Calculation method of active earth pressure in foundation pit soil, support adjustment device and support system

By using active earth pressure calculation and support adjustment devices for the foundation pit, the rationality, stability and safety of the foundation pit support structure are achieved, solving the problems of material waste and long construction period of traditional support structures, and improving construction efficiency and safety.

CN116335106BActive Publication Date: 2026-11-17HEFEI UNIV OF TECH
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310551992.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-05-15
Publication Date
2026-11-17
Estimated Expiration
2043-05-15

AI Technical Summary

Technical Problem

Existing foundation pit construction methods suffer from problems such as material waste, long construction periods, uneven support stress, foundation pit instability, and high costs. In particular, traditional fixed supports are difficult to adapt to soil creep and pressure changes.

Method used

The active earth pressure calculation method for the foundation pit soil is adopted. The active earth pressure is calculated through monitoring points. Combined with the support adjustment device and support system, the active support force is applied. The force sensor and displacement sensor are used for real-time adjustment to form an adjustable support structure.

Benefits of technology

It improves the stress rationality, stability and safety of the supporting structure, reduces construction costs, reduces material waste, improves construction efficiency and precision, and avoids the risk of foundation pit instability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116335106B_ABST
    Figure CN116335106B_ABST
Patent Text Reader

Abstract

This invention belongs to the technical field of prefabricated steel-concrete composite foundation pit support, specifically relating to a method for calculating active earth pressure in foundation pit soil, a support adjustment device, and a support system. The method for calculating active earth pressure in foundation pit soil of this invention includes the following steps: setting monitoring points at a specified depth at the boundary of the foundation pit, and obtaining the active earth pressure p at the monitoring point according to the following formula. a The active earth pressure calculation method for foundation pit soil of the present invention can provide a basis for the active thrust application of the support structure in the foundation pit by actively measuring the active earth pressure of the foundation pit soil, thereby ensuring the overall stress rationality, stability and safety of the support structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of prefabricated steel-concrete composite foundation pit support technology, specifically relating to a method for calculating active earth pressure in foundation pit soil, a support adjustment device, and a support system. Background Technology

[0002] Currently, temporary supports inside foundation pit excavations mostly utilize cast-in-place reinforced concrete structures, which necessitates their demolition upon project completion. The reuse rate of the demolished concrete and reinforcing steel is almost zero, resulting in significant waste of materials and funds. Furthermore, the long construction cycle, complex processes, and numerous uncontrollable on-site factors increasingly fail to meet the demands of modern concrete foundation pit construction. In addition to the existing situation, cast-in-place reinforced concrete structures also present the following problems: First, errors in the alignment of foundation pit piles can lead to uneven stress on fixed supports. In traditional foundation pit construction, achieving pile alignment is difficult; even with uniform fixed supports, poor pile alignment often results in large gaps between the supports and the piles, rendering some supports ineffective and causing uneven stress. Second, the passive stress on the support structure within the foundation pit leads to poor overall stress rationality, stability, and safety. Third, soil creep can cause foundation pit instability. Foundation pit construction often involves long cycles and complex construction climates and environments, making soil pressure changes and soil creep phenomena common. Traditional fixed supports are prone to disrupting the balance between the support and the foundation pit pressure under changing soil pressure and deformation, leading to foundation pit instability and even large-scale soil sliding. Fourth, traditional supports have a low turnover rate and high maintenance costs. Foundation pit dimensions often vary greatly depending on site and project requirements, and the length of traditional supports is difficult to adjust flexibly, resulting in low turnover rates and high manufacturing costs. Therefore, these issues urgently need to be addressed. Summary of the Invention

[0003] The purpose of this invention is to overcome the shortcomings of the prior art and provide a method for calculating active earth pressure in foundation pits. This method can actively calculate the active earth pressure in foundation pits, thereby providing a basis for applying active thrust to the support structure within the foundation pit, and ultimately ensuring the overall stress rationality, stability and safety of the support structure.

[0004] To achieve the above objectives, the present invention adopts the following technical solution:

[0005] The method for calculating active earth pressure in foundation pit soil is characterized by the following steps:

[0006] A monitoring point is set at a specified depth at the boundary of the foundation pit, and the active earth pressure p at the monitoring point is obtained according to the following formula. a :

[0007]

[0008] in:

[0009] p0 is the earth pressure at rest, p0=K0γz, the earth pressure coefficient at rest K0=1-sinψ, ψ is the internal friction angle of the soil, γ is the unit weight of the soil, and z is the depth of the soil.

[0010] s is the soil displacement, s≤0;

[0011] c and d are both soil property parameters.

[0012] K ai This refers to the horizontal subgrade coefficient.

[0013] p acr This is the active lateral pressure on the soil. f is the soil cohesion, K a The active earth pressure coefficient,

[0014] Preferred, K ai =30000km / m 3 .

[0015] Preferably, the support adjustment device, which applies the aforementioned active earth pressure calculation method for the foundation pit soil, is characterized by: including a support plate for resting against a designated monitoring point, the axis of the jack being perpendicular to the axis of the support plate, and both ends of the jack being fixed to the support plate and a fixed base point respectively; the device further includes a force sensor for obtaining the lifting force of the jack; the value of the force sensor is F = p a A, where A is the area of ​​the support plate.

[0016] Preferably, the cylinder wall of the jack is fixed to the steel bracket, and the steel bracket is fixed at the fixed base point; the support adjustment device also includes a guide component for assisting in guiding the jack's travel direction. The guide component includes a guide plate extending parallel to the support plate, a roller is provided on the guide plate, and a groove plate extends horizontally from the steel bracket along the jack's axial direction to the support plate. The groove plate cavity and the roller form a rolling guide engagement relationship.

[0017] Preferably, a displacement sensor for monitoring the horizontal displacement of both is installed between the steel support and the monitoring point; the signal output terminals of the displacement sensor and the force sensor are both electrically connected to the control module, and the control module is electrically connected to the drive module of the jack.

[0018] Preferably, the force sensor is clamped between the top of the piston rod of the jack and the support plate.

[0019] Preferably, the support system, which uses the aforementioned support adjustment device, is characterized by: including steel walers arranged around the boundary of the foundation pit; one side of the steel walers facing the support plate constitutes a contact surface for threaded engagement with the support plate, and the other side constitutes a fixing surface for fixing the piles; a horizontal support beam is arranged inside the annular support formed by the steel walers, and the end of the horizontal support beam is fixed to the steel walers by the support adjustment device; the horizontal support beam of the current layer is fixed to the bottom of the foundation pit or the horizontal support beam of the next layer by columns arranged vertically along the axis.

[0020] Preferably, the horizontal support beam includes transverse beams and longitudinal beams that are staggered and arranged in a frame layout. Each transverse beam has a shape that is formed by connecting transverse sub-beams end to end to form a "I"-shaped beam structure. The longitudinal beams are located between adjacent transverse beams, thereby connecting adjacent transverse beams longitudinally.

[0021] The beneficial effects of this invention are as follows:

[0022] 1) Through the above calculation method, this invention can actively obtain the active earth pressure at each preset monitoring point on the boundary of the foundation pit, thus enabling precise calculation when supporting the monitoring point and achieving the function of supporting the foundation pit boundary with appropriate support force. Furthermore, after obtaining the above active earth pressure, the support force at each monitoring point can be accurately designed during support, which not only achieves accurate measurement of materials, ensuring construction costs, but also makes the overall stress of the support structure more reasonable and stable, and improves safety, achieving multiple benefits.

[0023] 2) Based on the above scheme, this invention further designs the active support at the monitoring point as an adjustable support form. On the one hand, it provides support force to the monitoring point through active construction jacking, that is, actively applies lateral pressure to the soil; it no longer relies on the passive pressure bearing of the soil, transforming passive support into active support. This not only ensures the rationality, stability, and safety of the overall stress of the support structure, but also enables each support to achieve a multi-purpose effect, meeting any foundation pit plan size requirements, increasing the number of turnovers, and reducing construction costs. On the other hand, the telescopic jacks can also eliminate the adverse effects caused by the unevenness of the piles, optimize the distribution of support force between the pile supports, and further improve the safety of the foundation pit support.

[0024] 3) The installation of force and displacement sensors enables real-time balance between soil pressure and jacking force, while ensuring coordinated deformation of the foundation pit and mitigating the risk of large-scale soil sliding. In this way, on the one hand, the sensors adapt to changes in surrounding soil pressure, actively and adaptively adjusting the support force to ensure the stability of the foundation pit; on the other hand, they can also proactively overcome or counteract potential creep behavior of the foundation pit soil, ensuring a regular foundation pit alignment and improving construction accuracy and quality.

[0025] 4) Furthermore, this invention also provides a support system that, through the cooperation of horizontal support beams, columns, and steel walers, achieves disassembly and reusability. This not only avoids complex procedures such as formwork erection for on-site concrete pouring but also eliminates uncontrollable factors during the concrete pouring process, thus improving the overall structural quality. In addition, the modular and prefabricated design of this support system effectively avoids the curing procedures for cast-in-place concrete, thereby reducing construction time and improving construction efficiency; it also avoids the significant material and financial waste caused by dismantling the reinforced concrete internal support structure, demonstrating remarkable effectiveness. Attached Figure Description

[0026] Figure 1 This is a top view of the pile foundation and the capping beam.

[0027] Figure 2 This is a diagram showing the coordination between the steel waler and the piles.

[0028] Figure 3 A three-dimensional structural diagram of the supporting adjustment device;

[0029] Figure 4 for Figure 3 The front view;

[0030] Figure 5 for Figure 3 The diagram shows the action state of the structure shown.

[0031] Figure 6 This is a simplified structural diagram of the supporting system.

[0032] The actual correspondence between the reference numerals and component names in this invention is as follows:

[0033] a-Pile piles; b-Pile capping beam;

[0034] 10-Support plate; 20-Jack; 30-Force sensor; 40-Steel bracket;

[0035] 51-Guide plate; 52-Roller; 53-Groove plate; 60-Displacement sensor; 70-Steel waler;

[0036] 80 - Horizontal support beam; 81 - Transverse sub-beam; 82 - Longitudinal beam; 90 - Column. Detailed Implementation

[0037] For ease of understanding, this section combines... Figure 1-6 The specific structure and operation of the present invention are further described below:

[0038] like Figure 1-2 As shown, the support system of the present invention is actually built on the basis of pile a. Figure 1In the diagram, a circle represents pile group a, the square frame surrounding the circle is the pile cap beam b, and the blank area inside is the excavation area of ​​the foundation pit; while Figure 2 In the diagram, the diagonal line on the right represents pile a, which is connected to the steel waler 70. The steel waler 70 is welded from two I-beams and two steel plates, and bolt holes are pre-drilled on the inner steel plate at the position where it mates with the horizontal support beam 80, i.e., the fixed base point.

[0039] More specifically, such as Figure 6 As shown, the horizontal support beam 80 includes transverse beams and longitudinal beams 82 that are staggered and arranged in a frame-like layout. To highlight the location of each beam, Figure 6 The connection areas, i.e., the beam ends, are all blank in the design, but should actually include all connectors and support adjustment devices. Each transverse beam has a "I"-shaped structure formed by connecting transverse sub-beams 81 end-to-end. The longitudinal beams 82 are located between adjacent transverse beams, thus longitudinally connecting them. Figure 6 In the diagram, the square area represents the column installation points for the transverse sub-beam 81, while the circular area represents the column installation points for the longitudinal beam 82.

[0040] Based on the above structure, the construction process is as follows:

[0041] S1. Drive the piles (a) and pour the capping beam (b).

[0042] S2. Excavate the foundation pit. At each specified depth, i.e., after leveling the bottom of the foundation pit, connect the steel waler 70 to the pile a at the specified depth; the steel waler 70 surrounds the entire boundary of the foundation pit, and pre-reserves bolt holes at the locations where it needs to connect with the support adjustment device at the end of each layer of horizontal support beam 80 as planned in advance.

[0043] S3. The prefabricated transverse and longitudinal beams 82, along with connectors and bolts, are hoisted to the soil in the foundation pit and installed according to the layout. Specifically:

[0044] After the first layer of horizontal support beams 80 is installed, continue excavating to the designated depth. During excavation, continuously level the bottom of the pit, and gradually erect vertical lattice-type columns 90 along with the excavation of the soil at the middle of all the first layer of horizontal support beams 80. At this point, the top of the columns 90 supports the middle of each beam in the first layer, and the bottom rests on the leveled soil with a certain vertical bearing capacity. If the length of the columns 90 is insufficient, steel plates can be placed at the bottom.

[0045] S4. Install steel walers 70 on the soil at the base of column 90, lay out the lines, and hoist and connect the second layer of horizontal support beams 80, using the same installation method as the first layer of horizontal support beams 80, ensuring the second layer is a complete vertical replica of the first layer's vertical projection. While gradually assembling the second layer of horizontal support beams 80, gradually remove the aforementioned columns 90, simultaneously cutting off a certain length equal to the cross-sectional height of the matching beam. Reinstall the cut columns 90 vertically between the two layers of horizontal support beams 80, as shown in the installation details. Figure 6 As shown, this forms an internal support frame structure for the foundation pit with a specified height.

[0046] S6. Continue excavating the soil to the specified depth, install the new column 90, install the steel waler 70, lay out the lines, hoist and connect the third layer of horizontal support beam 80, repeat the above steps, and continue in this manner.

[0047] S7. According to the excavation depth requirements, excavate to the corresponding depth to form a prefabricated frame-type steel-concrete foundation pit internal support structure.

[0048] Of course, in actual design, monitoring points can be arranged at each contact point between the horizontal support beam 80 and the steel waler 70. In this case, both ends of the support adjustment device can be fixed to the corresponding ends of the steel waler 70 and the horizontal support beam 80, thus providing adaptive support. At this time, the beam ends of the horizontal support beam 80 constitute fixed base points. In other words, if... Figure 3-5 The support adjustment device shown can be installed at the end of the horizontal support beam 80 to form the end modification structure; of course, in actual operation, the support adjustment device can also be used independently, or the end of the horizontal support beam 80 can use a mixed structure of normal fixing and support adjustment device fixing.

[0049] In actual design, the support adjustment device includes, from front to back, a support plate 10, a jack 20, a guide assembly, a force sensor 30, a displacement sensor 60, and a steel bracket 40. During operation, the displacement sensor 60 monitors the creep value of the soil and transmits this value to the intelligent processor, i.e., the control module. The intelligent processor calculates the active earth pressure, which is also the lateral pressure of the soil, based on the aforementioned calculation method. A command is then issued to the jack 20, causing it to extend until the reading of the force sensor 30 at the jack 20 reaches the calculated value, ultimately achieving a stable state of soil mechanical equilibrium.

[0050] The mating surfaces of the support plate 10 and the steel waler 70 are connected by high-strength bolts.

[0051] There are four rollers 52 in the guide assembly, installed in pairs on the inner side of the guide plate 51. They are made of high-strength steel, and the bottom of the central rotation shaft of each roller 52 is welded to the inner side of the guide plate 51. At this time, two rollers 52 rotate and engage with the guide plate 51, while simultaneously rolling within the groove plate 53. To ensure the guiding effect, the groove plate 53 can be configured with a groove shape that matches the grooved rollers 52, such as... Figure 5 As shown.

[0052] Two jacks 20 are symmetrically distributed on both sides of the steel bracket 40. A flange is welded to the top of each jack 20 for connection to the bottom of the force sensor 30, and the top of the force sensor 30 is fixed to the support plate 10. The jacks 20 are electric screw jacks, and there are two of them, used to monitor the axial pressure of the jacks 20. The displacement sensor 60 is used to detect soil creep and is installed between the vertical steel plate welded to the steel waler 70 and the mating steel plate welded to the steel bracket 40.

[0053] Because two jacks 20 are used to apply pressure, the force sensor 30 reads... When working, turn on the power switch of jack 20, adjust the reading of the force sensor 30 of jack 20 to F1, and turn off the power. At this time, the force balance is achieved, which can avoid the risk of large-scale soil sliding.

[0054] Example:

[0055] Calculations were performed on large-scale foundation pits in China for verification.

[0056] A large foundation pit in Tianjin uses a reinforced concrete internal support structure. The maximum excavation depth is 14m. The soil in the pit is cohesive, with an internal friction angle ψ = 14° and a unit weight γ = 8.3kN / m³. 3 The cohesive force f = 8 kPa.

[0057] Monitoring points were set at three different depths of 4m, 8m, and 12m from the ground in the foundation pit to monitor the lateral displacement s of the soil at each point in real time and to obtain the lateral pressure p of the soil online as a standard comparison value.

[0058] The following table shows some of the monitoring data:

[0059] monitoring points Depth z(m) Lateral displacement of soil s (mm) Lateral pressure on soil p (kPa) 1 4 5.29 4.82 2 8 12.51 21.45 3 12 9.37 43.19

[0060] Based on the aforementioned calculation formula, the calculated value of active earth pressure p at each monitoring point can be obtained. a :

[0061] Monitoring point 1:

[0062] s=-0.00529m; z=4m; γ=8.3kN / m 3;ψ=14°; f=8Kpa; c=3.33×10 -5 m 3 / kN

[0063] Earth pressure at rest: p0 = K0γz = (1 - sin14°) × 8.3 kN / m 3 ×4m=25.17Kpa

[0064] Active earth pressure:

[0065]

[0066]

[0067] Therefore, the calculated value of active earth pressure is:

[0068]

[0069] The relative error between the calculated and measured values:

[0070]

[0071] Monitoring point 2:

[0072] s=-0.01251m; z=8m; γ=8.3kN / m 3 ;ψ=14°; f=8Kpa; c=3.33×10 -5 m 3 / kN

[0073] Earth pressure at rest: p0 = K0γz = (1 - sin14°) × 8.3 kN / m 3 ×8m=50.34Kpa

[0074] Active earth pressure:

[0075]

[0076]

[0077] Therefore, the calculated value of active earth pressure is:

[0078]

[0079] The relative error between the calculated and measured values:

[0080]

[0081] Monitoring point 3:

[0082] s=-0.00937m; z=12m; γ=8.3kN / m 3;ψ=14°; f=8Kpa; c=3.33×10 -5 m 3 / kN

[0083] Earth pressure at rest: p0 = K0γz = (1 - sin14°) × 8.3 kN / m 3 ×12m=75.51Kpa

[0084] Active earth pressure:

[0085]

[0086]

[0087] Therefore, the calculated value of active earth pressure is:

[0088]

[0089] The relative error between the calculated and measured values:

[0090]

[0091] In summary, the relative error between the calculated value of active earth pressure and the measured soil lateral pressure P of the present invention does not exceed 10%, indicating the reliability of the active earth pressure formula of the present invention.

[0092] Based on this, the force sensor 30 reading The approximate calculations can also be performed normally, and the verification results also prove the effectiveness and accuracy of the active earth pressure formula of the present invention.

[0093] Of course, those skilled in the art will recognize that the present invention is not limited to the details of the exemplary embodiments described above, but also includes the same or similar structures that can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. Therefore, the embodiments should be considered illustrative and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description. Thus, all variations falling within the meaning and scope of equivalents of the claims are intended to be included within the present invention. No reference numerals in the claims should be construed as limiting the scope of the claims.

[0094] Furthermore, it should be understood that although this specification describes embodiments, not every embodiment contains only one independent technical solution. This narrative style is merely for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be appropriately combined to form other embodiments that can be understood by those skilled in the art.

[0095] The technologies, shapes, and structures not described in detail in this invention are all known technologies.

Claims

1. A method for calculating active earth pressure of a foundation pit soil body, characterized in that Includes the following steps: A monitoring point is set at a specified depth of the foundation pit boundary, and the active earth pressure of the monitoring point is obtained according to the following formula : in: K0 is the at-rest earth pressure, K0 is the at-rest earth pressure coefficient , φ is the internal friction angle of the soil, γ is the unit weight of the soil, H is the depth of the soil; for soil displacement, ; are soil properties parameters, , Ks is the horizontal bed coefficient of the soil , This is the active lateral pressure on the soil. , For soil cohesion, The active earth pressure coefficient, .

2. The method according to claim 1, wherein: =30000 。 3. A support adjustment device, wherein the support adjustment device applies the active earth pressure calculation method for foundation pit soil as described in claim 1 or 2, characterized in that: The device includes a support plate (10) for resting against a designated monitoring point, with the axis of a jack (20) perpendicular to the axis of the support plate (10), and both ends of the jack (20) fixed to the support plate (10) and a fixed base point, respectively; the device also includes a force sensor (30) for obtaining the lifting force of the jack (20); the value of the force sensor (30) is... , A The area of ​​the support plate (10) is given.

4. The support adjustment device of claim 3, wherein: The cylinder wall of the jack (20) is fixed on the steel bracket (40), and the steel bracket (40) is fixed at the fixed base point. The support adjustment device also includes a guide component for assisting in guiding the direction of travel of the jack (20). The guide component includes a guide plate (51) extending parallel from the support plate (10), a roller (52) is provided at the guide plate (51), and a groove plate (53) extends horizontally from the steel bracket (40) along the axial direction of the jack (20) to the support plate (10). The groove cavity of the groove plate (53) and the roller (52) form a rolling guide fit relationship.

5. The support adjustment device of claim 4, wherein: A displacement sensor (60) for monitoring the horizontal displacement of both is installed between the steel support (40) and the monitoring point; the signal output terminals of the displacement sensor (60) and the force sensor (30) are electrically connected to the control module, and the control module is electrically connected to the drive module of the jack (20).

6. The support adjustment device of claim 3, wherein: The force sensor (30) is clamped between the top of the piston rod of the jack (20) and the support plate (10).

7. Support system applying the support adjustment device as claimed in claim 3, characterized in that: The structure includes steel walers (70) arranged around the boundary of the foundation pit. One side of the steel walers (70) facing the support plate (10) forms a contact surface for bolting the support plate (10), and the other side forms a fixing surface for fixing the piles. A horizontal support beam (80) is arranged inside the annular support formed by the steel walers (70). The end of the horizontal support beam (80) is fixed to the steel walers (70) by the support adjustment device. The horizontal support beam (80) of the current layer is fixed to the bottom of the foundation pit or the horizontal support beam (80) of the next layer by columns (90) arranged vertically along the axis.

8. The support system of claim 7, wherein: The horizontal support beam (80) includes transverse beams and longitudinal beams (82) that are intersected in a frame layout. Each transverse beam is formed by transverse sub-beams (81) connected end to end to form a "I"-shaped beam structure. The longitudinal beams (82) are located between adjacent transverse beams, thus connecting the adjacent transverse beams longitudinally.

Citation Information

Patent Citations

  • Oversized deep foundation pit concrete-assembly type section bar mixing supporting system and construction method thereof

    CN106968257A

  • Retaining engineering structure and design method for stabilizing deep excavations or earth slope instability near existing civil objects

    WO2020021294A1