and the inner key (142) being adaptively connected and the top ends of the outer key (141) and the inner key (142) are both provided with connecting pulleys (143); a glue injection tube (4) is also arranged between the outer key (141) and the inner key (142).

2. The prefabricated composite energy underground continuous wall according to claim 1 is characterized in that: An inner cavity steel cage (211) is arranged inside the inner cavity chamber (12), and the inner cavity steel cage (211) is combined with the cast-in-place concrete (2) to form an inner cavity column (21).

3. The prefabricated composite energy underground continuous wall according to claim 1 is characterized in that: The steel bar array (15) extends to the connection chamber (13) and is combined with the cast-in-place concrete (2) to form a connection chamber column (22).

4. The prefabricated composite energy underground continuous wall according to claim 1 is characterized in that: A plurality of limiting rings (18) for positioning the heat exchange tube (3) are provided on the wall of the inner chamber (12).

5. The prefabricated composite energy underground continuous wall according to claim 1 is characterized in that: The heat exchange tube (3) comprises a U-shaped tube, a W-shaped tube and a spiral tube.

6. The prefabricated composite energy underground continuous wall according to claim 1 is characterized in that: The top surfaces of the precast concrete wall (11) and the connecting key (14) are provided with a waterproof cushion layer (19).

7. A construction method of a prefabricated composite energy underground continuous wall, using the prefabricated composite energy underground continuous wall according to claim 6, comprising the following steps: S1: Find out the engineering geological conditions of the construction site and design the location and depth of the underground continuous wall according to the project overview; S2: Level the ground, determine the location of the underground continuous wall and excavate the guide wall; S3: Complete the preparation work on the ground; S4: lowering the first prefabricated structure (1) through the steel strands, with the connection port of the heat exchange tube (3) facing above the ground; S5: After the first prefabricated structure (1) is placed, the steel strand is passed through the positioning hole (17) of the second prefabricated structure (1), the heat exchange tube (3) is extended to the inner chamber (12) of the second prefabricated structure (1) and fixed, and the second prefabricated structure (1) is lowered to the top of the first prefabricated structure (1), thereby completing the installation of the first row of continuous walls; S6: pre-tighten the steel strands, lower the inner cavity steel cage (211) and cast concrete in the inner cavity (12); S7: After the preparation work is completed, a steel strand is inserted into the positioning hole (17) and one end is fixed to the bottom of the prefabricated structure (1). The second row of prefabricated structures (1) are lowered through the steel strand. During the vertical lowering process of the second row of prefabricated structures (1), the outer key (141) or the inner key (142) of the second row of prefabricated structures (1) is respectively buckled with the inner key (142) or the outer key (141) of the first row of prefabricated structures (1); S8: lowering the second prefabricated structure (1) in the same manner as S7. After the second prefabricated structure (1) of the second row of continuous walls is lowered, the heat exchange tubes (3) in the first prefabricated structure (1) are extended and arranged to the second prefabricated structure (1) above it, thereby completing the installation of the second row of continuous walls. S9: pre-tighten the steel strands in the positioning holes (17), and place the glue injection tube (4) in the two connecting keys (14) between the two rows of continuous walls, pour concrete into the inner chamber (12) of the second row of continuous walls and the connecting chamber (13) between the first row and the second row of continuous walls, and finally inject water-absorbing adhesive into the two connecting keys (14) through the glue injection tube (4); S10: The installation method of the third row and the rear continuous wall is the same as the installation method of the second row continuous wall.

8. The construction method of the prefabricated composite energy underground continuous wall according to claim 7 is characterized in that: The S3 comprises the following steps: S3.1: Lay the prefabricated structure (1) flat on the ground, arrange the heat exchange tube (3) in the inner chamber (12) of the prefabricated structure (1) and position it; S3.2: Insert the steel strand into the positioning hole (17) and fix one end to the bottom of the prefabricated structure (1).