Rail bolt tightening monitoring system and method

Through the track bolt fastening monitoring system, the bolt preload of the track fastener is automatically detected by using force sensors and wireless transmission technology, which solves the problems of low manual detection efficiency and difficulty in fastening monitoring, and improves track stability and train Operational security.

CN116608985BActive Publication Date: 2024-11-01GUANGZHOU MUNICIPAL ENG TESTING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310521557.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-05-09
Publication Date
2024-11-01
Estimated Expiration
2043-05-09

AI Technical Summary

Technical Problem

The existing rail fastener tightness monitoring methods have high manual labor intensity and difficulty in finding loose fastener bolts, which leads to a high probability of failure of rail fasteners and low detection efficiency.

Method used

The track bolt fastening monitoring system is adopted, including a force sensor, a force measuring circuit, a track monitoring module and a monitoring terminal. The force measuring sensor detects the bolt preload force of the track fastener through the force measuring sensor. The force measuring circuit converts the signal into an electrical signal. Transmitted to the track monitoring module for analysis, evaluate track stability, and generate operation adjustment instructions to improve train operation safety.

Benefits of technology

It improves the automation of track fastener tightness monitoring, reduces the labor intensity of manual inspection, enhances track stability assessment and train operation safety, and reduces track life loss.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116608985B_ABST
    Figure CN116608985B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of track detection, and discloses a rail bolt tightening monitoring system and method. The rail bolt tightening monitoring system includes a plurality of force sensors for detecting the pre-tightening force of rail fasteners of the track to be monitored, each of the force sensors is electrically connected to a force measuring circuit, each of the force measuring circuits is wirelessly connected to a track monitoring module, and the track monitoring module is electrically connected to a monitoring terminal. The present application has the effect of improving the degree of automation of rail fastener tightening monitoring.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of track detection, and in particular to a track bolt tightening monitoring system and method. Background Art

[0002] The stability of track installation is crucial to the safety of rail transit. Therefore, in order to ensure the continued safe operation of rail transit, the stability of the track needs to be continuously monitored.

[0003] The key to track stability monitoring is to monitor the stability of track fasteners. Track fasteners are the key structures of the track. Their main functions are to maintain the track gauge, increase rigidity, and suppress rail deformation and track creep. If the track fasteners fail, the elasticity, track gauge, and smoothness of the track will change, increasing the risk of train derailment. Track fastener failure is mainly manifested as: track fasteners loosening and missing, track fasteners loosening, and spring bar breakage. Among them, track fastener missing and spring bar breakage are easier to detect, and existing track inspection trains have this function.

[0004] Rail fasteners are composed of bolts, nuts, spring bars, flat washers, etc. The key to the force is the fastening bolts and spring bar system. Under the impact of dynamic force, the fastening bolts loosen, resulting in stress relaxation of the spring bars. This is the most common failure form of rail fasteners. The probability of occurrence is high, but it is difficult to detect. Currently, it is usually checked manually with a feeler gauge in proportion, which requires workers to work at night and bend over frequently, with high labor intensity and a huge number of rail fasteners that need to be checked.

[0005] Therefore, with respect to the above-mentioned related technologies, the inventors believe that the existing rail fastener tightness monitoring methods have the problem of high manual labor intensity. Summary of the invention

[0006] In order to improve the automation level of rail fastener tightness monitoring, the present application provides a rail bolt tightness monitoring system and method.

[0007] The first invention objective of this application is achieved by adopting the following technical solution:

[0008] A rail bolt tightening monitoring system includes a plurality of force sensors for detecting the pre-tightening force of rail fasteners of the track to be monitored, each of the force sensors is electrically connected to a force measuring circuit, each of the force measuring circuits is wirelessly connected to a track monitoring module, and the track monitoring module is electrically connected to a monitoring terminal.

[0009] By adopting the above technical solution, the rail bolt tightening monitoring system includes a force sensor, a force measuring circuit, a rail monitoring module and a monitoring terminal, wherein the force sensor is used to detect the bolt preload of each rail fastener on the track to be monitored, detect the deformation of the rail fastener and convert it into electrical quantity, the force measuring circuit is used to convert the electrical signal output by the force sensor into a signal that is convenient for the computer module to process, each force measuring circuit is wirelessly connected to the rail monitoring module so as to transmit the measured preload data to the rail monitoring module for analysis to evaluate the stability of the track, and the rail monitoring module is electrically connected to the monitoring terminal so as to send a corresponding signal to the monitoring terminal according to the stability evaluation conclusion of the track.

[0010] In a preferred example of the present application: the force measuring circuit is electrically connected to a LORA transmitting module, the track monitoring module is electrically connected to a LORA receiving module, and the LORA transmitting module is wirelessly connected to the LORA receiving module.

[0011] By adopting the above technical solution, the force measuring circuit is electrically connected to the LORA transmitting module, and the track monitoring module is electrically connected to the LORA receiving module, which facilitates the LORA wireless connection between the force measuring circuit and the track monitoring module, and has the characteristics of long transmission distance, low working power consumption, multiple networking nodes, strong anti-interference, and low cost.

[0012] In a preferred example of the present application: the track monitoring module includes:

[0013] A track monitoring model building module, used to obtain the design drawings of the track to be monitored, build a track monitoring model based on the design drawings and mark the positions of the track fasteners, wherein the design drawings are marked with the size parameters of each structure of the track to be monitored;

[0014] A track segment division module, used to divide the track segments and determine the type information of each track segment based on the track monitoring model, wherein the type information includes a straight segment, an undulating segment, and a curved segment;

[0015] A track performance parameter analysis module is used to obtain the preload monitoring data of the track fasteners of each track section, and calculate the corresponding track performance parameters based on the type information of each track section and the preload monitoring data;

[0016] The operation adjustment instruction generation module is used to obtain the operation information of each train, generate the operation adjustment instruction based on the track performance parameters of each track section within the train operation range and the train operation information, and send it to the corresponding train terminal. The operation information includes the operation range information and load information.

[0017] By adopting the above technical solution, the design drawings of the track to be monitored are obtained, wherein the information of the design drawings includes the dimensional parameters of each structure of the track facilities, and a track monitoring model of the track to be monitored is constructed based on the design drawings, so as to digitize the structure of the track to be monitored, so as to facilitate the subsequent analysis of the performance of each section of the track to be monitored, and mark the position information of each track fastener in the track monitoring model, so as to facilitate the subsequent marking of the measured track fastener preload monitoring data on the track monitoring model; based on the track monitoring model, the ups and downs and curvature of the track are analyzed, the track to be monitored is divided into several track segments, and the type information of each track segment is determined, and the types of track segments include straight segments, Undulating sections and curved sections; obtaining the preload monitoring data of all track fasteners of each track section, and calculating the track performance parameters of each track section according to the type information of each track section and the measured preload monitoring data, so as to determine the impact that each track section can withstand; obtaining the operation information of each train, including the operation range information and load information, and determining the speed and load limit of the train on each track section according to the track performance parameters of each track section within the train operation range and the operation information of the train, so as to generate operation adjustment instructions and send them to the corresponding train terminal, so as to facilitate the train driver to adjust the train operation, thereby improving the safety of train operation and reducing the loss of track life.

[0018] The second invention objective of this application is achieved by the following technical solution:

[0019] A method for monitoring the tightening of rail bolts, comprising:

[0020] Obtaining design drawings of the track to be monitored, constructing a track monitoring model based on the design drawings and marking the positions of track fasteners, wherein the design drawings are marked with dimensional parameters of various structures of the track to be monitored;

[0021] Based on the track monitoring model, the track segments are divided and type information of each track segment is determined, wherein the type information includes a straight segment, an undulating segment, and a curved segment;

[0022] Acquire the preload monitoring data of the track fasteners of each track section, and calculate the corresponding track performance parameters based on the type information of each track section and the preload monitoring data;

[0023] The operation information of each train is obtained, and based on the track performance parameters of each track section within the train operation range and the train operation information, an operation adjustment instruction is generated and sent to the corresponding train terminal, wherein the operation information includes the operation range information and the load information.

[0024] By adopting the above technical solution, the design drawings of the track to be monitored are obtained, wherein the information of the design drawings includes the dimensional parameters of each structure of the track facilities, and a track monitoring model of the track to be monitored is constructed based on the design drawings, so as to digitize the structure of the track to be monitored, so as to facilitate the subsequent analysis of the performance of each section of the track to be monitored, and mark the position information of each track fastener in the track monitoring model, so as to facilitate the subsequent marking of the measured track fastener preload monitoring data on the track monitoring model; based on the track monitoring model, the ups and downs and curvature of the track are analyzed, the track to be monitored is divided into several track segments, and the type information of each track segment is determined, and the types of track segments include straight segments, Undulating sections and curved sections; obtaining the preload monitoring data of all track fasteners of each track section, and calculating the track performance parameters of each track section according to the type information of each track section and the measured preload monitoring data, so as to determine the impact that each track section can withstand; obtaining the operation information of each train, including the operation range information and load information, and determining the speed and load limit of the train on each track section according to the track performance parameters of each track section within the train operation range and the operation information of the train, so as to generate operation adjustment instructions and send them to the corresponding train terminal, so as to facilitate the train driver to adjust the train operation, thereby improving the safety of train operation and reducing the loss of track life.

[0025] In a preferred example of the present application, after the step of obtaining the preload monitoring data according to a preset data collection cycle and obtaining the preload monitoring data of the track fasteners of each track segment, the present application further includes:

[0026] Mark the preload monitoring data into the corresponding track monitoring model, and generate historical monitoring data based on the preload monitoring data and the corresponding time nodes;

[0027] Based on the preload monitoring data of each track section, a corresponding track maintenance report is generated and sent to the corresponding maintenance personnel terminal.

[0028] By adopting the above technical solution, preload monitoring data is regularly acquired according to a preset data acquisition cycle, so as to reduce the computer resource requirements for preload monitoring data acquisition, analysis and storage; after the preload monitoring data of each track section is acquired, the latest acquired preload monitoring data is marked in the track monitoring model, and historical monitoring data is generated based on the acquisition time node corresponding to the preload monitoring data, so as to facilitate the subsequent analysis of historical changes in track performance; based on the current preload monitoring data of each track section, a corresponding track maintenance report is generated, and the maintenance report is sent to the corresponding maintenance personnel terminal, so as to facilitate the maintenance personnel to carry out targeted maintenance on loose track fasteners and improve the track maintenance efficiency.

[0029] In a preferred example of the present application, the step of obtaining the operation information of each train includes:

[0030] Based on the identification information of the target train, the operating section information and time efficiency requirement information of the target train are obtained from the train dispatch table, wherein the time efficiency requirement information includes a standard time efficiency value of the target train determined based on the train dispatch table;

[0031] Based on the identification information of the target train, a corresponding transport plan is obtained to determine the load information of the target train, where the load information is the maximum axle weight of the target train;

[0032] Generate train operation information based on the train's operating range information, time requirement information and load information.

[0033] By adopting the above technical solution, the unique identification information of the target train is obtained, so as to obtain the operating range information and time requirement information of the target train from the train dispatch table, so as to facilitate the determination of the track section that the target train needs to pass through, as well as the standard operating time and other time requirements of the target train; based on the identification information of the target train, the transportation plan set for the train is obtained, and the maximum axle weight data of the target train is obtained from the transportation plan as the load information; the obtained operating range information, time requirement information and load information are used to generate the train operation information, so as to know the operation plan of each train, so as to facilitate the subsequent adjustment of the bolt preload monitoring plan, the track fastener maintenance plan and the train operation plan according to the operation plan of each train.

[0034] In a preferred example of the present application, after the step of generating the train operation information based on the train operation range information, time requirement information and load information, the step includes:

[0035] Before the track maintenance period begins, obtain the train operation information of each track section in the next train operation period;

[0036] Based on the train operation information of each track section in the next train operation period and the current track performance parameters of each track section, the maintenance priority of each track section is evaluated.

[0037] By adopting the above technical solution, before the track maintenance period begins, the train operation information of each track section in the next train operation period is obtained to determine the load from the train that each track section needs to bear; combined with the current track performance parameters of each track section, it is evaluated whether each track section is overloaded or close to the maximum load, so as to evaluate the maintenance priority of each track section, so as to facilitate the subsequent track maintenance work according to the maintenance priority.

[0038] In a preferred example of the present application: the timeliness requirement information also includes an upper timeliness value and a lower timeliness value; after the step of generating the train operation information based on the train operation range information, the timeliness requirement information and the load information, the step further includes:

[0039] Based on the train operation information, determine whether the track performance parameters of each track section within the train operation range meet the train operation requirements;

[0040] If the track performance parameters of any track section do not meet the train operation requirements, determine whether the track performance parameters of each track section when the train runs at the lower limit time effectiveness value meet the train operation requirements. If yes, generate a speed adjustment instruction and send it to the corresponding train terminal and the train terminal of the adjacent train;

[0041] Determine whether the track performance parameters of each track section meet the train operation requirements when the train runs below the time limit value. If not, generate a load adjustment instruction and send it to the corresponding train terminal.

[0042] By adopting the above technical solution, in order to standardize the operation of trains, trains are usually required to operate according to a preset scheduling plan to reduce the possibility of trains arriving at specific stations too early or too late. The timeliness requirement information also includes an upper limit timeliness value and a lower limit timeliness value, which are used to determine the fastest operation timeliness requirement and the slowest operation timeliness requirement of the corresponding train; before the train departs from the station, according to the operation information of the train, it is judged whether the track performance parameters of each track section in the operation range of the train meet the requirements of the train when it runs at the standard timeliness value; if the track performance parameters of any track section in the operation range of the train do not meet the requirements, the performance requirements of the track when the train runs at the lower limit timeliness value are calculated, and it is further judged whether the track performance parameters of each track section meet the requirements. If they meet the requirements, a speed adjustment instruction is generated and sent to the train terminal of the train to improve the operation safety of the train by decelerating, and the speed adjustment instruction is sent to the train terminal of the adjacent train to facilitate the adjacent train to adjust the operation speed accordingly; if the track performance parameters of the track when the train runs at the lower limit timeliness value still cannot meet the requirements of the train, a load adjustment instruction is generated and sent to the corresponding train terminal to improve the operation safety of the train by reducing the load.

[0043] The third invention objective of this application is achieved by the following technical solution:

[0044] A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned rail bolt tightening monitoring method when executing the computer program.

[0045] The fourth invention objective of this application is achieved by the following technical solution:

[0046] A computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned rail bolt tightening monitoring method are implemented.

[0047] In summary, the present application includes at least one of the following beneficial technical effects:

[0048] 1. A rail bolt tightening monitoring system includes a force sensor, a force measuring circuit, a rail monitoring module and a monitoring terminal, wherein the force sensor is used to detect the bolt preload of each rail fastener on the track to be monitored, the force measuring circuit is used to convert the deformation measured by the force sensor into an electrical signal, each force measuring circuit is wirelessly connected to the rail monitoring module so as to transmit the measured preload data to the rail monitoring module for analysis to evaluate the stability of the track, and the rail monitoring module is electrically connected to the monitoring terminal so as to send a corresponding signal to the monitoring terminal according to the evaluation conclusion of the stability of the track.

[0049] 2. Obtain the design drawings of the track to be monitored, where the information in the design drawings includes the dimensional parameters of each structure of the track facilities, and build a track monitoring model of the track to be monitored based on the design drawings, so as to digitize the structure of the track to be monitored, which is convenient for the subsequent analysis of the performance of each section of the track to be monitored, and mark the position information of each track fastener in the track monitoring model, so as to facilitate the subsequent marking of the measured track fastener preload monitoring data on the track monitoring model; based on the track monitoring model, analyze the ups and downs and curvature of the track, divide the track to be monitored into several track segments, and determine the type information of each track segment, which includes straight segments, undulating segments and curved segments. track section; obtain the preload monitoring data of all track fasteners of each track section, calculate the track performance parameters of each track section according to the type information of each track section and the measured preload monitoring data, so as to judge the impact that each track section can withstand; obtain the operation information of each train, including the operation range information and load information, judge the speed and load limit of the train on each track section according to the track performance parameters of each track section in the train operation range and the operation information of the train, so as to generate the operation adjustment instruction and send it to the corresponding train terminal, so as to facilitate the train driver to adjust the train operation, thereby improving the safety of train operation and reducing the loss of track life.

[0050] 3. Before the track maintenance period begins, obtain the train operation information of each track section in the next train operation period to determine the load from the train that each track section needs to bear; combine the current track performance parameters of each track section to evaluate whether each track section is overloaded or close to the maximum load, so as to evaluate the maintenance priority of each track section, so as to facilitate the subsequent track maintenance work according to the maintenance priority. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 It is a structural schematic diagram of the rail bolt fastening monitoring system in Example 1 of the present application.

[0052] Figure 2 This is a principle block diagram of the track monitoring module of the present application.

[0053] Figure 3 It is a flow chart of the rail bolt tightening monitoring method in the second embodiment of the present application.

[0054] Figure 4 It is a flow chart of step S30 in the rail bolt tightening monitoring method of the present application.

[0055] Figure 5 It is a flow chart of step S40 in the rail bolt tightening monitoring method of the present application.

[0056] Figure 6 This is another flow chart of step S40 in the rail bolt tightening monitoring method of the present application.

[0057] Figure 7 It is another flow chart of the rail bolt tightening monitoring method of the present application.

[0058] Figure 8 It is a schematic diagram of the equipment in Example 3 of the present application.

[0059] Description of reference numerals:

[0060] 1. Force sensor; 2. Force measuring circuit; 21. LORA transmitting module; 3. Track monitoring module; 31. LORA receiving module; 4. Monitoring terminal. DETAILED DESCRIPTION

[0061] The following is combined with Figures 1 to 8 This application is described in further detail.

[0062] Embodiment 1

[0063] Reference Figure 1 The present application discloses a rail bolt tightening monitoring system, including a force sensor, a force measuring circuit, a rail monitoring module and a monitoring terminal. The force sensor is used to detect the preload force of the bolts of the rail fasteners on the track to be monitored, by detecting the deformation of the rail fasteners and converting it into electrical quantity. The force measuring circuit is used to convert the electrical signal output by the force sensor into a signal that is convenient for the computer module to process. The rail monitoring module is used to analyze the measured preload force data, generate the analysis results and send them to the monitoring terminal. The monitoring terminal is used to display the relevant information, so that the relevant staff can know the stability of each rail fastener in the track to be monitored.

[0064] The force sensor can specifically be a force washer, a nut sensor, an angle sensor or other types of sensors, which can be used to detect the preload force of the bolts of the track fasteners. The present embodiment uses a force washer, and the preload force of the corresponding bolt is determined by detecting the deformation of the force washer. A strain gauge for detecting the deformation is provided in the force washer, so as to convert the change in the deformation of the force washer into a change in the resistance value of the strain gauge. Since there are a large number of circuits in the prior art that detect the change in the resistance value of the strain gauge through a Wheatstone bridge or other forms, the present application will not elaborate on the principle of how to measure the bolt preload force through a strain gauge and output the measured preload force data in the form of an electrical signal; a number of force sensors are installed on each track fastener of the track to be monitored, specifically, force sensors are installed on all track fasteners, or force sensors are installed at even intervals or randomly installed, so as to reduce the monitoring cost of the track to be monitored.

[0065] Since the force measuring circuit is used to convert the electrical signal output by the force sensor into a signal that is convenient for the computer module to process, the force measuring circuit can be provided with an amplification circuit, a filtering circuit, and an analog-to-digital conversion circuit according to actual needs, so as to convert the electrical signal output by the force sensor into a signal that is convenient for the track monitoring module to process; in the present embodiment, each force sensor is electrically connected to a force measuring circuit.

[0066] Each force measuring circuit is electrically connected to a LORA transmitting module, and the track monitoring module is electrically connected to a LORA receiving module, so as to realize a radio connection between the force measuring circuit and the track monitoring module, so as to wirelessly transmit the preload data output by the force measuring circuit to the track monitoring module. In this embodiment, if the number of force measuring sensors does not exceed the maximum connection number of the LORA receiving module, the LORA transmitting modules of each force measuring circuit are connected to the same LORA receiving module and the corresponding track monitoring module; if the number exceeds the maximum connection number of the LORA receiving module, several LORA receiving modules and corresponding track monitoring modules can be added according to actual needs; the LoRa network has the characteristics of long transmission distance, low working power consumption, many networking nodes, strong anti-interference, low cost, etc., with a sensitivity of up to -148dBm, a communication distance of up to several kilometers, and can be powered by batteries for several years. The networking method is flexible and multiple nodes can be connected.

[0067] Reference Figure 2 The track monitoring module is used to analyze the preload data measured by each force sensor, including:

[0068] A track monitoring model building module, used to obtain the design drawings of the track to be monitored, build a track monitoring model based on the design drawings and mark the positions of the track fasteners, wherein the design drawings are marked with the size parameters of each structure of the track to be monitored;

[0069] A track segment division module, used to divide the track segments and determine the type information of each track segment based on the track monitoring model, wherein the type information includes a straight segment, an undulating segment, and a curved segment;

[0070] A track performance parameter analysis module is used to obtain the preload monitoring data of the track fasteners of each track section, and calculate the corresponding track performance parameters based on the type information of each track section and the preload monitoring data;

[0071] The operation adjustment instruction generation module is used to obtain the operation information of each train, generate the operation adjustment instruction based on the track performance parameters of each track section within the train operation range and the train operation information, and send it to the corresponding train terminal. The operation information includes the operation range information and load information.

[0072] The track monitoring module is electrically connected to the monitoring terminal, wherein the monitoring terminal includes a train terminal installed on the train, a dispatching terminal installed at the station, and a maintenance terminal carried by maintenance staff.

[0073] Embodiment 2

[0074] Reference Figure 3 The present application discloses a rail bolt tightening monitoring method, which can be used to control the rail bolt tightening monitoring system in the above-mentioned embodiment 1. In this embodiment, a control program is compiled according to the rail bolt tightening monitoring method, and the control program is stored in a rail monitoring module of the rail bolt tightening monitoring system, and the control program is executed by the rail monitoring module.

[0075] The present application discloses a method for monitoring the tightening of rail bolts, which specifically comprises the following steps:

[0076] S10: obtaining design drawings of the track to be monitored, constructing a track monitoring model based on the design drawings and marking positions of track fasteners, wherein the design drawings are marked with dimensional parameters of various structures of the track to be monitored.

[0077] In this embodiment, the track to be monitored refers to the track for which bolt preload monitoring is required by this method; the design drawing refers to the construction design drawing of the track to be monitored, which records the dimensional parameters of each structure of the track to be monitored, the material model or mechanical properties data, etc.; the track monitoring model refers to the BIM model established for the track to be monitored.

[0078] Specifically, the design drawings of the track to be monitored are obtained, and a BIM model of the track to be monitored is constructed as a track monitoring model according to the structural dimension parameters, material models, material mechanical property data, etc. recorded in the design drawings, so as to digitize the structure of the track to be monitored and facilitate the subsequent analysis of the performance of each section of the track to be monitored; the position information of all track fasteners is marked in the track monitoring model, so as to facilitate the subsequent marking of the measured track fastener preload monitoring data on the track monitoring model, which is convenient for analyzing the stability of the track fasteners at various locations of the track to be monitored on the one hand, and is also convenient for quickly locating the track fasteners to be maintained when track fastener maintenance is required.

[0079] S20: Based on the track monitoring model, the track segments are divided and type information of each track segment is determined, where the type information includes a straight segment, an undulating segment, and a curved segment.

[0080] In this embodiment, the type information of the track segment includes a straight segment, an undulating segment and a curved segment, wherein the type information of the track segment is judged based on a preset altitude change threshold and a turning radius threshold. A straight segment refers to a track segment whose altitude fluctuation is less than the altitude change threshold and whose turning radius at the bend is greater than the turning radius threshold; an undulating segment refers to a track segment whose altitude fluctuation is greater than the altitude change threshold and whose turning radius at the bend is greater than the turning radius threshold; a curved segment refers to a track segment whose turning radius at the bend is less than the turning radius threshold; wherein the altitude change threshold and the turning radius threshold can be set according to actual needs.

[0081] When a train runs on a slope or curve, the force exerted by the train on the track is significantly different from that exerted by the train on a straight track.

[0082] Specifically, based on the track monitoring model, the ups and downs and curvature of each track section in the track to be monitored are analyzed, the track to be monitored is divided into several track sections, and the type information of each track section is determined, including straight sections, undulating sections and curved sections, so as to facilitate the subsequent corresponding analysis of the forces that different types of track sections to be monitored can withstand from trains.

[0083] S30: Acquire the preload monitoring data of the track fasteners of each track segment, and calculate the corresponding track performance parameters based on the type information of each track segment and the preload monitoring data.

[0084] In this embodiment, the preload monitoring data refers to the preload data measured by the force sensor installed on the track fastener; the track performance parameter refers to the parameter of the force that the track can withstand from the train, which is specifically recorded in the form of the weight and speed of the train that the track can withstand.

[0085] Specifically, the preload monitoring data of all track fasteners of each track segment is obtained, and the track performance parameters of each track segment are calculated based on the type information of each track segment and the measured preload monitoring data, so as to determine the current situation in which each track segment can withstand the force from the train; preferably, in order to further improve the safety of train operation, a safety factor can be introduced in the calculation of the track performance parameters.

[0086] Among them, Figure 4 As shown, after step S30, the following steps are included:

[0087] S31: Mark the preload monitoring data into the corresponding track monitoring model, and generate historical monitoring data based on the preload monitoring data and the corresponding time nodes.

[0088] In this embodiment, the period for acquiring the preload monitoring data is a preset data collection period; the historical monitoring data refers to data recording the historical preload monitoring data of each rail fastener.

[0089] Specifically, preload monitoring data is acquired regularly according to a preset data acquisition cycle so as to reduce the computer resource requirements for acquiring, analyzing and storing preload monitoring data; after acquiring the preload monitoring data of each track segment, the most recently acquired preload monitoring data is marked in the track monitoring model so as to determine the stability of each track fastener in the current track to be monitored; historical monitoring data is generated based on the time nodes corresponding to the acquired preload monitoring data, so as to facilitate the subsequent analysis of historical changes in track performance.

[0090] Specifically, if a train happens to pass through the corresponding track section when the preload monitoring data is obtained, the data is discarded to reduce the impact of bolt preload measurement during train operation on the accuracy of the preload monitoring data.

[0091] S32: Based on the preload monitoring data of each track section, a corresponding track maintenance report is generated and sent to the corresponding maintenance personnel terminal.

[0092] In this embodiment, the track maintenance report refers to a report used to record the items that need to be inspected in the monitored track and the specific locations where the maintenance work is performed. The generation cycle of the track maintenance report corresponds to the data collection cycle; the maintenance personnel terminal is a type of track monitoring terminal disclosed in Example 1.

[0093] Specifically, based on the current preload monitoring data of each track section, the stability of each track fastener is determined, thereby determining the location of key track fasteners that need to be inspected and repaired, and generating a track maintenance report; the inspection report is sent to the corresponding maintenance personnel terminal to facilitate maintenance personnel to carry out targeted maintenance on loose track fasteners and improve track maintenance efficiency.

[0094] S40: Obtain the operation information of each train, generate an operation adjustment instruction based on the track performance parameters of each track section within the train operation range and the train operation information, and send it to the corresponding train terminal, wherein the operation information includes the operation range information and the load information.

[0095] In this embodiment, the train operation information refers to the information used to record the train operation plan, including the train operation range information and load information; the operation adjustment instruction refers to the instruction used to guide the train driver or train dispatcher to adjust the train operation mode on the track to be monitored; the train terminal refers to the track monitoring terminal installed in the train cab.

[0096] Specifically, based on the track performance parameters of each track section within the train operating range and the train operating information, the speed limit and load limit of the train when traveling on each track section are calculated to generate an operation adjustment instruction and send it to the corresponding train terminal, so that the train driver can adjust the operation of the train under the guidance of the operation adjustment instruction, thereby improving the safety of train operation and reducing the loss of track life.

[0097] Among them, Figure 5 As shown, in step S40, the step of obtaining the operation information of each train includes:

[0098] S41: Based on the identification information of the target train, the operating range information and time requirement information of the target train are obtained from the train dispatch table, wherein the time requirement information includes a standard time value of the target train determined based on the train dispatch table.

[0099] In this embodiment, identification information refers to unique identification information used to distinguish different trains, which may specifically be the train number; the train dispatch table refers to a form used to record the train operation plan; the operation range information refers to information recording the track sections that the train needs to pass through when running; and the timeliness requirement information refers to information used to record the timeliness requirements for the train to arrive at the destination station in the train operation plan.

[0100] Specifically, the unique identification information of the target train is obtained to obtain the operating range information and time requirement information of the target train from the train dispatch table; thereby facilitating the determination of the track section that the target train needs to pass through, as well as the standard operating time and other time requirements of the target train; wherein the time requirement information includes the standard time value, that is, information on the estimated time of arrival at each station arranged according to the train dispatch table.

[0101] Furthermore, the upper and lower limits of the time requirement information of the target train are determined based on the standard time requirements of the trains ahead and behind the target train to prevent the possibility of conflicts in the scheduling plans of various trains due to unreasonable settings of the upper and lower limits of the time requirement information.

[0102] S42: Based on the identification information of the target train, a corresponding transportation plan is obtained to determine the load information of the target train, where the load information is the maximum axle weight of the target train.

[0103] In this embodiment, the transport plan refers to a load plan for train operation.

[0104] Specifically, based on the identification information of the target train, the transport plan set for the train is obtained, the weight of each car of the target train is determined according to the transport plan, and the maximum axle weight data of the target train is calculated according to the number of axles of each car of the target train as load information, so as to facilitate subsequent analysis of the maximum force applied by the target train to the track to be inspected.

[0105] S43: Generate train operation information based on the train operation range information, time requirement information and load information.

[0106] Specifically, the train operation information is generated based on the acquired train operation range information, time requirement information and load information, so as to know the operation plan of each train, and facilitate the subsequent evaluation of the force exerted on the track during the operation of the train and the safety of the train operation according to the train operation information; and it is convenient to adjust the bolt preload monitoring plan, track fastener maintenance plan and train operation plan according to the operation plan of each train.

[0107] Furthermore, the load information can also be determined and corrected according to actual needs by measuring the maximum axle weight data of the train.

[0108] Among them, Figure 6 As shown, after step S43, the following steps are included:

[0109] S44: Based on the train operation information, determine whether the track performance parameters of each track section within the train operation range meet the train operation requirements.

[0110] Specifically, in order to standardize the operation of trains, trains are usually required to run according to pre-established scheduling plans, so as to reduce the possibility of trains arriving at specific stations too early or too late. The timeliness requirement information also includes an upper limit timeliness value and a lower limit timeliness value, which are used to determine the fastest and slowest timeliness requirements of the corresponding trains. Before the train departs from the station, based on the train's operation information, it is determined whether the track performance parameters of each track section within the train's operating range meet the requirements of the train when running at the standard timeliness values. If so, the train is ordered to run according to the standard timeliness values.

[0111] S45: If the track performance parameters of any track section do not meet the train operation requirements, determine whether the track performance parameters of each track section meet the train operation requirements when the train runs at the lower limit time value. If yes, generate a speed adjustment instruction and send it to the corresponding train terminal and the train terminal of the adjacent train.

[0112] Specifically, if the track performance parameters of any track section within the operating range of the train do not meet the requirements for the train to run at the standard time efficiency values, the performance requirements for the track when the train runs at the lower limit time efficiency values ​​are calculated, and it is further determined whether the track performance parameters of each track section meet the operating requirements of the train when the train runs at the lower limit time efficiency values; if so, a speed adjustment instruction is generated and sent to the train terminal of the train to improve the operating safety of the train by decelerating the speed, without adjusting the load condition of the train.

[0113] Furthermore, while sending the speed adjustment instruction to the train terminal of the train to be adjusted, the speed adjustment instruction also needs to be sent to the train terminals of adjacent trains, where the adjacent trains include the train in front and behind the train to be adjusted, so as to prompt the adjacent trains to adjust their running speeds accordingly and reduce the possibility of collision between the train to be adjusted and the trains in front and behind.

[0114] S46: Determine whether the track performance parameters of each track section when the train runs below the time limit value meet the train operation requirements. If not, generate a load adjustment instruction and send it to the corresponding train terminal.

[0115] In this embodiment,

[0116] Specifically, if after calculation, the track performance parameters of the track still cannot meet the operating requirements of the train when the train runs at the lower limit time value, a load adjustment instruction is generated and sent to the corresponding train terminal to prompt the staff to reduce the load of the train, thereby improving the operating safety of the train by reducing the load.

[0117] Among them, Figure 7 As shown, after step S43, the rail bolt fastening monitoring method further includes:

[0118] S50: Before the track maintenance period begins, the train operation information of each track section in the next train operation period is obtained.

[0119] In this embodiment, the track maintenance period refers to a time period dedicated to performing track maintenance work during the window period when no trains are running on the track to be monitored; and the train operation period refers to a time period when trains are running intensively on the track to be monitored.

[0120] Specifically, before the track maintenance period begins, the operation information of the trains that may pass on each track segment in the next train operation period is obtained to determine the force from the train that each track segment needs to bear.

[0121] S60: Evaluate the maintenance priority of each track section based on the train operation information of each track section in the next train operation time period and the current track performance parameters of each track section.

[0122] Specifically, based on the track performance parameters calculated in the most recent data collection cycle for each track section, it is evaluated whether each track section is overloaded or close to the rated load of the track section during the next train operation period, so as to evaluate the maintenance priority of each track section. Among them, if the track section is about to be overloaded, it has the highest maintenance priority. If none of the track sections will be overloaded, the maintenance priority is determined based on the degree of proximity between the maximum load borne by each track section during the next train operation period and the rated load of each track section, so as to facilitate the subsequent track maintenance work according to the maintenance priority.

[0123] Furthermore, a track maintenance plan is generated based on the maintenance priority of each track section and the track maintenance report.

[0124] It should be understood that the serial numbers of the steps in the above embodiments do not imply a sequence of execution. The execution sequence of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0125] In the present application, the track monitoring module in the first embodiment corresponds to the track bolt tightening monitoring method in the above embodiment.

[0126] Among them, the track performance parameter analysis module also includes:

[0127] A historical monitoring data generation submodule is used to mark the preload monitoring data into the corresponding track monitoring model, and generate historical monitoring data based on the preload monitoring data and the corresponding time nodes;

[0128] The track maintenance report generation submodule is used to generate the corresponding track maintenance report based on the preload monitoring data of each track section and send it to the corresponding maintenance personnel terminal.

[0129] The operation adjustment instruction generation module further includes:

[0130] The interval timeliness information acquisition submodule is used to acquire the operation interval information and timeliness requirement information of the target train from the train dispatch table based on the identification information of the target train, wherein the timeliness requirement information includes the standard speed value of the target train determined based on the train dispatch table;

[0131] A load information calculation submodule, used to obtain a corresponding transport plan based on the identification information of the target train to determine the load information of the target train, wherein the load information is the maximum axle weight of the target train;

[0132] An operation information generation submodule is used to generate train operation information based on the train operation range information, time requirement information and load information;

[0133] The operation demand judgment submodule is used to judge whether the track performance parameters of each track section within the train operation section meet the train operation demand based on the train operation information;

[0134] The speed adjustment instruction generation submodule is used to determine whether the track performance parameters of each track section when the train runs at the lower limit time value meet the train operation requirements if the track performance parameters of any track section do not meet the train operation requirements. If so, generate a speed adjustment instruction and send it to the corresponding train terminal and the train terminal of the adjacent train;

[0135] The load adjustment instruction generation submodule is used to determine whether the track performance parameters of each track section when the train is running below the time limit value meet the train operation requirements. If not, a load adjustment instruction is generated and sent to the corresponding train terminal.

[0136] The track monitoring module also includes:

[0137] The track maintenance preparation module is used to obtain the train operation information of each track section in the next train operation period before the track maintenance period starts;

[0138] The maintenance priority evaluation module is used to evaluate the maintenance priority of each track section based on the train operation information of each track section in the next train operation period and the current track performance parameters of each track section.

[0139] For the specific definition of the track monitoring module, please refer to the definition of the track bolt tightening monitoring method mentioned above, which will not be repeated here; each module in the above-mentioned track monitoring module can be implemented in whole or in part by software, hardware and their combination; each of the above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the corresponding operations of each of the above modules.

[0140] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 8As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data such as track monitoring models, type information of each track segment, preload monitoring data, track performance parameters, operation information of each train and operation adjustment instructions. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for monitoring the tightening of rail bolts is implemented.

[0141] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program:

[0142] S10: obtaining a design drawing of the track to be monitored, constructing a track monitoring model based on the design drawing and marking the positions of track fasteners, wherein the design drawing marks the size parameters of each structure of the track to be monitored;

[0143] S20: Based on the track monitoring model, divide the track segments and determine the type information of each track segment, where the type information includes a straight segment, an undulating segment, and a curved segment;

[0144] S30: acquiring preload monitoring data of the track fasteners of each track segment, and calculating corresponding track performance parameters based on type information of each track segment and the preload monitoring data;

[0145] S40: Obtain the operation information of each train, generate an operation adjustment instruction based on the track performance parameters of each track section within the train operation range and the train operation information, and send it to the corresponding train terminal, wherein the operation information includes the operation range information and the load information.

[0146] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:

[0147] S10: obtaining a design drawing of the track to be monitored, constructing a track monitoring model based on the design drawing and marking the positions of track fasteners, wherein the design drawing marks the size parameters of each structure of the track to be monitored;

[0148] S20: Based on the track monitoring model, divide the track segments and determine the type information of each track segment, where the type information includes a straight segment, an undulating segment, and a curved segment;

[0149] S30: acquiring preload monitoring data of the track fasteners of each track segment, and calculating corresponding track performance parameters based on type information of each track segment and the preload monitoring data;

[0150] S40: Obtain the operation information of each train, generate an operation adjustment instruction based on the track performance parameters of each track section within the train operation range and the train operation information, and send it to the corresponding train terminal, wherein the operation information includes the operation range information and the load information.

[0151] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink), DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0152] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.

[0153] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, it should be understood by those skilled in the art that the technical solutions described in the aforementioned embodiments may still be modified, or some of the features thereof may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A rail bolt tightening monitoring system, characterized in that: It includes several force sensors for detecting the preload force of the track fasteners of the track to be monitored, each of the force sensors is electrically connected to a force measuring circuit, each of the force measuring circuits is wirelessly connected to a track monitoring module, the track monitoring module is electrically connected to a monitoring terminal, the force measuring circuit is electrically connected to a LORA transmitting module, the track monitoring module is electrically connected to a LORA receiving module, the LORA transmitting module is wirelessly connected to the LORA receiving module, wherein the track monitoring module includes: A track monitoring model building module, used to obtain the design drawings of the track to be monitored, build a track monitoring model based on the design drawings and mark the positions of the track fasteners, wherein the design drawings are marked with the size parameters of each structure of the track to be monitored; A track segment division module, used to divide the track segments and determine the type information of each track segment based on the track monitoring model, wherein the type information includes a straight segment, an undulating segment, and a curved segment; A track performance parameter analysis module is used to obtain the preload monitoring data of the track fasteners of each track section, and calculate the corresponding track performance parameters based on the type information of each track section and the preload monitoring data; The operation adjustment instruction generation module is used to obtain the operation information of each train, generate the operation adjustment instruction based on the track performance parameters of each track section within the train operation range and the train operation information, and send it to the corresponding train terminal. The operation information includes the operation range information and load information.

2. A method for monitoring the tightening of rail bolts for controlling the system of claim 1, characterized in that: include: Obtaining design drawings of the track to be monitored, constructing a track monitoring model based on the design drawings and marking the positions of track fasteners, wherein the design drawings are marked with dimensional parameters of various structures of the track to be monitored; Based on the track monitoring model, the track segments are divided and type information of each track segment is determined, wherein the type information includes a straight segment, an undulating segment, and a curved segment; Acquire the preload monitoring data of the track fasteners of each track section, and calculate the corresponding track performance parameters based on the type information of each track section and the preload monitoring data; The operation information of each train is obtained, and based on the track performance parameters of each track section within the train operation range and the train operation information, an operation adjustment instruction is generated and sent to the corresponding train terminal, wherein the operation information includes the operation range information and the load information.

3. A method for monitoring rail bolt tightening according to claim 2, characterized in that: After the step of obtaining the preload monitoring data according to a preset data collection cycle and obtaining the preload monitoring data of the track fasteners of each track segment, the method further includes: Mark the preload monitoring data into the corresponding track monitoring model, and generate historical monitoring data based on the preload monitoring data and the corresponding time nodes; Based on the preload monitoring data of each track section, a corresponding track maintenance report is generated and sent to the corresponding maintenance personnel terminal.

4. A rail bolt tightening monitoring method according to claim 2, characterized in that: The steps of obtaining the operation information of each train include: Based on the identification information of the target train, the operating range information and time efficiency requirement information of the target train are obtained from the train dispatch table, wherein the time efficiency requirement information includes a standard speed value of the target train determined based on the train dispatch table; Based on the identification information of the target train, a corresponding transport plan is obtained to determine the load information of the target train, where the load information is the maximum axle weight of the target train; Generate train operation information based on the train's operating range information, time requirement information and load information.

5. A method for monitoring rail bolt tightening according to claim 4, characterized in that: After the step of generating the train operation information based on the train operation section information, time requirement information and load information, the method includes: Before the track maintenance period begins, obtain the train operation information of each track section in the next train operation period; Based on the train operation information of each track section in the next train operation period and the current track performance parameters of each track section, the maintenance priority of each track section is evaluated.

6. A method for monitoring rail bolt tightening according to claim 4, characterized in that: The timeliness requirement information also includes an upper timeliness value and a lower timeliness value; after the step of generating the train operation information based on the train operation range information, the timeliness requirement information and the load information, the method further includes: Based on the train operation information, determine whether the track performance parameters of each track section within the train operation range meet the train operation requirements; If the track performance parameters of any track section do not meet the train operation requirements, determine whether the track performance parameters of each track section when the train runs at the lower limit time effectiveness value meet the train operation requirements. If yes, generate a speed adjustment instruction and send it to the corresponding train terminal and the train terminal of the adjacent train; Determine whether the track performance parameters of each track section meet the train operation requirements when the train runs below the time limit value. If not, generate a load adjustment instruction and send it to the corresponding train terminal.

7. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the rail bolt tightening monitoring method according to any one of claims 2 to 6 are implemented.

8. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the rail bolt tightening monitoring method according to any one of claims 2 to 6 are implemented.