Caisson sinking construction method and construction system
By using high-pressure water jet technology and measurement and correction methods in caisson construction, the problems of uneven and skewed sinking of the caisson are solved, and the stability, uniform sinking of the caisson and the improvement of construction efficiency are achieved.
Patent Information
- Application Number
- CN202211551035.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-05
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2042-12-05
AI Technical Summary
During the construction of the caisson, due to the difficulty of taking soil from the well holes in the existing technology, the caisson is prone to skew and sudden sinking, and the caisson is unevenly sinking, making it difficult to reach the design allowable range.
By controlling the nozzle at the bottom of the caisson, the soil is sprayed with high pressure, reducing the soil bearing capacity, ensuring uniform sinking of the caisson; measuring the actual settlement amount and inclination, adjusting the nozzle work, correcting the caisson attitude, and achieving uniform sinking.
It effectively avoids the risks of caisson skewed and sudden sinking, ensures that the caisson sinks evenly to the predetermined position, reduces the soil bearing capacity, and improves the stability and efficiency of caisson construction.
Smart Images

Figure CN116122322B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of caisson construction, and in particular to a caisson sinking construction method and a construction system. Background Art
[0002] Caissons have a very wide range of applications. During the construction process, due to the large size, heavy weight, and deep sinking depth of the caisson, and the influence of groundwater, geology, and surrounding structures, there are still some difficult-to-solve technical problems.
[0003] When the caisson sinks without drainage, no precipitation construction is carried out, so the impact on the surrounding environment is relatively small. When taking soil, a grab shovel is generally used to dig soil from the well hole. However, since it is difficult to take soil from the well hole in the existing method, it is very easy to cause the caisson to tilt and sink suddenly due to uneven soil taking; and the sinking of the caisson is often accompanied by partial sinking, and the height difference of the four corners of the caisson and the center deviation increase, even exceeding the design allowable range, resulting in substandard caisson construction. Summary of the invention
[0004] In order to overcome the deficiencies in the prior art, the present invention provides a caisson sinking construction method and a construction system.
[0005] The present invention provides the following technical solutions:
[0006] A caisson sinking construction method, the caisson sinking construction method comprising the following steps:
[0007] S1: Controlling the sprinkler at the bottom of the caisson to spray water on the soil below the caisson to make the caisson sink;
[0008] S2: measuring the actual settlement and inclination of the caisson, comparing the difference with the expected settlement, when the caisson settles evenly and the actual settlement is not less than the expected settlement, repeating step S1 to allow the caisson to continue to settle; when the caisson settles evenly and the actual settlement is less than the expected settlement, proceeding to step S3; when the caisson settles unevenly, proceeding to step S4; when the total actual settlement of the caisson is not less than the total expected settlement, stopping the settlement operation;
[0009] S3: After taking soil from the inside of the caisson, repeat step S1;
[0010] S4: Start the nozzle in the area with smaller settlement to correct the deviation of the caisson, and repeat step S2 after the correction is completed.
[0011] In a possible embodiment, the caisson sinking construction method also includes setting a first blade foot at the bottom of the outer wall of the caisson, setting a partition wall inside the caisson, and setting a second blade foot at the bottom of the partition wall; a first nozzle and a second nozzle are respectively set on the first tread and the inclined surface of the first blade foot, and a third nozzle is set on the second tread of the second blade foot; by dividing the first tread, the inclined surface and the second tread into multiple areas, the nozzle in each of the areas is used to spray water on the corresponding soil.
[0012] In a possible implementation, step S1 is to adjust the water spraying time and jet intensity of the sprinklers in different areas by sensing the soil conditions under the first tread, the slope and the second tread and the posture of the caisson to sink the caisson.
[0013] In a possible implementation, the caisson is corrected by controlling the operation of a sprinkler located in an area with smaller settlement, thereby reducing the bearing capacity of the soil below the area with smaller settlement, thereby causing the caisson in the corresponding area to sink.
[0014] In a possible implementation, the actual settlement amount of the caisson is measured by setting a bracket around the caisson, installing a horizontal laser on the bracket, and setting scale lines on the outer side of the well wall of the caisson, the scale lines corresponding to the laser lines emitted by the horizontal laser; the settlement amount of the caisson is determined by observing the relative positions of the laser lines and the scale lines.
[0015] In the second aspect, the present invention also provides a construction system, which includes a caisson, a nozzle, a control mechanism, a settlement detection mechanism and an inclination detection mechanism; the nozzle is arranged at the bottom of the caisson, and the control mechanism is used to control the nozzle to spray water to the soil under the caisson; the settlement detection mechanism is used to measure the sinking amount of the caisson; the inclination detection mechanism is used to measure the inclination of the caisson.
[0016] In a possible embodiment, the caisson also includes a first blade foot, a partition wall and a second blade foot; the first blade foot is arranged at the bottom of the outer wall of the caisson, the partition wall is arranged inside the caisson, and the second blade foot is arranged at the bottom of the partition wall; a first nozzle is arranged on the first tread of the first blade foot, a second nozzle is arranged on the inclined surface of the first blade foot, and a third nozzle is arranged on the second tread of the second blade foot; the first nozzle, the second nozzle and the third nozzle are all used to spray water onto the soil under the caisson.
[0017] In a possible embodiment, a plurality of the first nozzles are provided on the first tread, and the plurality of the first nozzles are horizontally facing nozzles, and the length direction of the first nozzles is parallel to the length direction of the first tread; and the plurality of the first nozzles are arranged on the first tread at intervals along the length direction of the first tread.
[0018] In a possible implementation manner, on the first tread, a distance between two adjacent first nozzles is not less than twice the jet length of the first nozzle.
[0019] In a possible implementation, a protective member is provided on the outside of the nozzle, and the protective member is fixed to the bottom of the caisson.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] The caisson sinking construction method provided by the embodiment of the present invention has the following steps: first, by controlling the nozzle at the bottom of the caisson, the nozzle can spray high-pressure water on the soil below the caisson, thereby destroying the structure of the soil below the caisson and reducing the bearing capacity of the soil, so as to facilitate the sinking of the caisson. After the caisson sinks stably, the second step is performed to measure the actual settlement of the caisson, and by comparing the actual settlement with the expected caisson amount, if the actual settlement is not less than the expected settlement, the nozzle is controlled again to allow the caisson to continue to sink; if the actual settlement is less than the expected settlement, the third step is performed to measure the inclination of the caisson, and if the caisson is in an inclined state, the caisson is corrected and the second step is performed again; if the caisson is in a horizontal state, the soil is taken from the inside of the caisson and the second step is performed again. In the caisson sinking construction method of the present invention, after the nozzle sprays water at high pressure on the soil below the caisson, the soil becomes a mud-water mixture, thereby reducing the bearing capacity of the soil below the caisson, so as to facilitate the sinking of the caisson, and the mud-water mixture can be evenly extracted from the wellbore to avoid the risk of the caisson being skewed, suddenly sunk, etc. By adjusting the actual settlement amount and inclination of the caisson, it is ensured that the caisson can be evenly sunk to the predetermined position in a horizontal posture.
[0022] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and understandable, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0024] Figure 1A flow chart showing the process of the caisson sinking construction method of the present invention is shown;
[0025] Figure 2 A schematic structural diagram of a first blade foot according to an embodiment of the present invention is shown;
[0026] Figure 3 Shows Figure 2 The enlarged schematic diagram of point A in the middle;
[0027] Figure 4 Shows Figure 2 The enlarged schematic diagram of point B in the middle;
[0028] Figure 5 It shows a schematic structural diagram of the first nozzle of the present invention being arranged on the first tread;
[0029] Figure 6 A schematic diagram showing the structure of a second blade foot according to an embodiment of the present invention is shown;
[0030] Figure 7 Shows Figure 6 The enlarged schematic diagram of the center C;
[0031] Figure 8 A schematic diagram showing the distribution of the first nozzle, the second nozzle and the third nozzle on the caisson according to an embodiment of the present invention is shown;
[0032] Fig. 9 A schematic diagram of the division of the nozzle control area according to an embodiment of the present invention is shown.
[0033] Description of main component symbols:
[0034] 100-outer wall of caisson; 200-first blade foot; 210-first tread; 211-first nozzle; 212-first protective member; 220-inclined surface; 221-second nozzle; 222-second protective member; 300-partition wall; 400-second blade foot; 410-second tread; 411-third nozzle; 412-third protective member; 500-first pipeline; 510-second pipeline; 520-third pipeline; 530-branch pipe; 600-caisson. DETAILED DESCRIPTION
[0035] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0036] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0037] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0038] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0039] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0040] Embodiment 1
[0041] See also Figures 1 to 9 An embodiment of the present invention provides a caisson sinking construction method. The caisson sinking construction method is used in caisson construction to ensure that the caisson 600 sinks stably.
[0042] The caisson 600 in this embodiment is a structure in construction. The lower end of the outer wall of the caisson 600 is provided with a blade foot, which facilitates the caisson 600 to cut into the soil under the action of its own weight. The caisson 600 is provided with a partition wall 300 inside, which is used to increase the rigidity of the caisson 600 during the sinking process. At the same time, the partition wall 300 divides the caisson 600 into multiple construction wells, so that excavation and sinking can be carried out more evenly, and it is also convenient for the caisson 600 to correct the deviation when it is deviated.
[0043] See also Figure 1 The caisson sinking construction method comprises the following steps:
[0044] S1: Control the sprinkler at the bottom of the caisson 600 to spray water on the soil below the caisson 600 to make the caisson 600 sink.
[0045] Combination Figures 2 to 4 A first blade foot 200 is provided at the lower end of the caisson outer wall 100, the upper end of the first blade foot 200 is fixedly connected to the bottom of the caisson outer wall 100, and a first tread 210 is provided at the lower end of the first blade foot 200. The first blade foot 200 also includes an inclined surface 220, and the inclined surface 220 connects the first tread 210 and the lower end of the caisson outer wall 100.
[0046] The first tread 210 is used to reduce the sinking speed of the caisson 600 in the initial stage of sinking, so as to prevent the caisson 600 from sinking too quickly and causing tilting.
[0047] The first tread 210 is provided with a first nozzle 211 , and the inclined surface 220 is provided with a second nozzle 221 .
[0048] The first nozzle 211 is used to spray water on the soil below the first tread 210. The water sprayed by the first nozzle 211 can destroy the soil structure and reduce the bearing capacity of the soil, so that the first tread 210 sinks.
[0049] Combination Figure 5 As shown, the first nozzle 211 is a horizontally facing nozzle, and the length direction of the first nozzle 211 is parallel to the length direction of the first tread 210. The first nozzle 211 has two nozzles, and the jets ejected from the two nozzles are in opposite directions.
[0050] The high-pressure water jet sprayed by the first nozzle 211 falls on the soil below the first tread 210 under the influence of gravity, so as to reduce the bearing capacity of the soil, thereby reducing the resistance of the caisson 600 when sinking. Since the direction of the high-pressure water jet sprayed by the first nozzle 211 is not directly facing the soil, the high-pressure water jet is prevented from directly scouring the soil, preventing the formation of a deep depression on the soil, thereby reducing the risk of uneven sinking of the caisson 600.
[0051] The second nozzle 221 is a unidirectional nozzle, and the direction of the high-pressure water jet sprayed by the second nozzle 221 is perpendicular to the slope 220. The high-pressure water jet sprayed by the second nozzle 221 is used to destroy the soil structure below the slope 220, so that the slope 220 sinks.
[0052] Through the cooperation between the first nozzle 211 and the second nozzle 221, the soil structure below the first blade foot 200 is destroyed, thereby reducing the resistance when the first blade foot 200 is inserted into the soil, thereby facilitating the sinking of the caisson 600.
[0053] See also Figure 6 and Figure 7 A second blade foot 400 is provided at the lower end of the partition wall 300 of the caisson 600 , a second tread 410 is provided at the bottom of the second blade foot 400 , and a third nozzle 411 is provided on the second tread 410 .
[0054] The third nozzle 411 is a horizontally facing nozzle, and the length direction of the third nozzle 411 is parallel to the length direction of the second tread 410. In some embodiments, a plurality of the third nozzles 411 are provided on the second tread 410, and the plurality of the third nozzles 411 are arranged side by side on the second tread 410, and the plurality of the third nozzles 411 in each row are evenly spaced along the length direction of the second tread 410, thereby improving the efficiency of destroying the soil structure below the partition wall 300.
[0055] The first nozzle 211, the second nozzle 221 and the third nozzle 411 are respectively connected to a water supply mechanism, which includes a water tank, a high-pressure pump group and a high-pressure pipeline. The high-pressure pump group is respectively connected to the water tank and the high-pressure pipeline, and the high-pressure pipeline is respectively connected to the first nozzle 211, the second nozzle 221 and the third nozzle 411 through corresponding pipeline groups. The high-pressure pump group is electrically connected to an external control console. The water tank is used to store water, and the control console can control the high-pressure pump group to extract water from the water tank, and after pressurization, it is transported to each nozzle through the high-pressure pipeline and the pipeline group, so that the first nozzle 211, the second nozzle 221 and the third nozzle 411 can all spray high-pressure water jets.
[0056] Since the water in the high-pressure pipe has a certain positive pressure, the mud formed after the soil is soaked by water can be prevented from flowing back into each nozzle, thereby ensuring the normal operation of each nozzle.
[0057] In some embodiments, see Figure 8 The caisson 600 is a rectangular caisson, the cross section of the caisson outer wall 100 in the horizontal direction is a rectangle, the first blade foot 200 is at the bottom of the caisson outer wall 100 and is arranged around the circumference of the caisson outer wall 100; a plurality of the first nozzles 211 are arranged on the first tread 210, and a plurality of the second nozzles 221 are arranged on the inclined surface 220, and the second nozzles 221 are located on the inner side of the first nozzles 211. A plurality of the third nozzles 411 are arranged under the two partition walls 300 located in the center of the caisson 600, so that the plurality of the third nozzles 411 are arranged in a cross shape.
[0058] The operator may arrange the positions of the first nozzle 211 , the second nozzle 221 , and the third nozzle 411 according to the actual shape of the caisson.
[0059] The pipeline groups corresponding to the first nozzle 211, the second nozzle 221 and the third nozzle 411 are respectively provided with control valves (not shown in the figure), and the control valves are electrically connected to the control console, and the control console can control the opening and closing of the control valves.
[0060] The step S1 also includes dividing the bottom of the caisson 600 into a plurality of areas, and spraying high-pressure water on the soil below the caisson 600 by controlling the nozzles in different areas respectively, so as to make the caisson 600 sink evenly.
[0061] Combination Figure 8 and Fig. 9 As shown, the operator can divide the first tread 210 into eight areas, namely A1, A2, A2', A3', A3, A4, A4', and A1', and the plurality of first nozzles 211 are all arranged in the area from A1 to A1'; divide the inclined surface 220 into four areas, namely C1, C2, C3, and C4, and the plurality of second nozzles 221 are all arranged in the area from C1 to C4; divide the second tread 410 into eight areas, namely B1, B1', B2, B2', B3, B3', B4, and B4', and the plurality of third nozzles 411 are all arranged in the area from B1 to B4'.
[0062] The control console can control the operation of the nozzles in the corresponding area through the control valve.
[0063] In some embodiments, when the caisson 600 needs to sink, the operator first controls the first nozzle 211 in the corresponding areas of A1 to A1' to work in sequence to destroy the soil structure below the corresponding areas of A1 to A1'; then controls the second nozzle 221 in the corresponding areas of C1 to C4 to work in sequence to destroy the soil structure below the corresponding areas of C1 to C4; finally, controls the third nozzle 411 in the corresponding areas of B1 to B4' to work in sequence to destroy the soil structure below the corresponding areas of B1 to B4'.
[0064] The operator can take photos of the soil under each area through observation equipment, and compare the photos with photos of different types of soil to determine the type of soil under each area. The observation equipment can be a camera or other instrument.
[0065] Compared with the nozzles in all areas working at the same time, the present invention controls the corresponding nozzles in different areas to work separately, and can make corresponding adjustments according to the soil conditions in different areas below the caisson 600. For example, when the soil below the A1 area is relatively soft, the water pressure sprayed by the first nozzle 211 located in the A1 area can be reduced, and the working time of the first nozzle 211 can be shortened, so that the resistance of the soil below the A1 area will not be too small, so as to prevent the caisson 600 from tilting in the A1 area. When the soil below the A4 area is a sand and gravel layer, the water pressure sprayed by the first nozzle 211 located in the A4 area can be increased, and the working time of the first nozzle 211 can be increased, so as to greatly reduce the resistance of the soil below the A4 area, so as to facilitate the sinking of the caisson 600 in the A4 area.
[0066] The operator can adjust the working order of the corresponding areas according to actual needs. It is worth noting that multiple areas can work at the same time. For example, when the first nozzle 211 in the A1 area is working, the second nozzle 221 in the C1 area can also work at the same time, thereby improving the sinking efficiency of the caisson 600.
[0067] In other embodiments, in order to reduce the probability of the caisson 600 sinking to one side, the operator turns on the nozzles in mutually symmetrical areas to work at the same time. For example, when controlling the second nozzle 221 in the C1 area to work, the operator also controls the second nozzle 221 in the C3 area to work, thereby reducing the risk of the caisson 600 sinking to one side.
[0068] The operator may divide the first tread 210 , the inclined surface 220 , and the second tread 410 into regions according to actual conditions.
[0069] By controlling the operation of the sprinklers in different areas respectively, the soil structure in the corresponding areas can be destroyed and its bearing capacity can be reduced, so that the caisson 600 can sink smoothly, and the operation of the sprinklers in the corresponding areas can be adjusted according to the soil conditions in different areas below the caisson 600, so that the bearing capacity of the soil in each area below the caisson 600 after being infiltrated by water is similar, thereby reducing the uneven settlement caused by uneven geology; and by controlling the operation of the sprinklers in different areas respectively, the bearing capacity of the soil in each area can also be controlled, thereby adjusting the overall force of the caisson 600 to prevent the risks of refusal to sink, sudden sinking, etc. during the sinking process of the caisson 600.
[0070] S2: Measure the actual settlement and inclination of the caisson 600, and compare the difference with the expected settlement. When the settlement is uniform and the actual settlement is not less than the expected settlement, repeat step S1 to allow the caisson 600 to continue to settle. When the settlement is uniform and the actual settlement is less than the expected settlement, proceed to step S3. When the caisson 600 settles unevenly, proceed to step S4. When the total actual settlement of the caisson 600 is not less than the total expected settlement, stop the settlement operation.
[0071] The actual settlement amount of the caisson 600 is measured by setting a bracket (not shown) around the caisson 600, installing a horizontal laser instrument (not shown) on the bracket, and setting scale lines on the outer side of the wall of the caisson 600, the scale lines corresponding to the laser lines emitted by the horizontal laser instrument; by observing the relative positions of the laser lines and the scale lines, the settlement amount of the caisson 600 can be determined.
[0072] Operators can also measure the actual settlement amount through other equipment such as sonar.
[0073] The inclination of the caisson 600 is measured by setting an inclinometer (not shown) on the inner side of the wall of the caisson 600. The inclinometer is electrically connected to an external monitoring device. The inclinometer can detect the inclination angle and inclination direction of the caisson 600, and convert the detected data into electrical signals and send them to the monitoring device. The monitoring device converts the received electrical signals into specific numerical values so that the operator can obtain the inclination data of the caisson 600.
[0074] After the caisson is sunk for the first time, if the caisson 600 is sunk evenly and the first actual settlement amount is greater than or equal to the first estimated settlement amount, the caisson 600 is sunk for the second time again through step S1.
[0075] If the caisson 600 settles evenly and the first actual settlement amount is less than the first estimated settlement amount, step S3 is performed to take soil from the inside of the caisson 600 to reduce the height of the caisson 600.
[0076] If the caisson 600 sinks unevenly, the caisson 600 performs step S4 to correct the caisson to ensure that the caisson 600 sinks evenly.
[0077] If the total actual settlement amount of the caisson 600 is not less than the total expected settlement amount, the settlement operation is stopped.
[0078] S3: After taking soil from the interior of the caisson 600, repeat step S1.
[0079] The operator can use a mud pump to extract the soil that has been soaked by water below the caisson 600, so that the caisson 600 can sink further. Since the dry soil becomes a mud-water mixture, the mud-water mixture can be evenly extracted from the well hole by the mud pump. Compared with digging soil into the well hole of the caisson 600 with a grab shovel, the speed of extracting the mud-water mixture below the caisson 600 is controllable, and the height of the mud-water mixture drops more evenly.
[0080] After the caisson 600 is stabilized, the actual settlement of the caisson 600 is remeasured by the horizontal laser instrument. When the actual settlement is not less than the expected settlement, the caisson 600 repeats step S1 and the caisson 600 further sinks. When the first actual settlement is still less than the first expected settlement, step S2 is repeated again to take soil from the inside of the caisson 600 for the second time.
[0081] S4: Start the nozzle in the area with smaller settlement to correct the caisson 600, and repeat step S2 after the correction is completed.
[0082] When the caisson 600 sinks unevenly, the operator obtains information about the tilted area of the caisson 600 through the cooperation of the inclinometer and the monitoring equipment, and controls the operation of the sprinklers in the area with smaller settlement to reduce the bearing capacity of the soil below the area with smaller settlement, thereby causing the caisson 600 in the corresponding area to sink, thereby achieving the effect of correcting the deviation.
[0083] After the first correction of the sinking of the caisson 600, the inclination of the caisson 600 is measured again by the inclinometer. If the caisson 600 is still in a tilted state, a second correction is performed until the posture of the caisson 600 becomes horizontal; if the caisson 600 is in a horizontal state after correction, step S2 is repeated.
[0084] When the total actual settlement amount of the caisson 600 is not less than the total expected settlement amount, the sinking stage of the caisson 600 is completed, and the bottom sealing operation of the caisson 600 is performed.
[0085] The present invention can effectively control the sinking speed of the caisson 600 by sinking the caisson 600 in multiple times until it is located at a predetermined position of the caisson 600.
[0086] The caisson sinking construction method of the present invention comprises the following steps: first, by controlling the nozzle at the bottom of the caisson 600, the nozzle can spray water at high pressure on the soil at the bottom of the caisson 600, thereby destroying the soil structure below the caisson 600 and reducing the bearing capacity of the soil, so as to facilitate the sinking of the caisson 600. After the caisson 600 sinks stably, the second step is performed, the actual settlement of the caisson 600 is measured, and by comparing the actual settlement with the expected settlement, if the actual settlement is not less than the expected settlement, the nozzle is controlled again to make the caisson 600 continue to sink; if the actual settlement is less than the expected settlement, the third step is performed, the inclination of the caisson 600 is measured, if the caisson 600 is in an inclined state, the caisson 600 is corrected and the second step is performed again, and if the caisson 600 is in a horizontal state, the soil is taken from the inside of the caisson 600 and the second step is performed again. In the caisson sinking construction method of the present invention, after the nozzle sprays high-pressure water on the soil below the caisson 600, the soil becomes a mud-water mixture, thereby reducing the bearing capacity of the soil to facilitate the sinking of the caisson 600. By measuring the actual settlement amount and inclination of the caisson 600, it is ensured that the caisson 600 can sink evenly to the predetermined position in a horizontal posture.
[0087] Embodiment 2
[0088] See also Figures 2 to 9 The present invention also provides a construction system, which can use the above-mentioned caisson sinking construction method to ensure that the caisson 600 sinks stably.
[0089] The construction system includes a caisson 600, a nozzle, a control mechanism, a settlement detection mechanism and an inclination detection mechanism; the nozzle is arranged at the bottom of the caisson 600, and the control mechanism is used to control the nozzle to spray high-pressure water to the soil under the caisson 600; the settlement detection mechanism is used to measure the sinking amount of the caisson 600; the inclination detection mechanism is used to measure the inclination of the caisson 600.
[0090] The caisson 600 also includes a first blade foot 200, a partition wall 300 and a second blade foot 400; the first blade foot 200 is arranged at the bottom of the caisson outer wall 100, the partition wall 300 is arranged inside the caisson 600, and the second blade foot 400 is arranged at the bottom of the partition wall 300; a first nozzle 211 is arranged on the first tread 210 of the first blade foot 200, a second nozzle 221 is arranged on the inclined surface 220 of the first blade foot 200, and a third nozzle 411 is arranged on the second tread 410 of the second blade foot 400; the first nozzle 211, the second nozzle 221 and the third nozzle 411 are all used for high-pressure water spraying to the soil below the caisson 600.
[0091] See also Figure 2 The vertical cross-section of the first blade foot 200 is a right-angled trapezoid. The upper end of the first blade foot 200 is fixedly connected to the bottom of the caisson outer wall 100 by a tension screw, and the first tread 210 is located at the lower end of the first blade foot 200.
[0092] Combination Figure 5 As shown, the first nozzle 211 is fixed to the first tread 210 through a steel pipe. The steel pipe is provided with an external thread, and the first tread 210 is provided with a first fixing hole, and the first fixing hole is provided with an internal thread corresponding to the external thread, and the steel pipe is fixed in the first fixing hole through a threaded structure. The other end of the steel pipe is fixedly connected to the first nozzle 211 by welding.
[0093] The first tread 210 is provided with a plurality of the first nozzles 211, and the plurality of the first nozzles 211 are horizontally facing nozzles. The plurality of the first nozzles 211 are evenly spaced on the first tread 210 along the length direction of the first tread 210. The spacing between two adjacent first nozzles 211 is not less than twice the length of the high-pressure water jet sprayed by the first nozzle 211.
[0094] For example, in some embodiments, due to the influence of the model of the first nozzle 211 and the water pressure in the first nozzle 211, the length of the high-pressure water jets sprayed from the two nozzles of the first nozzle 211 is 100 cm. When the operator sets multiple first nozzles 211 on the first tread 210, the interval between two adjacent first nozzles 211 is not less than 200 cm to avoid mutual interference between the high-pressure water jets sprayed from the two adjacent first nozzles 211. The operator can adjust the setting interval between two adjacent first nozzles 211 according to actual conditions.
[0095] Combination Figure 4As shown, the inclined surface 220 is provided with a second fixing hole matched with the second nozzle 221, and the second nozzle 221 is fixed in the second fixing hole by welding.
[0096] See also Figure 6 and Figure 7 The vertical cross-section of the second blade foot 400 is a trapezoid. The upper end of the second blade foot 400 is fixedly connected to the partition wall 300 by a tension screw. The lower end of the second blade foot 400 is provided with the second tread 410. The third nozzle 411 is fixed to the second tread 410 by the steel pipe.
[0097] The third nozzle 411 is a horizontally facing nozzle, and a plurality of the third nozzles 411 are disposed on the second tread 410, and the plurality of the third nozzles 411 are arranged side by side on the second tread 410. In each row, the spacing between two adjacent third nozzles 411 is not less than twice the length of the high-pressure water jet sprayed by the third nozzle 411. The operator can adjust the spacing between two adjacent third nozzles 411 according to actual conditions.
[0098] In some embodiments, the spacing distance between two corresponding third nozzles 411 in two rows is between 50 cm and 500 cm.
[0099] See also Figure 3 A first protective member 212 is disposed outside the first nozzle 211. The first protective member 212 is used to protect the first nozzle 211 to prevent the soil from damaging the first nozzle 211 when the caisson 600 sinks. The first protective member 212 is welded from three steel plates, one of which is fixed to the first tread 210 by welding, and the steel pipe connected to the first nozzle 211 is fixed to the first tread 210 through the corresponding steel plate. The vertical cross-section of the first protective member 212 is inverted triangular, so that it is easy to insert into the soil.
[0100] See also Figure 4 A second protective member 222 is provided outside the second nozzle 221, and the second protective member 222 is used to protect the second nozzle 221. The second protective member 222 is composed of a fixing plate and a protective tube, and the protective tube is fixed to the inclined surface 220 through the fixing plate. The second nozzle 221 is arranged inside the protective tube, and the second nozzle 221 passes through the fixing plate and is fixed to the inclined surface 220. The axial direction of the protective tube is parallel to the jet direction of the second nozzle 221.
[0101] See also Figure 7A third protective member 412 is disposed outside the third nozzle 411, and the third protective member 412 is used to protect the third nozzle 411. The shape of the third protective member 412 is the same as that of the first protective member 212.
[0102] See also Figures 2 to 7 The construction system also includes a water supply mechanism, which includes a water tank, a high-pressure pump group and a high-pressure pipeline. The high-pressure pump group is respectively connected to the water tank and the high-pressure pipeline, and the high-pressure pipeline is respectively connected to the first nozzle 211, the second nozzle 221 and the third nozzle 411 through corresponding pipeline groups.
[0103] The construction system further includes a control mechanism, which is a console with a central processing unit, and the console is electrically connected to the high-pressure pump group. The water tank is used to store water, and the console can control the high-pressure pump group to extract water from the water tank, and after pressurization, transport the water to each nozzle through the high-pressure pipeline and the pipeline group, so that the first nozzle 211, the second nozzle 221 and the third nozzle 411 can all spray high-pressure water jets.
[0104] In some embodiments, the pipeline group includes a first pipeline 500, a second pipeline 510 and a third pipeline 520, wherein the first pipeline 500 is a vertical main pipeline, the upper end of the first pipeline 500 is connected to the high-pressure pipeline, and the lower end of the first pipeline 500 is connected to the second pipeline 510. The second pipeline 510 is a horizontal pipeline, and the extension direction of the second pipeline 510 is parallel to the length direction of the first tread 210 or the second tread 410. The third pipeline 520 is a vertical branch pipe 530, the upper end of the third pipeline 520 is connected to the second pipeline 510, and the lower end of the third pipeline 520 is connected to the corresponding nozzle.
[0105] The high-pressure pump group draws water from the water tank and, after pressurizing it, enters the corresponding nozzle through the high-pressure pipeline, the first pipeline 500, the second pipeline 510 and the third pipeline 520 in sequence.
[0106] The pipeline group corresponding to the second nozzle 221 also includes a branch pipe 530, one end of which is connected to the third pipeline 520, and the other end is connected to the second nozzle 221, and the length direction of the branch pipe 530 is parallel to the length direction of the second nozzle 221.
[0107] The third pipeline is connected to the corresponding first nozzle 211 or the corresponding third nozzle 411 through the steel pipe.
[0108] The third pipeline 520 is provided with a control valve (not shown), and the control valve is electrically connected to the control console. The control console can control the opening and closing of the control valve to control the corresponding nozzle to spray high-pressure water jets.
[0109] In some embodiments, the settlement amount detection mechanism includes a bracket and a horizontal laser instrument. The bracket is arranged around the caisson, the horizontal laser instrument is arranged on the bracket, and scale lines are arranged on the outer side of the wall of the caisson 600, and the scale lines correspond to the laser lines emitted by the horizontal laser instrument; by observing the relative position of the laser line and the scale lines, the settlement amount of the caisson 600 can be determined.
[0110] In some embodiments, the inclination detection mechanism is an inclinometer. The inclinometer is arranged on the inner side of the wall of the caisson 600, and is electrically connected to an external monitoring device. The inclinometer can detect the inclination angle and inclination direction of the caisson 600, and convert the detected data into an electrical signal and send it to the monitoring device. The monitoring device converts the received electrical signal into a specific value so that the operator can obtain the inclination data of the caisson 600.
[0111] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0112] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A caisson sinking construction method, characterized in that: The following steps are involved: S1: Controlling the sprinkler at the bottom of the caisson to spray water on the soil below the caisson to make the caisson sink; S2: measuring the actual settlement and inclination of the caisson, comparing the difference with the expected settlement, when the caisson settles evenly and the actual settlement is not less than the expected settlement, repeating step S1 to allow the caisson to continue to settle; when the caisson settles evenly and the actual settlement is less than the expected settlement, proceeding to step S3; when the caisson settles unevenly, proceeding to step S4; when the total actual settlement of the caisson is not less than the total expected settlement, stopping the settlement operation; S3: After taking soil from the inside of the caisson, repeat step S1; S4: starting the nozzle in the area with smaller settlement to correct the caisson, and repeating step S2 after the correction is completed; A first blade foot is arranged at the bottom of the outer wall of the caisson, a partition wall is arranged inside the caisson, and a second blade foot is arranged at the bottom of the partition wall; a first nozzle and a second nozzle are arranged on the first tread and the inclined surface of the first blade foot respectively, and a third nozzle is arranged on the second tread of the second blade foot; by dividing the first tread, the inclined surface and the second tread into a plurality of areas respectively, the nozzle in each area is used to spray water on the soil corresponding to the area; Step S1 is to adjust the water spraying time and jet intensity of the sprinklers in different areas by sensing the soil conditions under the first tread, the inclined surface and the second tread and the posture of the caisson, so as to sink the caisson; The actual settlement of the caisson is measured by setting a bracket around the caisson, installing a horizontal laser on the bracket, and setting scale lines on the outer side of the wall of the caisson, the scale lines corresponding to the laser lines emitted by the horizontal laser; the settlement of the caisson is determined by observing the relative positions of the laser lines and the scale lines.
2. The caisson sinking construction method according to claim 1, characterized in that: The caisson is corrected by controlling the operation of the sprinklers in the area with smaller settlement, thereby reducing the bearing capacity of the soil below the area with smaller settlement, thereby causing the caisson in the corresponding area to sink.
3. A construction system, characterized in that: The invention comprises a caisson, a nozzle, a control mechanism, a settlement detection mechanism and an inclination detection mechanism; the nozzle is arranged at the bottom of the caisson, the control mechanism is used to control the nozzle to spray water to the soil below the caisson; the settlement detection mechanism is used to measure the sinking amount of the caisson; the inclination detection mechanism is used to measure the inclination of the caisson; the caisson also comprises a first blade foot, a partition wall and a second blade foot; the first blade foot is arranged at the bottom of the outer wall of the caisson, the partition wall is arranged inside the caisson, and the second blade foot is arranged at the bottom of the partition wall. part; a first nozzle is provided on the first tread of the first blade foot, a second nozzle is provided on the inclined surface of the first blade foot, and a third nozzle is provided on the second tread of the second blade foot; the first nozzle, the second nozzle and the third nozzle are all used to spray water to the soil under the caisson, the settlement detection mechanism includes a bracket and a horizontal laser instrument, the bracket is arranged around the caisson, the horizontal laser instrument is arranged on the bracket, and scale lines are arranged on the outer side of the wall of the caisson, and the scale lines correspond to the laser lines emitted by the horizontal laser instrument.
4. The construction system according to claim 3, characterized in that: A plurality of the first nozzles are arranged on the first tread, and the plurality of the first nozzles are horizontally facing nozzles, and the length direction of the first nozzles is parallel to the length direction of the first tread; the plurality of the first nozzles are arranged on the first tread at intervals along the length direction of the first tread.
5. The construction system according to claim 4, characterized in that: On the first tread, the distance between two adjacent first nozzles is 1.5 to 2.0 times the jet length of the first nozzle.
6. The construction system according to claim 3, characterized in that: A protective piece is arranged on the outside of the nozzle, and the protective piece is fixed to the bottom of the caisson.
Citation Information
Patent Citations
Construction method of deep foundation pit open caisson self-sinking support system
CN110805053A
Hard plastic cohesive soil area open caisson and construction method thereof
CN112281887A
Caisson structure and fast construction method of opencaisson
CN1441127A
Sinking construction mechanism for land ultra-large sink well
CN201865115U
Super large plane size open caisson foundation structure
CN208293597U