Simulation-based data processing method for cargo airports, and related equipment

By using a simulation-based data processing method for cargo airports, target flights with abnormal transit time scores were identified and optimized, which solved the problem of low logistics transportation efficiency at cargo airports, improved logistics transit efficiency, and saved costs.

CN117035567BActive Publication Date: 2026-11-17SHENZHEN S F TAISEN HLDG (GRP) CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210463464.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-28
Publication Date
2026-11-17
Estimated Expiration
2042-04-28

AI Technical Summary

Technical Problem

In cargo airports, insufficient coordination between cargo aircraft and cargo vehicles affects logistics efficiency in logistics transportation management.

Method used

By using a simulation-based cargo airport data processing method, the transit timeliness score parameters for each flight are determined, target flights with abnormal transit timeliness scores are identified, and key abnormal simulation indicators are determined and optimized by linking multiple scenario simulation key indicator datasets.

Benefits of technology

It improved the overall efficiency of cargo airport logistics transit, saved operating costs, and optimized the efficiency of abnormal flights.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117035567B_ABST
    Figure CN117035567B_ABST
Patent Text Reader

Abstract

This application provides a simulation-based data processing method and related apparatus for cargo airports. The method includes: determining the transit timeliness score parameter for each flight based on the total number of tickets loaded, planned departure time, and actual departure time parameters of each flight within a preset time range at the cargo airport; identifying target flights with abnormal transit timeliness scores from the flights within the preset time range based on the transit timeliness score parameter for each flight; acquiring a simulation key indicator dataset of multiple scenarios linked to the target flight; and determining the abnormal simulation key indicators that cause the abnormal transit timeliness score of the target flight based on the simulation key indicator dataset of multiple scenarios linked to the target flight. Ultimately, an optimized scheme verified by simulation is obtained, thereby improving the overall efficiency of logistics transportation transit at the cargo airport and saving operating costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of logistics and transportation technology, specifically to a simulation-based method for processing cargo airport data and related apparatus. Background Technology

[0002] The rapid development of the air cargo industry has become a crucial foundation for supporting my country's economic and trade development. Currently, my country's economic development is entering a period of slower growth, a shift in growth drivers, and structural optimization. The general laws of economic development and industrial upgrading, combined with the emergence of new industries and new business models, have led to significant structural changes on the demand side of air cargo, driving structural reforms on the supply side. The transformation and upgrading of air cargo towards specialization and logistics has become an inevitable trend, placing demands on the construction and development of my country's cargo airports.

[0003] Currently, cargo airports typically have a large volume of logistics transportation management, such as cargo aircraft and cargo vehicles, and insufficient coordination between emergency management, which affects logistics transportation efficiency.

[0004] Therefore, how to improve the logistics and transportation efficiency of cargo airports is a technical problem that urgently needs to be solved in the field of logistics and transportation technology. Summary of the Invention

[0005] This application provides a simulation-based data processing method and related apparatus for cargo airports, aiming to solve the technical problem of how to improve the logistics and transportation efficiency of cargo airports.

[0006] On the one hand, this application provides a simulation-based method for processing cargo airport data, the method comprising:

[0007] Based on the total number of tickets loaded on each flight within a preset time range at the cargo airport, the planned departure time parameter, and the actual departure time parameter, the transfer efficiency score parameter corresponding to each flight is determined;

[0008] Based on the transit timeliness score parameter corresponding to each flight, target flights with abnormal transit timeliness scores are identified from the flights within the preset time range;

[0009] Obtain the simulation key indicator dataset for the target flight across multiple scenarios;

[0010] Based on the simulation key indicator dataset of the aforementioned multi-scenario linkage, the abnormal simulation key indicators that cause the abnormal transfer timeliness score of the target flight are identified.

[0011] In one possible implementation of this application, the step of determining the abnormal simulation key indicators that cause the abnormal transit timeliness score of the target flight based on the simulation key indicator dataset of the linked multi-scenario scenarios includes:

[0012] Obtain the preset simulation key indicator threshold set corresponding to each key indicator in the simulation key indicator dataset of the linked multi-scenario;

[0013] Based on the linked multi-scenario simulation dataset and the preset simulation key indicator threshold set, the influencing factors that cause the abnormal transit time score of the target flight are determined.

[0014] In one possible implementation of this application, after determining the abnormal simulation key indicators that cause the abnormal transit time score of the target flight based on the simulation key indicator dataset of the linked multi-scenario scenarios, the method further includes:

[0015] Obtain multiple business parameters of the key indicators of the abnormal simulation;

[0016] Based on the aforementioned multiple business parameters, the key indicators for anomaly simulation are optimized.

[0017] In one possible implementation of this application, optimizing the key indicators of the anomaly simulation based on the multiple business parameters includes:

[0018] The multiple business parameters are input into a preset simulation optimization model to obtain optimization adjustment parameters;

[0019] The key performance indicators of the anomaly simulation are optimized based on the aforementioned optimization adjustment parameters.

[0020] In one possible implementation of this application, determining the transit timeliness score parameter for each flight based on the total number of tickets loaded on each flight within a preset time range at the cargo airport, the planned departure time parameter, and the actual departure time parameter includes:

[0021] Based on the planned departure time parameter and the actual departure time parameter, the transfer time efficiency score ratio parameter for each flight is determined;

[0022] Obtain the total number of tickets corresponding to each cargo aircraft in each flight;

[0023] Based on the transit time efficiency score ratio parameter for each flight and the total number of tickets corresponding to cargo aircraft in each flight, the transit time efficiency score parameter for each flight is determined.

[0024] In one possible implementation of this application, determining the target flight with an abnormal transfer timeliness score from the flights within the preset time range based on the transfer timeliness score parameter corresponding to each flight includes:

[0025] Obtain the total number of departing tickets within a preset time period, and calculate the transit time score parameter based on the total number of departing tickets.

[0026] Based on the transit time score parameters for departure and the transit time score parameters for each flight, it is determined whether the transit time of the cargo airport is abnormal.

[0027] If an anomaly is found, the transit time score parameters corresponding to each flight will be sorted.

[0028] Flights ranked last in transit timeliness score are identified as target flights with abnormal transit timeliness scores.

[0029] In one possible implementation of this application, obtaining the simulation key indicator dataset of the target flight across multiple scenarios includes:

[0030] Obtain the flight information of the target flight;

[0031] The flight information is input into a preset multi-scenario simulation model to obtain the simulation key indicator dataset corresponding to the target flight. The multi-scenario simulation model is an asynchronous message framework that runs batch simulation models simultaneously.

[0032] On the other hand, this application provides a simulation-based cargo airport data processing device, the device comprising:

[0033] The first determining unit is used to determine the transit efficiency score parameter for each flight based on the total number of tickets loaded on each flight within a preset time range at the cargo airport, the planned departure time parameter, and the actual departure time parameter.

[0034] The second determining unit is used to determine the target flight with an abnormal transfer time score from the flights within the preset time range based on the transfer time score parameter corresponding to each flight.

[0035] The first acquisition unit is used to acquire the simulation key indicator dataset of the target flight in multiple scenarios.

[0036] The third determining unit is used to determine the abnormal simulation key indicators that cause the abnormal transfer timeliness score of the target flight based on the simulation key indicator dataset of the linked multi-scenario.

[0037] In one possible implementation of this application, the third determining unit is specifically used for:

[0038] Obtain the preset simulation key indicator threshold set corresponding to each key indicator in the simulation key indicator dataset of the linked multi-scenario;

[0039] Based on the linked multi-scenario simulation dataset and the preset simulation key indicator threshold set, the influencing factors that cause the abnormal transit time score of the target flight are determined.

[0040] In one possible implementation of this application, after the third determining unit, the apparatus further includes:

[0041] The second acquisition unit is used to acquire multiple business parameters of the key indicators of the abnormal simulation;

[0042] The first optimization unit is used to optimize the key indicators of the abnormal simulation based on the multiple business parameters.

[0043] In one possible implementation of this application, the first optimization unit is specifically used for:

[0044] The multiple business parameters are input into a preset simulation optimization model to obtain optimization adjustment parameters;

[0045] The key performance indicators of the anomaly simulation are optimized based on the aforementioned optimization adjustment parameters.

[0046] In one possible implementation of this application, the first determining unit is specifically used for:

[0047] Based on the planned departure time parameter and the actual departure time parameter, the transfer time efficiency score ratio parameter for each flight is determined;

[0048] Obtain the total number of tickets corresponding to each cargo aircraft in each flight;

[0049] Based on the transit time efficiency score ratio parameter for each flight and the total number of tickets corresponding to cargo aircraft in each flight, the transit time efficiency score parameter for each flight is determined.

[0050] In one possible implementation of this application, the second determining unit is specifically used for:

[0051] Obtain the total number of departing tickets within a preset time period, and calculate the transit time score parameter based on the total number of departing tickets.

[0052] Based on the transit time score parameters for departure and the transit time score parameters for each flight, it is determined whether the transit time of the cargo airport is abnormal.

[0053] If an anomaly is found, the transit time score parameters corresponding to each flight will be sorted.

[0054] Flights ranked last in transit timeliness score are identified as target flights with abnormal transit timeliness scores.

[0055] In one possible implementation of this application, the first acquisition unit is specifically used for:

[0056] Obtain the flight information of the target flight;

[0057] The flight information is input into a preset multi-scenario simulation model to obtain the simulation key indicator dataset corresponding to the target flight. The multi-scenario simulation model is an asynchronous message framework that runs batch simulation models simultaneously.

[0058] On the other hand, this application also provides a server, the server comprising:

[0059] One or more processors;

[0060] Memory; and

[0061] One or more applications, wherein the one or more applications are stored in the memory and configured to be executed by the processor to implement the simulation-based cargo airport data processing method.

[0062] On the other hand, this application also provides a computer-readable storage medium having a computer program stored thereon, the computer program being loaded by a processor to perform the steps in the simulation-based cargo airport data processing method.

[0063] The simulation-based cargo airport data processing method provided in this application includes: determining the transfer timeliness score parameter for each flight based on the total number of tickets loaded, planned departure time parameter, and actual departure time parameter of each flight within a preset time range at the cargo airport; identifying target flights with abnormal transfer timeliness scores from the flights within the preset time range based on the transfer timeliness score parameter for each flight; obtaining a simulation key indicator dataset of multiple scenarios linked to the target flight; and determining the abnormal simulation key indicators that cause the abnormal transfer timeliness score of the target flight based on the simulation key indicator dataset of multiple scenarios linked to the target flight. Compared to traditional methods, given the current challenges of managing large volumes of logistics and transportation, such as cargo aircraft and vehicles, and insufficient coordination in emergency management at cargo airports, which impacts logistics efficiency, this application creatively proposes a method to identify target flights with abnormal transit time scores based on transit time score parameters for each flight. This allows for rapid location of abnormal target flights. Furthermore, by linking multi-scenario simulation key indicator datasets, the application identifies the abnormal simulation key indicators causing the abnormal transit time scores of target flights. This allows for rapid location of the abnormal simulation key indicators causing the abnormal transit time scores of target flights, effectively optimizing the efficiency of abnormal target flights, thereby improving the overall logistics transit efficiency of cargo airports and saving operating costs. Attached Figure Description

[0064] To more clearly illustrate the technical solutions in the embodiments of this application, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0065] Figure 1 This is a schematic diagram of a simulation-based cargo airport data processing system provided in an embodiment of this application.

[0066] Figure 2 This is a schematic flowchart of an embodiment of the simulation-based cargo airport data processing method provided in this application.

[0067] Figure 3 This is a flowchart illustrating an embodiment of optimizing key indicators for anomaly simulation provided in this application.

[0068] Figure 4 This is a schematic diagram of an embodiment of the simulation-based cargo airport data processing device provided in this application.

[0069] Figure 5 This is a schematic diagram of an embodiment of the server provided in this application. Detailed Implementation

[0070] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0071] In the description of this application, it should be understood that the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," and "outer," etc., indicating orientation or positional relationships based on the orientation or positional relationships shown in the accompanying drawings, are used only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this application. Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, features defined with "first" and "second" may explicitly or implicitly include one or more of the stated features. In the description of this application, "a plurality of" means two or more, unless otherwise explicitly specified.

[0072] In this application, the term "exemplary" is used to mean "used as an example, illustration, or description." Any embodiment described as "exemplary" in this application is not necessarily to be construed as being more preferred or advantageous than other embodiments. The following description is provided to enable any person skilled in the art to make and use this application. Details are set forth in the following description for purposes of explanation. It should be understood that those skilled in the art will recognize that this application can be made without using these specific details. In other instances, well-known structures and processes are not described in detail to avoid obscuring the description of this application with unnecessary detail. Therefore, this application is not intended to be limited to the embodiments shown, but is consistent with the broadest scope of the principles and features disclosed in this application.

[0073] This application provides a simulation-based method for processing cargo airport data, as well as related apparatus, which will be described in detail below.

[0074] like Figure 1 As shown, Figure 1 This is a schematic diagram of a simulation-based cargo airport data processing system provided in an embodiment of this application. The simulation-based cargo airport data processing system may include multiple terminals 100 and a server 200, which are network-connected. The server 200 integrates a simulation-based cargo airport data processing device, such as... Figure 1 In the server, terminal 100 can access server 200.

[0075] In this embodiment, server 200 is mainly used to determine the transit timeliness score parameter for each flight based on the total number of tickets loaded on each flight within a preset time range at the cargo airport, the planned departure time parameter, and the actual departure time parameter; based on the transit timeliness score parameter for each flight, determine the target flight with abnormal transit timeliness score from the flights within the preset time range; obtain the simulation key indicator dataset of the target flight in multiple scenarios; and based on the simulation key indicator dataset of the multiple scenarios, determine the abnormal simulation key indicators that cause the abnormal transit timeliness score of the target flight.

[0076] In this embodiment, the server 200 can be a standalone server, a server network, or a server cluster. For example, the server 200 described in this embodiment includes, but is not limited to, a computer, a network terminal, a single network server, a set of multiple network servers, or a cloud server composed of multiple servers. The cloud server is composed of a large number of computers or network servers based on cloud computing. In this embodiment, communication between the server and the terminal can be achieved through any communication method, including but not limited to, mobile communication based on the 3rd Generation Partnership Project (3GPP), Long Term Evolution (LTE), and Worldwide Interoperability for Microwave Access (WiMAX), or computer network communication based on the TCP / IP Protocol Suite (TCP / IP) and User Datagram Protocol (UDP).

[0077] It is understood that the terminal 100 used in this application embodiment can be a device that includes both receiving and transmitting hardware, i.e., a device with receiving and transmitting hardware capable of performing bidirectional communication on a bidirectional communication link. Such a terminal may include: cellular or other communication devices having a single-line display, a multi-line display, or a cellular or other communication device without a multi-line display. Specifically, the terminal 100 may be a desktop terminal or a mobile terminal, and the terminal 100 may also be one of a mobile phone, tablet computer, laptop computer, etc.

[0078] Those skilled in the art will understand that Figure 1 The application environment shown is merely one application scenario of the solution in this application and does not constitute a limitation on the application scenario of the solution in this application. Other application environments may include more than one application scenario. Figure 1The number of more or fewer terminals, or server network connections shown, for example Figure 1 Only one server and two terminals are shown in the diagram. It is understood that this simulation-based cargo airport data processing system may also include one or more other servers, and / or one or more terminals connected to the server network, which is not limited here.

[0079] In addition, such as Figure 1 As shown, the simulation-based cargo airport data processing system may also include a memory 300 for storing data, such as relevant information for each flight at the cargo airport and data processing data of the cargo airport, for example, data processing data of the cargo airport during the operation of the simulation-based cargo airport data processing system.

[0080] It should be noted that, Figure 1 The schematic diagram of the simulation-based cargo airport data processing system shown is merely an example. The simulation-based cargo airport data processing system and scenario described in this application are intended to more clearly illustrate the technical solutions of this application and do not constitute a limitation on the technical solutions provided in this application. As those skilled in the art will know, with the evolution of simulation-based cargo airport data processing systems and the emergence of new business scenarios, the technical solutions provided in this application are also applicable to similar technical problems.

[0081] Next, we will introduce the simulation-based cargo airport data processing method provided in the embodiments of this application.

[0082] In this embodiment of the simulation-based cargo airport data processing method, a simulation-based cargo airport data processing device is used as the execution subject. For simplicity and ease of description, this execution subject will be omitted in subsequent method embodiments. The simulation-based cargo airport data processing device is applied to a server. The method includes: determining the transfer timeliness score parameter corresponding to each flight based on the total number of tickets loaded on each flight within a preset time range, the planned departure time parameter, and the actual departure time parameter; determining the target flight with abnormal transfer timeliness score from the flights within the preset time range based on the transfer timeliness score parameter corresponding to each flight; obtaining a simulation key indicator dataset of multiple scenarios linked to the target flight; and determining the abnormal simulation key indicators that cause the abnormal transfer timeliness score of the target flight based on the simulation key indicator dataset of multiple scenarios linked to the target flight.

[0083] Please see Figures 2 to 5 , Figure 2 This is a schematic flowchart of an embodiment of the simulation-based cargo airport data processing method provided in this application. The simulation-based cargo airport data processing method includes:

[0084] 201. Based on the total number of tickets loaded on each flight within a preset time range at the cargo airport, the planned departure time parameter, and the actual departure time parameter, determine the transfer efficiency score parameter corresponding to each flight.

[0085] In this embodiment, the preset time range can be multiple months, one month, one week, several days, one day, or several hours within one day. Specifically, it can be set according to actual needs. For example, when it is necessary to analyze the flight situation of each day, the preset time range can be set to one day. Similarly, when it is necessary to analyze the flight situation within a week, the preset time range can be set to one week.

[0086] The transit time score is a parameter used to evaluate the speed of flight transit. Specifically, the higher the transit time score of a flight, the faster the transit time; conversely, the lower the transit time score of a flight, the slower the transit time.

[0087] In some embodiments of this application, the transit timeliness score parameter for each flight is determined based on the total number of tickets loaded on each flight within a preset time range at the cargo airport, the planned departure time parameter, and the actual departure time parameter. This includes: determining the transit timeliness score ratio parameter for each flight based on the planned departure time parameter and the actual departure time parameter; obtaining the total number of tickets corresponding to the cargo aircraft in each flight; and determining the transit timeliness score parameter for each flight based on the transit timeliness score ratio parameter for each flight and the total number of tickets corresponding to the cargo aircraft in each flight.

[0088] In some embodiments of this application, the transfer time efficiency score ratio parameter for each flight is determined based on the planned departure time parameter and the actual departure time parameter. This includes: calculating the difference between the actual departure time parameter and the planned departure time parameter; and determining the transfer time efficiency score ratio parameter for each flight based on the difference and the pre-defined correspondence between the difference and the transfer time efficiency score ratio parameter. For example, if the difference between the actual departure time parameter and the planned departure time parameter is in the range of [15, +infinity], the transfer time efficiency score ratio parameter is 1.2; if the difference is between [0, 15], the transfer time efficiency score ratio parameter is 1; if the difference is between [-15, 0], the transfer time efficiency score ratio parameter is 0.8; and if the difference is between [-30, -15], the score is 0.2.

[0089] In some embodiments of this application, obtaining the total number of tickets for each cargo aircraft in each flight includes: obtaining the total number of tickets for each cargo aircraft in each flight from a preset apron simulation platform. It should be noted that in this application, the status of each flight within the preset time range is that it has completed loading and has already departed. Therefore, before takeoff, its relevant data is recorded in the preset apron simulation platform, and when the relevant data is needed, it can be directly retrieved from the apron simulation platform.

[0090] In one specific embodiment, the transfer timeliness score parameter for each flight is determined based on the transfer timeliness score ratio parameter for each flight and the total number of tickets corresponding to cargo aircraft in each flight. This includes multiplying the transfer timeliness score ratio parameter for each flight by the total number of tickets corresponding to cargo aircraft in each flight to obtain the transfer timeliness score parameter for each flight. For example, if the actual departure times of flights A, B, and C are 20 minutes earlier than the scheduled departure time, 12 minutes earlier than the scheduled departure time, and 10 minutes later than the scheduled departure time, respectively, then their corresponding transfer timeliness score ratio parameters are 1.2, 1, and 0.8, respectively; and if the total number of tickets corresponding to flights A, B, and C are 800, 960, and 1000, respectively, then their corresponding transfer timeliness score parameters are 960, 960, and 800, respectively.

[0091] 202. Based on the transit timeliness score parameters corresponding to each flight, identify the target flights with abnormal transit timeliness scores from the flights within the preset time range.

[0092] In some embodiments of this application, based on the transit timeliness score parameter corresponding to each flight, the target flight with abnormal transit timeliness score is determined from flights within a preset time range. This includes: obtaining the number of total departing tickets within a preset time, and calculating the transit timeliness score parameter based on the number of departing tickets; determining whether the transit timeliness of the cargo airport is abnormal based on the departing transit timeliness score parameter and the transit timeliness score parameter corresponding to each flight; if abnormal, sorting the transit timeliness score parameters corresponding to each flight; and determining the flight with the lowest-ranked transit timeliness score parameter as the target flight with abnormal transit timeliness score. For example, the transit timeliness score parameters corresponding to flights A, B, and C are 960, 960, and 800, respectively, with flight C having the lowest transit timeliness score, thus determining flight C as the target flight with abnormal transit timeliness score.

[0093] In some embodiments of this application, the transit time score parameter for departure is calculated based on the total number of departure tickets. This can be achieved by setting a transit time ratio for departure, and then multiplying the total number of departure tickets by the transit time ratio. For example, if the transit time ratio for departure is set to 1, and the actual total number of departure tickets is 500, then the transit time score parameter for departure is 500*1=500.

[0094] In some embodiments of this application, determining whether the transit time of a cargo airport is abnormal based on the transit time score parameter for departure and the transit time score parameter corresponding to each flight may include summing the transit time score parameter for departure and the transit time score parameter corresponding to each flight to obtain a total transit time score parameter, and then comparing the total transit time score parameter with a preset transit time score parameter threshold to determine whether the transit time of the cargo airport is abnormal. Specifically, if the total transit time score parameter is not less than the preset transit time score parameter threshold, then the transit time of the cargo airport is determined to be normal; if the total transit time score parameter is less than the preset transit time score parameter threshold, then the transit time of the cargo airport is determined to be abnormal.

[0095] 203. Obtain the simulation key indicator dataset of the target flight in multiple scenarios.

[0096] In this embodiment, the multi-scenario linkage refers to the linkage of multiple scenarios in a cargo airport, including the apron, sorting center, and road traffic. The simulation key indicator dataset for the multi-scenario linkage refers to the dataset corresponding to the simulation key indicators that affect the transit timeliness score. Specifically, the simulation key indicator dataset for the multi-scenario linkage may include the transport efficiency of trailers, aircraft takeoff efficiency, number of early takeoff flights, number of on-time takeoff flights, number of slightly delayed takeoff flights, number of severely delayed takeoff flights, summary statistics of ULDs (containers) taken by departing flights, statistics of ticket volume taken by departing flights, statistics of cargo unloading at departing stopovers and transfer ULDs, sorting timeliness (sorting time of tickets for each flow direction), cargo unloading rate, and equipment utilization rate.

[0097] In some embodiments of this application, obtaining a simulation key indicator dataset for a target flight across multiple scenarios includes: obtaining flight information for the target flight; inputting the flight information into a preset simulation model for multiple scenarios to obtain a simulation key indicator dataset corresponding to the target flight. The flight information may be flight number information. By inputting the flight information into the preset simulation model for multiple scenarios, the model can generate a simulation key indicator dataset corresponding to the target flight. For example, it can obtain the flight's departure status, the specific tickets it carries, and the corresponding sorting time, etc.

[0098] The simulation model that links multiple scenarios involves running batch simulation models simultaneously using an asynchronous messaging framework. This allows for flexible switching between multiple scenarios and parameters. The specific implementation is as follows: Install asynchronous tools such as CELERY and RabbitMQ, configure parameters on the server under the Linux system, build a clustered batch asynchronous messaging framework, and construct and start a network Python backend system based on Vue front-end and back-end separation. Configure parameters such as the network IP address, asynchronous simulation task mapping, and timed detection of simulation tasks in the simulation model. Users modify and upload simulation input parameters on the simulation front-end according to business rules. The simulation model backend system stores the request parameters in the batch simulation preparation table of the database, and then the database backend starts a timed task to check if there is batch simulation preparation data. After detecting the simulation preparation data, the simulation model distributes the corresponding simulation input parameters to the corresponding simulation database table on the cluster server, and simultaneously adds batch simulation tasks to the batch simulation task table. The timed task of the batch asynchronous messaging framework periodically checks if there are any unprocessed simulation tasks in the batch simulation tasks. If a new task is detected, the task message is sent to the asynchronous message queue of RabbitMQ, and then the batch celery_workers running on dozens of cluster servers consume the task information in a first-in-first-out manner. The worker starts the simulation model deployed on the server through a process. The model then reads the simulation parameters of the task and updates the simulation input data. The simulation is run through multi-threading, multi-processing, and coroutine interaction to achieve batch simulation on the cluster server.

[0099] 204. Based on the simulation key indicator dataset of multiple interconnected scenarios, identify the abnormal simulation key indicators that cause abnormal transfer timeliness scores of target flights.

[0100] In some embodiments of this application, based on a simulation key indicator dataset of multiple interconnected scenarios, abnormal simulation key indicators that cause abnormal transit time scores of target flights are determined, including: obtaining a preset simulation key indicator threshold set corresponding to each key indicator in the simulation key indicator dataset of multiple interconnected scenarios; and determining the influencing factors that cause abnormal transit time scores of target flights based on the simulation dataset of multiple interconnected scenarios and the preset simulation key indicator threshold set.

[0101] In this embodiment, compared to traditional methods, given the current situation at cargo airports where there is often a large volume of logistics transportation management, such as cargo aircraft and cargo vehicles, and insufficient coordination between emergency management, which affects logistics transportation efficiency, this application creatively proposes to identify target flights with abnormal transfer timeliness scores based on the transfer timeliness score parameters corresponding to each flight. This allows for the rapid location of abnormal target flights. Furthermore, by linking simulation key indicator datasets from multiple scenarios, the application identifies the abnormal simulation key indicators that cause the abnormal transfer timeliness scores of target flights, thereby quickly locating the abnormal simulation key indicators that cause the abnormal transfer timeliness scores of target flights, effectively optimizing the efficiency of abnormal target flights, thereby improving the overall logistics transfer efficiency of cargo airports and saving operating costs.

[0102] In some embodiments of this application, after determining the abnormal simulation key indicators that cause the abnormal transfer timeliness score of the target flight based on the simulation key indicator dataset of multiple interconnected scenarios, the method may further include: determining the key influencing factors that cause the abnormal transfer timeliness score of the target flight based on the abnormal simulation key indicators, formulating an optimization scheme, verifying the optimization effect through multiple simulations, and thus obtaining the simulation-verified optimization scheme.

[0103] In some embodiments of this application, such as Figure 3 As shown, after identifying the abnormal simulation key indicators that cause the abnormal transfer timeliness score of the target flight in the simulation key indicator dataset based on multiple interconnected scenarios, the method also includes:

[0104] 301. Obtain multiple business parameters of key indicators for abnormal simulation.

[0105] Among them, business parameters refer to business parameters related to key simulation indicators. For example, the key indicator for anomaly simulation is the transportation efficiency of trailers, and its corresponding business parameters include trailer task duration data, trailer travel distance data, and trailer travel time. Similarly, the multiple business parameters corresponding to aircraft takeoff efficiency include aircraft taxiing time and aircraft taxiing distance.

[0106] 302. Optimize key indicators for anomaly simulation based on multiple business parameters.

[0107] In some embodiments of this application, the key indicators of anomaly simulation are optimized based on multiple business parameters, including: inputting multiple business parameters into a preset simulation optimization model to obtain optimization adjustment parameters; and optimizing the key indicators of anomaly simulation based on the optimization adjustment parameters.

[0108] In this embodiment of the application, by analyzing multiple business parameters of key indicators of anomaly simulation and optimizing the key indicators of anomaly simulation, the efficiency of adjusting the target flights of anomalies is improved, thereby improving the logistics transportation efficiency of cargo airports.

[0109] In one specific embodiment of this application, for flight pushback time analysis, based on a specific flight schedule, the OTT score (transfer timeliness score parameter) is used as a unified evaluation standard to analyze the flight pushback timing. First, one of the influencing factors affecting flight pushback timing is identified: the apron flow restriction parameter. Second, the apron flow restriction parameters (corresponding to the business parameters in step 301) are set in the simulation model, and the simulation is started. By setting different restriction parameters, OTT data and taxiing time are analyzed, and the optimal apron flow restriction parameters are identified, outputting apron flow restriction parameters and related solutions that conform to business logic. This avoids the situation where setting the apron flow restriction parameter too low can easily cause flights to be unable to push back on time, avoiding apron congestion and saving taxiing costs, but failing to maximize timeliness; or setting the apron flow restriction parameter too high can optimize timeliness, but lead to more congestion and queuing on the apron, increasing taxiing costs. This ensures flight timeliness and express transfer timeliness, while also achieving cost savings.

[0110] In another specific embodiment of this application, the design scheme of the cargo sorting center is evaluated, analyzed, and optimized. Based on the sorting center design scheme, a sorting center simulation model is constructed, detailing each sorting device and process. The sorting center simulation model is embedded into the simulation system to accurately reproduce and record the entire process of each shipment from arrival at the airport, transportation to the sorting center unloading port, sorting by various levels of sorting equipment, loading onto aircraft / trucks, and departure from the airport. Based on the simulation output results, the design scheme is evaluated by comprehensively considering KPI indicators such as the airport's overall timeliness (OTT score), sorting center sorting timeliness (sorting time of each destination's express shipments at the sorting center), and cargo handling rate. A thorough analysis of congestion and equipment utilization during each sorting process is conducted to pinpoint bottlenecks in the design scheme. Equipment processing capacity parameters and equipment connection relationships are adjusted, and the simulation is restarted to verify the improvements in overall timeliness, sorting timeliness, and cargo handling rate after the adjustments. Based on multiple scheme adjustments and simulation results, an optimized scheme is determined. The optimized scheme improves sorting timeliness, cargo handling, and overall timeliness.

[0111] In another specific embodiment of this application, the landside elevated bridge scheme is simulated and evaluated: the simulation recreates the traffic operation status of multiple scenarios such as commuter vehicles, freight vehicles, and passenger vehicles on the airport landside; the simulation results are analyzed to evaluate the advantages and disadvantages of the two schemes of building an elevated bridge and not building an elevated bridge from the perspective of the traffic efficiency of various vehicles, and the long-term vehicle traffic status is further analyzed based on long-term prediction data; a stress test environment is constructed to simulate and analyze vehicle traffic under peak pressure conditions; the simulation results under near-term, long-term and peak pressure conditions are combined to show that the scheme without an elevated bridge can meet the commuter efficiency requirements of various vehicles on the airport landside. The adoption of the scheme without an elevated bridge saves tens of millions of yuan in construction costs and saves time costs.

[0112] In another specific embodiment of this application, simulation and algorithm iterative optimization are used to output the optimal parking space allocation scheme based on comprehensive timeliness: Based on historical data and simulation results, combined with business rules and constraints, a key factor strategy and 0-1 programming algorithm are used to construct an algorithm model for optimizing parking space allocation; a simulation system cloud service platform is deployed, and an algorithm-simulation interactive optimization mode is adopted to adjust algorithm parameters. With a distributed architecture, hundreds of simulation versions are run synchronously to iteratively optimize the algorithm model; the simulation outputs full-process event node records of flights, trailers, ULDs (containers), and express mail under multiple scenarios, and provides multi-dimensional analysis source data for the algorithm, such as comprehensive timeliness OTT score and cargo landing rate, to provide quantitative support for algorithm model optimization; the algorithm model and simulation interact and iterate to achieve multi-factor linkage optimization of parking spaces, loading cut-off time, unloading sequence, and other factors, and finally obtain the optimal parking space allocation scheme to help the airport operate safely and efficiently.

[0113] In some embodiments of this application, before using the simulation model that links multiple scenarios, the method further includes: constructing a simulation model that links multiple scenarios. Specifically, constructing the simulation model that links multiple scenarios includes: acquiring super hub data chassis information; integrating and processing super hub data chassis data information; and simulating the linkage of the apron, MHS sorting center, and landside traffic.

[0114] In some embodiments of this application, acquiring super hub data chassis information may include: acquiring high-precision GIS geographic coordinate information of airport runways, transfer centers, parking stands, parking lots, lanes, etc.; acquiring building CAD model information; acquiring attribute parameters of airport management objects such as logistics data, flight information, aircraft, and vehicles, processing capacity of sorting center equipment and path relationships between equipment, and operational data; acquiring MHS sorting center business rules and data information, including the operation processes of various equipment inlets, conveyor belts, chutes, etc., and the sorting operation processes of tickets through different equipment in cargo sorting centers such as parcel sorting machines, small item sorting machines, and security inspection machines; and investigating and confirming the simulation objects and scope specifically involved in landside transportation. Acquiring apron business rules and data information includes: multiple core links such as flight arrival and departure taxiing, loading and unloading, sorting, and flight transit support; operation links and specific processes of flight support vehicle modules, aircraft container transportation, and loading and unloading modules; and business rules for air traffic control, ground support, and vehicle dispatching.

[0115] In some embodiments of this application, integrating and processing super hub data chassis data information may include: extracting CAD and GIS data through BIM automation tools and integrating and importing them into a persistent database; integrating the logistics data, flight information, aircraft, vehicle and other airport management object attribute parameters, sorting center equipment processing capacity and inter-equipment path relationships, and operation data, and storing them in the database;

[0116] The system assigns realistic geographic and temporal coordinates to objects such as tickets, vehicles, and aircraft, enabling the simulation system to clearly define the location and status of each entity at different time points. It uses tickets as the smallest unit of granularity to link more entities such as aircraft, service vehicles, and sorting systems. Combining apron location information and MSH sorting equipment connection information, it uses Python to draw complex path big data.

[0117] Some implementation examples of this application involve simulations of interconnected aprons, MHS sorting centers, and landside traffic, including: using Python to simulate interconnected aprons, MHS sorting centers, and landside traffic via coroutines. The process involves several steps. First, based on the apron information, apron simulation is performed using Python. Specifically, this includes: initializing apron business input data from the project database and drawing a directed graph of apron grid paths; constructing business modules such as vehicles, aircraft, and ULDs using a Python development framework; setting corresponding lane-changing and intersection-changing rules, apron vehicle scheduling algorithms, etc., based on business rules and path planning algorithms; and connecting these modules using a SIMPY discrete simulation model. Second, digitizing the information of MHS sorting center equipment, sorting paths, and sorting rules using standardized scheme data and datafication of business scenarios. Third, after the overall simulation model is developed, simulation can be started using a front-end / back-end separated Django WEB+Nginx+CELERY+rabbitmq framework. During simulation, vehicle simulation trajectories, ULD transport trajectories, and aircraft taxiing trajectories are recorded in real-time. Finally, after simulation completion, the recorded simulation data is automatically stored in the corresponding database, and apron simulation KPI indicators are updated to the results table.

[0118] To better implement the simulation-based cargo airport data processing method in the embodiments of this application, this application also provides a simulation-based cargo airport data processing apparatus, such as... Figure 5 As shown, the simulation-based cargo airport data processing device 400 includes:

[0119] The first determining unit 401 is used to determine the transit efficiency score parameter for each flight based on the total number of tickets loaded on each flight within a preset time range at the cargo airport, the planned departure time parameter, and the actual departure time parameter.

[0120] The second determining unit 402 is used to determine the target flight with abnormal transfer time score from the flights within a preset time range based on the transfer time score parameter corresponding to each flight.

[0121] The first acquisition unit 403 is used to acquire the simulation key indicator dataset of the target flight's multi-scenario linkage.

[0122] The third determining unit 404 is used to determine the abnormal simulation key indicators that cause the transfer timeliness score of the target flight to be abnormal based on the simulation key indicator dataset of multiple linked scenarios.

[0123] In some embodiments of this application, the third determining unit 404 is specifically used for:

[0124] Obtain the preset threshold set of simulation key indicators corresponding to each key indicator in the simulation key indicator dataset that is linked with multiple scenarios;

[0125] Based on a multi-scenario simulation dataset and a preset set of key simulation indicator thresholds, the influencing factors that cause abnormal transit time scores for target flights are identified.

[0126] In some embodiments of this application, after the third determining unit 404, the apparatus further includes:

[0127] The second acquisition unit is used to acquire multiple business parameters of key indicators of abnormal simulation;

[0128] The first optimization unit is used to optimize key indicators of anomaly simulation based on multiple business parameters.

[0129] In some embodiments of this application, the first optimization unit is specifically used for:

[0130] Multiple business parameters are input into a preset simulation optimization model to obtain optimization adjustment parameters;

[0131] The key performance indicators of anomaly simulation are optimized based on the optimized adjustment parameters.

[0132] In some embodiments of this application, the first determining unit 401 is specifically used for:

[0133] Based on the planned departure time parameters and the actual departure time parameters, the transfer time efficiency score ratio parameters for each flight are determined;

[0134] Obtain the total number of tickets corresponding to each cargo aircraft in each flight;

[0135] Based on the transit time efficiency score ratio parameter for each flight and the total number of tickets corresponding to cargo aircraft in each flight, the transit time efficiency score parameter for each flight is determined.

[0136] In some embodiments of this application, the second determining unit 402 is specifically used for:

[0137] Obtain the total number of departing tickets within a preset time period, and calculate the transit time score based on the total number of departing tickets.

[0138] Based on the transit time score parameters for departure and the transit time score parameters for each flight, determine whether the transit time of the cargo airport is abnormal;

[0139] If an anomaly is found, the transit time score parameters for each flight will be sorted.

[0140] Flights ranked last in transit timeliness score are identified as target flights with abnormal transit timeliness scores.

[0141] In some embodiments of this application, the first acquisition unit 403 is specifically used for:

[0142] Obtain flight information for the target flight;

[0143] The flight information is input into a preset simulation model that links multiple scenarios to obtain a dataset of key simulation indicators for the target flight. The simulation model that links multiple scenarios is an asynchronous message framework that runs batch simulation models simultaneously.

[0144] The simulation-based cargo airport data processing device 400 provided in this application includes: a first determining unit 401, used to determine the transit timeliness score parameter corresponding to each flight based on the total number of tickets loaded on each flight within a preset time range, the planned departure time parameter, and the actual departure time parameter; a second determining unit 402, used to determine the target flight with abnormal transit timeliness score from the flights within the preset time range based on the transit timeliness score parameter corresponding to each flight; a first acquiring unit 403, used to acquire the simulation key indicator dataset of the target flight in multiple interconnected scenarios; and a third determining unit 404, used to determine the abnormal simulation key indicators that cause the abnormal transit timeliness score of the target flight based on the simulation key indicator dataset of multiple interconnected scenarios. Compared to traditional methods, current cargo airports typically involve large-scale logistics transportation management, such as cargo aircraft and cargo vehicles, and there is often insufficient coordination between emergency management and logistics, which affects logistics efficiency. This application creatively proposes a method to identify target flights with abnormal transit time scores based on the transit time score parameters corresponding to each flight. This allows for rapid location of abnormal target flights. Furthermore, by linking multiple scenario simulation key indicator datasets, the application identifies the abnormal simulation key indicators causing the abnormal transit time scores of target flights, thereby quickly locating these indicators and effectively optimizing the efficiency of abnormal target flights. This improves the overall logistics transit efficiency of cargo airports and saves operating costs.

[0145] In addition to the simulation-based cargo airport data processing method and apparatus described above, embodiments of this application also provide a server that integrates any of the simulation-based cargo airport data processing apparatuses provided in the embodiments of this application. The server includes:

[0146] One or more processors;

[0147] Memory; and

[0148] One or more applications, wherein the applications are stored in memory and configured to be operated by a processor using any of the methods in any of the embodiments of the above-described simulation-based cargo airport data processing method.

[0149] This application also provides a server that integrates any of the simulation-based cargo airport data processing devices provided in this application. See also... Figure 5 , Figure 5 This is a schematic diagram of the structure of a server provided in one embodiment of this application.

[0150] like Figure 5 As shown, it illustrates the structural schematic diagram of the simulation-based cargo airport data processing device designed according to an embodiment of this application. Specifically:

[0151] The simulation-based cargo airport data processing device may include components such as a processor 501 with one or more processing cores, a storage unit 502 with one or more computer-readable storage media, a power supply 503, and an input unit 504. Those skilled in the art will understand that... Figure 5 The simulation-based cargo airport data processing device structure shown does not constitute a limitation on the simulation-based cargo airport data processing device, and may include more or fewer components than shown, or combine certain components, or have different component arrangements. Wherein:

[0152] The processor 501 is the control center of the simulation-based cargo airport data processing device. It connects various parts of the device via various interfaces and lines, and executes software programs and / or modules stored in the storage unit 502, as well as calling data stored in the storage unit 502, to perform various functions and process data, thereby providing overall monitoring of the simulation-based cargo airport data processing device. Optionally, the processor 501 may include one or more processing cores; preferably, the processor 501 may integrate an application processor and a modem processor, wherein the application processor mainly handles the operating system, user interface, and applications, and the modem processor mainly handles wireless communication. It is understood that the modem processor may not be integrated into the processor 501.

[0153] Storage unit 502 can be used to store software programs and modules. Processor 501 executes various functional applications and data processing by running the software programs and modules stored in storage unit 502. Storage unit 502 may mainly include a program storage area and a data storage area. The program storage area may store the operating system, application programs required for at least one function (such as sound playback function, image playback function, etc.), etc.; the data storage area may store data created based on the use of the simulation-based cargo airport data processing device, etc. In addition, storage unit 502 may include high-speed random access memory, and may also include non-volatile memory, such as at least one disk storage device, flash memory device, or other volatile solid-state storage device. Accordingly, storage unit 502 may also include a memory controller to provide processor 501 with access to storage unit 502.

[0154] The simulation-based cargo airport data processing device also includes a power supply 503 that supplies power to the various components. Preferably, the power supply 503 can be logically connected to the processor 501 through a power management system, thereby enabling functions such as charging, discharging, and power consumption management through the power management system. The power supply 503 may also include one or more DC or AC power supplies, recharging systems, power fault detection circuits, power converters or inverters, power status indicators, and other arbitrary components.

[0155] The simulation-based cargo airport data processing device may also include an input unit 504, which can be used to receive input digital or character information and generate keyboard, mouse, joystick, optical or trackball signal inputs related to user settings and function control.

[0156] Although not shown, the simulation-based cargo airport data processing device may also include a display unit, etc., which will not be described in detail here. Specifically, in the embodiments of this application, the processor 501 in the simulation-based cargo airport data processing device loads the executable files corresponding to the processes of one or more application programs into the storage unit 502 according to the following instructions, and the processor 501 runs the application programs stored in the storage unit 502 to realize various functions, as follows:

[0157] Based on the total number of tickets loaded on each flight within a preset time range at the cargo airport, the planned departure time parameter, and the actual departure time parameter, the transfer timeliness score parameter corresponding to each flight is determined. Based on the transfer timeliness score parameter corresponding to each flight, the target flight with abnormal transfer timeliness score is identified from the flights within the preset time range. The simulation key indicator dataset of the target flight in multiple scenarios is obtained. Based on the simulation key indicator dataset of the multiple scenarios, the abnormal simulation key indicators that cause the abnormal transfer timeliness score of the target flight are determined.

[0158] The simulation-based data processing method for cargo airports provided in this application addresses the challenges of traditional methods. Given the current reality of large-scale logistics transportation management at cargo airports, including cargo aircraft and vehicles, and insufficient coordination in emergency management, which impacts logistics efficiency, this application creatively proposes a method to identify target flights with abnormal transfer timeliness scores based on the transfer timeliness score parameters corresponding to each flight. This allows for rapid location of the abnormal target flights. Furthermore, by linking simulation key indicator datasets from multiple scenarios, the method identifies the abnormal simulation key indicators causing the abnormal transfer timeliness scores of the target flights. This rapidly locates the abnormal simulation key indicators causing the abnormal transfer timeliness scores of the target flights, effectively optimizing the efficiency of the abnormal target flights. Ultimately, this improves the overall logistics transfer efficiency of cargo airports and saves operating costs.

[0159] Therefore, embodiments of this application provide a computer-readable storage medium, which may include: read-only memory (ROM), random access memory (RAM), a magnetic disk, or an optical disk, etc. The computer-readable storage medium stores multiple instructions, which can be loaded by a processor to execute steps in any of the simulation-based cargo airport data processing methods provided in embodiments of this application. For example, the instructions can execute the following steps:

[0160] Based on the total number of tickets loaded on each flight within a preset time range at the cargo airport, the planned departure time parameter, and the actual departure time parameter, the transfer timeliness score parameter corresponding to each flight is determined. Based on the transfer timeliness score parameter corresponding to each flight, the target flight with abnormal transfer timeliness score is identified from the flights within the preset time range. The simulation key indicator dataset of the target flight in multiple scenarios is obtained. Based on the simulation key indicator dataset of the multiple scenarios, the abnormal simulation key indicators that cause the abnormal transfer timeliness score of the target flight are determined.

[0161] In the above embodiments, the descriptions of each embodiment have different focuses. For parts not described in detail in a certain embodiment, please refer to the relevant descriptions in other embodiments.

[0162] The above provides a detailed description of the simulation-based cargo airport data processing method and related apparatus provided in the embodiments of this application. Specific examples have been used to illustrate the principles and implementation methods of this application. The descriptions of the above embodiments are only for the purpose of helping to understand the method and core ideas of this application. At the same time, for those skilled in the art, there will be changes in the specific implementation methods and application scope based on the ideas of this application. Therefore, the content of this specification should not be construed as a limitation of this application.

Claims

1. A simulation-based method for processing cargo airport data, characterized in that, The method includes: Based on the total number of tickets loaded on each flight within a preset time range at the cargo airport, the planned departure time parameter, and the actual departure time parameter, the transfer efficiency score parameter corresponding to each flight is determined; this includes: determining the transfer efficiency score ratio parameter for each flight based on the planned departure time parameter and the actual departure time parameter; obtaining the total number of tickets corresponding to the cargo aircraft in each flight; and determining the transfer efficiency score parameter corresponding to each flight based on the transfer efficiency score ratio parameter for each flight and the total number of tickets corresponding to the cargo aircraft in each flight. Based on the transit timeliness score parameter corresponding to each flight, target flights with abnormal transit timeliness scores are identified from the flights within the preset time range; Obtain the simulation key indicator dataset for the target flight across multiple scenarios; Based on the simulation key indicator dataset of the aforementioned multi-scenario linkage, the abnormal simulation key indicators that cause the abnormal transfer timeliness score of the target flight are identified.

2. The simulation-based cargo airport data processing method according to claim 1, characterized in that, The simulation key indicator dataset based on the multi-scenario linkage identifies abnormal simulation key indicators that cause the transfer timeliness score of the target flight to be abnormal, including: Obtain the preset simulation key indicator threshold set corresponding to each key indicator in the simulation key indicator dataset of the linked multi-scenario; Based on the linked multi-scenario simulation dataset and the preset simulation key indicator threshold set, the influencing factors that cause the abnormal transit time score of the target flight are determined.

3. The simulation-based cargo airport data processing method according to claim 1, characterized in that, After identifying the abnormal simulation key indicators that cause the abnormal transfer timeliness score of the target flight based on the simulation key indicator dataset of the aforementioned multi-scenario linkage, the method further includes: Obtain multiple business parameters of the key indicators of the abnormal simulation; Based on the aforementioned multiple business parameters, the key indicators for anomaly simulation are optimized.

4. The simulation-based cargo airport data processing method according to claim 3, characterized in that, The optimization of the key indicators for anomaly simulation based on the multiple business parameters includes: The multiple business parameters are input into a preset simulation optimization model to obtain optimization adjustment parameters; The key performance indicators of the anomaly simulation are optimized based on the aforementioned optimization adjustment parameters.

5. The simulation-based cargo airport data processing method according to claim 1, characterized in that, The step of determining target flights with abnormal transfer timeliness scores from flights within the preset time range based on the transfer timeliness score parameters corresponding to each flight includes: Obtain the total number of departing tickets within a preset time period, and calculate the transit time score parameter based on the total number of departing tickets. Based on the transit time score parameters for departure and the transit time score parameters for each flight, it is determined whether the transit time of the cargo airport is abnormal. If an anomaly is found, the transit time score parameters corresponding to each flight will be sorted. Flights ranked last in transit timeliness score are identified as target flights with abnormal transit timeliness scores.

6. The simulation-based cargo airport data processing method according to claim 1, characterized in that, The acquisition of the simulation key indicator dataset for the target flight across multiple scenarios includes: Obtain the flight information of the target flight; The flight information is input into a preset multi-scenario simulation model to obtain the simulation key indicator dataset corresponding to the target flight. The multi-scenario simulation model is an asynchronous message framework that runs batch simulation models simultaneously.

7. A simulation-based cargo airport data processing device, characterized in that, The device includes: The first determining unit is used to determine the transit efficiency score parameter for each flight based on the total number of tickets loaded on each flight within a preset time range at the cargo airport, the planned departure time parameter, and the actual departure time parameter; including: determining the transit efficiency score ratio parameter for each flight based on the planned departure time parameter and the actual departure time parameter; obtaining the total number of tickets corresponding to the cargo aircraft in each flight; and determining the transit efficiency score parameter for each flight based on the transit efficiency score ratio parameter for each flight and the total number of tickets corresponding to the cargo aircraft in each flight. The second determining unit is used to determine the target flight with an abnormal transfer time score from the flights within the preset time range based on the transfer time score parameter corresponding to each flight. The first acquisition unit is used to acquire the simulation key indicator dataset of the target flight in multiple scenarios. The third determining unit is used to determine the abnormal simulation key indicators that cause the abnormal transfer timeliness score of the target flight based on the simulation key indicator dataset of the linked multi-scenario.

8. A server, characterized in that, The server includes: One or more processors; Memory; and One or more applications, wherein the one or more applications are stored in the memory and configured to be executed by the processor to implement the simulation-based cargo airport data processing method as described in any one of claims 1 to 6.

9. A computer-readable storage medium, characterized in that, It stores a computer program, which is loaded by a processor to perform the steps in the simulation-based cargo airport data processing method as described in any one of claims 1 to 6.

Citation Information

Patent Citations

  • Flight information processing method and device

    CN108615411A

  • Bayesian network-based flight departure sliding time dynamic-prediction method

    CN108846523A