A marine fishery breeding combined facility and its use method
By adopting the submerged anchor assembly of underwater facilities and the floating anchor assembly of overwater facilities in marine fishery aquaculture facilities, the stability problem of distant sea aquaculture facilities under large waves is solved by using the cooperation of load-bearing chain groups and electromagnetic sheets, the stability problem of distant sea aquaculture facilities under large waves is achieved. The safety of facilities has been subsided and separated, improving the stability and safety of long-sea aquaculture.
Patent Information
- Application Number
- CN202310342809.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-03
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2043-04-03
AI Technical Summary
Far-sea aquaculture facilities are difficult to maintain stability when facing large waves, resulting in unstable facilities and affecting fishery production.
A marine fishery aquaculture combination facility was designed, including underwater facility monomers and overwater facility monomers, through the submerged anchoring assembly of underwater facility monomers and floating anchoring assembly of overwater facility monomers, using load-bearing chain groups and electromagnetic sheets The cooperation of the underwater facilities can achieve the sinking of underwater facilities and the separation of overwater facilities in the face of heavy wind and waves, ensuring the stability of the facilities.
It effectively avoids the swing and overturning of underwater and water facilities in the wind and waves, improves the stability and safety of remote sea aquaculture facilities, and ensures the continuity of fishery production.
Smart Images

Figure CN116349631B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of aquaculture combined facilities, and more specifically, to a marine fishery aquaculture combined facility and a use method thereof. Background Art
[0002] The marine aquaculture industry is one of the important marine economic industries. The aquaculture model has developed from simple raft-type aquaculture facilities near the shore to large-scale professional aquaculture facilities in the deep sea. Deep-sea aquaculture facilities must have an ultra-large-scale aquaculture water volume, be able to withstand harsh ocean conditions, and be easy to build and install at sea, so that the total project investment cost can be controlled.
[0003] A common problem faced by offshore aquaculture is that it is easy to generate large waves in the open sea. If the same method as offshore floating aquaculture is adopted, when large waves come, the aquaculture facilities are easy to be swept by the waves and it is difficult to maintain the state of calmness like on the calm sea surface. Their stability is greatly reduced. How to ensure the stability of marine aquaculture facilities has become an urgent problem to be solved.
[0004] To this end, we propose a marine fishery farming combined facility and a method of using the same to solve some problems existing in the prior art. Summary of the invention
[0005] The present invention aims to solve the problem that the existing offshore aquaculture is difficult to withstand strong winds and waves. Compared with the existing technology, a marine fishery aquaculture combined facility is provided, including an underwater facility monomer and an above-water facility monomer. The underwater facility monomer includes a cage frame, and the periphery and upper and lower sections of the cage frame are all paved with fishing nets. The bottom end of the underwater facility monomer is provided with a bottom anchoring assembly for traction and anchoring it. The above-water facility monomer includes a workbench and a floating body installed at the bottom of the workbench. The outer end of the workbench is provided with a floating anchoring assembly connected to the underwater facility monomer. The floating anchoring assembly includes a floating anchoring assembly embedded and installed on the end wall of the workbench. A reel-up device is provided with an upper anchor rope wound on the reel-up device, a magnetic ball is connected to the free end of the upper anchor rope, a sleeve matching the floating anchor assembly is fixedly installed on the outer end wall of the underwater facility monomer, a load-bearing chain group fixedly plugged with the magnetic ball is nested in the sleeve, the load-bearing chain group includes a plurality of load-bearing disks, and the plurality of load-bearing disks are fixedly connected with each other by chains, an electromagnetic sheet 1 and an electromagnetic sheet 2 are respectively embedded in the inner walls of the upper and lower ends of the sleeve, the electromagnetic sheet 1 and the electromagnetic sheet 2 correspond to the positions of the load-bearing disks distributed at the head and tail respectively, and magnetic blocks are embedded in the load-bearing disks at the head and tail positions, and the load-bearing disk located at the upper position is fixedly docked with the magnetic ball.
[0006] Furthermore, a central column is fixedly connected to the inside of the enclosure frame, on which a wind and wave sensor is provided, and grid pieces connected to the inner wall of the enclosure frame are provided around the central column, so that multiple water areas are formed for marine fishery farming.
[0007] Furthermore, hollow chambers are provided inside the enclosure frame and the central column to ensure that the buoyancy is greater than the gravity after launching and the unit floats on the water surface, making it convenient to use a tugboat to tow the underwater facility unit to the designated aquaculture sea area for installation. After it is towed to the designated aquaculture sea area, it is sunk and lowered, and water is released into the hollow chamber to increase the weight of the underwater facility unit, so that the underwater facility unit floats and is moored at a predetermined depth, taking care to avoid surface waters that are overly affected by typhoons.
[0008] Furthermore, the bottom anchoring assembly includes an anchoring seat fixed to the seabed, with anchoring rods distributed around the anchoring seat, and a reel-2 installed on the anchoring seat, with multiple lower anchoring ropes wound on the reel-2, and the upper ends of the multiple lower anchoring ropes respectively pass through the bottom of the underwater facility unit and are fixedly connected to the anchoring rods corresponding to their positions. The bottom of the underwater facility unit is towed by utilizing the cooperation of the reel-2, the lower anchoring ropes and the anchoring rod, and the anchoring traction force cooperates with the buoyancy of the underwater facility unit to realize that the underwater facility unit is fixed in a floating form at the designed water depth of the seabed.
[0009] Furthermore, an anchor column positioned on the seabed is provided on one side of the anchor seat, and the anchor column is arranged corresponding to the position of the sleeve.
[0010] Furthermore, a limiting ring is embedded in the sleeve and is arranged to counteract the lowermost load-bearing plate. The limiting ring is used to limit the load-bearing plate. The outer diameter of the anchor column is smaller than the inner diameter of the limiting ring. When the sleeve sinks with the underwater facility unit, the heavy chain group inside the sleeve detaches from the sleeve and floats on the bottom of the water. After sinking, the sleeve is directly mounted on the anchor column, which further improves the stability of the underwater facility unit. The specific working process of this process is that when the reel-up device 2 is started, the electromagnetic plate 1 is disconnected, and the load-bearing plates located above are gradually detached from the sleeve and float to the bottom of the water. The load-bearing plate located at the lowest end is still fixed in the sleeve, which is used to continuously anchor and traction the water facility unit.
[0011] Furthermore, multiple load-bearing plates are made of high-density materials, and multiple water seepage holes are distributed on the sleeve. A load-bearing material matching the weight of the sleeve is embedded at the other end of the enclosure frame. During the installation of the underwater facility unit, the load-bearing chain group is placed in the sleeve, and the electromagnetic plate 1 and the electromagnetic plate 2 on the sleeve are activated to achieve a fixed connection between the sleeve and the load-bearing chain group, thereby increasing the weight of the underwater facility unit and facilitating the stable sinking of the underwater facility unit.
[0012] A method for using a marine fishery aquaculture combined facility comprises the following steps:
[0013] S1. First, the underwater facility monomer is towed to the designated aquaculture sea area, and then sunk and lowered. The bottom anchoring assembly is seated on the seabed mud surface to make the underwater facility monomer float and moor at a predetermined depth. After stabilization, the installation of a single underwater facility monomer is completed. This process is repeated one by one until all underwater facility monomers are installed to form an underwater combined facility.
[0014] S2. After the installation of the underwater facility monomer is completed, the surface facility monomer is towed to the mooring point for installation in sequence. The surface facility monomer is fixedly connected to the load-bearing component on the underwater facility monomer through the floating anchor component to complete the fixed-point floating of the surface facility monomer;
[0015] S3. The above-water facility monomer is provided with a docking module and a functional module. The docking module realizes the functions of fish fry placement, bait placement, and adult fish recovery for the underwater facility monomer, and the functional module realizes the functions of fishery processing and fish storage;
[0016] S4. When encountering strong winds and waves, the underwater facility unit first sinks to a safe depth of water under the action of the bottom anchoring assembly, and the load-bearing chain group is completely separated from the sleeve under the traction force of the above-water facility unit, and the above-water facility unit is released from the mooring point and towed to the anchorage for typhoon prevention.
[0017] Optionally, a pressure sensor is provided on the load-bearing plate, the other end of the pressure sensor is connected to a chain rope, and the number of the pressure sensors is less than the load-bearing plate and is distributed at intervals.
[0018] Optionally, a power mechanism is provided at the bottom end of the above-water facility monomer, and the power mechanism is preferably a marine power propeller. A pressure sensor is added to the load-bearing plate, which is conducive to step-by-step pressure detection in wave-affected sea areas, expanding the detection range, and using the tension exerted on each point to more accurately detect the distribution range and size of wind and waves, and analyze the data. When the wind and waves are too large, the second electromagnetic plate on the sleeve is disconnected, the load-bearing chain group is separated from the sleeve, and the power mechanism is started. The above-water facility monomer is separated from the underwater facility monomer and drives away from the waters and enters safe waters. During this process, the load-bearing plate can detect the size of the wind and waves in real time on the one hand, and on the other hand, it has a heavy effect, and has a certain sinking and anchoring force on the above-water facility monomer during its driving process, effectively preventing the underwater facility monomer from being lifted up by wind and waves.
[0019] Compared with the prior art, the advantages of this application are:
[0020] (1) This scheme adds a sleeve with a load-bearing chain group pre-installed inside to the underwater facility unit. Under normal use, the water facility unit is anchored by the floating anchor assembly and the load-bearing chain group. When the wind and waves are detected to be too strong, the underwater facility unit sinks under the action of the bottom anchor assembly and moves away from the surface waters with large wave force. At the same time, the electromagnetic plate 1 is disconnected, and the load-bearing chain group detaches from the sleeve after the sleeve sinks and continues to tow the water facility unit. When the wind and waves continue and the wind force does not decrease, the electromagnetic plate 2 is disconnected, and the load-bearing chain group completely detaches from the sleeve under the traction force of the water facility unit. The water facility unit is released from the mooring point and towed to the anchorage for typhoon prevention. The load-bearing chain group has a heavy effect and has a certain sinking anchoring force on the water facility unit during the towing process, effectively preventing the water facility unit from being lifted by wind and waves.
[0021] (2) There are hollow chambers inside the cage frame and the central column to ensure that the buoyancy is greater than the gravity after launching and the cage floats on the water surface, making it easy to use a tugboat to tow the underwater facility unit to the designated aquaculture sea area for installation. After it is towed to the designated aquaculture sea area, it is sunk and lowered, and water is released into the hollow chamber to increase the weight of the underwater facility unit, so that the underwater facility unit floats and is moored at a predetermined depth, taking care to avoid surface waters that are overly affected by typhoons.
[0022] (3) The bottom anchoring assembly includes an anchoring seat fixed on the seabed, anchoring rods are distributed around the anchoring seat, and a reel 2 is installed on the anchoring seat. A plurality of lower anchoring ropes are wound on the reel 2. The upper ends of the plurality of lower anchoring ropes respectively penetrate the bottom of the underwater facility unit and are fixedly connected to the anchoring rods corresponding to their positions. The bottom of the underwater facility unit is towed by the cooperation of the reel 2, the lower anchoring ropes and the anchoring rods. The anchoring traction force cooperates with the buoyancy of the underwater facility unit to realize that the underwater facility unit is fixed in a floating form at the designed water depth of the seabed.
[0023] (4) Multiple load-bearing plates are made of high-density materials. There are multiple water seepage holes distributed on the sleeve. A load-bearing material matching the weight of the sleeve is embedded at the other end of the enclosure frame. During the installation of the underwater facility unit, the load-bearing chain group is placed in the sleeve, and the electromagnetic plates 1 and 2 on the sleeve are activated to achieve a fixed connection between the sleeve and the load-bearing chain group, thereby increasing the weight of the underwater facility unit and facilitating the stable sinking of the underwater facility unit.
[0024] (5) The pressure sensor installed on the load-bearing plate is used to detect the tension, which is conducive to performing pressure detection in a stepped manner in wave-affected sea areas, expanding the detection range, and using the tension exerted on each point to more accurately detect the distribution range and size of wind and waves. The data is analyzed to determine whether it is necessary to disconnect the connection between the underwater facility unit and the surface facility unit, so as to take corresponding measures based on the actual situation. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is a schematic diagram of the structure of this application;
[0026] Figure 2 This is a schematic diagram of the structure of the underwater facility unit of the present application;
[0027] Figure 3 This is a schematic diagram of the structure of the above-water facility unit and the underwater facility unit before installation of the present application;
[0028] Figure 4 This is a schematic diagram of the internal structure of the sleeve of this application;
[0029] Figure 5 This is the workflow diagram of this application;
[0030] Figure 6 This is a schematic diagram of the state of the underwater facility unit when it is sinking;
[0031] Figure 7 This is a schematic diagram of the state of re-anchoring the above-water facility unit after the underwater facility unit sinks in this application;
[0032] Figure 8 This is a schematic diagram of the structure in Example 2 of the present application;
[0033] Fig. 9 This is the workflow diagram of Example 2 of the present application;
[0034] Fig.10 This is a schematic diagram of the state after the above-water facility unit and the underwater facility unit are separated in Example 2 of the present application.
[0035] Description of the numbers in the figure:
[0036] 1 underwater facility unit, 11 enclosure frame, 12 center column, 13 fishing net, 14 grid mesh, 2 above-water facility unit, 21 workbench, 22 float, 23 upper anchor rope, 24 magnetic ball, 25 reel one, 3 lower anchor rope, 4 anchor rod, 5 anchor seat, 6 reel two, 7 anchor column, 8 sleeve, 81 electromagnetic sheet one, 82 electromagnetic sheet two, 83 limit ring, 9 load-bearing plate, 10 chain rope, 15 power mechanism. DETAILED DESCRIPTION
[0037] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all the embodiments. All other embodiments obtained by ordinary technicians in this field without making creative work based on the embodiments in the present application are within the scope of protection of this application.
[0038] Embodiment 1:
[0039] This application discloses a marine fishery farming combined facility, see Figure 1-2 , including an underwater facility monomer 1 and an above-water facility monomer 2. The underwater facility monomer 1 includes a breeding frame 11. The periphery and upper and lower sections of the breeding frame 11 are all covered with fishing nets 13. A central column 12 is fixedly connected to the breeding frame 11. A wind and wave sensor is arranged on the central column 12. A grid sheet 14 connected to the inner wall of the breeding frame 11 is arranged around the central column 12. The formed multiple water body intervals are used for marine fishery breeding. Empty compartments are arranged inside the breeding frame 11 and the central column 12 to ensure that the buoyancy is greater than the gravity after launching and the fishing boat floats on the water surface, so that the underwater facility monomer 1 can be towed to the predetermined breeding sea area for installation by a tugboat. After the fishing boat is towed to the predetermined breeding sea area, the sinking operation is carried out, and water is released into the empty compartment to increase the weight of the underwater facility monomer 1, so that the underwater facility monomer 1 floats and is moored at a predetermined depth, and the surface waters with excessive influence of typhoons are avoided.
[0040] See also Figure 5-7 The bottom end of the underwater facility monomer 1 is provided with a bottom anchoring assembly for traction and anchoring thereof. After the underwater facility monomer 1 is sunk into the water, the bottom of the underwater facility monomer 1 is anchored by the bottom anchoring assembly to reduce its floating amplitude. The bottom anchoring assembly includes an anchoring seat 5 fixed to the seabed, and anchoring rods 4 are distributed around the anchoring seat 5. A reel 2 6 is installed on the anchoring seat 5, and a plurality of lower anchoring ropes 3 are wound on the reel 2 6. The upper ends of the plurality of lower anchoring ropes 3 respectively penetrate the bottom of the underwater facility monomer 1 and are fixedly connected to the anchoring rods corresponding to their positions. 4, the bottom of the underwater facility monomer 1 is towed by the cooperation of the reel 2 6, the lower anchor rope 3 and the anchor rod 4, and the anchoring traction force cooperates with the buoyancy of the underwater facility monomer 1 to realize that the underwater facility monomer 1 is fixed at the designed water depth of the seabed in a floating form. A wind and wave sensor is provided on the central column 12. When a large wind and wave occurs at the location where the underwater facility monomer 1 is located, at this time, the reel 2 6 is used to reel in multiple lower anchor ropes 3, so that the underwater facility monomer 1 is sunk and away from the surface waters with large wave force.
[0041] See also Figure 3-6 The above-water facility monomer 2 includes a workbench 21 and a floating body 22 installed at the bottom of the workbench 21. The outer end of the workbench 21 is provided with a floating anchor assembly connected to the underwater facility monomer 1. The floating anchor assembly includes a reel-25 embedded and installed on the end wall of the workbench 21. The reel-25 is wound with an upper anchor rope 23. The free end of the upper anchor rope 23 is connected to a magnetic ball 24. The outer end wall of the underwater facility monomer 1 is fixedly installed with a sleeve 8 matching the floating anchor assembly. One side of the anchor seat 5 is also provided with an anchor column 7 positioned on the seabed. The anchor column 7 and the sleeve 8 are arranged in a corresponding position.
[0042] A load-bearing chain group fixedly connected to the magnetic ball 24 is nested in the sleeve 8, and the load-bearing chain group includes multiple load-bearing plates 9. The multiple load-bearing plates 9 are fixedly connected to each other by a chain rope 10. The inner walls of the upper and lower ends of the sleeve 8 are respectively embedded with an electromagnetic plate 1 81 and an electromagnetic plate 2 82. The electromagnetic plate 1 81 and the electromagnetic plate 2 82 correspond to the positions of the load-bearing plates 9 distributed at the head and tail, respectively, and the load-bearing plates 9 located at the head and tail positions are all embedded with magnetic blocks, and the load-bearing plate 9 located at the upper end is fixedly docked with the magnetic ball 24.
[0043] A limiting ring 83 is embedded inside the sleeve 8 and is set against the lowest load-bearing plate 9. The limiting ring 83 is used to limit the load-bearing plate 9. The outer diameter of the anchor column 7 is smaller than the inner diameter of the limiting ring 83. When the sleeve 8 sinks with the underwater facility monomer 1, the heavy chain group inside the sleeve 8 is separated from the sleeve 8 and floats on the bottom of the water. After sinking, the sleeve 8 is directly sleeved on the anchor column 7, which further improves the stability of the underwater facility monomer 1. When encountering wind and waves, the specific work is that when the reel 2 6 is started, the electromagnetic sheet 1 81 is disconnected, and the load-bearing plate 9 located above is separated from the sleeve 8 one by one and floats to the bottom of the water. The weight plate 9 is also fixed in the sleeve 8, and is used to provide continuous anchoring and traction for the water facility monomer 2. The upper anchor rope 23 is appropriately reeled in by the reel-in 25, and the load-bearing chain group is connected between the underwater facility monomer 1 and the water facility monomer 2 to enhance the stability of the connection between the two. When the wind and waves continue and the wind force does not decrease, the process can be detected and judged by manual observation or by adding the same wind force sensor to the water facility monomer, and the electromagnetic plate 2 82 is disconnected. The load-bearing chain group is completely separated from the sleeve 8 under the traction force of the water facility monomer 2, and the water facility monomer 2 is released from the mooring point and towed to the anchorage for typhoon prevention.
[0044] Multiple load-bearing plates 9 are made of high-density materials, and multiple water seepage holes are distributed on the sleeve 8. The other end of the enclosure frame 11 is embedded with a load-bearing material that matches the weight of the sleeve 8. During the installation of the underwater facility monomer 1, the load-bearing chain group is placed in the sleeve 8, and the electromagnetic plate 1 81 and the electromagnetic plate 2 82 on the sleeve 8 are started to achieve a fixed connection between the sleeve 8 and the load-bearing chain group, thereby increasing the weight of the underwater facility monomer 1, which is beneficial to the stable sinking of the underwater facility monomer 1. In addition, the load-bearing chain group has a heavy effect, and has a certain sinking anchoring force on the water facility monomer 2 during the towing process, which effectively prevents the underwater facility monomer 1 from being lifted up by wind and waves.
[0045] A method for using a marine fishery aquaculture combined facility comprises the following steps:
[0046] S1. First, the underwater facility monomer 1 is towed to the predetermined aquaculture sea area, and then sunk and lowered. The bottom anchoring assembly is seated on the seabed mud surface to make the underwater facility monomer 1 float and moor at a predetermined depth. After stabilization, the installation of a single underwater facility monomer 1 is completed. This process is repeated one by one until all underwater facility monomers 1 are installed to form an underwater combined facility.
[0047] S2. After the installation of the underwater facility monomer 1 is completed, the surface facility monomer 2 is towed to the mooring point and installed in sequence. The surface facility monomer 2 is fixedly connected to the load-bearing component on the underwater facility monomer 1 through the floating anchor component, and the fixed-point floating of the surface facility monomer 2 is completed;
[0048] S3, the above-water facility monomer 2 is provided with a docking module and a functional module, the docking module realizes the functions of fish fry placement, bait placement, and adult fish recovery for the underwater facility monomer 1, and the functional module realizes the functions of fishery processing and fish storage;
[0049] S4. When encountering strong winds and waves, the underwater facility monomer 1 first sinks to a safe depth of water under the action of the bottom anchoring assembly, and the load-bearing chain group completely separates from the sleeve 8 under the traction force of the above-water facility monomer 2, and the above-water facility monomer 2 is released from the mooring point and towed to the anchorage for typhoon prevention.
[0050] Embodiment 2:
[0051] The difference between this embodiment and the first embodiment is that: on the basis of the first embodiment, the second embodiment adds a pressure sensor on 9 and adds a power mechanism 15 on the bottom of the water facility unit 2, and the rest of the structure is consistent with the first embodiment, as follows:
[0052] See also Figure 8-10 , a pressure sensor is provided on the bearing plate 9, and the other end of the pressure sensor is connected to the chain 10. The number of pressure sensors is less than the bearing plate 9 and is distributed at intervals. A power mechanism 15 is provided at the bottom of the water facility monomer 2. The power mechanism 15 is preferably a marine propeller. Adding a pressure sensor to the bearing plate 9 is conducive to step-by-step pressure detection in wave-affected sea areas, expanding the detection range, and using the tension at each point to more accurately detect the distribution range and size of the wind and waves, and analyzing the data to determine whether it is necessary to disconnect the underwater facility. The connection between the water facility monomer 1 and the water facility monomer 2, when the wind and waves are too large and exceed the wind force that the water facility monomer 2 can withstand, at this time, the electromagnetic plate 82 on the sleeve 8 is disconnected, the load-bearing chain group is separated from the sleeve 8, and the power mechanism 15 is started. The water facility monomer 2 is separated from the underwater facility monomer 1 and drives away from the water area and enters a safe water area. During this process, the load-bearing plate 9 can detect the size of the wind and waves in real time on the one hand, and on the other hand, it has a heavy effect, and has a certain sinking anchoring force on the water facility monomer 2 during its driving process, effectively preventing the underwater facility monomer 1 from being lifted up by the wind and waves.
[0053] The above are only preferred specific implementation methods of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed in the present application according to the technical solution and improved ideas of the present application, which should be covered by the protection scope of the present application.
Claims
1. A marine fishery breeding combined facility, comprising an underwater facility unit (1) and an above-water facility unit (2), characterized in that: The underwater facility unit (1) comprises a cage frame (11), the outer periphery and upper and lower sections of the cage frame (11) are all provided with fishing nets (13), the bottom end of the underwater facility unit (1) is provided with a bottom anchoring assembly for traction and anchoring the underwater facility unit (1), the above-water facility unit (2) comprises a workbench (21) and a floating body (22) installed at the bottom of the workbench (21), the outer end of the workbench (21) is provided with a floating anchoring assembly connected to the underwater facility unit (1), the floating anchoring assembly comprises a reel (25) embedded in the end wall of the workbench (21), an upper anchor rope (23) is wound on the reel (25), and the free end of the upper anchor rope (23) is connected to a magnetic ball ( 24), a sleeve (8) matching the floating anchor assembly is fixedly installed on the outer end wall of the underwater facility monomer (1), a load-bearing chain group fixedly plugged with the magnetic ball (24) is embedded in the sleeve (8), the load-bearing chain group includes a plurality of load-bearing plates (9), and the plurality of load-bearing plates (9) are fixedly connected to each other by a chain rope (10), and the inner walls of the upper and lower ends of the sleeve (8) are respectively embedded with an electromagnetic sheet 1 (81) and an electromagnetic sheet 2 (82), and the electromagnetic sheet 1 (81) and the electromagnetic sheet 2 (82) correspond to the positions of the load-bearing plates (9) distributed at the head and tail, respectively, and the load-bearing plates (9) located at the head and tail positions are both embedded with magnetic blocks, and the load-bearing plate (9) located at the upper end is fixedly connected to the magnetic ball (24); The method for using the above-mentioned marine fishery aquaculture combined facility comprises the following steps: S1. First, the underwater facility monomer (1) is towed to the predetermined aquaculture sea area, and then sunk and lowered. The bottom anchoring assembly is seated on the seabed mud surface to make the underwater facility monomer (1) float and moor at a predetermined depth. After stabilization, the installation of a single underwater facility monomer (1) is completed. This process is repeated one by one until all underwater facility monomers (1) are installed to form an underwater combined facility. S2. After the underwater facility monomer (1) is installed, the surface facility monomer (2) is towed to the mooring point and installed in sequence. The surface facility monomer (2) is fixedly connected to the load-bearing component on the underwater facility monomer (1) through the floating anchor component, thereby completing the fixed-point floating of the surface facility monomer (2); S3, the above-water facility unit (2) is provided with a docking module and a functional module, the docking module realizes the functions of the underwater facility unit (1) including the release of fry, the release of bait, and the recovery of adult fish, and the functional module realizes the functions including fishery processing and fish storage; S4. When encountering strong winds and waves, the underwater facility monomer (1) first sinks to a safe depth of water under the action of the bottom anchoring assembly, and the load-bearing chain group is completely separated from the sleeve (8) under the traction force of the above-water facility monomer (2), and the above-water facility monomer (2) is released from the mooring point and towed to the anchorage for typhoon prevention.
2. A marine fishery farming combined facility according to claim 1, characterized in that: A central column (12) is fixedly connected to the interior of the enclosure frame (11), a wind and wave sensor is provided on the central column (12), and grid sheets (14) connected to the inner wall of the enclosure frame (11) are provided around the central column (12).
3. A marine fishery farming combined facility according to claim 2, characterized in that: The colony frame (11) and the central column (12) are both provided with empty cabins.
4. The marine fishery farming combined facility according to claim 1, characterized in that: The bottom anchoring assembly comprises an anchor seat (5) fixed to the seabed, anchor rods (4) are distributed around the anchor seat (5), a reel-2 (6) is mounted on the anchor seat (5), a plurality of lower anchor ropes (3) are wound around the reel-2 (6), and the upper ends of the plurality of lower anchor ropes (3) respectively penetrate the bottom of the underwater facility unit (1) and are fixedly connected to the anchor rods (4) corresponding to their positions.
5. The marine fishery farming combined facility according to claim 4 is characterized by: An anchor column (7) positioned on the seabed is also provided on one side of the anchor seat (5), and the anchor column (7) and the sleeve (8) are arranged in a corresponding position.
6. The marine fishery farming combined facility according to claim 5, characterized in that: A limiting ring (83) is embedded inside the sleeve (8) and is arranged to abut against the lowermost bearing plate (9); the outer diameter of the anchor column (7) is smaller than the inner diameter of the limiting ring (83).
7. The marine fishery farming combined facility according to claim 1, characterized in that: The plurality of load-bearing plates (9) are all made of high-density material, the sleeve (8) is provided with a plurality of water seepage holes, and the other end of the colonization frame (11) is embedded with a load-bearing material that matches the weight of the sleeve (8).
8. The marine fishery farming combined facility according to claim 1, characterized in that: The load-bearing plate (9) is provided with a pressure sensor, the other end of which is connected to a chain rope (10), and the number of the pressure sensors is less than the load-bearing plate (9) and is distributed at intervals.
9. The marine fishery farming combined facility according to claim 1, characterized in that: A power mechanism (15) is provided at the bottom end of the water facility unit (2); the power mechanism (15) is a marine power propeller.