Refrigeration system

By introducing rubber ball components into the refrigeration system and using rubber balls to clean dirt in the condenser, the problem of increased heat transfer resistance caused by circulating water pollution is solved, the heat exchange efficiency of the condenser is improved and energy consumption is reduced.

CN116123761BActive Publication Date: 2024-10-18XIAMEN TOBACCO IND
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202211231386.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-09
Publication Date
2024-10-18
Estimated Expiration
2042-10-09

AI Technical Summary

Technical Problem

The circulating water is contaminated during the heat exchange process of the condenser, causing the heat transfer resistance to increase, reducing the heat exchange efficiency of the condenser and increasing energy consumption.

Method used

A refrigeration system is designed, which includes a circulating water component and a rubber ball component. The circulating water component circulates through the cooling tower and condenser in the working state. The rubber ball component provides rubber balls in the non-working state. The rubber balls follow the The circulating water flows into the condenser to clean the dirt in the heat exchange tube and realize online cleaning of the condenser.

Benefits of technology

It effectively reduces the heat transfer resistance of the condenser heat exchange tube, improves the heat exchange efficiency, and reduces energy consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116123761B_ABST
    Figure CN116123761B_ABST
Patent Text Reader

Abstract

The present disclosure relates to a refrigeration system, comprising: a circulating water component, comprising a cooling tower and a condenser, wherein the circulating water component is configured to make circulating water flow through the cooling tower and the condenser in sequence in a working state, and circulate continuously; and a rubber ball component, comprising a rubber ball, wherein the rubber ball component is configured to provide the rubber ball to the circulating water component when the circulating water component is in a non-working state, and the rubber ball is configured to flow with the circulating water when the circulating water component is in a working state, so as to clean the condenser. The present disclosure can realize online cleaning of the condenser, reduce the heat transfer resistance of the heat exchange tube, improve the heat exchange efficiency of the condenser, and reduce energy consumption.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of heat exchange, and in particular to a refrigeration system. Background Art

[0002] The refrigerator includes components such as a compressor, a condenser, a throttle valve and an evaporator. Among them, the condenser releases heat during the refrigeration cycle. In order to absorb the heat released by the condenser, in some related technologies, circulating water is used to exchange heat with the condenser. The circulating water absorbs heat during the heat exchange process with the condenser, and the circulating water after absorbing heat is transported to the cooling tower through a water pump for cooling. The cooled circulating water re-enters the condenser for heat exchange. The circulating water contacts the surrounding air in the cooling tower, and the temperature decreases. During the contact between the circulating water and the air and the process of its own evaporation and concentration, the water quality of the circulating water will gradually be polluted due to the presence of pollutants in the air and water. During the heat exchange between the circulating water and the condenser, the pollutants will adhere to the wall of the heat exchange tube of the condenser. The heat transfer resistance of the pollutants adhering to the tube wall is much greater than the heat transfer resistance of the heat exchange tube, thereby reducing the heat exchange efficiency of the condenser and increasing energy consumption. Summary of the invention

[0003] Some embodiments of the present disclosure provide a refrigeration system for alleviating the problem of reduced heat exchange efficiency.

[0004] In one aspect of the present disclosure, there is provided a refrigeration system, comprising:

[0005] A circulating water component, comprising a cooling tower and a condenser, wherein the circulating water component is configured to allow circulating water to flow through the cooling tower and the condenser in sequence and circulate continuously in a working state; and

[0006] The colloid ball assembly comprises a colloid ball, wherein the colloid ball assembly is configured to provide the colloid ball to the circulating water assembly when the circulating water assembly is in a non-working state, and the colloid ball is configured to flow with the circulating water when the circulating water assembly is in a working state to clean the condenser.

[0007] In some embodiments, the circulating water component further comprises:

[0008] a first pipeline configured to guide the circulating water in the condenser to the cooling tower;

[0009] A second pipeline is configured to guide the circulating water in the cooling tower to the condenser; and

[0010] A water pump is provided in the first pipeline or the second pipeline, and the water pump is configured to provide power for circulating water to circulate.

[0011] In some embodiments, the colloid ball assembly further includes a third pipeline, the third pipeline being connected to a portion of the second pipeline close to the condenser, and the third pipeline being configured to deliver the colloid ball to the second pipeline when the circulating water assembly is in a non-working state.

[0012] In some embodiments, the rubber ball assembly further includes a filter element, the lower portion of the filter element forms a first cavity for accommodating the rubber ball, and the third pipeline is connected to the bottom of the filter element and communicates with the first cavity.

[0013] In some embodiments, the filter element is disposed above the cooling tower, the upper part of the filter element forms a second cavity, the side walls of the second cavity and part of the side walls of the first cavity are provided with through holes allowing circulating water to flow out, and the first pipeline is connected to the top of the filter element.

[0014] In some embodiments, the filter element also includes a retaining ring and a brush, the first end of the retaining ring is arranged at the connection between the first cavity and the second cavity, the second end of the retaining ring is tapered and extends into the first cavity, the second end of the retaining ring allows the rubber ball to pass through, and the brush is arranged on the side of the retaining ring facing the second cavity.

[0015] In some embodiments, the rubber ball assembly further includes a first valve disposed on the third pipeline, and the first valve is configured to be closed when the water pump is turned on, and to be opened when the water pump is turned off.

[0016] In some embodiments, the first valve is close to the connection between the third pipeline and the second pipeline.

[0017] In some embodiments, the refrigeration system also includes a fourth pipeline and a second valve arranged on the fourth pipeline, the fourth pipeline is connected to the first cavity of the filter element and is configured to replenish water into the first cavity, and the second valve is configured to control the opening and closing of the fourth pipeline.

[0018] In some embodiments, the refrigeration system further includes a fifth pipeline and a third valve, wherein the fifth pipeline is connected to the bottom of the condenser, and the third valve is configured to control the opening and closing of the fifth pipeline.

[0019] Based on the above technical solution, the present disclosure has at least the following beneficial effects:

[0020] In some embodiments, when the circulating water component is in working condition, the circulating water flows through the cooling tower and the condenser in sequence, and then flows through the cooling tower and the condenser again, thereby continuously circulating. When the circulating water component is in non-working condition, the circulating water stops circulating, and the rubber ball component provides rubber balls to the circulating water component. When the circulating water component is in working condition, the rubber balls flow with the circulating water, flow into the heat exchange tubes of the condenser, squeeze through the heat exchange tubes of the condenser, and wipe off the dirt adhered to the wall of the heat exchange tubes of the condenser. Removing the dirt in the heat exchange tubes can achieve online cleaning of the condenser, reduce the heat transfer resistance of the heat exchange tubes, improve the heat exchange efficiency of the condenser, and reduce energy consumption. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The drawings described herein are used to provide a further understanding of the present disclosure and constitute a part of the present application. The illustrative embodiments of the present disclosure and their descriptions are used to explain the present disclosure and do not constitute an improper limitation on the present disclosure. In the drawings:

[0022] Figure 1 A schematic diagram of a refrigeration system provided according to some embodiments of the present disclosure;

[0023] Figure 2 It is a schematic diagram of a filter element provided according to some embodiments of the present disclosure.

[0024] The reference numerals in the accompanying drawings are described as follows:

[0025] 1-cooling tower; 11-water distribution tray; 12-water collection tray; 13-liquid level gauge; 14-filler;

[0026] 2- Condenser;

[0027] 31-first pipeline; 32-second pipeline; 33-third pipeline; 34-fourth pipeline; 35-fifth pipeline;

[0028] 4-Gum ball;

[0029] 5-filter; 51-through hole; 52-first cavity; 53-second cavity; 54-retaining ring; 55-brush; 56-steering block; 57-interface;

[0030] 61-first valve; 62-second valve; 63-third valve;

[0031] 7- Water pump;

[0032] 100-circulating water assembly; 200-rubber ball assembly.

[0033] It should be understood that the size of each part shown in the accompanying drawings is not drawn according to the actual proportional relationship. In addition, the same or similar reference numerals represent the same or similar components. DETAILED DESCRIPTION

[0034] Various exemplary embodiments of the present disclosure will now be described in detail with reference to the accompanying drawings. The description of the exemplary embodiments is merely illustrative and is in no way intended to limit the present disclosure and its application or use. The present disclosure can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to make the present disclosure thorough and complete and to fully express the scope of the present disclosure to those skilled in the art. It should be noted that unless otherwise specifically stated, the relative arrangement of the components and steps, the composition of the materials, the numerical expressions and the numerical values ​​set forth in these embodiments should be interpreted as being merely exemplary and not as limiting.

[0035] The words "first", "second" and similar words used in this disclosure do not indicate any order, quantity or importance, but are only used to distinguish different parts. The words "include" or "comprise" and similar words mean that the elements before the word include the elements listed after the word, and do not exclude the possibility of including other elements. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0036] In the present disclosure, when a specific device is described as being located between a first device and a second device, there may or may not be an intermediate device between the specific device and the first device or the second device. When a specific device is described as being connected to other devices, the specific device may be directly connected to the other device without an intermediate device, or may not be directly connected to the other device but have an intermediate device.

[0037] All terms (including technical terms or scientific terms) used in the present disclosure have the same meanings as those understood by ordinary technicians in the field to which the present disclosure belongs, unless otherwise specifically defined. It should also be understood that terms defined in general dictionaries, such as general dictionaries, should be interpreted as having meanings consistent with their meanings in the context of the relevant technology, and should not be interpreted in an idealized or extremely formal sense, unless explicitly defined herein.

[0038] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered part of the specification.

[0039] Figure 1 Schematic diagram of the structure of some embodiments of the refrigeration system according to the present disclosure. Figure 1 In some embodiments, the refrigeration system includes a circulating water assembly 100 and a colloid ball assembly 200 .

[0040] The circulating water assembly 100 includes a cooling tower 1 and a condenser 2. The circulating water assembly 100 is configured to allow the circulating water to flow through the cooling tower 1 and the condenser 2 in sequence in a working state, and then flow through the cooling tower 1 and the condenser 2 again, thereby continuously circulating.

[0041] The colloid ball assembly 200 includes a colloid ball 4, which is configured to provide the colloid ball 4 to the circulating water assembly 100 when the circulating water assembly 100 is in a non-working state. The colloid ball 4 is configured to flow with the circulating water when the circulating water assembly 100 is in a working state to clean the condenser 2.

[0042] The diameter of the rubber ball 4 is slightly larger than the inner diameter of the heat exchange tube of the condenser 2, and the density is the same or similar to that of water, so the rubber ball 4 can flow freely with the water flow. The rubber ball 4 is corrosion-resistant and wear-resistant. Optionally, the rubber ball 4 is made of rubber or rubber-plastic material, and can be plastically deformed under extrusion.

[0043] When the circulating water component 100 is in working state, the circulating water flows through the cooling tower 1 and the condenser 2 in sequence, and then flows through the cooling tower 1 and the condenser 2 again, so as to continuously circulate. When the circulating water component 100 is in non-working state, the circulating water stops circulating, and the rubber ball component 200 provides the rubber ball 4 to the circulating water component 100. When the circulating water component 100 is in working state, the rubber ball 4 flows into the heat exchange tube of the condenser 2 under the push of the circulating water, squeezes through the heat exchange tube of the condenser 2, and wipes off the dirt adhering to the heat exchange tube wall of the condenser 2. By removing the dirt in the heat exchange tube, the condenser 2 can be cleaned online, so that the heat transfer resistance of the heat exchange tube of the condenser 2 can be reduced, the heat exchange efficiency of the condenser 2 can be improved, and the energy consumption can be reduced.

[0044] In some embodiments, the refrigeration system further includes a compressor, an evaporator, a throttle valve, etc. The compressor, the evaporator, the throttle valve and the condenser 2 form a refrigeration cycle component.

[0045] In some embodiments, the circulating water assembly 100 further includes a first pipeline 31 , a second pipeline 32 and a water pump 7 .

[0046] The first pipeline 31 is configured to guide the circulating water in the condenser 2 to the cooling tower.

[0047] The second pipeline 32 is configured to guide the circulating water in the cooling tower 1 to the condenser 2 .

[0048] The water pump 7 is disposed in the first pipeline 31 or the second pipeline 32 , and the water pump 7 is configured to provide power to circulate the circulating water.

[0049] The water pump 7 is turned on, and the circulating water in the cooling tower 1 enters the condenser 2 through the second pipe 32. The circulating water is heated after heat exchange with the condenser 2. The heated circulating water enters the cooling tower 1 through the first pipe 31. After the circulating water cools down in the cooling tower 1, it enters the condenser 2 again through the second pipe 32, and the cycle is repeated.

[0050] In some embodiments, the rubber ball assembly 200 also includes a third pipeline 33, which is connected to the second pipeline 32 near the condenser 2. The third pipeline 33 is configured to deliver the rubber ball 4 to the second pipeline 32 when the circulating water assembly 100 is in a non-working state.

[0051] When the second pipeline 32 delivers the circulating water in the cooling tower 1 to the condenser 2 , the rubber balls 4 delivered thereto by the third pipeline 33 can be brought into the condenser 2 , so as to clean the condenser 2 through the rubber balls 4 .

[0052] refer to Figure 2 In some embodiments, the rubber ball assembly 200 further includes a filter 5 . The lower part of the filter 5 forms a first cavity 52 for accommodating the rubber ball 4 . The third pipeline 33 is connected to the bottom of the filter 5 and communicates with the first cavity 52 .

[0053] The filter element 5 is used to provide the rubber balls 4 to the third pipeline 33 .

[0054] In some embodiments, the filter element 5 is funnel-shaped, the top opening area of ​​the filter element 5 is large, and the bottom opening area is small, and the bottom opening of the filter element 5 is connected to the third pipeline 33.

[0055] In some embodiments, the filter element 5 is disposed above the cooling tower 1. The upper portion of the filter element 5 forms a second cavity 53, and the side wall of the second cavity 53 and the side wall of the first cavity 52 close to the second cavity 53 (to facilitate the rubber ball 4 to enter the first cavity 52 through the retaining ring 54, and to retain some liquid for subsequent movement of the rubber ball 4) are provided with a through hole 51 allowing the circulating water to flow out, and the first pipeline 31 is connected to the top of the filter element 5.

[0056] The first pipeline 31 is connected to the top of the filter element 5, and is used to introduce the circulating water in the condenser 2 into the filter element 5. The upper part of the filter element 5 forms a second cavity 53. The side walls of the second cavity 53 and part of the side walls of the first cavity 52 are provided with through holes 51 for allowing the circulating water to flow out. The circulating water flows down through the through holes 51 and falls into the cooling tower 1.

[0057] The side wall of the second cavity 53 and part of the side wall of the first cavity 52 (the upper side wall of the first cavity 52) are provided with a plurality of through holes 51 to facilitate the passage of circulating water, so that the circulating water will not overflow from the top of the filter element 5 at the maximum circulating water flow rate. The aperture of the through hole 51 is slightly smaller than the diameter of the rubber ball 4. The circulating water flows out through the plurality of through holes 51 on the side wall of the second cavity 53 and part of the side wall of the first cavity 52, and the side wall where the through holes 51 are located can also intercept and filter the rubber ball 4 and allow the rubber ball 4 to enter the first cavity 52.

[0058] In some embodiments, the filter element 5 also includes a retaining ring 54 and a brush 55. The first end of the retaining ring 54 is arranged at the connection between the first cavity 52 and the second cavity 53. The second end of the retaining ring 54 is in a constricted shape and extends into the first cavity 52. ​​The second end of the retaining ring 54 allows the rubber ball 4 to pass through.

[0059] The retaining ring 54 divides the cavity in the filter element 5 into a first cavity 52 located at the bottom and a second cavity 53 located at the top. The second cavity 53 has a function of intercepting and filtering the rubber balls 4 , and the first cavity 52 has a function of retaining the rubber balls 4 .

[0060] The second end of the retaining ring 54 is provided with a bottom opening, the diameter of which is slightly larger than the diameter of the rubber ball 4 so that the rubber ball 4 can pass through.

[0061] In some embodiments, the brush 55 is disposed on a side of the retaining ring 54 facing the second cavity 53 .

[0062] A brush 55 is provided on the side of the retaining ring 54 facing the second cavity 53. The rubber ball 4 in the filter element 5 rolls due to the impact of the circulating water flow and contacts and rubs against the brush 55. Therefore, by providing the brush 55, the rubber ball 4 that is impacted and rolled by the circulating water flow can be flushed and cleaned to clean the dirt on the surface of the rubber ball 4.

[0063] After the rubber ball 4 is rubbed and cleaned by the brush 55, the rubber ball 4 can follow the cooling circulating water flow and enter the first cavity 52 through the bottom opening of the retaining ring 54, because the first cavity 52 has some through holes 51, and wait for the circulating water component 100 to be in a non-working state. Therefore, it can prevent the rubber ball 4 from rolling in the filter element 5 for a long time, causing excessive wear. When the circulating water component 100 is in a non-working state, the rubber ball 4 flows to the circulating water component 100 through the third pipeline 33.

[0064] In some embodiments, the filter element 5 further includes a steering block 56, which is disposed below the bottom opening of the retaining ring 54. The steering block 56 is pushed and rotated during the falling process of the rubber ball 4, so that the rubber ball 4 moves around the steering block 56 in the first cavity 52, and converts the dynamic pressure of the water flow impact into static pressure, thereby reducing the impact and wear of the rubber ball 4.

[0065] In some embodiments, the filter element 5 further includes an interface 57 , and the interface 57 is used to connect the bottom opening of the filter element 5 and the third pipeline 33 .

[0066] Optionally, the filter element 5 and the retaining ring 54 are made of steel plates, and the brush 55 is made of plastic.

[0067] In some embodiments, the rubber ball assembly 200 further includes a first valve 61 disposed on the third pipeline 33 , and the first valve 61 is configured to be closed when the water pump 7 is turned on, and opened when the water pump 7 is turned off. The first valve 61 is used to control the on-off of the third pipeline 33 .

[0068] When the water pump 7 is running, the first valve 61 is closed to prevent the high-pressure circulating water from driving the rubber ball 4 from flowing from the second pipeline 32 to the filter element 5 through the third pipeline 33. When the water pump 7 is turned off, the first valve 61 is open, and the rubber ball 4 flows to the second pipeline 32 through the third pipeline 33 under its own gravity and the gravity of the circulating water accumulated in the first cavity 52, or the pressure of the water replenished in the fourth pipeline 34.

[0069] The inner diameters of the third pipeline 33 and the first valve 61 are slightly larger than the diameter of the rubber ball 4 to allow the rubber ball 4 to pass through.

[0070] In some embodiments, the first valve 61 is close to the connection between the third pipeline 33 and the second pipeline 32 .

[0071] In some embodiments, the refrigeration system also includes a fourth pipeline 34 and a second valve 62 arranged on the fourth pipeline 34. The fourth pipeline 34 is connected to the first cavity 52 of the filter element 5 and is configured to replenish water into the first cavity 52. ​​The second valve 62 is configured to control the opening and closing of the fourth pipeline 34.

[0072] In some embodiments, the second valve 62 is further configured to adjust the flow rate of the fourth pipeline 34 to prevent excessive water flow and air blockage in the third pipeline 33 .

[0073] In some embodiments, the cooling tower 1 further includes a water collecting pan 12 and a liquid level meter 13. The water collecting pan 12 is disposed at the bottom of the cooling tower 1 and is used to collect the circulating water after cooling. The water collecting pan 12 is connected to the second pipeline 32. The liquid level meter 13 is disposed in the water collecting pan 12 and is used to detect the liquid level in the water collecting pan 12 in real time. When the liquid level in the water collecting pan 12 is lower than a preset value, the second valve 62 is opened, water is replenished through the fourth pipeline 34, and the liquid level in the water collecting pan 12 is detected by the liquid level meter 13. After the liquid level in the water collecting pan 12 reaches the preset value, the second valve 62 is closed.

[0074] The liquid level meter 13 is linked with the second valve 62 for control to ensure that the liquid level in the water collecting tray 12 fluctuates within a reasonable range.

[0075] In some embodiments, the refrigeration system has two water replenishment conditions.

[0076] In the first water replenishment situation, when the water pump 7 stops running, the second valve 62 is opened to replenish water through the fourth pipeline 34, so that the rubber ball 4 flows to the second pipeline 32 through the third pipeline 33 under the action of the replenishment water pressure. At the same time, under the control of the liquid level meter 13, the cooling tower 1 is prevented from overflowing due to excessive replenishment of water.

[0077] In the second water replenishment situation, when the water pump 7 is running, the liquid level meter 13 detects that the liquid level in the water collecting tray 12 is low, opens the second valve 62, and replenishes water through the fourth pipeline 34.

[0078] In some embodiments, the fourth pipeline 34 is in communication with the first cavity 52. ​​The first pipeline 31 is in communication with the second cavity 53. The third pipeline 33 is in communication with the bottom of the first cavity 52.

[0079] In some embodiments, the cooling tower 1 further includes a water distribution tray 11 , which is disposed at the top of the cooling tower 1 and is used to evenly distribute the circulating water introduced by the first pipeline 31 into the cooling tower 1 .

[0080] In some embodiments, the cooling tower 1 further includes a filler 14 , which is disposed between the water distribution tray 11 and the water collection tray 12 .

[0081] In some embodiments, the refrigeration system further includes a fifth pipeline 35 and a third valve 63 . The fifth pipeline 35 is connected to the bottom of the condenser 2 . The third valve 63 is configured to control the opening and closing of the fifth pipeline 35 .

[0082] The bottom end of the condenser 2 is connected with a fifth pipeline 35, and a third valve 63 is installed on the fifth pipeline 35. By opening the third valve 63, the dirt cleaned by the rubber ball 4 in the condenser 2 and the dirt in the circulating water component can be removed in time.

[0083] The cleaning process of the refrigeration system provided in the embodiment of the present disclosure is as follows:

[0084] When the water pump 7 is turned off, the circulating water in the first pipeline 31 above the liquid level of the water collecting pan 12 will be pushed by gravity to flow back to the condenser 2, and the water in the condenser 2 will flow back to the water collecting pan 12 through the water pump 7 and the second pipeline 32. In the static state, the liquid level in the first pipeline 31 is the same as the liquid level in the water collecting pan 12. The first pipeline 31 above the liquid level of the water collecting pan 12 is an empty pipe.

[0085] When the water pump 7 is turned off, the first valve 61 is opened, and the rubber ball 4 in the first cavity 52 of the filter element 5 flows with the circulating water through the third pipeline 33 under the action of the rubber ball 4's own gravity and the gravity of the circulating water accumulated in the first cavity 52, until the liquid level of the circulating water in the third pipeline 33 is consistent with the liquid level of the water collecting pan 12, which is the first height. The more circulating water is accumulated in the first cavity 52, the higher the height of the rubber ball 4 will fall (if the water accumulated in the first cavity 52 is enough, the accumulated water can bring the rubber ball 4 to the inlet end of the condenser 2 at one time).

[0086] When the water pump 7 is turned on, the first valve 61 is closed, and the circulating water assembly continues to circulate water. During this process, the first cavity 52 of the filter element 5 and the portion above the first height in the third pipeline 33 are filled with circulating water.

[0087] When the water pump 7 is turned off, the first valve 61 is opened, and the circulating water filled in the first cavity 52 and the third pipeline 33 above the first height pushes the rubber ball 4 to continue to flow downward until the liquid level of the third pipeline 33 is consistent with the liquid level of the water collecting tray 12. At this time, the rubber ball 4 flows downward for a distance and is at the second height.

[0088] Then when the water pump 7 is turned on again, the above-mentioned circulation process continues. It can be understood that each time the water pump 7 is started and stopped, the rubber ball 4 descends once until the rubber ball 4 enters the second pipeline 32. Then when the water pump 7 is turned on, the rubber ball 4 enters the condenser 2 along with the circulating water in the second pipeline 32 to clean the condenser 2.

[0089] Reference below Figure 1 and Figure 2 Some specific embodiments of the refrigeration system are described in detail.

[0090] The refrigeration system includes a cooling tower 1 , a condenser 2 , a first pipeline 31 , a second pipeline 32 , a third pipeline 33 , a fourth pipeline 34 , a fifth pipeline 35 , a rubber ball 4 and a filter 5 .

[0091] The cooling tower 1 includes a water distribution tray 11, a water collection tray 12, a liquid level meter 13 and a filler 14. The water distribution tray 11 is arranged at the top of the cooling tower 1 to evenly sprinkle the circulating water. The water collection tray 12 is arranged at the bottom of the cooling tower 1 to collect the circulating water. The filler 14 is arranged between the water distribution tray 11 and the water collection tray 12 to cool the circulating water. The liquid level meter 13 is arranged in the water collection tray 12 to detect the liquid level in the water collection tray 12.

[0092] The filter element 5 comprises a funnel-shaped shell, the top opening area of ​​the filter element 5 is larger than the bottom opening area, the filter element 5 is divided into a first cavity 52 located at the bottom and a second cavity 53 located at the top, the side wall of the second cavity 53 and the upper side wall of the first cavity 52 are provided with a through hole 51, the aperture of the through hole 51 is slightly smaller than the diameter of the rubber ball 4. A retaining ring 54 is provided in the filter element 5, the retaining ring 54 is funnel-shaped, the top opening area of ​​the retaining ring 54 is larger than the bottom opening area, the top of the retaining ring 54 is located at the connection between the first cavity 52 and the second cavity 53, the bottom of the retaining ring 54 extends into the first cavity 52, and the bottom opening of the retaining ring 54 is slightly larger than the diameter of the rubber ball 4. There is no opening in the lower side wall of the first cavity 52, the rubber ball 4 and part of the circulating water can be located in the first cavity 52, and the other part of the circulating water flows out through the through hole 51 on the side wall of the second cavity 53. A brush 55 is provided on the side of the retaining ring 54 facing the second cavity 53. The brush 55 is used to clean the rubber ball 4. A steering block 56 is provided below the bottom opening of the retaining ring 54 in the first cavity 52. ​​The steering block 56 is pushed and rotated during the falling process of the rubber ball 4, so that the rubber ball 4 moves around the steering block 56 in the first cavity 52, and converts the dynamic pressure of the water flow impact into static pressure, thereby reducing the impact and wear of the rubber ball 4. An interface 57 is provided at the bottom opening of the filter element 5, and the interface 57 is used to connect the third pipeline 33.

[0093] The filter element 5 is arranged above the cooling tower 1. The first pipeline 31 connects the condenser 2 and the filter element 5, and the connection between the first pipeline 31 and the filter element 5 is located at the top of the filter element 5. The circulating water introduced by the first pipeline 31 enters the filter element 5 from the top of the filter element 5, part of the circulating water flows down through the through hole 51 on the side wall of the second cavity 53 of the filter element 5 and falls into the cooling tower 1, and part of the circulating water enters the first cavity 52. ​​The first end of the second pipeline 32 is connected to the bottom of the cooling tower 1 and communicates with the water collecting pan 12, and the second end of the second pipeline 32 is connected to the condenser 2. The water pump 7 is arranged in the second pipeline 32.

[0094] The third pipeline 33 connects the filter element 5 and the second pipeline 32. The first end of the third pipeline 33 is connected to the bottom opening of the filter element 5, the second end of the third pipeline 33 is connected to the second pipeline 32, and the connection between the third pipeline 33 and the second pipeline 32 is located between the water pump 7 and the condenser 2. The third pipeline 33 is provided with a first valve 61, which is used to control the on and off of the third pipeline 33.

[0095] The fourth pipeline 34 is connected to the filter element 5 and communicated with the first cavity 52 for replenishing water into the first cavity 52. ​​The fourth pipeline 34 is provided with a second valve 62 for controlling the on-off and flow rate of the fourth pipeline 34.

[0096] The fifth pipeline 35 is connected to the bottom of the condenser 2 and is used to discharge dirt in the condenser 2. The fifth pipeline 35 is provided with a third valve 63, and the third valve 63 is used to control the opening and closing of the fifth pipeline 35.

[0097] When the refrigeration system is in normal working condition, the rubber ball 4 is located in the first cavity 52, the water pump 7 is turned on, and the first valve 61 is closed. Under the power provided by the water pump 7, the circulating water flows out from the cooling tower 1, flows into the condenser 2 along the second pipeline 32, and then flows from the condenser 2 to the filter element 5 through the first pipeline 31. Part of the circulating water enters the first cavity 52, and part of the circulating water is discharged from the through hole 51 on the side wall of the second cavity 53 to the water distribution tray 11 of the cooling tower 1, and is evenly sprinkled to the packing 14 through the water distribution tray 11. After flowing through the packing 14, the circulating water falls into the water collecting tray 12, and the circulating water in the water collecting tray 12 flows to the condenser 2 through the second pipeline 32, and the cycle is repeated in this way.

[0098] When the water pump 7 is turned off, the first valve 61 is opened, and the rubber ball 4 and circulating water in the first cavity 52 of the filter element 5 flow through the third pipeline 33 under the action of gravity until the height in the third pipeline 33 is consistent with the liquid level height in the water collecting tray 12, which is the first height.

[0099] When the water pump 7 is turned on, the first valve 61 is closed, and the circulating water assembly continues to circulate water. During this process, the first cavity 52 of the filter element 5 and the portion above the first height in the third pipeline 33 are filled with circulating water.

[0100] When the water pump 7 is turned off, the first valve 61 is opened, and the circulating water filled in the first cavity 52 and the third pipeline 33 above the first height pushes the rubber ball 4 to continue to flow downward until the liquid level of the third pipeline 33 is consistent with the liquid level of the water collecting tray 12. At this time, the rubber ball 4 flows downward for a distance and is at the second height.

[0101] Then when the water pump 7 is turned on again, the above-mentioned cycle process continues. It can be understood that each time the water pump 7 is started and stopped, the rubber ball 4 descends once until the rubber ball 4 enters the second pipeline 32. Then when the water pump 7 is turned on, the rubber ball 4 enters the condenser 2 along with the circulating water in the second pipeline 32. Through the squeezing and wiping effect, the heat exchange tubes of the condenser 2 are cleaned, thereby reducing the heat exchange thermal resistance of the condenser 2 and improving the energy efficiency of the condenser 2.

[0102] The rubber ball 4 flows in the condenser 2, cleans the condenser 2, enters the second cavity 53 of the filter element 5 along the first pipeline 31, is cleaned by the brush 55 on the retaining ring 54, is filtered and retained in the second cavity 53, enters the first cavity 52 through the bottom opening of the retaining ring 54, and waits for the next water pump 7 to be shut down.

[0103] In some embodiments, the connection relationship and functions of various components in the refrigeration system are as follows.

[0104] A filter 5 is installed at the liquid inlet position of the cooling tower 1 to filter and retain the rubber balls 4. A third pipeline 33 is connected to the bottom of the filter 5 to recover the rubber balls 4 to the second pipeline 32, close to the side of the condenser 2. The rubber balls 4 in the second pipeline 32 enter the heat exchange pipe of the condenser 2 under the action of the water pressure of the water pump 7 to wipe and clean the dirt on the inner wall of the heat exchange pipe.

[0105] A first valve 61 is installed on the third pipeline 33. When the water pump 7 is running, the first valve 61 is closed to prevent the circulating water from having too high a water pressure. The circulating water flows back to the filter element 5 through the third pipeline 33 and flows to the water distribution tray 11 of the cooling tower 1. When the water pump 7 is turned off, the second valve 62 on the fourth pipeline 34 is opened to replenish water to the cooling tower 1. The replenishing water is input into the third pipeline 33 to raise the liquid level of the third pipeline 33 and continuously push the rubber ball 4 until the rubber ball 4 flows to the circulating water inlet end of the condenser 2 with the replenishing water. The through hole 51 of the second cavity 53 in the filter element 5 and the position of the retaining ring 54 are reasonably set to meet the filtering requirements of the filter cavity of the rubber ball 4 and the static requirements of the first cavity 52.

[0106] The filter element 5 is connected to the fourth pipeline 34, and the fourth pipeline 34 replenishes water to the cooling tower 1 through the filter element 5. When the water pump 7 is turned off, when the condenser 2 needs to be cleaned, or when the circulating water needs to be replenished, the second valve 62 is opened. The fourth pipeline 34 is connected to the third pipeline 33 through the filter element 5, pushing the rubber ball 4 in the third pipeline 33 to move toward the second pipeline 32 until the rubber ball 4 enters the second pipeline 32. A liquid level gauge 13 is installed on the water collecting pan 12, and the liquid level gauge 13 is controlled in linkage with the second valve 62 to prevent excessive water replenishment and overflow of the cooling tower 1. At the same time, the water replenishment amount of the fourth pipeline 34 is controlled to prevent air blockage of the third pipeline 33.

[0107] Based on the above-mentioned embodiments of the present disclosure, in the absence of explicit negation or conflict, the technical features of one embodiment may be beneficially combined with one or more other embodiments.

[0108] Although some specific embodiments of the present disclosure have been described in detail by way of examples, it should be understood by those skilled in the art that the above examples are for illustration only and are not intended to limit the scope of the present disclosure. It should be understood by those skilled in the art that the above embodiments may be modified or some technical features may be replaced by equivalents without departing from the scope and spirit of the present disclosure. The scope of the present disclosure is defined by the appended claims.

Claims

1. A refrigeration system, characterized in that: include: A circulating water component (100) comprises a cooling tower (1) and a condenser (2), wherein the circulating water component (100) is configured to allow circulating water to flow through the cooling tower (1) and the condenser (2) in sequence in a working state, and to circulate continuously; as well as A rubber ball assembly (200) comprising a rubber ball (4); the rubber ball assembly (200) is configured to provide the rubber ball (4) to the circulating water assembly (100) when the circulating water assembly (100) is in a non-operating state; the rubber ball (4) is configured to flow with the circulating water when the circulating water assembly (100) is in an operating state, so as to clean the condenser (2); The circulating water component (100) further comprises: A first pipeline (31) is configured to guide the circulating water in the condenser (2) to the cooling tower (1); a second pipeline (32) configured to guide the circulating water in the cooling tower (1) to the condenser (2); and a water pump (7), arranged in the first pipeline (31) or the second pipeline (32), the water pump (7) being configured to provide power for circulating water to circulate; The rubber ball assembly (200) further comprises a third pipeline (33), the third pipeline (33) being connected to a portion of the second pipeline (32) close to the condenser (2), and the third pipeline (33) being configured to deliver the rubber ball (4) to the second pipeline (32) when the circulating water assembly (100) is in a non-operating state; The rubber ball assembly (200) further comprises a filter element (5), the lower part of which forms a first cavity (52) for accommodating the rubber ball (4), and the third pipeline (33) is connected to the bottom of the filter element (5) and communicates with the first cavity (52); The filter element (5) is arranged above the cooling tower (1), the upper part of the filter element (5) forms a second cavity (53), the side wall of the second cavity (53) is provided with a through hole (51) allowing circulating water to flow out, and the first pipeline (31) is connected to the top of the filter element (5); The rubber ball assembly (200) further comprises a first valve (61) provided on the third pipeline (33), wherein the first valve (61) is configured to be closed when the water pump (7) is turned on, and to be opened when the water pump (7) is turned off.

2. The refrigeration system according to claim 1, characterized in that: The filter element (5) further comprises a retaining ring (54) and a brush (55); the first end of the retaining ring (54) is arranged at the connection between the first cavity (52) and the second cavity (53); the second end of the retaining ring (54) is in a constricted shape and extends into the first cavity (52); the second end of the retaining ring (54) allows the rubber ball (4) to pass through; and the brush (55) is arranged on a side of the retaining ring (54) facing the second cavity (53).

3. The refrigeration system according to claim 1, characterized in that: The first valve (61) is close to the connection between the third pipeline (33) and the second pipeline (32).

4. The refrigeration system according to any one of claims 1 to 3, characterized in that: It also comprises a fourth pipeline (34) and a second valve (62) arranged on the fourth pipeline (34); the fourth pipeline (34) is in communication with the first cavity (52) of the filter element (5) and is configured to replenish water into the first cavity (52); the second valve (62) is configured to control the on-off of the fourth pipeline (34).

5. The refrigeration system according to any one of claims 1 to 3, characterized in that: It also includes a fifth pipeline (35) and a third valve (63), wherein the fifth pipeline (35) is connected to the bottom of the condenser (2), and the third valve (63) is configured to control the opening and closing of the fifth pipeline (35).