Through-wall group pipe construction method

By directly splicing the formwork to wrap the through-wall pipes, the problems of complex formwork erection and loose concrete pouring were solved, achieving simple construction, dense concrete and reliable waterproofing, and improving construction quality and reuse rate.

CN117166769BActive Publication Date: 2026-03-20CHINA METALLURGICAL CONSTR ENG GRP
View PDF 2 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-05-24
Publication Date
2026-03-20

AI Technical Summary

Technical Problem

The construction of through-wall pipe groups involves complex and inaccurate formwork erection, loose concrete pouring, difficult waterproofing construction, and low reuse rate.

Method used

The wall-penetrating pipes are wrapped with directly spliced ​​templates, and both ends are sealed with plastic sheeting. The inner diameter of the sleeve is slightly larger than that of the pipes. The outside of the sleeve is wrapped with plastic film. The support template is fixed with tie rods. The longitudinal and transverse reinforcement rods are used to enhance the support. The joints are sealed with sponge strips. After the concrete is vibrated and compacted, the excess parts are removed.

Benefits of technology

It simplifies formwork erection, improves the accuracy and stability of formwork, ensures dense concrete pouring, facilitates waterproofing construction, and improves construction quality and reusability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117166769B_ABST
    Figure CN117166769B_ABST
Patent Text Reader

Abstract

The application provides a kind of wall-penetrating group pipe construction method, and relates to the field of building construction technology, including wall-penetrating group pipe and sleeve pipe fixed on wall steel bars, using the following construction steps: according to the design, the wall-penetrating group pipe is placed in the specified wall steel bar position, and is welded with the steel bar to prevent loosening; the two ends of the wall-penetrating group pipe are blocked with plastic cloth or other materials to prevent subsequent concrete pouring into the pipe; the wall-penetrating group pipe is positioned and the two ends of the wall-penetrating group pipe are covered with sleeve pipes; the wall formwork at the wall-penetrating group pipe is erected; the wall concrete is poured and vibrated to be compacted; after the concrete reaches the side form removal condition, the formwork can be removed, then the excess poured concrete is removed according to the needs; the invention uses formwork for direct splicing and installation, and wraps the wall-penetrating group pipe, without the need for hole opening or prefabrication, the construction is simple and convenient, and the concrete pouring compactness is easier to ensure.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of building construction, in particular to a method for constructing a group of pipes penetrating a wall. BACKGROUND

[0002] In daily electrical construction, the construction of a group of pipes penetrating a wall is often encountered. The entry of a cable into a basement is generally constructed by penetrating a group of sleeves, and then the cable is laid in the sleeves. The sleeves at the group of pipes penetrating the wall are dense, and the steel bars are dense. The sleeves are wide at both ends of the basement outer wall, and the inner wall is less wide, and the outer wall is more wide. This makes it difficult to set the formwork at this place, and the concrete is not compacted, and the subsequent waterproof construction is difficult.

[0003] At present, in order to solve the above problems, the conventional operation method is to cut a plurality of holes in the wooden formwork of the wall at the group of pipes penetrating the wall after the sleeves are buried, and then nest the formwork, or to use a hole-forming steel plate to prefabricate a formwork, or even to directly fill other materials. Since the number of the group of pipes penetrating the wall is usually small, the formwork processing is complex and has low accuracy and low reusability. In addition, the concrete pouring at this place is seriously leaked, the concrete is not easy to vibrate, and the waterproof construction is difficult. SUMMARY

[0004] Therefore, the present application provides a method for constructing a group of pipes penetrating a wall, which changes the conventional formwork setting method of the group of pipes penetrating the wall, reduces the opening of the formwork, improves the firmness and accuracy of the formwork setting, improves the quality of the concrete pouring, and strengthens the waterproof protection.

[0005] The method for constructing a group of pipes penetrating a wall provided by the present application adopts the following technical scheme:

[0006] A method for constructing a group of pipes penetrating a wall, including a group of pipes penetrating a wall and sleeves fixed on the steel bars of the wall, adopts the following construction steps:

[0007] S1, placing the group of pipes penetrating the wall at the specified position of the steel bars of the wall according to the design, and welding and reinforcing the group of pipes penetrating the wall with the steel bars to prevent loosening;

[0008] S2, blocking the two ends of the group of pipes penetrating the wall with plastic cloth or other materials to prevent the subsequent concrete pouring from entering the pipes;

[0009] S3, sleeving the wide parts of the two ends of the wall with the sleeves after the group of pipes penetrating the wall is positioned;

[0010] S4, setting the formwork of the wall at the group of pipes penetrating the wall;

[0011] S5, pouring and vibrating the concrete of the wall;

[0012] S6, removing the formwork after the concrete reaches the side formwork demolding condition, and then removing the excess poured concrete according to the needs.

[0013] Further, the sleeve has an inner diameter slightly larger than the diameter of the wall-penetrating pipe group, and the outer side of the sleeve is wrapped with a plastic film.

[0014] Further, the template comprises a support template and a fixing member for fixing the support template, the support template is arranged at both ends of the wall-penetrating pipe group for pouring wall concrete, and the fixing member is a tension screw.

[0015] Further, the support template comprises a fixed template abutting against the end of the wall-penetrating pipe group and a pouring template arranged at both ends of the fixed template, and the tension screw is arranged on the fixed template to fix the support template.

[0016] Further, the end of the sleeve is provided with a sealing ring abutting against the fixed template.

[0017] Further, the pouring template comprises two vertical vertical plates, and the two vertical plates are arranged at the side of the wall-penetrating pipe group and the side of the wall, respectively.

[0018] Further, the distance between the vertical plate arranged at the side of the wall-penetrating pipe group and the wall-penetrating pipe group is arranged.

[0019] Further, the outer wall of the support template is provided with a plurality of reinforcing rods intersecting longitudinally and transversely.

[0020] Further, sponge rubber strips are used to seal the joints between the fixed template and the pouring template to prevent concrete leakage.

[0021] Further, the two ends of the wall-penetrating pipe group are blocked by plastic cloth or other materials.

[0022] In summary, the present application has at least one of the following beneficial effects: the template is directly spliced and installed in the present application, the wall-penetrating pipe group is wrapped, no hole is needed or prefabricated, the construction is simple and convenient, the concrete pouring density is more easily guaranteed, the concrete can be chiseled and polished according to the needs or used as waterproof reinforcement, the operation is easy, the quality is reliable, and it is more conducive to subsequent waterproof construction and multiple waterproof protection. BRIEF DESCRIPTION OF DRAWINGS

[0023] Fig. 1 The structure of the embodiment of the present application is shown in the figure;

[0024] Fig. 2 The cross-sectional structure of the wall-penetrating pipe group is shown in the figure.

[0025] Explanation of reference signs:

[0026] 1, wall-penetrating pipe group; 2, sleeve; 3, template; 31, support template; 311, fixed template; 312, pouring template; 32, fixing member; 33, reinforcing rod. DETAILED DESCRIPTION

[0027] The present application is further explained by the following specific examples, which should not be construed as limiting the scope of the application. Other advantages and benefits of the present application will be readily appreciated by those skilled in the art in view of the disclosure.

[0028] The application will be further described by reference to the drawings, wherein: Figs. 1-2 The application will be further described by reference to the drawings, wherein:

[0029] The present application discloses a kind of wall group pipe construction method. Referring to Figs. 1-2 A kind of wall group pipe construction method, including fixed in wall steel bar wall group pipe 1 and sleeve pipe 2, using the following construction steps:

[0030] Step one, according to design, wall group pipe 1 is placed in the specified wall steel bar position, and is welded with reinforcement to prevent loosening, the spacing between each pipe in wall group pipe 1 is same, so that concrete can be wrapped each pipe when pouring concrete.

[0031] Step two, wall group pipe 1 both ends are blocked using plastic cloth or other materials, prevent subsequent concrete pouring into pipe, by using plastic cloth or other materials to block both ends of wall group pipe 1, it can avoid concrete immersion in wall group pipe 1 when pouring concrete, avoid wall group pipe 1 being blocked by concrete.

[0032] Step three, wall group pipe 1 is positioned and the wall body both ends part is covered with sleeve pipe 2, the sleeve pipe 2 can be plastic pipe in the embodiment, can also be steel pipe, wherein the inner diameter of sleeve pipe 2 is slightly larger than the diameter of wall group pipe 1, the outer side of sleeve pipe 2 is wrapped with plastic film, so that subsequent concrete can be removed, can also be used according to circumstances without removing, in turn assemble and wrap all wall group pipes.

[0033] Step four, wall group pipe 1 is set up wall body formwork 3, formwork 3 includes support formwork 31 and fixing piece 32 for fixing support formwork 31, support formwork is arranged at both ends of wall group pipe 1 for pouring wall concrete, fixing piece 32 is a tensioning screw, formwork 3 is wrapped around both ends of wall group pipe 1 and abuts tightly with both ends of wall group pipe 1, formwork 3 is fixed at both ends of wall group pipe 1 by tensioning screw.

[0034] Meanwhile, the support template 31 comprises a fixed template 311 abutting against the end of the through-wall group pipe 1 and a pouring template 312 arranged at both ends of the fixed template 311, and the support template 31 is fixed by passing a pull screw through the two fixed templates 311. In order to avoid the concrete from being poured into the joint between the fixed template 311 and the sleeve pipe 2 during the pouring of the concrete, a sealing ring is arranged at the end of the sleeve pipe 2 and abuts against the fixed template 311. The sealing ring can well play the role of sealing and preventing leakage, and further plays the role of sealing the through-wall group pipe 1.

[0035] The pouring template 312 comprises two vertical standing plates arranged at the side of the through-wall group pipe 1 and the side of the wall respectively, and the two standing plates are perpendicular to each other. The standing plate arranged at the side of the through-wall group pipe 1 is arranged perpendicularly to the fixed template 311. In order to wrap each pipe in the through-wall group pipe 1 with the concrete, the interval between the standing plate arranged at the side of the through-wall group pipe 1 and the through-wall group pipe 1 is arranged.

[0036] In order to increase the overall strength of the support template 31, a plurality of reinforcing rods 33 are arranged on the outer wall of the support template 31 in a longitudinal and transverse interlaced manner, and the reinforcing rods 33 are fixed on the support template 31, which can further increase the overall strength of the support template 31.

[0037] In order to avoid the leakage of the concrete at the joint between the fixed template 311 and the pouring template 312, sponge rubber strips are arranged at the joint between the fixed template 311 and the pouring template 312 to prevent the leakage of the concrete, so that the forming effect is better.

[0038] Step five, pouring the concrete of the wall and vibrating and compacting.

[0039] Step six, after the concrete reaches the condition of the side template disassembly, the template 3 can be disassembled, and then the excess poured concrete is disassembled according to the needs. The inner wall of the underground garage through-wall group pipe 1 often needs to be decorated and has a small length, and it is suggested to be disassembled. The outer wall part can be disassembled or not disassembled according to the position needs. The disassembly points are as follows: first, the excess concrete is cut to the outside of the sleeve pipe by closely abutting against the wall, and then the concrete is chiseled by using the air pipe. It is necessary to control the chiseling force. Since the sleeve pipe 2 is wrapped with a plastic film, the excess concrete has no steel bar, and the concrete strength is insufficient, and the like, the chiseling is relatively easy. After the end is cut and chiseled, the concrete block can be pulled outwards as a whole to achieve the effect of disassembling the excess concrete as a whole. If there is leakage, the excess concrete cannot be chiseled as a whole, and the excess concrete is chiseled from the far end to the near end step by step. After the chiseling is completed, the wall is appropriately polished. After the chiseling is completed, waterproof construction can be carried out. The excess concrete which does not need to be chiseled can be used as a waterproof reinforcing layer, and the unchiseled excess part will be covered by the backfilling soil of the side wall, which has no influence on the appearance and quality.

[0040] Finally, it is to be explained that the above embodiments are only used to illustrate the technical solutions of the present application but not to limit the present application. Although the present application has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present application can be modified or equivalently replaced without departing from the purpose and scope of the present application, and all of them should be covered in the scope of the claims of the present application.

Claims

1. A method for constructing a multi-channel pipe network through a wall, characterized in that: Includes the following steps: The construction process includes through-wall pipes (1) and sleeves (2) fixed to the wall reinforcement, and the following steps are taken: S1. According to the design, place the through-wall pipe (1) at the designated wall reinforcement position and weld it to the reinforcement to prevent loosening; S2. Block both ends of the through-wall pipe (1) to prevent subsequent concrete pouring from penetrating deep into the pipe; S3. The two ends of the positioned through-wall pipe (1) that extend beyond the wall are covered by sleeves (2); S4. Install wall formwork (3) at the through-wall group pipe (1); S5. Pour the concrete for the wall and vibrate it to ensure it is compacted. S6. Once the concrete reaches the conditions for side formwork removal, the formwork can be removed, and then any excess concrete poured can be removed as needed. The template (3) includes a support template (31) and a fastener (32) for fixing the support template (31). The support template is set at both ends of the through-wall pipe (1) for pouring wall concrete. The fastener (32) is a tie rod. The support template (31) includes a fixed template (311) that abuts against the end of the sleeve (2) and a casting template (312) that is set at both ends of the fixed part. The tie rod is set on the fixed template (311) to fix the support template (31). The end of the sleeve (2) is provided with a sealing ring, which abuts against the fixed template (311); The casting template (312) includes two vertically arranged uprights, which are respectively located on the side of the through-wall pipe (1) and the side of the wall. The outer wall of the support template (31) is provided with several crisscrossing reinforcing rods (33). The joint between the fixed template (311) and the casting template (312) is sealed with sponge strips to prevent grout leakage; Both ends of the through-wall pipe (1) are sealed with plastic sheeting or other materials.

2. The method for constructing through-wall pipe groups according to claim 1, characterized in that: The inner diameter of the sleeve (2) is slightly larger than the diameter of the through-wall pipe (1), and the outer side of the sleeve (2) is covered with a plastic film.

3. The method for constructing through-wall pipe groups according to claim 1, characterized in that: The casting template (312) is set at a distance between the upright plate on the side of the through-wall pipe (1) and the through-wall pipe (1).

Citation Information

Patent Citations

  • Basement crowd manages wall outside waterproof construction

    CN206694665U

  • Civil air defense basement through-wall group pipe waterproof assembly

    CN216041311U