A method and device for reinforcing in-situ soil around an offshore wind power single pile
By laying and inserting grid plates, strengthening piles and cover plates around the offshore wind power single pile foundation, the problem of eroding the pit after reinforcement is solved, and effective reinforcement and stability improvement of the pile foundation soil is achieved.
Patent Information
- Application Number
- CN202310400227.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-13
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2043-04-13
AI Technical Summary
The existing in-situ soil reinforcement method for single pile piles on offshore wind power still has the problem of eroding the pit after reinforcement, resulting in insufficient stability of the pile foundation.
A combination device of grid plate, reinforced pile and cover plate is adopted. The grid plate is laid around the pile foundation and inserted into the soil. Reinforced piles are installed inside. The cover plate covers the grid plate, and the gap is filled by grouting to form a stable overall structure. To enhance soil stability.
It effectively slows down the soil erosion of the soil around the pile foundation, improves the stability and reliability of the pile foundation, and extends the service life.
Smart Images

Figure CN116378127B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of offshore pile foundations, and in particular to a method and a device for reinforcing in-situ soil around an offshore wind power single pile. Background Art
[0002] Offshore pile foundation is an important part of offshore wind power. The scouring of waves and currents will damage the in-situ soil around the pile foundation, and scouring pits will be formed after the soil is scoured by water. Scour pits will weaken the soil's constraint on the pile foundation, causing the pile structure to become unstable, thus causing the danger of foundation overturning. Therefore, it is necessary to conduct morphological inspection and control and reinforcement of scour pits around the pile foundation.
[0003] The existing methods for strengthening pile foundations generally include riprap, cementation and solidification of soil, bionic plant covering, etc., which mainly backfill the surface of the scour pit and strengthen the surface covering of the soil. However, after reinforcement by this reinforcement method, the local area around the pile is still scoured and soil erosion still exists. Summary of the invention
[0004] Therefore, the technical problem to be solved by the present invention is to overcome the defect of the in-situ soil reinforcement method around a single offshore wind power pile in the prior art that after the pile foundation is reinforced, the local area around the pile is still easily scoured to form a scour pit, thereby providing an in-situ soil reinforcement device and reinforcement method around a single offshore wind power pile that can strengthen the soil around the pile, can reinforce the soil in the scour pit, and improve the stability of the pile foundation.
[0005] In order to solve the above problems, the first aspect of the present invention provides an in-situ soil reinforcement method around an offshore wind power single pile, comprising:
[0006] Lay the mesh plate around the pile foundation and insert the mesh plate into the soil around the pile foundation;
[0007] Inserting reinforcement piles in the mesh of the mesh plate;
[0008] A cover plate is placed on the grid plate;
[0009] Grouting is performed between the gaps between the reinforcement piles and the mesh panels.
[0010] Furthermore, the grid plate includes a first semi-ring structure, a second semi-ring structure, and a first connecting structure connected between the first semi-ring structure and the second semi-ring structure, and the grid plate is laid around the pile foundation, including:
[0011] Splicing the first half ring structure and the second half ring structure on both sides of the pile foundation so that the first half ring structure and the second half ring structure surround the pile foundation;
[0012] The first half-ring structure and the second half-ring structure are connected using a first connecting structure.
[0013] Further, the mesh panels are laid around the pile foundation, and the method also includes:
[0014] Scan the range of the scour pit around the pile foundation, define the point with the maximum distance between the scour pit and the pile foundation as the far point, and the distance between the far point and the axis of the pile foundation is the outer circle radius of the grid plate.
[0015] Further, the mesh plate is inserted into the soil around the pile foundation, including:
[0016] Press the mesh plate into the soil perpendicular to the ground so that the top surface of the mesh plate is flush with the soil around the pile foundation.
[0017] Furthermore, reinforcing piles are inserted into the grids of the grid plate, including:
[0018] Select the grid within the scouring pit around the pile foundation to insert the reinforcement piles, and make the upper end of the reinforcement pile flush with the upper end of the grid plate;
[0019] A cover plate is installed on the mesh plate that is not within the scope of the scour pit.
[0020] Furthermore, the number of the reinforcement piles is two or more, a second connection structure is provided between adjacent reinforcement piles, and the reinforcement piles are inserted into the grid of the grid plate, including:
[0021] Inserting two or more reinforcement piles into the grid of the grid plate in sequence;
[0022] Adjacent reinforcement piles are fixedly connected via the second connection structure.
[0023] The second aspect of the present invention relates to an in-situ soil reinforcement device around an offshore wind power single pile, comprising:
[0024] A grid plate is disposed around the pile foundation and at least partially inserted into the soil;
[0025] Reinforcement piles are inserted into the mesh of the mesh plate, and a reinforcement layer is formed between the mesh plate and the reinforcement piles;
[0026] The cover plate is arranged on the mesh plate and the reinforcement piles.
[0027] Further, the grid plate is annular, and the inner circle radius of the grid plate is equal to the radius of the pile foundation; and / or,
[0028] The point where the scour pit outside the pile foundation is at the maximum distance from the pile foundation is defined as the far point, and the outer circle radius of the grid plate is equal to the distance between the far point and the axis of the pile foundation; and / or,
[0029] The thickness of the mesh plate is equal to the diameter of the pile foundation.
[0030] Furthermore, the grid plate includes a first semi-ring structure, a second semi-ring structure and a first connecting structure connected between the first semi-ring structure and the second semi-ring structure.
[0031] Further, one of the two adjacent reinforcement piles is defined as a first reinforcement pile, and the other is defined as a second reinforcement pile. A second connection structure is connected between the first reinforcement pile and the second reinforcement pile. The second connection structure includes:
[0032] A first ring wing, which is arranged at the upper end of the first reinforcement pile, and the first ring wing is provided with a first mounting hole extending in the height direction;
[0033] A second ring wing is arranged at the upper end of the second reinforcement pile, the second ring wing is provided with a second mounting hole extending in the height direction, and the flanges of the first ring wing and the second ring wing are staggered in the height direction;
[0034] The shear bolt is adapted to pass through the first mounting hole and the second mounting hole in sequence.
[0035] The present invention has the following advantages:
[0036] The first aspect of the present invention is a method for reinforcing the in-situ soil around a single offshore wind power pile, which includes laying a grid plate around the pile foundation, and the grid plate is inserted into the soil around the pile foundation, which can strengthen the soil around the pile foundation, improve the stress condition of the soil around the pile foundation, and slow down the loss of soil around the pile foundation. On this basis, the reinforcement method of the present invention also includes inserting a reinforcement pile in the grid plate, and the reinforcement pile can further strengthen the soil around the pile foundation. The cover plate is arranged on the grid plate, which can prevent water from scouring the soil around the pile foundation. By grouting between the grid plate and the reinforcement pile, it is possible to avoid leaving a gap between the grid plate and the reinforcement pile, which causes soil loss due to water scouring, and the grid plate, the reinforcement pile and the cover plate can be connected into a stable whole, further strengthening the soil around the pile foundation. Therefore, the method for reinforcing the in-situ soil around a single offshore wind power pile of the present invention can effectively strengthen the soil around the pile foundation, slow down the speed of soil and water loss of the soil around the pile foundation, and help improve the stability of the pile foundation.
[0037] The in-situ soil reinforcement device around the offshore wind power single pile of the second aspect of the present invention mainly includes a grid plate, a reinforcement pile, a cover plate, and a reinforcement layer formed between the grid plate and the reinforcement pile. The grid plate is inserted into the soil around the pile foundation, which can reinforce the soil around the pile foundation, improve the stress condition of the soil around the pile foundation, and slow down the loss of soil around the pile foundation. The reinforcement pile can further strengthen the soil around the pile foundation. The cover plate is arranged on the grid plate, which can prevent water from scouring the soil around the pile foundation. By grouting between the grid plate and the reinforcement pile, it is possible to avoid leaving a gap between the grid plate and the reinforcement pile, which causes water scouring and soil and water loss, and the grid plate, the reinforcement pile and the cover plate can be connected into a stable whole, further enhancing the reliability of the in-situ soil reinforcement device around the offshore wind power single pile. Therefore, the in-situ soil reinforcement device around the offshore wind power single pile of the present invention can reinforce the soil of the scouring pit, slow down the speed of soil and water loss of the soil around the pile foundation, and help improve the stability of the pile foundation. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0039] Figure 1 A flow chart showing an in-situ soil reinforcement method around an offshore wind power single pile according to Embodiment 1 of the present invention is shown;
[0040] Figure 2 A top view of an in-situ soil reinforcement device around an offshore wind power single pile according to Embodiment 2 of the present invention;
[0041] Figure 3 This is a side view of a reinforced pile of the in-situ soil reinforcement device around an offshore wind power single pile according to Example 2 of the present invention.
[0042] Description of reference numerals:
[0043] 1. Pile foundation; 21. First half ring structure; 22. Second half ring structure; 3. Cover plate; 4. Reinforced piles; 41. First ring wing; 42. Second ring wing; 43. Shear bolts. DETAILED DESCRIPTION
[0044] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0045] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0046] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0047] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0048] Example 1
[0049] Figure 1 A flow chart of an in-situ soil reinforcement method around an offshore wind power single pile according to Embodiment 1 of the present invention is shown. Figure 2 FIG. 2 is a top view of an in-situ soil reinforcement device for offshore wind power single piles according to Embodiment 2 of the present invention. Figure 1 and Figure 2 As shown, the present invention relates to a method for reinforcing in-situ soil around an offshore wind power single pile, comprising step S1, step S2, step S3 and step S4.
[0050] Step S1 mainly includes: laying the grid plate around the pile foundation 1 , and inserting the grid plate into the soil around the pile foundation 1 .
[0051] Step S2 mainly includes: inserting reinforcement piles 4 into the grids of the grid plate.
[0052] Step S3 mainly includes: placing a cover plate 3 on the grid plate.
[0053] Step S4 mainly includes: grouting between the reinforcement piles 4 and the gaps between the grid plates.
[0054] The in-situ soil reinforcement method around the offshore wind power single pile of embodiment 1 of the present invention includes laying a grid plate around the pile foundation 1, and the grid plate is inserted into the soil around the pile foundation 1, which can strengthen the soil around the pile foundation 1, improve the stress condition of the soil around the pile foundation 1, and slow down the loss of soil around the pile foundation 1. On this basis, the reinforcement method of this embodiment also includes inserting a reinforcement pile 4 in the grid plate. The reinforcement pile 4 can further strengthen the soil around the pile foundation 1. The cover plate 3 is covered on the grid plate, which can prevent water from scouring the soil around the pile foundation 1. By grouting between the grid plate and the reinforcement pile 4, it is possible to avoid leaving a gap between the grid plate and the reinforcement pile 4, which causes water scouring and soil and water loss, and the grid plate, the reinforcement pile 4 and the cover plate 3 can be connected into a stable whole, further strengthening the soil around the pile foundation 1. Therefore, the in-situ soil reinforcement method around the offshore wind power single pile of this embodiment can reinforce the soil of the scouring pit, slow down the speed of soil and water loss of the soil around the pile foundation 1, and help improve the stability of the pile foundation.
[0055] Among them, the reinforcement pile 4 is preferably but not limited to a vibro-impact high-pressure pile, a jet-jet pile or a cylindrical pile. Preferably, in this embodiment, the pile foundation 1 is cylindrical. The grid plate can be pressed into the soil by a driving mechanism such as a hydraulic hammer. Preferably, in this embodiment, the reinforcement pile 4 is pressed into the soil by the negative pressure of a suction cylinder.
[0056] In this embodiment, the grid plate includes a first semi-ring structure 21, a second semi-ring structure 22, and a first connecting structure connected between the first semi-ring structure 21 and the second semi-ring structure 22. Step S1 mainly includes step S11 and step S12.
[0057] Step S11 mainly includes: splicing the first semi-ring structure 21 and the second semi-ring structure 22 on both sides of the pile foundation 1, so that the first semi-ring structure 21 and the second semi-ring structure 22 surround the pile foundation 1. The first semi-ring structure 21 and the second semi-ring structure 22 surround the pile foundation 1, which means that the first semi-ring structure 21 and the second semi-ring structure 22 are spliced into a ring structure surrounding the pile foundation 1.
[0058] Step S12 mainly includes: connecting the first half-ring structure 21 and the second half-ring structure 22 using a first connecting structure.
[0059] In such Figure 1In the embodiment shown, the mesh plate can also be optionally formed by splicing a plurality of petals, and a first connection structure is formed between two adjacent petals. The operator can sequentially splice the plurality of petals around the pile foundation 1, and sequentially connect the plurality of petals through the first connection structure to form a circular mesh plate. The first connection structure is preferably, but not limited to, a bolt connection assembly, a clamping assembly, or a riveted assembly. For example, in the present embodiment, the first semi-ring structure 21 and the second semi-ring structure 22 are connected by a mortise and tenon structure, which has high reliability and is not easily disconnected from the first semi-ring structure 21 and the second semi-ring structure 22 due to external vibration.
[0060] In this embodiment, step S1 preferably also includes step S13.
[0061] Step S13 mainly includes: pressing the mesh plate into the soil perpendicularly to the ground, so that the height of the top surface of the mesh plate is flush with the height of the soil around the pile foundation 1. The height of the soil around the pile foundation 1 is the height of the soil where the scouring pit is not formed. Therefore, when the mesh plate is vertically inserted into the soil and the top height is flush with the height of the soil around the pile foundation 1, the part of the mesh plate located in the scouring pit will be exposed from the surface of the scouring pit.
[0062] Preferably, in this embodiment, step S0 is also included before step S1. Step S0 mainly includes: scanning the range of the scour pit around the pile foundation 1, defining the point where the scour pit is at the maximum distance from the pile foundation 1 as the far point, and the distance between the far point and the axis of the pile foundation 1 is the outer circle radius of the grid plate. By setting in this way, it can be ensured that the range of the grid plate covers the entire scour pit, so as to effectively strengthen the place where soil loss occurs, and the construction cost will not be increased due to the excessive coverage of the grid plate.
[0063] In this embodiment, step S2 mainly includes step S21 and step S22.
[0064] Step S21 mainly includes: selecting a grid within the scouring pit around the pile foundation 1 to insert a reinforcement pile 4, and making the upper end of the reinforcement pile 4 flush with the upper end of the grid plate. Since the part of the grid plate located in the scouring pit will be exposed from the surface of the scouring pit, inserting the reinforcement pile 4 here can fill the scouring pit, avoid the vortex of water flow in the depression, thereby aggravating the scouring of the water flow here, and prevent the soil here from further loss.
[0065] Step S22 mainly includes: covering the mesh plate not in the scouring pit with a cover plate 3. The upper end of the mesh plate not in the scouring pit is flush with the surface of the soil, and there is no gap between the mesh plate and the soil, so only the cover plate 3 can significantly slow down the loss of water around the pile foundation 1.
[0066] The number of the reinforcement piles 4 can be selected as one. Preferably, in this embodiment, the number of the reinforcement piles 4 is two or more. Arranging the reinforcement piles 4 in multiple numbers can facilitate the production together with the grid plate, so that the reinforcement piles 4 can be stably embedded in the soil. A second connection structure is arranged between adjacent reinforcement piles 4, and step S2 preferably also includes steps S23 and S24.
[0067] Step S23 mainly includes inserting two or more reinforcement piles 4 into the grid of the grid plate in sequence.
[0068] Step S24 mainly includes fixing and connecting adjacent reinforcing piles 4 through the second connecting structure. The second connecting structure can connect multiple reinforcing piles 4 into a whole.
[0069] Example 2
[0070] Example 2 relates to an in-situ soil reinforcement device around an offshore wind power single pile. Figure 3 As shown, the in-situ soil reinforcement device around the offshore wind power monopile includes a grid plate, a reinforcement pile 4 and a cover plate 3. The grid plate is arranged around the pile foundation 1 and at least partially inserted into the soil. The reinforcement pile 4 is inserted into the grid of the grid plate, and a reinforcement layer is formed between the grid plate and the reinforcement pile 4. The cover plate 3 is covered on the grid plate and the reinforcement pile 4.
[0071] The reinforcement layer is formed by grouting between the grid plate and the reinforcement piles 4 .
[0072] The in-situ soil reinforcement device around the offshore wind power single pile of Example 2 mainly includes a grid plate, a reinforcement pile 4, a cover plate 3, and a reinforcement layer formed between the grid plate and the reinforcement pile 4. The grid plate is inserted into the soil around the pile foundation 1, which can reinforce the soil around the pile foundation 1, improve the stress condition of the soil around the pile foundation 1, and slow down the loss of soil around the pile foundation 1. The reinforcement pile 4 can further strengthen the soil around the pile foundation 1. The cover plate 3 is covered on the grid plate to prevent water from scouring the soil around the pile foundation 1. By grouting between the grid plate and the reinforcement pile 4, it is possible to avoid leaving a gap between the grid plate and the reinforcement pile 4, which causes water scouring and soil and water loss, and the grid plate, reinforcement pile 4 and cover plate 3 can be connected into a stable whole, further enhancing the reliability of the in-situ soil reinforcement device around the offshore wind power single pile. Therefore, the in-situ soil reinforcement device around the offshore wind power single pile of this embodiment can effectively strengthen the soil around the pile foundation 1, slow down the speed of soil and water loss around the pile foundation 1, and help to extend the service life of the pile foundation 1.
[0073] In this embodiment, the mesh plate is preferably pressed into the soil through a suction cylinder, and the grouting operation between the mesh plate and the reinforcement pile 4 is preferably achieved through the hole on the suction cylinder. In an embodiment not shown, a negative pressure hole and an exhaust hole are reserved on the cover plate 3, which can allow the operator to grout between the mesh plate and the reinforcement pile 4 through the negative pressure hole, and open the exhaust hole at the same time until the grout is filled and flows out.
[0074] The mesh plate is preferably, but not limited to, square, circular or elliptical. Preferably, in this embodiment, the mesh plate is annular, and the inner circle radius of the mesh plate is equal to the radius of the pile foundation 1. This allows the inner circle of the mesh plate to fit tightly with the pile foundation 1, preventing the pile foundation 1 and the mesh plate from being washed by water.
[0075] The scouring pit outside the pile foundation 1 is defined as the far point where the distance between the far point and the pile foundation 1 is the largest, and the outer circle radius of the grid plate is equal to the distance between the far point and the axis of the pile foundation 1. By setting in this way, it can be ensured that the range of the grid plate covers the entire scouring pit, so as to effectively strengthen the place where soil loss occurs, and the construction cost will not be increased due to the excessive coverage of the grid plate.
[0076] The thickness of the grid plate is preferably set to be equal to the diameter of the pile foundation 1. It can be effectively inserted into the surface soil to ensure the in-situ stability of the grid plate.
[0077] In this embodiment, the grid plate includes a first semi-ring structure 21, a second semi-ring structure 22, and a first connection structure connected between the first semi-ring structure 21 and the second semi-ring structure 22. The first connection structure is preferably, but not limited to, a bolt connection assembly, a clamping assembly, or a riveted assembly, etc. For example, in this embodiment, the first semi-ring structure 21 and the second semi-ring structure 22 are connected by a mortise and tenon structure, which has high reliability.
[0078] The first reinforcement pile and the second reinforcement pile are preferably connected to each other by a bolt connection assembly, a clamping assembly, a riveting assembly or a mortise and tenon structure, but not limited thereto. Preferably, in this embodiment, one of the two adjacent reinforcement piles 4 is defined as the first reinforcement pile, and the other is defined as the second reinforcement pile, and the second connection structure preferably includes a first ring wing 41, a second ring wing 42 and a shear bolt 43. The shear bolt 43 can resist the lateral shear force, so that the connection between the first ring wing 41 and the second ring wing 42 is more reliable. The first ring wing 41 is arranged at the upper end of the first reinforcement pile, and the first ring wing 41 is provided with a first mounting hole extending in the height direction. The second ring wing 42 is arranged at the upper end of the second reinforcement pile, and the second ring wing 42 is provided with a second mounting hole extending in the height direction, and the flanges of the first ring wing 41 and the second ring wing 42 are staggered in the height direction. The shear bolt 43 is suitable for passing through the first mounting hole and the second mounting hole in sequence. The cover plate 3 is preferably formed with a through hole that allows the reinforcement pile 4 to pass through in a matching manner, so that after the cover plate 3 is covered on the reinforcement pile 4 and the cover plate 3 is covered on the grid plate, the reinforcement pile 4 passes through the through hole in a matching manner, and the top surface height of the cover plate 3 is just flush with the top surface height of the reinforcement pile 4. Preferably, in this embodiment, the sum of the thickness of the flanges of the first ring wing 41 and the second ring wing 42 is the thickness of the cover plate 3.
[0079] In summary, the in-situ soil reinforcement method around an offshore wind power single pile of Example 1 and the in-situ soil reinforcement device around an offshore wind power single pile of Example 2 of the present invention can reinforce the soil in the scour pit, slow down the soil and water loss around the reinforced pile foundation, and help improve the stability of the pile foundation.
[0080] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. An in-situ soil reinforcement device around an offshore wind power single pile, characterized in that: include: A grid plate is arranged around the pile foundation (1) and is at least partially inserted into the soil; Reinforcement piles (4) are inserted into the mesh of the mesh plate, and a reinforcement layer is formed between the mesh plate and the reinforcement piles (4); A cover plate (3) which covers the mesh plate and the reinforcement pile (4); It is defined that one of the two adjacent reinforcement piles (4) is a first reinforcement pile and the other is a second reinforcement pile, a second connection structure is connected between the first reinforcement pile and the second reinforcement pile, and the second connection structure comprises: A first ring wing (41) is arranged at the upper end of the first reinforcement pile, and a first mounting hole extending in a height direction is arranged on the first ring wing (41); A second ring wing (42) is arranged at the upper end of the second reinforcement pile, the second ring wing (42) is provided with a second mounting hole extending in the height direction, and the flanges of the first ring wing (41) and the second ring wing (42) are staggered in the height direction; A shear bolt (43) is adapted to pass through the first mounting hole and the second mounting hole in sequence.
2. The in-situ soil reinforcement device around an offshore wind power single pile according to claim 1, characterized in that: The grid plate is annular, and the inner radius of the grid plate is equal to the radius of the pile foundation (1); and / or, The point where the scour pit outside the pile foundation (1) is at the maximum distance from the pile foundation (1) is defined as the far point, and the outer circle radius of the grid plate is equal to the distance between the far point and the axis of the pile foundation (1); and / or, The thickness of the grid plate is equal to the diameter of the pile foundation (1).
3. The in-situ soil reinforcement device around an offshore wind power single pile according to claim 1, characterized in that: The grid plate comprises a first semi-ring structure (21), a second semi-ring structure (22), and a first connecting structure connected between the first semi-ring structure (21) and the second semi-ring structure (22).
4. A method for reinforcing in-situ soil around an offshore wind power single pile, used in an in-situ soil reinforcement device around an offshore wind power single pile as claimed in any one of claims 1 to 3, characterized in that: include: Laying a mesh plate around the pile foundation (1), and inserting the mesh plate into the soil around the pile foundation (1); Inserting reinforcement piles (4) into the grid of the grid plate; A cover plate (3) is provided on the grid plate; Grouting between the reinforcement pile (4) and the gap between the grid plate; The number of the reinforcement piles (4) is two or more, a second connection structure is provided between adjacent reinforcement piles (4), and the reinforcement piles (4) are inserted into the grid of the grid plate, comprising: Inserting two or more reinforcement piles (4) into the grid of the grid plate in sequence; Adjacent reinforcement piles (4) are fixedly connected via the second connection structure.
5. The method for reinforcing the in-situ soil around an offshore wind power single pile according to claim 4, characterized in that: The grid plate comprises a first semi-ring structure (21), a second semi-ring structure (22), and a first connection structure connected between the first semi-ring structure (21) and the second semi-ring structure (22), and the grid plate is laid around the pile foundation (1), comprising: splicing a first semi-ring structure (21) and a second semi-ring structure (22) on both sides of the pile foundation (1), so that the first semi-ring structure (21) and the second semi-ring structure (22) surround the pile foundation (1); The first half ring structure (21) and the second half ring structure (22) are connected using a first connecting structure.
6. The method for reinforcing the in-situ soil around an offshore wind power single pile according to claim 4, characterized in that: The step of laying the mesh plate around the pile foundation (1) also includes: The range of the scour pit around the pile foundation (1) is scanned, and the point where the scour pit is at the maximum distance from the pile foundation (1) is defined as the far point, and the distance between the far point and the axis of the pile foundation (1) is the outer circle radius of the grid plate.
7. The method for reinforcing the in-situ soil around an offshore wind power single pile according to claim 4, characterized in that: The step of inserting the mesh plate into the soil surrounding the pile foundation (1) comprises: The grid plate is pressed into the soil perpendicularly to the ground, so that the height of the top surface of the grid plate is flush with the height of the soil around the pile foundation (1).
8. The method for in-situ soil reinforcement around an offshore wind power single pile according to any one of claims 4 to 7, characterized in that: The reinforcing piles (4) are inserted into the grid of the grid plate, comprising: Selecting a grid within the scouring pit surrounding the pile foundation (1) to insert reinforcement piles (4), and making the upper end of the reinforcement pile (4) flush with the upper end of the grid plate; A cover plate (3) is placed on the mesh plate that is not within the scouring pit.
Citation Information
Patent Citations
Offshore fan combination-type single pile foundation and construction method thereof
CN110984212A
Offshore wind power reinforced single pile foundation and construction method thereof
CN111074926A
Repair structure and repair method for underwater foundation structure scour pit
CN113175014A
Siltation promoting and repairing device and method for local scoured pit
CN114855707A
Anti-scouring structure for single-pile foundation of offshore wind turbine generator and construction method of anti-scouring structure
CN115075283A