A distribution network dispatching control method considering flexible ramping and flexible standby

By introducing flexible ramping and flexible backup scheduling and control methods into the distribution network, and utilizing the flexibility resources of substations, energy storage power stations, and flexible loads, the scheduling strategy is optimized, which solves the problems of voltage deviation and power fluctuation in the distribution network and improves the reliability and economy of operation.

CN116667324BActive Publication Date: 2024-11-19STATE GRID JIANGSU ELECTRIC POWER CO LTD NANJING POWER SUPPLY COMPANY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310614627.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-05-26
Publication Date
2024-11-19
Estimated Expiration
2043-05-26

AI Technical Summary

Technical Problem

The existing power distribution network suffers from voltage deviation and excessive fluctuations in total power of substations during dispatching, resulting in unstable operation and poor economic efficiency.

Method used

By establishing a flexible ramping and flexible reserve distribution network dispatching and control method, utilizing the flexibility resources of substations, energy storage power stations and flexible loads, formulating flexible ramping and flexible reserve capacity constraints, and optimizing dispatching strategies to reduce voltage deviation and power fluctuations.

Benefits of technology

It effectively reduces voltage deviation and substation total power fluctuation during distribution network dispatching, and improves the operational reliability and economy of the distribution network.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116667324B_ABST
    Figure CN116667324B_ABST
Patent Text Reader

Abstract

The present invention specifically relates to a distribution network dispatching and control method taking flexible ramping and flexible standby into consideration, involving a database storing known distribution network operating parameters, lines and nodes of the distribution network, substations, photovoltaic power stations and energy storage power stations, and comprising the following steps: first establishing substation, flexible operating load and energy storage power station operation models; then establishing a regional power grid dispatching model; then adding flexible ramping and flexible standby constraints; finally solving the model and outputting the solution value; because the distribution network control method adds flexible ramping constraints and flexible standby capacity constraints to the flexibility resources in the distribution network, the flexible auxiliary mechanism of the flexibility resources is more perfect, so that the flexibility resources can better balance the distribution network voltage deviation caused by the access of distributed power sources to the distribution network and the total power fluctuation of the substation in the distribution network, so that the reliability and economy of the dispatching process of the distribution network are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention specifically relates to a distribution network dispatching control method taking flexible ramping and flexible standby into consideration, and belongs to the technical field of distribution network dispatching. Background Art

[0002] Distributed resources such as photovoltaics, energy storage, and electric vehicles have become an important way to transform the distribution network into a low-carbon one due to their low carbon emissions, high energy efficiency, and quick and easy installation. However, with the access of a large number of distributed resources to the distribution network, the operating losses and uncertainties on the grid side continue to increase, resulting in power supply instability (excessive voltage deviation) and large power fluctuations. This urgently requires the distribution network to have short-term rapid ramping capabilities and sufficient spare capacity to support the flexible and stable operation of the grid. However, the existing technology has not conducted detailed research on the flexible auxiliary mechanism of flexible resources (energy storage power stations, substations, etc.) with short-term rapid ramping capabilities and sufficient spare capacity in the distribution network, resulting in excessive voltage deviations and total power fluctuations of substations during the dispatch of the existing distribution network, which has a great impact on the reliability and economy of the distribution network dispatching process. Summary of the invention

[0003] The technical problem to be solved by the present invention is: how to reduce the voltage deviation and total power fluctuation of the substation during the distribution network dispatching process.

[0004] The technical solution proposed in the present invention is: a distribution network dispatching control method considering flexible ramping and flexible standby, involving a known database storing distribution network operating parameters, lines and nodes of the distribution network, substations, photovoltaic power stations and energy storage power stations, and the control method comprises the following steps:

[0005] Step 1: first divide the distribution network operating load parameters in the database into substation operating load, flexibility load and energy storage power station operating load; then establish a substation operating cost model and its constraints, a flexibility load response compensation cost model and its constraints, and an energy storage power station operating cost model and its constraints;

[0006] The substation operation cost model is shown in the following formula (1):

[0007]

[0008] In formula (1), w1 is the operating cost of the substation; i is the node i connected to the substation in the distribution network, N G is the set of nodes connecting the distribution network and the substation; c t is the electricity purchase price in period t; is the active power generated by the substation at node i during the tth period;

[0009] The flexibility load response compensation cost model is shown in the following formula (2):

[0010]

[0011] In formula (2), w2 is the compensation cost of flexible load response, and the flexible load includes the transferable load b and the curtailable load d; N LT is the set of transferable loads, N LS is the set of loads that can be cut; and are the unit response compensation prices of the load that can be transferred and the load that can be curtailed in period t, respectively; is the transfer power of the transferable load in the tth period; is the curtailed power of the curtailable load in period t;

[0012] The energy storage power station operation cost model is shown in the following formula (3):

[0013]

[0014] In formula (3), w3 is the operating cost of the energy storage power station, e is the energy storage unit in the energy storage power station; N ES is the energy storage unit collection; γ ES is the operating cost coefficient of the energy storage unit; and are the charging and discharging power of the energy storage unit in period t respectively;

[0015] Step 2: First, establish the distribution network dispatching cost model as shown in the following formula (4), then obtain the constraints of the distribution network dispatching cost model, and finally establish the distribution network dispatching objective function f(x) with the goal of minimizing the distribution network dispatching cost as shown in the following formula (5);

[0016]

[0017] In formula (4), t is the scheduling period; T is the total scheduling period;

[0018] f(x) = min w (5);

[0019] Step 3: Add flexible climbing constraints to the distribution network dispatch objective function f(x) through the following equations (6), (7), (8), (9), (10), (11) and (12);

[0020]

[0021]

[0022]

[0023]

[0024]

[0025]

[0026]

[0027] In formulas (6) to (12): represents the upward flexible ramping demand of the distribution network in period t, represents the downward flexible ramping demand required by the distribution network in period t; Represents the net load of the distribution network in period t. and They represent the uncertainty of the increase and decrease of net load in period t+1 respectively; and represents the upward and downward ramping demands provided by the substation at node i in period t; and They represent the upward and downward ramping requirements provided by the energy storage unit charging and discharging at node i in time period t respectively; and They represent the upward and downward ramping demands provided by the transferable load at time period t, respectively; and They represent the upward and downward ramping demands provided by the load that can be reduced in period t respectively;

[0028] Step 4: Add flexible reserve capacity constraints to the distribution network dispatch objective function f(x) through the following equations (13), (14), (15), (16), (17) and (18);

[0029]

[0030]

[0031]

[0032]

[0033]

[0034]

[0035] In formulas (13) to (18), represents the upper flexible reserve required by the distribution network in period t; represents the flexible reserve required by the distribution network in period t; α i represents the flexible reserve coefficient of photovoltaic power at node i; β i represents the flexible reserve coefficient of the flexibility load at node i; represents the predicted output of the photovoltaic power at node i in period t; and represents the upward and downward flexible reserve capacity provided by the substation at node i in period t; and They represent the upward and downward flexible reserve capacities provided by the charging and discharging of the energy storage unit at node i in period t, respectively; and They represent the upward and downward flexible reserve capacities provided by the transferable load at time period t, respectively; and They represent the upward and downward flexible reserve capacity provided by load curtailment at time period t, respectively;

[0036] Step 5: Use the GUROBI solver in the GAMS software to solve the distribution network dispatch objective function f(x) with the flexible ramp constraint and the flexible reserve capacity constraint added, and output the dispatch value of the distribution network according to the solution result in the GAMS software.

[0037] A further improvement of the above technical solution is that the substation operation cost model constraints in step 1 are as shown in the following equations (19), (20), (21) and (22):

[0038]

[0039]

[0040]

[0041]

[0042] In formulas (19) to (22), and are the minimum and maximum active powers generated by the substation at node i, respectively; and are the minimum and maximum reactive power generated by the substation at node i, respectively; represents the maximum power fluctuation allowed for node i; k i is the voltage offset coefficient of node i; V i,p is the square of the rated voltage amplitude of node i; Δ p is the average voltage offset of the main node of the distribution network.

[0043] A further improvement of the above technical solution is that the flexibility load response compensation cost model constraints in step 1 are as shown in the following equations (23), (24) and (25):

[0044]

[0045]

[0046]

[0047] In formulas (23) to (25): is the response state of the transferable load in period t; and is the minimum and maximum transfer power of the transferable load in period t; is the response state of the load that can be reduced in period t; is the maximum load reduction power that can be reduced in period t.

[0048] A further improvement of the above technical solution is that the energy storage power station operation cost model constraint in step 1 is as shown in the following formula (26):

[0049]

[0050] In formula (26), and are the charging state and discharging state of the energy storage unit at node i in time period t, respectively; and are the maximum power of the energy storage unit charging and discharging at node i in period t; E i,t is the energy storage capacity of node i in period t; η c and η d are the efficiency of energy storage charging and discharging respectively. and are the minimum and maximum amount of electricity that the energy storage unit can store at node i; is the switching state of the energy storage unit charging and discharging at the node i in the tth period; max It is the maximum number of charge and discharge state switching times allowed by the energy storage power station during the entire dispatch cycle.

[0051] A further improvement of the above technical solution is that the constraint conditions of the distribution network dispatching cost model in step 2 are as shown in the following equations (27), (28) and (29):

[0052]

[0053] Formula (27) is the second-order cone AC / DC branch power flow constraint, where the subscript i represents the node; N S is the set of AC and DC nodes; subscripts j and k represent the end and start of the branch respectively; F(i) represents the set of terminal nodes with node i as the head end; T(i) represents the set of head end nodes with node i as the end end; P i,t and Q i,t are the active and reactive power injected into node i in period t, respectively; Pij,t and Q ij,t are the active power and reactive power flowing through branch ij in period t respectively; P ki,t and Q ki,t are respectively the active power and reactive power flowing through branch ki in period t; l ki,t is the square of the current amplitude flowing through branch ki in the tth period; r ki and x ki are the resistance and reactance of branch ki respectively; V i,t represents the square of the voltage amplitude of node i in the tth period; B S Represents a collection of branches; is the active power injected by the PV into node i in period t; and are the reactive power injected into node i by the substation and PV at time period t, respectively; and are the charging and discharging powers of the energy storage unit at node i in period t, respectively; and are the active load and reactive load of node i in period t, respectively;

[0054]

[0055] Formula (28) is the photovoltaic grid-connected operation constraint. In formula (14), is the output curve coefficient of a single photovoltaic panel at node i in period t; is the number of photovoltaic panels connected to node i; E PV is the capacity of a single photovoltaic panel; is the predicted output of a single photovoltaic panel at node i in period t; is the maximum number of photovoltaic panels allowed to be connected to node i; β is the power factor angle; N PV A collection of nodes connected to photovoltaic panels;

[0056]

[0057] Formula (29) is the security constraint of the distribution network. In formula (15), V min and V max are the upper and lower limits of the square of the node voltage amplitude respectively; It is the upper limit of the square of the current amplitude in branch ij.

[0058] Beneficial effects: Since the distribution network control method adds flexible climbing constraints and flexible standby capacity constraints to the flexibility resources in the distribution network, the flexible auxiliary mechanism of the flexibility resources is more perfect, so that the flexibility resources can better balance the distribution network voltage deviation caused by the access of distributed power sources to the distribution network and the total power fluctuation of the substation in the distribution network, thereby improving the reliability and economy of the distribution network dispatching process. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] The following is a further description of a distribution network control method considering flexible climbing and flexible standby according to the present invention in conjunction with the accompanying drawings.

[0060] Figure 1 It is a flow chart of the present invention.

[0061] Figure 2 It is a comparison diagram of daily power fluctuation of substations with and without considering flexible ramping and flexible reserve constraints. DETAILED DESCRIPTION

[0062] The following is a further detailed description of a distribution network dispatching and control method taking into account flexible climbing and flexible standby according to the present invention in conjunction with the accompanying drawings and specific preferred embodiments.

[0063] A distribution network dispatching control method considering flexible ramping and flexible standby involves a known database storing distribution network operating parameters, distribution network lines and nodes, substations, photovoltaic power stations and energy storage power stations. The process of the control method is as follows Figure 1 As shown, the control method includes the following steps:

[0064] Step 1: First, divide the distribution network operating load parameters in the distribution network database into substation operating load, flexibility load and energy storage power station operating load; then establish the substation operating cost model and its constraints, the flexibility load response compensation cost model and its constraints, and the energy storage power station operating cost model and its constraints.

[0065] The specific steps are as follows:

[0066] Step 1.1: First, establish the substation operation cost model through the following formula (1), and then obtain the constraints of the substation operation cost model through the following formulas (19), (20), (21) and (22);

[0067]

[0068] In formula (1), w1 is the operating cost of the substation; i is the node i connected to the substation in the distribution network, N G is the set of nodes connecting the distribution network and the substation; c t is the electricity purchase price in period t; is the active power generated by the substation at node i during the tth period;

[0069]

[0070]

[0071]

[0072]

[0073] In formulas (19) to (22), and are the minimum and maximum active powers generated by the substation at node i, respectively; and are the minimum and maximum reactive power generated by the substation at node i, respectively; represents the maximum power fluctuation allowed for node i; k i is the voltage offset coefficient of node i; V i,p is the square of the rated voltage amplitude of node i; Δ p is the average voltage offset of the main node of the distribution network.

[0074] Step 1.2: First, establish the flexible load response compensation cost model through the following formula (2), and then obtain the constraints of the flexible load response compensation cost model through the following formulas (23), (24) and (25),

[0075]

[0076] In formula (2), w2 is the compensation cost of flexible load response, and the flexible load includes the transferable load b and the curtailable load d; N LT is the set of transferable loads; N LS is the set of loads that can be cut; and are the unit response compensation prices of the load that can be transferred and the load that can be curtailed in period t, respectively; is the transfer power of the transferable load in the tth period; is the curtailed power of the curtailable load in period t;

[0077]

[0078]

[0079]

[0080] In formulas (23) to (25): is the response state of the transferable load in period t; and is the minimum and maximum transfer power of the transferable load in period t; is the response state of the load that can be reduced in period t; is the maximum load reduction power that can be reduced in period t.

[0081] Step 1.3: First, establish the energy storage power station operation cost model through the following formula (3), and then obtain the constraint conditions of the energy storage power station operation cost model through the following formula (26):

[0082]

[0083] In formula (3), w3 is the operating cost of the energy storage power station, subscript e is the energy storage unit in the energy storage power station; N ES is the energy storage unit collection; γ ES is the operating cost coefficient of the energy storage unit; and are the charging and discharging power of the energy storage unit in period t respectively;

[0084]

[0085] In formula (26), and are the charging state and discharging state of the energy storage unit at node i in time period t, respectively; and are the maximum power of the energy storage unit charging and discharging at node i in period t; E i,t is the energy storage capacity of node i in period t; η c and η d are the efficiency of energy storage charging and discharging respectively. and are the minimum and maximum amount of electricity that the energy storage unit can store at node i; is the switching state of the energy storage unit charging and discharging at the node i in the tth period; max It is the maximum number of charge and discharge state switching times allowed by the energy storage power station during the entire dispatch cycle.

[0086] Step 2: First, establish the distribution network dispatching cost model through the following formula (4):

[0087]

[0088] In formula (4), t is the scheduling period; T is the total scheduling period;

[0089] Then the constraints of the distribution network dispatching cost model are obtained through the following equations (27), (28) and (29):

[0090]

[0091] Formula (27) is the second-order cone AC / DC branch power flow constraint. In formula (27), the subscript i represents the node; N S is the set of AC and DC nodes; subscripts j and k represent the end and start of the branch respectively; F(i) represents the set of terminal nodes with node i as the head end; T(i) represents the set of head end nodes with node i as the end end; P i,t and Q i,t are the active and reactive power injected into node i in period t, respectively; P ij,t and Q ij,t are the active power and reactive power flowing through branch ij in period t respectively; P ki,t and Q ki,t are respectively the active power and reactive power flowing through branch ki in period t; l ki,t is the square of the current amplitude flowing through branch ki in the tth period; r ki and x ki are the resistance and reactance of branch ki respectively; V i,t represents the square of the voltage amplitude of node i in the tth period; B S Represents a collection of branches; is the active power injected by the PV into node i in period t; and are the reactive power injected into node i by the substation and PV at time period t, respectively; and are the charging and discharging powers of the energy storage unit at node i in period t, respectively; and are the active load and reactive load of node i in period t, respectively;

[0092]

[0093] Formula (28) is the photovoltaic grid-connected operation constraint. In formula (28), is the output curve coefficient of a single photovoltaic panel at node i in period t; is the number of photovoltaic panels connected to node i; E PV is the capacity of a single photovoltaic panel; is the predicted output of a single photovoltaic panel at node i in period t; is the maximum number of photovoltaic panels allowed to be connected to node i; β is the power factor angle; N PV A collection of nodes connected to photovoltaic panels;

[0094]

[0095] Formula (29) is the security constraint of the distribution network. In formula (29), V min and V maxare the upper and lower limits of the square of the node voltage amplitude respectively; is the upper limit of the square of the current amplitude of branch ij;

[0096] Finally, with the goal of minimizing the distribution network dispatching cost, the distribution network dispatching objective function f(x) is established, as shown in the following formula (5):

[0097] f(x)=minw(5).

[0098] Step 3: Add flexible climbing constraints to the distribution network dispatching model through the following equations (6), (7), (8), (9), (10), (11) and (12), so that the substation operating load, energy storage power station operating load and flexible load have a certain range of flexible climbing capabilities to balance the power fluctuations caused by the access of distributed energy to the distribution network;

[0099]

[0100]

[0101]

[0102]

[0103]

[0104]

[0105]

[0106] In formulas (6) to (12): represents the upward flexible ramping demand of the distribution network in period t, represents the downward flexible ramping demand required by the distribution network in period t; Represents the net load of the distribution network in period t. and They represent the uncertainty of the increase and decrease of net load in period t+1 respectively; and represents the upward and downward ramping demands provided by the substation at node i in period t; and They represent the upward and downward ramping requirements provided by the energy storage unit charging and discharging at node i in time period t respectively; and They represent the upward and downward ramping demands provided by the transferable load at time period t, respectively; and They represent the upward and downward ramping demands provided by the load that can be reduced in period t respectively.

[0107] Step 4: Add flexible reserve capacity constraints to the distribution network dispatching model through the following equations (13), (14), (15), (16), (17) and (18), use the upper flexible reserve capacity provided by substations, energy storage stations and flexible loads to offset the impact of overestimating photovoltaic output, and use the lower flexible reserve capacity provided by substations, energy storage stations and flexible loads to offset the impact of underestimating photovoltaic output.

[0108]

[0109]

[0110]

[0111]

[0112]

[0113]

[0114] In formulas (13) to (18), represents the upper flexible reserve required by the distribution network in period t; represents the flexible reserve required by the distribution network in period t; α i represents the flexible reserve coefficient of photovoltaic power at node i; β i represents the flexible reserve coefficient of the flexibility load at node i; represents the predicted output of the photovoltaic power at node i in period t; and represents the upward and downward flexible reserve capacity provided by the substation at node i in period t; and They represent the upward and downward flexible reserve capacities provided by the charging and discharging of the energy storage unit at node i in period t, respectively; and They represent the upward and downward flexible reserve capacities provided by the transferable load at time period t, respectively; and They represent the upward and downward flexible reserve capacity provided by the load that can be reduced in period t.

[0115] Step 5: Use the GUROBI solver in the GAMS software to solve the distribution network dispatch objective function f(x) with the flexible ramping constraint and flexible reserve capacity constraint added in steps 3 and 4, and output the dispatch value of the distribution network according to the solution results in the GAMS software.

[0116] Through an example, a 33-node AC / DC distribution network is dispatched and controlled. The equipment parameters of the 33-node AC / DC distribution network are shown in Table 1. Two energy storage power stations (ES1 and ES2) are located at nodes 16 and 33 of the distribution network, and two photovoltaic panels (PV1 and PV2) are located at nodes 18 and 31.

[0117]

[0118]

[0119] Table 1 Equipment parameters

[0120] First, the GAMS software is used to solve the distribution network dispatching model without considering flexible ramping and flexible standby, and then the distribution network dispatching model considering flexible ramping and flexible standby is solved; first, the total voltage average offset and the total power fluctuation of the substation are solved according to formulas (21) and (22), and then the dispatching cost is solved by formula (5). The solution results are shown in Table 2 below. The daily power fluctuation comparison diagram of the substation considering flexible ramping and flexible standby constraints and not considering flexible ramping and flexible standby constraints is obtained, as shown in Figure 2 As shown,

[0121]

[0122] The results show that after using the distribution network dispatching and control method that takes into account flexible ramping and flexible standby, the total node voltage offset of the distribution network is reduced by 0.016pu, and the total power fluctuation of the substation is reduced by 0.235pu.

Claims

1. A distribution network dispatching and control method considering flexible ramping and flexible standby, involving a database storing distribution network operation parameters, lines and nodes of the distribution network, substations, photovoltaic power stations and energy storage power stations, Features: The control method comprises the following steps: Step 1: firstly divide the distribution network operation load parameters in the database into substation operation load, flexibility load and energy storage power station operation load; then establish a substation operation cost model and its constraints, a flexibility load response compensation cost model and its constraints and an energy storage power station operation cost model and its constraints; The substation operation cost model is shown in the following formula (1): In formula (1), w 1 is the operating cost of the substation; i is the node i where the distribution network connects to the substation, N G is the set of nodes connecting the distribution network and the substation; c t is the electricity purchase price in period t; is the active power generated by the substation at node i during the tth period; The flexibility load response compensation cost model is shown in the following formula (2): In formula (2), w 2 is the flexibility load response compensation cost, where flexibility load includes transferable load and curtailable load; subscript b is transferable load; N LT is the set of transferable loads; subscript d is the load that can be reduced; N LS is the set of loads that can be cut; and are the unit response compensation prices of the load that can be transferred and the load that can be curtailed in period t, respectively; is the transfer power of the transferable load in the tth period; is the curtailed power of the curtailable load in period t; The energy storage power station operation cost model is shown in the following formula (3): In formula (3), w 3 is the operating cost of the energy storage power station, subscript e is the energy storage unit in the energy storage power station; N ES is the collection of energy storage units; γ ES is the operating cost coefficient of the energy storage unit; and are the charging and discharging power of the energy storage unit in period t respectively; Step 2: First, establish a distribution network dispatching cost model, then obtain the constraints of the distribution network dispatching cost model, and finally establish the distribution network dispatching objective function f(x) with the goal of minimizing the distribution network dispatching cost; The distribution network dispatching cost model is shown in the following formula (4): In formula (4), t is the scheduling period; T is the total scheduling period; The distribution network dispatch objective function f(x) is shown in the following formula (5): f(x) = min w (5); Step 3: Add flexible climbing constraints to the distribution network dispatch objective function f(x) through the following equations (6), (7), (8), (9), (10), (11) and (12); In formulas (6) to (12): P t S,U represents the upward flexible ramping demand of the distribution network in period t, P t S,D P represents the downward flexible ramping demand of the distribution network in the t period; t PL represents the net load of the distribution network in the tth period; and They represent the uncertainty of the increase and decrease of net load in period t+1 respectively; and represents the upward and downward ramping demands provided by the substation at node i in period t; and They represent the upward and downward ramping requirements provided by the energy storage unit charging and discharging at node i in time period t respectively; and They represent the upward and downward ramping demands provided by the transferable load at time period t, respectively; and They represent the upward and downward ramping demands provided by the load that can be reduced in period t respectively; Step 4: Add flexible reserve capacity constraints to the distribution network dispatch objective function f(x) through the following equations (13), (14), (15), (16), (17) and (18); In formulas (13) to (18), represents the upper flexible reserve required by the distribution network in period t; represents the flexible reserve required by the distribution network in period t; α i represents the flexible reserve coefficient of photovoltaic power at node i; β i represents the flexible reserve coefficient of the flexibility load at node i; represents the predicted output of the photovoltaic power at node i in period t; and represents the upward and downward flexible reserve capacity provided by the substation at node i in period t; and They represent the upward and downward flexible reserve capacities provided by the charging and discharging of the energy storage unit at node i in period t, respectively; and They represent the upward and downward flexible reserve capacities provided by the transferable load at time period t, respectively; and They represent the upward and downward flexible reserve capacity provided by load curtailment at time period t, respectively; Step 5: Use the GUROBI solver in the GAMS software to solve the distribution network dispatch objective function f(x) with the flexible ramp constraint and the flexible reserve capacity constraint added, and output the dispatch value of the distribution network according to the solution result in the GAMS software.

2. The distribution network control method considering flexible ramping and flexible standby according to claim 1, Features: The substation operation cost model constraints in step 1 are as shown in equations (19), (20), (21) and (22): In formulas (19) to (22), and are the minimum and maximum active powers generated by the substation at node i, respectively; and are the minimum and maximum reactive power generated by the substation at node i; ΔP i max represents the maximum power fluctuation allowed for node i; k i is the voltage offset coefficient of node i; V i,p is the square of the rated voltage amplitude of node i; Δ p is the average voltage offset of the main node of the distribution network.

3. The distribution network control method considering flexible ramping and flexible standby according to claim 1, Features: The constraints of the flexibility load response compensation cost model in step 1 are shown in equations (23), (24) and (25): In formulas (23) to (25): is the response state of the transferable load in period t; and is the minimum and maximum transfer power of the transferable load in period t; is the response state of the load that can be reduced in period t; is the maximum load reduction power that can be reduced in period t.

4. The distribution network control method considering flexible ramping and flexible standby according to claim 1, Features: The energy storage power station operation cost model constraint in step 1 is shown in the following formula (26): In formula (26), and are the charging state and discharging state of the energy storage unit at node i in time period t, respectively; and are the maximum power of the energy storage unit charging and discharging at node i in period t; E i,t is the energy storage capacity of node i in period t; η c and η d are the efficiency of energy storage charging and discharging, respectively; and are the minimum and maximum amounts of electricity that the energy storage unit can store at node i.

5. The distribution network control method considering flexible ramping and flexible standby according to claim 1, Features: The constraints of the distribution network dispatching cost model in step 2 are shown in equations (27), (28) and (29): Formula (27) is the second-order cone AC / DC branch power flow constraint. In formula (27), the subscript i represents the node; N S is the set of AC and DC nodes; subscripts j and k represent the end and start of the branch respectively; F(i) represents the set of terminal nodes with node i as the head end; T(i) represents the set of head nodes with node i as the end; P i,t and Q i,t are the active and reactive power injected into node i in period t, respectively; P ij,t and Q ij,t are the active power and reactive power flowing through branch ij in period t respectively; P ki,t and Q ki,t are respectively the active power and reactive power flowing through branch ki in period t; l ki,t is the square of the current amplitude flowing through branch ki in the tth period; r ki and x ki are the resistance and reactance of branch ki respectively; V i,t represents the square of the voltage amplitude of node i in the tth period; B S Represents a collection of branches; is the active power injected by the PV into node i in period t; and are the reactive power injected into node i by the substation and PV at time period t, respectively; and are the charging and discharging powers of the energy storage unit at node i in period t, respectively; and are the active load and reactive load of node i in period t, respectively; Formula (28) is the photovoltaic grid-connected operation constraint. In formula (28), is the output curve coefficient of a single photovoltaic panel at node i in period t; is the number of photovoltaic panels connected to node i; E PV is the capacity of a single photovoltaic panel; is the predicted output of a single photovoltaic panel at node i in period t; is the maximum number of photovoltaic panels allowed to be connected to node i; β is the power factor angle; N PV A collection of nodes connected to photovoltaic panels; Formula (29) is the security constraint of the distribution network. In formula (29), V min and V max are the upper and lower limits of the square of the node voltage amplitude respectively; It is the upper limit of the square of the current amplitude in branch ij.