Steam turbine and steam turbine control method
By designing adjustable flow components and inlet structures in the steam turbine, and adjusting the flow process according to the steam flow rate, the problem of reduced efficiency of the steam turbine during peak operation is solved, and efficient operation and economic improvement under different powers are achieved.
Patent Information
- Application Number
- CN202310830207.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-07
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2043-07-07
AI Technical Summary
When high-power and high-parameter steam turbines are operated during peak regulation, the flow area is fixed due to changes in steam parameters, making it difficult to adapt to load fluctuations, reducing efficiency, and affecting the economics of the power plant.
Design a steam turbine that includes two flow components and a selectively openable inlet. The flow process is adjusted according to the steam flow rate to ensure ideal flow area and optimal efficiency under different powers.
It realizes the high-efficiency operation of the steam turbine in a wide power range and improves the efficiency and economy of peak-shaving operation.
Smart Images

Figure CN116733545B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power generation, and in particular to a steam turbine and a control method for the steam turbine. Background Art
[0002] Usually, the flow area of a high-power and high-parameter steam turbine is fixed due to the influence of steam parameters (pressure and temperature) and the limitation of turbine structure design. When designing the flow area of a steam turbine, the rated load point is usually used as the design basis. The flow efficiency of the steam turbine is the highest when it is running at rated power. When it deviates from this load point, the efficiency will gradually decrease. The more the load value deviates from the design point, the more obvious the efficiency decreases. When the steam turbine is running at peak load, the load fluctuation range is very large, and it often deviates from the rated load, which has a great impact on the economy of the power plant. In this case, the flow design of the steam turbine is difficult to adapt to the peak load operation requirements of the unit.
[0003] Therefore, how to make the steam turbine have a higher operating efficiency during peak load operation is a technical problem that needs to be solved urgently by technicians in this field. Summary of the invention
[0004] The object of the present invention is to provide a steam turbine capable of changing the flow path of steam in the through-flow as the power changes.
[0005] To achieve the above object, the present application provides a steam turbine, comprising a cylinder, wherein the cylinder has a first accommodating chamber, a second accommodating chamber, and a rotating shaft, wherein the rotating shaft simultaneously passes through the first accommodating chamber and the second accommodating chamber;
[0006] A first flow assembly is disposed inside the first accommodating cavity, and a cavity wall of the first accommodating cavity has a first inlet and a first outlet, which are respectively located at two axial ends of the first flow assembly;
[0007] A second flow assembly is disposed inside the second accommodating chamber, and a cavity wall of the second accommodating chamber has a second inlet and a second outlet, which are respectively located at two axial ends of the second flow assembly, and the first outlet is communicated with the second accommodating chamber;
[0008] Wherein, the first flow assembly and the second flow assembly each include at least one rotor blade and at least one stator, the rotor blade is connected to the rotating shaft, and the stator is connected to the cylinder;
[0009] When the steam turbine is in a first working state, the first inlet is in a state of being connected to an external steam pipeline, and the second inlet is in a state of being disconnected from the external steam pipeline;
[0010] When the steam turbine is in the second working state, the first inlet and the second inlet are both in communication with the external steam pipeline.
[0011] In an embodiment of the present invention, the flow assembly in the steam turbine includes at least two sections: a first flow assembly and a second flow assembly, and the accommodating chamber where the two flow assemblies are located is respectively provided with a first inlet and a second inlet, and the first inlet and the second inlet can be selectively opened according to the flow rate of steam entering the steam turbine, so that the flow flow of steam in the flow assembly can be changed as the power changes, so that the steam turbine can obtain an ideal flow area and optimal flow efficiency under various powers, and the steam turbine can operate efficiently within a wider power range.
[0012] Optionally, it further includes a first communication port, which is arranged on the cavity wall of the second accommodating cavity and located upstream of the second flow-through component, and the first outlet is connected to the first port through a first pipeline.
[0013] Optionally, a one-way valve is further provided on the first pipeline to control the one-way flow of steam from the first outlet to the first connecting port.
[0014] Optionally, the first communication port can also be connected to the external steam pipeline, and a flow control valve is provided on the communication pipeline between the first communication port and the external steam pipe.
[0015] Optionally, a third flow assembly is further provided inside the second accommodating chamber, and the third flow assembly is located downstream of the second flow assembly. A second communication port is further provided on the cavity wall of the second accommodating chamber, and is located between the second flow assembly and the third flow assembly. The second outlet is located downstream of the third flow assembly. The first outlet can also be communicated with the second communication port.
[0016] The third flow component also includes at least one rotor blade and at least one stator, wherein the rotor blade is connected to the rotating shaft, and the stator is connected to the cylinder.
[0017] Optionally, the first outlet and the second connecting port are connected via a second pipeline, and the second pipeline is further configured to be connected to a steam extraction pipeline, and a steam extraction valve is provided on the steam extraction pipeline.
[0018] Optionally, the first flow component and the second flow component both include one of a nozzle steam distribution structure and a throttling steam distribution structure, and the third flow component adopts a full-circle steam inlet structure.
[0019] Optionally, the steam turbine has an inner cavity, which is divided into the first accommodating cavity and the second accommodating cavity by a partition, the first accommodating cavity and the second accommodating cavity are arranged along the axial direction of the rotating shaft, the first inlet and the second inlet are located at the end of the corresponding accommodating cavity close to the partition, and the first outlet and the second outlet are located at the end of the corresponding accommodating cavity away from the partition.
[0020] Optionally, the number of the first inlets is two, and the two first inlets are arranged radially opposite to each other or axially symmetrically;
[0021] Alternatively, the number of the first inlets is at least three, and all the first inlets are arranged at intervals along the circumferential direction;
[0022] Alternatively, the number of the second inlets is two, and the two second inlets are arranged radially opposite to each other or axisymmetrically;
[0023] Alternatively, the number of the second inlets is at least three, and all the second inlets are arranged at intervals in the circumferential direction.
[0024] Optionally, a connecting pipeline between the first inlet and the external steam pipeline, and a connecting pipeline between the second inlet and the external steam pipeline are both provided with a control valve group, and the control valve group at least includes a flow regulating valve.
[0025] In addition, the present invention also provides a control method for a steam turbine, which is used for controlling any one of the steam turbines, and the control method specifically includes: when the total flow rate entering the steam turbine is less than a predetermined flow rate, opening the first inlet and closing the second inlet; when the total flow rate entering the steam turbine is equal to or greater than the predetermined flow rate, opening the first inlet and the second inlet at the same time.
[0026] Optionally, as the power of the steam turbine increases, the opening of the second flow regulating valve arranged at the second inlet is gradually increased, and at the same time, the opening of the valve on the pipeline connecting the first outlet and the second flow port is also gradually increased.
[0027] The control method of the steam turbine of the present invention is based on the above-mentioned steam turbine, so the control method of the steam turbine also has the above-mentioned technical effect of the steam turbine. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 The figure is a schematic diagram of the structure of a steam turbine in one embodiment of the present invention. DETAILED DESCRIPTION
[0029] The features and exemplary embodiments of various aspects of the present application will be described in detail below. In order to make the objectives, technical solutions and advantages of the present application more clear, the present application is further described in detail below in conjunction with the drawings and specific embodiments.
[0030] Please refer to Figure 1 , Figure 1 Schematic diagram of the structure of a steam turbine in one embodiment of the present invention; dotted lines, double-dotted lines, and solid lines with arrows in the figure all indicate the direction of steam flow.
[0031] The present invention provides a steam turbine, which includes a cylinder 17, the cylinder 17 has a first accommodating chamber, a second accommodating chamber and a rotating shaft 18, the rotating shaft 18 penetrates the first accommodating chamber and the second accommodating chamber at the same time, and the two ends of the rotating shaft 18 can pass through the first accommodating chamber and the second accommodating chamber respectively, and one of the passing ends of the rotating shaft 18 is connected to an external power generation component to drive the power generation component to rotate. The rotating shaft 18 can be rotatably supported on the cylinder 17 by a bearing.
[0032] A first flow assembly 9 is arranged inside the first accommodating chamber, and the cavity wall of the first accommodating chamber has a first inlet 171 and a first outlet 12, which are respectively located at the axial ends of the first flow assembly 9; the axial direction herein refers to the direction of the rotation axis parallel to the rotating shaft 18. The first inlet 171 can be connected to an external steam pipeline, so that the steam in the external steam pipeline can enter the first accommodating chamber from the first inlet 171 and flow out of the first accommodating chamber from the first outlet 12 after passing through the first flow assembly 9. A first air intake chamber 3 can also be arranged inside the cylinder 17, and the first inlet 171 is connected to the first air intake chamber 3. The steam outlet of the first air intake chamber 3 is roughly parallel to the axial direction. The steam flows from the first air intake chamber 3 to the first accommodating chamber. The first air intake chamber plays a role of buffering the airflow on the one hand, and can play a role of guiding the flow on the other hand.
[0033] In the embodiment of the present invention, a second flow assembly 10 is arranged inside the second accommodating chamber, and the cavity wall of the second accommodating chamber has a second inlet 172 and a second outlet 16, which are respectively located at the axial ends of the second flow assembly 10, and the first outlet 12 is connected to the second accommodating chamber; similarly, a second air intake chamber 6 can also be arranged inside the cylinder 17, and the second inlet 172 is connected to the second air intake chamber 6. The steam outlet of the second air intake chamber 6 is roughly parallel to the axial direction, and the steam flows from the second air intake chamber 6 to the second accommodating chamber. The second air intake chamber 6 plays a role of buffering the airflow on the one hand, and can play a role of guiding the flow on the other hand.
[0034] The first flow assembly 9 and the second flow assembly 10 each include at least one rotor blade and at least one stator, the rotor blade is connected to the rotating shaft, and the stator is connected to the cylinder 17. The first flow assembly 9 and the second flow assembly 10 can be a nozzle steam distribution structure, or a throttling steam distribution structure, or a combination of the nozzle steam distribution structure and the throttling steam distribution structure.
[0035] The steam turbine in the present invention can selectively open the first inlet 171 and the second inlet 172 according to the size of the preset power. When the preset power is less than the maximum power value that the first flow component 9 can reach, the steam turbine is in the first working state, the first inlet 171 is in a connected state with the external steam pipeline, and the second inlet 172 is in a disconnected state with the external steam pipeline; in this way, the steam in the external steam pipeline only flows into the steam turbine from the first inlet 171, and after passing through the first flow component 9 and the second flow component 10 in turn, the steam flows from the second outlet 16 to the outside of the steam turbine.
[0036] When the preset power of the steam turbine is greater than the maximum power value that the first flow assembly 9 can reach, when the steam turbine is in the second working state, the first inlet 171 and the second inlet 172 are both in a state of being connected to the external steam pipeline. At this time, the steam in the external steam pipeline can enter the steam turbine through the first inlet 171 and the second inlet 172 at the same time. The steam flowing in from the first inlet 171 expands and works through the first flow assembly 9. As the steam flows in the first flow assembly 9, the temperature and pressure of the steam gradually decrease, and the volume gradually increases. The steam completes the work inside the first flow assembly 9, flows out of the first accommodating chamber and enters the second accommodating chamber, expands and works again through the second flow assembly 10, and then flows out of the steam turbine through the second outlet 16. The steam flowing in from the second inlet 172 expands and works through the second flow assembly 10, and finally flows out of the cylinder 17 through the second outlet 16; that is, another part of the steam flowing in from the second inlet 172 directly expands and works through the second flow assembly 10, and then flows out of the cylinder 17 through the second outlet 16. The steam flowing out of the first accommodating chamber can be mixed with the steam flowing in from the second inlet 172 and then flow through the second flow assembly 10, thereby reducing the interference between the air flows in the flow assembly.
[0037] The maximum power that the first flow assembly 9 can generate can be reasonably designed according to the specific operating environment of the steam turbine. In a specific embodiment, the maximum power of the first flow assembly 9 is a part of the full power of the steam turbine, that is, when the regulating valve 2 in front of the first inlet 171 is in a fully open state and the steam parameter reaches the rated value, the power that the steam turbine can generate is only a part of the maximum power. In the embodiment of the present invention, the flow assembly in the steam turbine includes at least two sections: the first flow assembly 9 and the second flow assembly 10, and the accommodating chamber where the two flow assemblies are located is respectively provided with a first inlet 171 and a second inlet 172, and the first inlet 171 and the second inlet 172 can be selectively opened according to the flow rate of steam entering the steam turbine, so that the flow of steam in the flow assembly can be changed with the power change, so that the steam turbine can obtain an ideal flow area and an optimal flow efficiency under various powers, and the steam turbine can operate efficiently in a wide power range.
[0038] In the embodiment of the present invention, the steam turbine further includes a first communication port 173, which is disposed on the cavity wall of the second accommodating cavity and is located upstream of the second flow assembly 10, and the first outlet 12 is connected to the first communication port through the first pipeline 13. In other words, the steam flowing out of the first outlet 12 can enter the second accommodating cavity from the first communication port 173 and flow through all the second flow assemblies. The steam flow at this time is shown by the dotted line in the figure.
[0039] In this embodiment, the first communication port 173 is disposed at an upstream position of the second flow component 10 for convenience.
[0040] Of course, in order to avoid reverse flow of the airflow and improve the working reliability of the steam turbine, a one-way valve 21 is also provided on the first pipeline 13 to control the one-way flow of steam from the first outlet 12 to the first connecting port 173. The one-way valve 21 mainly acts to make the airflow flow in one direction. A flow control valve 8 is also provided on the first pipeline to adjust the steam flow in the first pipeline 13.
[0041] Of course, in the embodiment of the present application, the first connecting port 173 can also be connected to the external steam pipeline through the third pipeline 14, and a flow control valve and a switch valve are provided on the connecting pipeline between the first connecting port 173 and the external steam pipe. The flow control valve can adjust the steam flow on the pipeline to meet the working requirements of the steam turbine at different powers.
[0042] In the embodiment of the present invention, a third flow assembly 11 is further disposed inside the second accommodation chamber, wherein the third flow assembly 11 also includes at least one rotor blade and at least one stator, the rotor blade is connected to the rotating shaft, and the stator is connected to the cylinder 17. The third flow assembly 11 is a full-circle steam inlet structure.
[0043] The third flow assembly 11 is located downstream of the second flow assembly 10, and the second outlet 16 is located downstream of the third flow assembly 11, so that the steam flowing through the second flow assembly 10 further flows through the third flow assembly 11 to further expand and do work, thereby improving the utilization rate of the steam.
[0044] In the embodiment of the present invention, the cavity wall of the second accommodating cavity is further provided with a second connecting port 174, which is located between the second flow assembly 10 and the third flow assembly 11; the first outlet 12 can also be connected to the second connecting port 174. When the steam flowing in from the second inlet 172 of the second accommodating cavity causes the pressure at the position of the first connecting port 173 to be relatively high, it is difficult for the steam flowing out of the first outlet 12 to enter the first connecting port 173. At this time, the second connecting port 174 and the first outlet 12 can be connected. Because the second connecting port 174 is located downstream of the first connecting port 173, the pressure at the second connecting port 174 is relatively low. The steam of the first outlet 12 can enter the second accommodating cavity from the second connecting port 174, and then expand and work through the third flow assembly 11, and finally flow out of the steam turbine from the second outlet 16. Of course, the steam flowing in from the second inlet 172 expands and works through the second flow assembly 10 and the third flow assembly 11 in sequence. The steam flow in the flow is shown by the double dotted line and the solid line with arrows in the figure.
[0045] The above arrangement improves the reliability and safety of the steam turbine operation.
[0046] In the embodiment of the present invention, the first outlet 12 and the second connecting port 174 are connected via the second pipeline 15 . The second pipeline 15 is also configured to be connected to the steam extraction pipeline 19 . The steam extraction pipeline 19 is provided with a steam extraction valve 20 .
[0047] Of course, a valve 7 may also be provided at the position of the second connecting port 174 to control the on-off of the pipeline connected to the second connecting port 174 and the steam flow entering the second connecting port 174 .
[0048] In a specific embodiment of the present invention, the steam turbine has an inner cavity, which is divided into a first accommodating cavity and a second accommodating cavity by a partition. The first accommodating cavity and the second accommodating cavity are arranged along the axial direction of the rotating shaft. The first inlet 171 and the second inlet 172 are located at the end of the corresponding accommodating cavity close to the partition, and the first outlet 12 and the second outlet 16 are located at the end of the corresponding accommodating cavity away from the partition.
[0049] In this embodiment, the first flow assembly 9 and the second flow assembly 10 are located on the left and right sides of the partition, which can optimize the force on the rotating shaft and improve the overall performance of the steam turbine.
[0050] In the above embodiments, the number of the first inlets 171 may be two, and the two first inlets 171 are arranged radially opposite to each other or axially symmetrically.
[0051] Of course, the number of the first inlets 171 may also include at least three, and all the first inlets 171 are arranged at intervals along the circumferential direction.
[0052] Alternatively, the number of the second inlets 172 may be two, and the two second inlets 172 are arranged radially opposite to each other or axially symmetrically;
[0053] Similarly, the number of the second inlets 172 may also include at least three, and all the second inlets 172 are arranged at intervals along the circumferential direction.
[0054] In the above embodiments, the connecting pipeline between the first inlet 171 and the external steam pipeline and the connecting pipeline between the second inlet 172 and the external steam pipeline are both provided with a control valve group, and the control valve group at least includes a flow regulating valve, please refer to Figure 1 A first flow regulating valve 2 is provided on the pipeline connected to the first inlet 171, and the steam flow entering the first accommodating chamber is controlled by the first flow regulating valve 2 to control the power of the steam turbine. When the opening of the first flow regulating valve 2 reaches the maximum value, the power of the steam turbine is increased by increasing the steam pressure. When the steam pressure reaches the rated value, the power that the first flow component 9 can generate reaches the maximum value. At this time, if the power continues to increase, the second inlet 172 needs to be opened to introduce new steam into the second accommodating chamber. The new steam is mixed with the steam flowing out of the first accommodating chamber and passes through the second flow component 10 and the third flow component 11 in sequence.
[0055] As the power of the steam turbine increases, the opening of the second flow regulating valve 5 becomes larger and larger, and the inlet steam pressure of the second accommodating chamber continues to increase. This situation will squeeze out the steam from the first accommodating chamber entering the second accommodating chamber, and the steam flow from the first flow regulating valve 2 into the first accommodating chamber will automatically decrease. In order to ensure that the steam flow in the first accommodating chamber does not change and the power of the steam turbine does not disturb, it is necessary to gradually open the valve 7 to gradually transfer the steam from the first accommodating chamber to the position of the third flow component 11.
[0056] When the second flow regulating valve 5 is fully opened, the power of the steam turbine reaches the maximum value, and the steam in the first accommodating chamber is also fully introduced into the position of the third flow assembly 11, and the flow control valve 8 is completely closed. If it is necessary to extract steam for external heat supply at this time, the steam extraction valve 20 provided on the steam extraction pipeline 19 can be opened to realize steam extraction of the steam turbine.
[0057] Of course, the first inlet 171 and the second inlet 172 may be further provided with switch valves to realize the opening and closing of the corresponding pipelines. For example, a first switch valve 1 is provided on the pipeline connected to the first inlet 171, and a second switch valve 4 is provided on the pipeline connected to the second inlet 172.
[0058] In addition, the present invention also provides a control method for a steam turbine, which is used to control any of the above-mentioned steam turbines, and the control method specifically includes: when the overall flow rate entering the steam turbine is less than a predetermined flow rate, opening the first inlet and closing the second inlet; when the overall flow rate entering the steam turbine is equal to or greater than the predetermined flow rate, opening the first inlet and the second inlet at the same time.
[0059] As described above, when the first flow regulating valve is provided at the first inlet, when the predetermined flow rate is reached, the first flow regulating valve at the first inlet position is opened to the maximum opening degree.
[0060] In a specific embodiment, as the power of the steam turbine increases, the opening of the second flow regulating valve 5 disposed at the second inlet 173 is gradually increased, and the valve opening 7 on the pipeline connecting the first outlet and the second flow port is also gradually increased. The specific effects are described above.
[0061] The above is a detailed introduction to a steam turbine and a control method for a steam turbine provided by the present invention. Specific examples are used in this article to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. It should be pointed out that for ordinary technicians in this technical field, without departing from the principle of the present invention, several improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
Claims
1. Steam turbine, It is characterized in that The invention comprises a cylinder, wherein the cylinder has a first accommodating chamber, a second accommodating chamber and a rotating shaft, and the rotating shaft passes through the first accommodating chamber and the second accommodating chamber at the same time; A first flow assembly is disposed inside the first accommodating cavity, and a cavity wall of the first accommodating cavity has a first inlet and a first outlet, which are respectively located at two axial ends of the first flow assembly; A second flow assembly is disposed inside the second accommodating chamber, and a cavity wall of the second accommodating chamber has a second inlet and a second outlet, which are respectively located at two axial ends of the second flow assembly, and the first outlet is communicated with the second accommodating chamber; Wherein, the first flow assembly and the second flow assembly each include at least one rotor blade and at least one stator, the rotor blade is connected to the rotating shaft, and the stator is connected to the cylinder; The steam turbine has an inner cavity, which is divided into the first accommodating cavity and the second accommodating cavity by a partition, the first accommodating cavity and the second accommodating cavity are arranged along the axial direction of the rotating shaft, the first inlet and the second inlet are located at the end of the corresponding accommodating cavity close to the partition, and the first outlet and the second outlet are located at the end of the corresponding accommodating cavity away from the partition; When the steam turbine is in a first working state, the first inlet is in a state of being connected to an external steam pipeline, and the second inlet is in a state of being disconnected from the external steam pipeline; When the steam turbine is in the second working state, the steam in the external steam pipeline enters the steam turbine through the first inlet and the second inlet at the same time.
2. The steam turbine according to claim 1, It is characterized in that It also includes a first communication port, which is arranged on the cavity wall of the second accommodating cavity and located at the upstream position of the second flow-through component. The first outlet is communicated with the first communication port through a first pipeline.
3. The steam turbine according to claim 2, It is characterized in that The first pipeline is also provided with a one-way valve for controlling the one-way flow of steam from the first outlet to the first connecting port.
4. The steam turbine according to claim 2, It is characterized in that The first communication port can also be connected to the external steam pipeline, and a flow control valve is provided on the communication pipeline between the first communication port and the external steam pipe.
5. The steam turbine according to claim 1, It is characterized in that A third flow assembly is further provided inside the second accommodating chamber, and the third flow assembly is located downstream of the second flow assembly. A second communication port is further provided on the cavity wall of the second accommodating chamber, and is located between the second flow assembly and the third flow assembly. The second outlet is located downstream of the third flow assembly. The first outlet can also be communicated with the second communication port. The third flow component also includes at least one rotor blade and at least one stator, wherein the rotor blade is connected to the rotating shaft, and the stator is connected to the cylinder.
6. The steam turbine according to claim 5, It is characterized in that The first outlet and the second connecting port are connected via a second pipeline, and the second pipeline is also configured to be connected to a steam extraction pipeline, and a steam extraction valve is provided on the steam extraction pipeline.
7. The steam turbine according to claim 5, It is characterized in that The first flow component and the second flow component both include a nozzle steam distribution structure and a throttling steam distribution structure, and the third flow component is a full-circle steam inlet structure.
8. The steam turbine according to any one of claims 1 to 7, It is characterized in that The number of the first inlets is two, and the two first inlets are arranged radially opposite to each other or axisymmetrically; Alternatively, the number of the first inlets is at least three, and all the first inlets are arranged at intervals along the circumferential direction; Alternatively, the number of the second inlets is two, and the two second inlets are arranged radially opposite to each other or axisymmetrically; Alternatively, the number of the second inlets is at least three, and all the second inlets are arranged at intervals in the circumferential direction.
9. The steam turbine according to any one of claims 1 to 7, It is characterized in that The connecting pipeline between the first inlet and the external steam pipeline and the connecting pipeline between the second inlet and the external steam pipeline are both provided with a control valve group, and the control valve group at least includes a flow regulating valve.
10. A method for controlling a steam turbine, used for controlling a steam turbine according to any one of claims 1 to 9, It is characterized in that The control method specifically includes: when the total flow rate entering the steam turbine is less than a predetermined flow rate, opening the first inlet and closing the second inlet; when the total flow rate entering the steam turbine is equal to or greater than the predetermined flow rate, opening the first inlet and the second inlet at the same time.
11. The steam turbine control method according to claim 10, It is characterized in that As the power of the steam turbine increases, the opening of the second flow regulating valve arranged at the second inlet is gradually increased, and at the same time, the opening of the valve on the pipeline connecting the first outlet and the second flow port is also gradually increased.
