An automatic inspection method and system for a high-voltage direct-current circuit breaker transfer branch sub-module

The automatic inspection system automatically inspects the transfer branch submodules of the high-voltage DC circuit breaker, solving the inspection problem caused by the large number and high voltage level, and realizing the timely detection of faults and the elimination of safety hazards.

CN116879729BActive Publication Date: 2026-11-10SUPER HIGH VOLTAGE BRANCH OF STATE GRID JIBEI ELECTRIC POWER CO LTD +2
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202310835329.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-07-07
Publication Date
2026-11-10
Estimated Expiration
2043-07-07

Smart Images

  • Figure CN116879729B_ABST
    Figure CN116879729B_ABST
Patent Text Reader

Abstract

The application discloses a kind of high-voltage direct-current circuit breaker transfer branch sub-module automatic inspection method and system, it is related to flexible direct current transmission technical field, main purpose is to realize automatic inspection relying on various high-voltage direct-current circuit breaker control system, can find hidden danger in time.The main technical scheme of the application is: applied to automatic inspection system, when the state of the high-voltage direct-current circuit breaker meets the inspection condition, the control unit sends inspection instruction to target sub-module in turn according to preset inspection rule through the trigger loop driving unit;The target sub-module receives the inspection instruction, and obtains execution state after executing corresponding action, and the execution state is fed back to the control unit by the trigger loop driving unit;The control unit receives the execution state, and when the execution state is not corresponding to the inspection instruction, it is determined that the target sub-module is a fault module.The application is used for high-voltage direct-current circuit breaker.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of flexible DC transmission technology, and in particular to an automatic inspection method and system for a high-voltage DC circuit breaker transfer branch submodule. Background Technology

[0002] The design of high-voltage direct current (HVDC) circuit breakers is one of the challenges in flexible DC networks. Currently, three technical approaches are considered: hybrid, mechanical, and negative voltage coupling. These three approaches share a similar design philosophy for their transfer branches, all characterized by a large number of IGBT modules, their control systems, and high voltage levels. Because HVDC circuit breaker transfer branch submodules can fail during use, leading to accidents, regular inspections are necessary to promptly identify faulty submodules and reduce the likelihood of accidents.

[0003] Currently, due to the large number of IGBT modules and their control systems involved in the transfer branch of high-voltage DC circuit breakers, as well as the problem that the voltage level is too high to be accessed during operation, routine manual inspections cannot be completed. Therefore, annual inspections are usually adopted, which involves stopping the high-voltage DC circuit breaker at a fixed time each year and conducting manual inspections while ensuring personnel safety.

[0004] However, the above-mentioned annual inspection method has too long an interval, which makes it impossible to observe the status of the high-voltage DC circuit breaker transfer branch sub-module in a timely manner and to detect faulty transfer branch sub-modules in a timely manner, thus posing a safety hazard. Summary of the Invention

[0005] In view of the above problems, the present invention provides an automatic inspection method and system for the transfer branch submodule of a high-voltage DC circuit breaker. The main purpose is to realize automatic inspection based on various high-voltage DC circuit breaker control systems, and to detect potential safety hazards in a timely manner.

[0006] To solve the above-mentioned technical problems, the present invention proposes the following solution:

[0007] In a first aspect, the present invention provides an automatic inspection method for a transfer branch submodule of a high-voltage DC circuit breaker, applied to an automatic inspection system, the automatic inspection system comprising a control unit, a trigger circuit drive unit, and a submodule, the method comprising:

[0008] When the state of the high-voltage DC circuit breaker meets the inspection conditions, the control unit sends inspection commands to the target sub-modules sequentially through the trigger circuit drive unit according to the preset inspection rules; wherein, the target sub-module is the sub-module that needs to be inspected; the inspection command is a set of commands with an execution order, including pre-conduction command, idle command, conduction command, idle command, shutdown command, and idle command in the execution order; the preset inspection rules include the target sub-module switching order and switching time interval;

[0009] The target submodule receives the inspection command through the trigger loop drive unit, performs the corresponding action according to the inspection command, obtains the execution status, and feeds back the execution status to the control unit through the trigger loop drive unit;

[0010] The control unit receives the execution status through the trigger circuit drive unit, and when the execution status does not correspond to the inspection command, it determines that the target sub-module is a faulty module.

[0011] Secondly, the present invention provides an automatic inspection system for a transfer branch submodule of a high-voltage DC circuit breaker. The system includes a control unit, a trigger circuit drive unit, and submodules. The trigger circuit drive unit is a multi-level structure configured according to the control structure of the high-voltage DC circuit breaker and controls a preset number of submodules. The control unit, the trigger circuit drive unit, and the submodules in the system are used to execute the method described.

[0012] To achieve the above objectives, according to a third aspect of the present invention, a storage medium is provided, the storage medium including a stored program, wherein, when the program is executed, the device where the storage medium is located is controlled to perform the automatic inspection method of the high-voltage DC circuit breaker transfer branch submodule described in the first aspect.

[0013] To achieve the above objectives, according to a fourth aspect of the present invention, an electronic device is provided, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor, when executing the program, implements all or part of the steps of the automatic inspection device for a high-voltage DC circuit breaker transfer branch submodule as described in the second aspect.

[0014] By means of the above technical solution, the automatic inspection method and device for the transfer branch submodule of the high voltage DC circuit breaker provided by the present invention addresses the problem that the transfer branch of the high voltage DC circuit breaker involves a large number of IGBT modules and their control systems, and the high voltage level makes them inaccessible during operation. Daily manual inspection cannot be completed, the status of the transfer branch submodule of the high voltage DC circuit breaker cannot be observed in time, and faulty transfer branch submodules cannot be detected in time, which poses a safety hazard. Therefore, this invention is applied to an automatic inspection system, which includes a control unit, a trigger loop drive unit, and sub-modules. When the state of the high-voltage DC circuit breaker meets the inspection conditions, the control unit sends inspection commands sequentially to the target sub-modules through the trigger loop drive unit according to preset inspection rules. The target sub-module is the sub-module currently requiring inspection. The inspection command is a set of commands with an execution order, including pre-conduction command, idle command, conduction command, idle command, shutdown command, and idle command. The preset inspection rules include the target sub-module switching order and switching time interval. The target sub-module receives the inspection command through the trigger loop drive unit, performs the corresponding action according to the inspection command, obtains an execution status, and feeds back the execution status to the control unit through the trigger loop drive unit. The control unit receives the execution status through the trigger loop drive unit, and if the execution status does not correspond to the inspection command, it determines that the target sub-module is a faulty module. The system applied by the method of this invention has at least a three-layer structure: a control unit, a trigger circuit drive unit, and a sub-module. Due to the flexibility of the trigger circuit drive unit, its applicability is greatly improved. It can be used in various high-voltage DC circuit breaker control systems to perform daily inspections of transfer branches simply and quickly, thus comprehensively solving the inspection problem of high-voltage DC circuit breakers.

[0015] The above description is merely an overview of the technical solution of the present invention. In order to better understand the technical means of the present invention and to implement it in accordance with the contents of the specification, and in order to make the above and other objects, features and advantages of the present invention more apparent and understandable, specific embodiments of the present invention are described below. Attached Figure Description

[0016] Various other advantages and benefits will become apparent to those skilled in the art upon reading the following detailed description of preferred embodiments. The accompanying drawings are for illustrative purposes only and are not intended to limit the invention. Furthermore, the same reference numerals denote the same parts throughout the drawings. In the drawings:

[0017] Figure 1 The flowchart of an automatic inspection method for a high-voltage DC circuit breaker transfer branch submodule provided by an embodiment of the present invention is shown.

[0018] Figure 2 The flowchart of an automatic inspection method for a high-voltage DC circuit breaker transfer branch submodule provided in an embodiment of the present invention is shown.

[0019] Figure 3 The diagram shows the composition of an automatic inspection system for a high-voltage DC circuit breaker transfer branch submodule provided in an embodiment of the present invention. Detailed Implementation

[0020] Exemplary embodiments of the present disclosure will now be described in more detail with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be implemented in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.

[0021] Current methods for inspecting the transfer branch submodules of high-voltage DC circuit breakers are problematic due to the large number of IGBT modules and their control systems involved, as well as the high voltage levels making them inaccessible during operation. Annual inspections are insufficient to promptly observe the status of these submodules and identify faulty ones, posing safety hazards. To address this issue, the inventors devised an automated inspection system.

[0022] Therefore, this invention provides an automatic inspection method for the transfer branch submodule of a high-voltage DC circuit breaker. This method enables automatic inspection based on various high-voltage DC circuit breaker control systems, allowing for the timely detection of safety hazards. The specific execution steps are as follows: Figure 1 As shown, it includes:

[0023] 101. When the condition of the high-voltage DC circuit breaker meets the inspection conditions, the control unit sends inspection instructions to the target sub-module sequentially through the trigger circuit drive unit according to the preset inspection rules.

[0024] The control unit and the trigger loop drive unit are applied to the chassis and implemented through control boards and trigger loop drive boards, respectively. The submodules are submodules on the transfer branch and serve as the objects to be inspected. The control unit sends the inspection command to the trigger loop drive unit; the target submodule is the submodule currently requiring inspection; the inspection command is a set of commands with an execution order, including pre-conduction command, idle command, conduction command, idle command, shutdown command, and idle command in that order; the preset inspection rules include the target submodule switching order and switching time interval.

[0025] Specifically, the method in this embodiment is applied to the automatic inspection system of the present invention. This system consists of a control unit, a trigger loop drive unit, and submodules. The submodules are the objects to be inspected, i.e., the transfer branch submodules. Each submodule has a number, arranged in a certain order, for example: the first submodule is numbered 001, the second submodule is numbered 002… the Nth submodule is numbered N, etc., but this embodiment does not impose a specific limitation. The control unit sends inspection instructions to the corresponding submodules sequentially according to the numbering order "001, 002…N". It is important to note that after the first submodule receives and executes the inspection instruction and reports the execution status back to the control unit, the control unit first switches the target submodule from the first submodule to the second submodule before sending the inspection instruction to the target submodule again, and so on. Therefore, the control unit needs a time interval each time it sends an inspection instruction to the target submodule. This time interval must be set to satisfy the sum of the time required for a submodule to complete the inspection and the time required to switch the target submodule. This avoids situations where the detected object and the detection result do not correspond, reducing the error rate.

[0026] 102. The target submodule receives the inspection command through the trigger loop drive unit, and after performing the corresponding action according to the inspection command, it obtains the execution status and feeds back the execution status to the control unit through the trigger loop drive unit.

[0027] The execution status refers to the result after the target submodule executes the inspection command, such as whether the action is completed or not. This embodiment does not make specific limitations.

[0028] After receiving the inspection instruction from step 101, the target submodule performs corresponding actions according to the inspection instruction and sends the corresponding execution status to the trigger loop drive unit. Then, the trigger loop drive unit sends the execution status to the control unit for subsequent judgment.

[0029] Specifically, upon receiving the inspection command, the target submodule receives a set of instructions to be executed sequentially. These instructions, in the order of execution, are: pre-on command, idle command, on command, idle command, off command, and idle command again. The target submodule must then perform actions according to each instruction, resulting in a corresponding outcome. The results from all the instructions in the set are then combined to form the execution state corresponding to the inspection command. This execution state is then sent to the control unit via the trigger loop drive unit.

[0030] 103. The control unit receives the execution status through the trigger loop drive unit, and when the execution status does not correspond to the inspection command, the target sub-module is determined to be a faulty module.

[0031] After the control unit obtains the execution status from step 102 through the trigger loop drive unit, in order to determine whether the target sub-module being detected is a faulty module, it needs to compare the received execution status with the inspection command. If they correspond, the target sub-module is determined to be a normal module; if they do not correspond, the target sub-module is determined to be a faulty module.

[0032] For example:

[0033] When a target submodule receives a conduction command and the feedback status after execution is a disconnection status, it is determined that the target submodule cannot operate correctly, and is therefore a faulty submodule.

[0034] Based on the above Figure 1 As can be seen from the implementation of the embodiments, the present invention provides an automatic inspection method for a transfer branch submodule of a high-voltage DC circuit breaker. The present invention is applied to an automatic inspection system, which includes a control unit, a trigger circuit drive unit, and submodules. When the state of the high-voltage DC circuit breaker meets the inspection conditions, the control unit sends inspection commands sequentially to the target submodules through the trigger circuit drive unit according to preset inspection rules. The target submodule is the submodule currently requiring inspection. The inspection command is a set of commands with an execution order, including pre-conduction command, idle command, conduction command, idle command, shutdown command, and idle command. The preset inspection rules include the target submodule switching order and switching time interval. The target submodule receives the inspection command through the trigger circuit drive unit, performs the corresponding action according to the inspection command, obtains an execution status, and feeds back the execution status to the control unit through the trigger circuit drive unit. The control unit receives the execution status through the trigger circuit drive unit, and when the execution status does not correspond to the inspection command, it determines that the target submodule is a faulty module. The system applied by the method of this invention has at least a three-layer structure: a control unit, a trigger circuit drive unit, and a sub-module. Due to the flexibility of the trigger circuit drive unit, its applicability is greatly improved. It can be used in various high-voltage DC circuit breaker control systems to perform daily inspections of transfer branches simply and quickly, thus comprehensively solving the inspection problem of high-voltage DC circuit breakers.

[0035] Furthermore, as a response to Figure 1 Further refinement and extension of the illustrated embodiment, this invention also provides another automatic inspection method for the transfer branch submodule of a high-voltage DC circuit breaker, such as... Figure 2 As shown, the specific steps are as follows:

[0036] 201. The control unit sets a preset inspection cycle and obtains the inspection time based on the preset inspection cycle.

[0037] The preset inspection cycle can be set to daily, weekly, or quarterly inspections, etc., and this embodiment does not impose a specific limitation. The inspection time is obtained according to the preset inspection cycle to control when the inspection begins.

[0038] 202. When the inspection time is reached, the control unit obtains the current status of the high-voltage DC circuit breaker and determines whether the current status of the high-voltage DC circuit breaker is at least one of the following: opening process, closing process, or submodule over-redundancy.

[0039] After obtaining the inspection time in step 201, the control unit monitors whether the current time has arrived. When the inspection time is reached, the control unit first collects the current status of the high-voltage DC circuit breaker and determines whether the current status of the high-voltage DC circuit breaker is in at least one of the following states: opening process, closing process, or submodule over-redundancy. Specifically, the determination of the opening process is based on whether there is an extension of the opening command signal; the determination of the closing process is based on whether there is an extension of the closing command signal; and the determination of submodule over-redundancy is based on whether an over-redundancy signal is generated.

[0040] 203. If the current state of the high-voltage DC circuit breaker is not at least one of the following: opening process, closing process, or submodule over-redundancy, then the control unit determines that the state of the high-voltage DC circuit breaker meets the inspection conditions.

[0041] 204. If the current state of the high-voltage DC circuit breaker is at least one of the following: opening process, closing process, or submodule over-redundancy, the control unit determines that the state of the high-voltage DC circuit breaker does not meet the inspection conditions, does not perform this inspection, and waits for the next inspection time to arrive.

[0042] 205. When the condition of the high-voltage DC circuit breaker meets the inspection conditions, the control unit sends inspection instructions to the target sub-module sequentially through the trigger circuit drive unit according to the preset inspection rules.

[0043] After obtaining the status of the high-voltage DC circuit breaker meeting the inspection conditions in step 203, the control unit begins to send inspection commands. This step is combined with the description of step 101 in the above method, and the same content will not be repeated here.

[0044] Furthermore, in this embodiment, when the control unit switches the target submodule, it also sends a shutdown command to all other non-target submodules through the trigger loop drive unit.

[0045] Specifically, the target submodule needs to be switched, and the switching must be done in sequence. For example, initially, the first submodule is the target submodule by default. The control unit first sends an inspection command to the first submodule through the trigger loop drive unit. After the first submodule completes the inspection and feeds back the execution status to the control unit, the control unit needs to switch the target submodule from the original first submodule to the second submodule. At this time, all submodules except the second submodule are non-target submodules. Before the control unit sends the inspection command to the target submodule through the trigger loop drive unit, for safety reasons, it needs to send a shutdown command to all non-target submodules to ensure that all non-target submodules are in a shutdown state before the inspection.

[0046] Furthermore, in this embodiment, when the control unit sends an inspection command to the target submodule through the trigger loop drive unit, it also sends an idle command to all other non-target submodules through the trigger loop drive unit. The purpose is to ensure that other non-target submodules do not operate when the target submodule operates.

[0047] It is important to emphasize that sending shutdown commands to all non-target submodules before the inspection is to ensure that all non-target submodules remain inactive before the inspection begins. Furthermore, sending idle commands to all other non-target submodules while sending the inspection command to the target submodule ensures that these non-target submodules remain inactive during the inspection. This dual approach provides a double guarantee for the safety of the inspection.

[0048] 206. The target submodule receives the inspection command through the trigger loop drive unit, and after performing the corresponding action according to the inspection command, it obtains the execution status and feeds back the execution status to the control unit through the trigger loop drive unit.

[0049] This step combines the description of step 102 in the above method, and the same content will not be repeated here.

[0050] Furthermore, in this embodiment, when the target submodule performs the corresponding action based on the inspection command, the control unit detects a tripping command, a submodule remote control command, submodule over-redundancy, or all target submodules have completed inspection, the inspection is stopped and the next inspection time is waited for.

[0051] Specifically, when the control unit detects a tripping command, a submodule remote control command, submodule over-redundancy, or all target submodules have completed their inspections, the control unit sends a shutdown command to all lower-level trigger circuit drive units through a preset widened window of the upper-level trigger circuit drive unit. The preset widened window is the window after the upper-level trigger circuit drive unit widens the inspection enable by 30µs. Each lower-level trigger circuit drive unit receives the shutdown command and sends it to each corresponding controlled submodule to stop the inspection.

[0052] It should be noted that the trigger loop drive unit includes at least one upper-level trigger loop drive unit and at least one lower-level trigger loop drive unit; each lower-level trigger loop drive unit controls a preset number of sub-modules. For example... Figure 3 As shown.

[0053] It should be noted that: the control unit sends the inspection command corresponding to the target submodule to the upper-level trigger loop drive unit; the upper-level trigger loop drive unit sends the received inspection command corresponding to the target submodule to the lower-level trigger loop drive unit; the lower-level trigger loop drive unit sends the received inspection command corresponding to the target submodule to the target submodule.

[0054] 207. The control unit receives the execution status through the trigger loop drive unit, and when the execution status does not correspond to the inspection command, the target sub-module is determined to be a faulty module.

[0055] This step combines the description of step 103 in the above method, and the same content will not be repeated here.

[0056] Based on the above Figure 2 As can be seen from the implementation method, the present invention provides an automatic inspection method for the transfer branch submodule of a high-voltage DC circuit breaker. By designing a stop inspection step in the control unit, the normal operation of the high-voltage DC circuit breaker can be guaranteed. Furthermore, by designing to send shutdown and idle instructions to submodules that are not currently being inspected during the inspection instruction sending process, the safety of the inspection can be improved.

[0057] Furthermore, such as Figure 3 As shown, this embodiment of the invention also provides an automatic inspection system for a high-voltage DC circuit breaker transfer branch submodule. The system includes a control unit, a trigger circuit drive unit, and submodules. The trigger circuit drive unit is a multi-level structure configured according to the control structure of the high-voltage DC circuit breaker, and controls a preset number of submodules. The control unit, trigger circuit drive unit, and submodules in the system are used to perform the above-described... Figure 1-2 The method described in [the document / article].

[0058] Furthermore, such as Figure 3 As shown, this embodiment of the invention also provides another automatic inspection system for a high-voltage DC circuit breaker transfer branch submodule. The trigger circuit drive unit includes at least one upper trigger circuit drive unit and at least one lower trigger circuit drive unit; each lower trigger circuit drive unit controls a preset number of submodules; the control unit, the trigger circuit drive unit, and the submodules in the system are used to perform the above-described... Figure 1-2 The method described in [the document / article].

[0059] Furthermore, embodiments of the present invention also provide a processor for running a program, wherein the program executes the above-described... Figure 1-2 The automatic inspection method for the transfer branch submodule of the high-voltage DC circuit breaker described in the article.

[0060] Furthermore, embodiments of the present invention also provide a storage medium for storing a computer program, wherein the computer program, when running, controls the device where the storage medium is located to execute the above-described... Figure 1-2 The automatic inspection method for the transfer branch submodule of the high-voltage DC circuit breaker described in the article.

[0061] In the above embodiments, the descriptions of each embodiment have different focuses. For parts not described in detail in a certain embodiment, please refer to the relevant descriptions in other embodiments.

[0062] It is understood that the relevant features in the above methods and apparatus can be referenced interchangeably. Furthermore, the terms "first," "second," etc., in the above embodiments are used to distinguish between embodiments and do not represent the superiority or inferiority of any particular embodiment.

[0063] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the specific working processes of the systems, devices, and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here.

[0064] The algorithms and displays provided herein are not inherently related to any particular computer, virtual system, or other device. Various general-purpose systems can also be used in conjunction with the teachings herein. The required structure for constructing such systems is apparent from the above description. Furthermore, this invention is not directed to any particular programming language. It should be understood that the contents of the invention described herein can be implemented using various programming languages, and the above description of specific languages ​​is for the purpose of disclosing the best mode of implementation of the invention.

[0065] In addition, the memory may include non-permanent memory in computer-readable media, such as random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.

[0066] Those skilled in the art will understand that embodiments of this application can be provided as methods, systems, or computer program products. Therefore, this application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application can take the form of a computer program product embodied on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0067] This application is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of this application. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart... Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.

[0068] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.

[0069] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.

[0070] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0071] Memory may include non-persistent memory in computer-readable media, such as random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM. Memory is an example of computer-readable media.

[0072] Computer-readable media includes both permanent and non-permanent, removable and non-removable media that can store information using any method or technology. Information can be computer-readable instructions, data structures, modules of programs, or other data. Examples of computer storage media include, but are not limited to, phase-change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technologies, CD-ROM, digital versatile optical disc (DVD) or other optical storage, magnetic tape, magnetic magnetic disk storage or other magnetic storage devices, or any other non-transferable medium that can be used to store information accessible by a computing device. As defined herein, computer-readable media does not include transient computer-readable media, such as modulated data signals and carrier waves.

[0073] It should also be noted that the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus. Unless otherwise specified, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes that element.

[0074] Those skilled in the art will understand that embodiments of this application can be provided as methods, systems, or computer program products. Therefore, this application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application can take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0075] The above are merely embodiments of this application and are not intended to limit the scope of this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the scope of the claims of this application.

Claims

1. An automatic inspection method for a high-voltage DC circuit breaker transfer branch submodule, characterized in that, The method is applied to an automatic inspection system, which includes a control unit, a trigger loop drive unit, and sub-modules. The trigger loop drive unit includes at least one upper-level trigger loop drive unit and at least one lower-level trigger loop drive unit, each of which controls a preset number of sub-modules. Applied to the control unit, when the state of the high voltage DC circuit breaker meets the inspection conditions, before the control unit sends the inspection command to the target sub-module sequentially through the trigger circuit drive unit according to the preset inspection rules, a preset inspection cycle is set, and the inspection time is obtained based on the preset inspection cycle. When the inspection time is reached, the current status of the high-voltage DC circuit breaker is obtained, and it is determined whether the current status of the high-voltage DC circuit breaker is at least one of the following: opening process, closing process, or submodule over-redundancy. If not, then the condition of the high-voltage DC circuit breaker meets the inspection conditions; If so, it is determined that the state of the high-voltage DC circuit breaker does not meet the inspection conditions, the current inspection is not performed, and the inspection is waited for the next inspection time to be reached. When the state of the high-voltage DC circuit breaker meets the inspection conditions, the control unit sends inspection instructions to the target sub-module sequentially through the trigger circuit drive unit according to the preset inspection rules; wherein, the target sub-module is the sub-module that needs to be inspected; the inspection instruction is a set of instructions with an execution order, including pre-conduction instruction, conduction instruction, shutdown instruction and idle instruction according to the execution order; the preset inspection rules include the target sub-module switching order and switching time interval; The target submodule receives the inspection command through the trigger loop drive unit, performs the corresponding action according to the inspection command, obtains the execution status, and feeds back the execution status to the control unit through the trigger loop drive unit; During the process of the target submodule performing corresponding actions based on the inspection command, when the control unit detects a tripping command, a submodule remote control command, submodule over-redundancy, or all target submodules have completed inspection, the inspection is stopped and the next inspection time is waited for. Specifically, when the control unit detects a tripping command, a submodule remote control command, submodule over-redundancy, or all target submodules have completed inspection, it stops the inspection. This includes: when the control unit detects a tripping command, a submodule remote control command, submodule over-redundancy, or all target submodules have completed inspection, the control unit sends a shutdown command to all lower-level trigger circuit drive units through a preset widened window of the upper-level trigger circuit drive unit; wherein, the preset widened window is the window after the upper-level trigger circuit drive unit widens the inspection enable by 30µs; each lower-level trigger circuit drive unit receives the shutdown command and sends the shutdown command to each submodule under its corresponding control to complete the stop inspection. The control unit receives the execution status through the trigger circuit drive unit, and when the execution status does not correspond to the inspection command, it determines that the target sub-module is a faulty module.

2. The method according to claim 1, characterized in that, The method further includes: When the control unit switches the target submodule, it also sends a shutdown command to all other non-target submodules through the trigger loop drive unit.

3. The method according to claim 2, characterized in that, The method further includes: When the control unit sends an inspection command to the target submodule through the trigger loop drive unit, it also sends an idle command to all other non-target submodules through the trigger loop drive unit.

4. An automatic inspection system for a high-voltage DC circuit breaker transfer branch submodule, characterized in that, The system includes a control unit, a trigger circuit drive unit, and sub-modules, wherein the trigger circuit drive unit is a multi-level structure configured according to the control structure of the high-voltage DC circuit breaker, and controls a preset number of the sub-modules; the control unit, the trigger circuit drive unit, and the sub-modules in the system are used to execute the method as described in any one of claims 1 to 3.

5. The system according to claim 4, characterized in that, The trigger loop drive unit includes at least one upper trigger loop drive unit and at least one lower trigger loop drive unit; each lower trigger loop drive unit controls a preset number of sub-modules.

6. A storage medium comprising a stored program, characterized in that, When the program is running, it controls the device containing the storage medium to perform the automatic inspection method of the high-voltage DC circuit breaker transfer branch submodule as described in any one of claims 1 to 3.

7. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the program, it implements the automatic inspection method for the high-voltage DC circuit breaker transfer branch submodule as described in any one of claims 1 to 3.

Citation Information

Patent Citations

  • Transformer substation automatic inspection method, device, equipment, system and medium

    CN115880804A