A heat exchange rotating tube method

By adopting the front-changing rotating tube solution in the four molding line production lines of a kiln, and using forklifts and clamps for precise positioning and replacement, the problem of uneven glass molten quality caused by insufficient kiln space has been solved, and efficient rotating tube heating has been achieved. Replacement operations ensure product quality and save labor.

CN116874168BActive Publication Date: 2024-10-18CHINA TRIUMPH INT ENG CO LTD

Patent Information

Application Number
CN202310967742.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-08-02
Publication Date
2024-10-18
Estimated Expiration
2043-08-02

AI Technical Summary

Technical Problem

The existing technology cannot effectively perform the heat exchange rotating tube operation in the four forming line production lines of a kiln, resulting in uneven quality of glass liquid and affecting product quality.

Method used

By moving the forming chamber away from the front end of the muffle furnace, taking out and installing the new large shaft and new rotating tube from the front end of the muffle furnace, the front-replacement rotating tube solution is realized without using the rear space of the Dana machine. , using forklifts and fixtures for precise positioning and replacement to ensure efficient heat exchange of the rotating tubes.

Benefits of technology

The seamless heat exchange rotating tube operation in the four forming line production lines of a kiln is realized, ensuring uniform quality of glass liquid, improving product quality, saving labor and reducing labor intensity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116874168B_ABST
    Figure CN116874168B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of glass tube production, and in particular to a heat exchange rotating tube method, wherein a molding chamber is moved away from the front end of a muffle furnace, an original shaft and an original rotating tube attached to the original shaft are taken out from the front end of the muffle furnace, a new shaft and a new rotating tube attached to the new shaft are taken out from a preheating furnace, the new shaft and the new rotating tube are sent into the muffle furnace from the front end of the muffle furnace, and the new shaft is docked with a sleeve on the head of a Danner machine. A front exchange rotating tube scheme is implemented, which is operated on the front end side of the muffle furnace without using the rear space of the Danner machine, so that the heat exchange rotating tube requirements of four molding line production lines of a kiln can be met without lengthening and widening the working pool, thereby ensuring uniform glass liquid quality of each molding line, thereby ensuring product quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of glass tube production, and in particular to a heat exchange rotating tube method. Background Art

[0002] Neutral borosilicate pharmaceutical glass tubes are usually produced by the Danner molding method, in which the glass liquid drips through the nozzle onto a rotating tube made of refractory material, and then is drawn into shape by blowing. Due to the erosion of the glass liquid, the rotating tube needs to be replaced after a period of use.

[0003] like Figure 1 and Figure 2 The figure shows an existing kiln with two molding lines, wherein a molding line is provided on each side of the kiln 101, and each molding line includes a Danner machine 201, a muffle furnace 202 and a molding chamber 203 arranged in sequence from back to front. The Danner machine 201 has a rotatable head with a shaft sleeve provided on the head, the rear end of the large shaft 204 is docked with the head shaft sleeve of the Danner machine 201, the front end of the large shaft 204 is sleeved with a rotating tube 205 and inserted into the muffle furnace 202 from the rear end of the muffle furnace 202, so that the rotating tube 205 is located in the furnace of the muffle furnace 202, and the Danner machine 201 and the muffle furnace 202 are both arranged on a lifting platform 206, so that the front end of the muffle furnace 202 is flush with the rear end of the molding chamber 203, and the rear end of the molding chamber 203 is movably docked with the front end of the muffle furnace 202. The glass liquid in the kiln 101 flows into the working pool 103 through the liquid flow hole 102, and then flows into the muffle furnace 202 through two platinum channels 104, and drips onto the rotating tube 205 through the nozzle, and then is blown and drawn into a glass tube in the molding chamber 203.

[0004] The above-mentioned one kiln two molding lines production line usually adopts the rear replacement rotating tube solution of withdrawing the Danner machine 201 to replace the rotating tube 205. A tube replacement fixing bracket 301 is respectively provided on the side of the two lifting platforms 206 away from the kiln 101, and an electric hoist 302 and a preheating furnace 303 are provided on the tube replacement fixing bracket 301 for heat exchange of the rotating tube. The method for heat exchange of the rotating tube of the two molding lines of a kiln includes two steps: step 1, see Figure 3 , withdraw the Danner machine 201 to a certain distance, so that the main shaft 204 and the rotating tube 205 are completely out of the muffle furnace 202; step 2, see Figure 4 , rotate the head of the Danner machine 201 90°, turn the main shaft 204 and the rotating tube 205 to the tube replacement fixing bracket 301, and complete the heat exchange of the rotating tube through the electric hoist 302 and the preheating furnace 303. After the replacement is completed, the head of the Danner machine 201 can be reversed and moved forward to reset to resume working state.

[0005] In order to save energy, reduce consumption, and improve market competitiveness, one kiln with multiple lines is the future development trend of medium-boron silicon tube drawing production lines. At present, there is no mass production of medium-boron silicon production lines with one kiln and four lines using the Danner method in China. The main reason is that when using a production process with one kiln and four molding lines, if the two middle molding lines use the conventional rear-changing rotary tube solution, in order to make the rear of the Danner machine 201 have enough space, the length and width of the working pool 103 need to be increased sharply, which will inevitably cause uneven quality of glass liquid in each molding line and affect product quality. Therefore, the production line with four molding lines in one kiln cannot adopt the conventional rear-changing rotary tube solution because there is not enough space behind the Danner machine 201 of the two middle molding lines. Therefore, there is an urgent need for a heat exchange rotary tube solution suitable for a production line with four molding lines in one kiln. Summary of the invention

[0006] In view of the above-mentioned defects of the prior art, the technical problem to be solved by the present invention is to provide a heat exchange rotary tube method, which does not need to use the rear space of the Danner machine, thereby meeting the heat exchange rotary tube requirements of four molding line production lines of one kiln.

[0007] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0008] The present invention provides a heat exchange rotating tube method, which comprises the steps of moving a molding chamber away from the front end of a muffle furnace, taking out an original shaft and an original rotating tube attached to the original shaft from the front end of the muffle furnace, taking out a new shaft and a new rotating tube attached to the new shaft from a preheating furnace, sending the new shaft and the new rotating tube from the front end of the muffle furnace into the muffle furnace, and docking the new shaft with a shaft sleeve on the head of a Danner machine.

[0009] Preferably, the original main shaft and the original rotating tube are adjusted to rotate parallel to the ground before being taken out from the front end of the muffle furnace, and the new main shaft and the new rotating tube are docked with the sleeve in a posture parallel to the ground and then adjusted to rotate to the inclination angle in the working state.

[0010] Preferably, a clamp disposed on the fork tines of a forklift is used to pick up and place the original shaft and the new shaft.

[0011] Preferably, the original main shaft and the original rotating tube are adjusted to be lowered to the set tube replacement height and then taken out from the front end of the muffle furnace, and the new main shaft and the new rotating tube are adjusted to rise to the height in the working state after being docked with the sleeve at the tube replacement height.

[0012] Preferably, a sensor for detecting the height signal of the bushing is provided on the Danner machine, and a forklift is used with a visual positioning system. The visual positioning system positions the fork tines of the forklift to a specified height according to the height signal detected by the sensor. The specified height enables the fixture to clamp the original large shaft and dock the new large shaft with the bushing.

[0013] Preferably, the lifting platform drives the Dana machine and the muffle furnace to rise and fall synchronously, and the lifting platform can lower the sleeve to a lowest position of 1.6 meters from the operating floor where the forklift is located.

[0014] Compared with the prior art, the present invention has significant improvements:

[0015] The heat exchange rotating tube method of the present invention realizes a front-exchange rotating tube scheme by removing the magnifying shaft and the rotating tube from the front end of the muffle furnace after the molding chamber is moved away from the front end of the muffle furnace. The front-exchange rotating tube scheme is operated on the front end side of the muffle furnace without using the rear space of the Danner machine. Therefore, it can meet the heat exchange rotating tube requirements of four molding line production lines of a kiln without lengthening and widening the working pool, thereby ensuring uniform quality of glass liquid on each molding line, thereby ensuring product quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the plan layout of one kiln and two molding line production lines in the prior art.

[0017] Figure 2 yes Figure 1 Schematic diagram of the AA section.

[0018] Figure 3 The schematic diagram of step 1 of the heat exchange rotary tube method of one kiln and two molding lines in the prior art shows that Figure 1 Schematic diagram of the cross section along the AA direction.

[0019] Figure 4 The schematic diagram of step 2 of the heat exchange rotary tube method of one kiln and two molding lines in the prior art shows that Figure 1 Schematic diagram of the cross section along the BB direction.

[0020] Figure 5 It is a schematic diagram of the plan layout of one kiln and four molding line production lines in an embodiment of the present invention.

[0021] Figure 6 yes Figure 5 Schematic diagram of the cross section along CC direction.

[0022] Figures 7 to 14 The following are the schematic diagrams of the steps of the heat exchange rotary tube method according to an embodiment of the present invention: Figures 7 to 14 All displayed as Figure 5 Schematic diagram of the CC section.

[0023] The reference numerals are described as follows:

[0024] 101 Kiln

[0025] 102 Liquid Flow Tunnel

[0026] 103 Work Pool

[0027] 104 Platinum Channel

[0028] 201 Dana Machine

[0029] 202 Muffle furnace

[0030] 203 Molding Room

[0031] 204 Big Axle

[0032] 204a Original shaft

[0033] 204b New large shaft

[0034] 205 Rotating Tube

[0035] 205a Original rotating tube

[0036] 205b New rotating tube

[0037] 206 Lifting Platform

[0038] 301 Tube replacement bracket

[0039] 302 Electric Hoist

[0040] 303 Preheating furnace

[0041] 401 Forklift

[0042] 402 Fixture

[0043] 501 Rotating Bracket DETAILED DESCRIPTION

[0044] The specific embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings. These embodiments are only used to illustrate the present invention, but not to limit the present invention.

[0045] In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0046] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0047] Furthermore, in the description of the present invention, unless otherwise specified, “plurality” means two or more.

[0048] like Figures 5 to 14 As shown, an embodiment of the heat exchange rotary tube method of the present invention. In the description of the present invention, it should be noted that the definition of the "rear" side is Figure 1 and Figure 5 On the left side of the paper, the "front" side is Figure 1 and Figure 5 Right side of the paper.

[0049] Figure 5 and Figure 6 The schematic diagram of the plan layout of a kiln with four molding lines is shown. A kiln with four molding lines has a molding line on both sides of the kiln 101, and two molding lines are provided between the two molding lines and in front of the kiln 101. The glass liquid in the kiln 101 flows into the working pool 103 through the liquid flow hole 102, and then flows to the muffle furnace 202 of the four molding lines through four platinum channels 104, and drips onto the rotating tube 205 through the nozzle, and then is blown and drawn into a glass tube in the molding chamber 203. Each forming line includes a Danner machine 201, a muffle furnace 202 and a forming chamber 203 which are arranged in sequence from back to front. The Danner machine 201 has a rotatable head with a bushing provided on the head. The rear end of the main shaft 204 is docked with the head bushing of the Danner machine 201. The front end of the main shaft 204 is attached with a rotating tube 205 and is inserted into the muffle furnace 202 from the rear end of the muffle furnace 202 so that the rotating tube 205 is located in the furnace of the muffle furnace 202. The Danner machine 201 and the muffle furnace 202 are both arranged on a lifting platform 206 so that the front end of the muffle furnace 202 is flush with the rear end of the forming chamber 203, and the rear end of the forming chamber 203 is movably docked with the front end of the muffle furnace 202.

[0050] Figures 7 to 14The schematic diagram of the steps of the heat exchange rotating tube method of this embodiment is shown. The heat exchange rotating tube method of this embodiment is to remove the molding chamber 203 from the front end of the muffle furnace 202, take out the original shaft 204a and the original rotating tube 205a attached to the original shaft 204a from the front end of the muffle furnace 202, and separate the rear end of the original shaft 204a from the sleeve on the head of the Danner machine 201. Take out the new shaft 204b and the new rotating tube 205b attached to the new shaft 204b from the preheating furnace 303, send the new shaft 204b and the new rotating tube 205b from the front end of the muffle furnace 202 into the muffle furnace 202, and dock the new shaft 204b with the sleeve on the head of the Danner machine 201. The heat exchange rotating tube is completed.

[0051] The heat exchange rotating tube method of this embodiment realizes the front exchange rotating tube scheme by removing the molding chamber 203 from the front end of the muffle furnace 202, taking the enlarged shaft and the rotating tube from the front end of the muffle furnace 202, and the front exchange rotating tube scheme is operated on the front end side of the muffle furnace 202, without using the rear space of the Danner machine 201, so it can meet the heat exchange rotating tube requirements of four molding lines of a kiln without lengthening and widening the working pool 103, ensuring the uniform quality of the glass liquid of each molding line, thereby ensuring the product quality. When in use, the four molding lines of the four molding lines of a kiln can adopt the front exchange rotating tube scheme of this embodiment for heat exchange rotating tubes.

[0052] In this embodiment, preferably, see Figures 7 to 9 The original large shaft 204a and the original rotating tube 205a are adjusted to rotate parallel to the ground and then taken out from the front end of the muffle furnace 202, thereby facilitating the original large shaft 204a and the original rotating tube 205a to move forward and exit from the front end of the muffle furnace 202. Figures 10 to 14 The new large shaft 204b and the new rotating tube 205b are connected with the sleeve on the head of the Danner machine 201 in a posture parallel to the ground and then adjusted to rotate to the inclined angle in the working state, thereby facilitating the new large shaft 204b and the new rotating tube 205b to be translated backward from the front end of the muffle furnace 202 into the muffle furnace 202 and connected with the sleeve on the head of the Danner machine 201.

[0053] In this embodiment, preferably, a clamp 402 provided on the fork tine of a forklift 401 is used to pick up and place the original shaft 204a and the new shaft 204. The clamp 402 is fixed on the fork tine of the forklift 401, and the clamp 402 can clamp or release the original shaft 204a and the new shaft 204. By clamping the original shaft 204a or the new shaft 204, the clamp 402 is sent into the muffle furnace 202 through the fork tine of the forklift 401, which solves the problem that the operator cannot operate at close range due to the high temperature in the muffle furnace 202. The forklift 401 and the clamp 402 are integrated into an integrated heat exchange equipment, which gives full play to the flexible and maneuverable characteristics of the forklift 401, reduces the labor intensity, and enables the heat exchange rotary tube operation of this embodiment to be completed by only 3-4 people, saving half the labor compared with the conventional heat exchange rotary tube operation.

[0054] Further, the original main shaft 204a and the original rotating tube 205a are adjusted to be lowered to the set tube replacement height and then taken out from the front end of the muffle furnace 202, and the new main shaft 204b and the new rotating tube 205b are adjusted to rise to the height in the working state after docking with the sleeve on the head of the Danner machine 201 at the tube replacement height. The height adjustment of the main shaft 204 and the rotating tube 205 is achieved by adjusting the overall height of the Danner machine 201 and the muffle furnace 202. The set tube replacement height can be determined according to the height of the fork tine of the forklift 401 from the operating floor where the forklift 401 is located, so that the clamp 402 can be sent into the muffle furnace 202 by the fork tine of the forklift 401.

[0055] Preferably, a sensor for detecting the height signal of the sleeve on the head of the Danner machine 201 is provided on the Danner machine 201, and the forklift 401 is a forklift 401 with a visual positioning system. The visual positioning system configured for the forklift 401 is a prior art and will not be described in detail herein. The visual positioning system of the forklift 401 positions the fork tines of the forklift 401 to a specified height according to the height signal detected by the sensor on the Danner machine 201, and the specified height enables the clamp 402 fixed on the fork tines of the forklift 401 to clamp the original large shaft 204a and dock the new large shaft 204b with the sleeve on the head of the Danner machine 201. By adding a sensor to the Danner machine 201 to detect the height signal of the bushing on the head of the Danner machine 201, the lifting height of the Danner machine 201 can be accurately positioned and fed back to the forklift 401 driver. The forklift 401 is equipped with a visual positioning system, which can accurately position the height of the fork teeth of the forklift 401 according to the height signal fed back by the sensor, ensuring that the clamp 402 can accurately clamp the original large shaft 204a and accurately dock the new large shaft 204b with the bushing on the head of the Danner machine 201.

[0056] The lifting platform 206 has a lifting function, and the lifting of the lifting platform 206 drives the Dana machine 201 and the muffle furnace 202 to rise and fall synchronously. Preferably, the lifting platform 206 in this embodiment can lower the shaft sleeve on the head of the Dana machine 201 to a minimum position of 1.6 meters from the operating floor where the forklift 401 is located, and the Dana machine 201 and the muffle furnace 202 can be lowered to a height that is convenient for the heat exchange rotating tube and convenient for the forklift 401 driver to visually observe the heat exchange rotating tube process.

[0057] In a specific embodiment, the heat exchange rotary tube method of this embodiment includes the following steps in sequence.

[0058] Step 1: See Figure 7 , move the molding chamber 203 away from the front end of the muffle furnace 202; lower the lifting platform 206, drive the Danner machine 201 and the muffle furnace 202 to descend synchronously, until the original large shaft 204a and the original rotating tube 205a are lowered to the set tube replacement height; rotate the head of the Danner machine 201 until the shaft sleeve on the head of the Danner machine 201 is parallel to the ground, that is, the original large shaft 204a and the original rotating tube 205a are rotated to be parallel to the ground.

[0059] Step 2: See Figure 8 The driver of forklift 401 receives the height signal fed back by the sensor detection on Danner machine 201, and the visual positioning system positions the fork tine of forklift 401 to the specified height according to the height signal fed back by the sensor; forklift 401 moves backward and sends the clamp 402 on the fork tine into the muffle furnace 202, so that the clamp 402 clamps and locks the original large shaft 204a.

[0060] Step 3: See Fig. 9 , the forklift 401 moves forward to separate the rear end of the original shaft 204a from the sleeve on the head of the Danner machine 201, and the fixture 402 moves forward with the original shaft 204a and the original rotating tube 205a until the original shaft 204a and the original rotating tube 205a exit the front end of the muffle furnace 202. Thus, the original shaft 204a and the original rotating tube 205a are taken out from the front end of the muffle furnace 202 by the forklift 401 and the fixture 402.

[0061] Step 4: See Fig.10, the fixture 402 on the forklift 401 puts down the original shaft 204a and the original rotating tube 205a, and the forklift 401 driver drives the forklift 401 to the vicinity of the preheating furnace 303. The front end of the new shaft 204b with the new rotating tube 205b is placed in the preheating furnace 303, so that the new rotating tube 205b is located in the preheating furnace 303, and the preheating furnace 303 preheats the new rotating tube 205b. The rear end of the new shaft 204b is placed on the rotating bracket 501, and the rotating bracket 501 has a rotating function. When the new rotating tube 205b is preheated in the preheating furnace 303, the rotating bracket 501 rotates to drive the new shaft 204b and the new rotating tube 205b to rotate, so that the new rotating tube 205b is evenly heated in the preheating furnace 303.

[0062] Step 5: See Fig.11 The forklift 401 delivers the clamp 402 into the preheating furnace 303 and docks the clamp 402 with the new large shaft 204b, so that the clamp 402 clamps and locks the new large shaft 204b.

[0063] Step 6: See Fig.12 The forklift 401 moves in the direction away from the preheating furnace 303 and takes out the new large shaft 204b and the new rotating tube 205b from the preheating furnace 303 through the clamp 402.

[0064] Step 7, see Fig.13 The forklift 401 and the clamp 402 carry the new large shaft 204b and the new rotating tube 205b to the front side of the front end of the muffle furnace 202, and send the new large shaft 204b and the new rotating tube 205b from the front end of the muffle furnace 202 into the muffle furnace 202, and dock the new large shaft 204b with the sleeve on the head of the Danner machine 201.

[0065] Step 8, see Fig.14 , the clamp 402 releases the new shaft 204b and the new rotating tube 205b, and the forklift 401 withdraws the muffle furnace 202 from the front end of the muffle furnace 202 with the clamp 402. The lifting platform 206 is raised, driving the Dana machine 201 and the muffle furnace 202 to rise synchronously until the new shaft 204b and the new rotating tube 205b rise to the height in the working state. The head of the Dana machine 201 is rotated until the sleeve on the head of the Dana machine 201 rotates to the tilt angle in the working state, that is, the new shaft 204b and the new rotating tube 205b rotate to the tilt angle in the working state. Thus, the Dana machine 201 and the muffle furnace 202 are restored to the working position and working state.

[0066] Thus, a heat exchange rotary tube operation is completed. Then the removed molding chamber 203 is reset to restore the molding line to working condition.

[0067] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.

Claims

1. A heat exchange rotating tube method, applied to a neutral borosilicate glass tube production line, characterized in that: The molding chamber (203) is moved away from the front end of the muffle furnace (202), the original shaft (204a) and the original rotating tube (205a) attached to the original shaft (204a) are taken out from the front end of the muffle furnace (202), the new shaft (204b) and the new rotating tube (205b) attached to the new shaft (204b) are taken out from the preheating furnace (303), the new shaft (204b) and the new rotating tube (205b) are sent from the front end of the muffle furnace (202) into the muffle furnace (202), and the new shaft (204b) is docked with the shaft sleeve on the head of the Danner machine (201); the clamp (402) provided on the fork teeth of the forklift (401) is used to take and place the original shaft (204a) and the new shaft (204b); A large shaft (204b), a sensor for detecting a height signal of the shaft sleeve is arranged on the Danner machine (201), the forklift (401) adopts a forklift (401) with a visual positioning system, and the visual positioning system positions the fork teeth of the forklift (401) to a specified height according to the height signal detected by the sensor, and the specified height enables the clamp (402) to clamp the original large shaft (204a) and dock the new large shaft (204b) with the shaft sleeve, and the Danner machine (201) and the muffle furnace (202) are raised and lowered by the lifting platform (206), and the lifting platform (206) can lower the shaft sleeve to the lowest position 1.6 meters away from the operating floor where the forklift (401) is located.

2. The heat exchange rotating tube method according to claim 1, characterized in that: The original large shaft (204a) and the original rotating tube (205a) are adjusted to rotate to be parallel to the ground and then taken out from the front end of the muffle furnace (202); the new large shaft (204b) and the new rotating tube (205b) are docked with the sleeve in a posture parallel to the ground and then adjusted to rotate to the inclination angle in the working state.

3. The heat exchange rotating tube method according to claim 1, characterized in that: The original large shaft (204a) and the original rotating tube (205a) are adjusted to be lowered to the set tube replacement height and then taken out from the front end of the muffle furnace (202); the new large shaft (204b) and the new rotating tube (205b) are adjusted to be raised to the height in the working state after being docked with the shaft sleeve at the tube replacement height.

Citation Information

Patent Citations

  • Heat is traded and is revolved more changing trains of rotating -barrel

    CN207329580U

Cited By

  • Glass kiln mechanism and glass tube production device

    CN121342306A