A pressure relief protection structure and construction method for roadways affected by mining

The three-dimensional support structure consisting of a support frame and a support mesh solves the problem of the support structure being easily damaged by impact during the drilling and pressure relief process. It achieves uniform distribution of impact force and improves impact resistance, thus ensuring construction safety.

CN117167038BActive Publication Date: 2026-11-10HENAN EVONIK MINING ENG CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311202495.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-18
Publication Date
2026-11-10
Estimated Expiration
2043-09-18

AI Technical Summary

Technical Problem

During tunnel construction, the drilling and decompression process can easily create a fracture zone around the borehole, which can cause the support structure to be damaged by impact, posing a safety hazard. Existing technologies are not sufficiently impact-resistant.

Method used

The three-dimensional support structure, which adopts a support frame and a support net, includes a support frame, telescopic beams, support columns, linkage assemblies and a support net. Through the linkage of the linkage assemblies and the buffering effect of the elastic elements, the impact force is evenly distributed, thereby improving the impact resistance of the structure.

Benefits of technology

During the drilling and pressure relief process, the impact force is evenly distributed, reducing the concentration of mechanical fatigue, improving the impact resistance and construction safety of the support structure, and the construction method is simple and easy to implement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117167038B_ABST
    Figure CN117167038B_ABST
Patent Text Reader

Abstract

This application relates to the field of tunnel construction technology, and in particular to a pressure relief protection structure and construction method for tunnels affected by mining. The key points of its technical solution are: it includes a support frame and a support net, with the support net fixedly connected to any two adjacent support frames; the support frame includes a bottom rail assembly fixedly installed at the bottom of the tunnel; two support columns, vertically arranged, with their bottom ends slidably connected to the bottom rail assembly; a telescopic crossbeam located above the support columns, with both ends slidably connected to the support columns; and a connecting rod assembly connected to the telescopic crossbeam and the two support columns respectively; in a first state, when the telescopic crossbeam moves under pressure, the connecting rod assembly pushes the two support columns towards the two sides to press against each other; in a second state, when the support columns are subjected to lateral pressure from the two sides, the connecting rod assembly pushes the telescopic crossbeam upwards to press against the top of the tunnel. This application has the effect of improving the impact resistance of the pressure relief protection structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of tunnel construction technology, and in particular to a pressure relief protection structure and construction method for tunnels affected by mining. Background Technology

[0002] A roadway is a road feature drilled between the surface and the ore body. Based on its function, it can be divided into development roadways, preparation roadways, and mining roadways, etc., serving functions such as ore transportation, ventilation roadways, drainage, and pedestrian roadways, and is widely used in underground mining operations.

[0003] Currently, due to the highly complex geological conditions, after tunnel excavation, it is usually necessary to install wire mesh and anchor bolts on the tunnel walls and apply shotcrete to form tunnel support. The basic purpose of tunnel support is to mitigate and reduce the movement of the surrounding rock, keeping the rock strata in a stable state, which is beneficial to the safety of underground construction. However, during mining operations, vibrations are inevitable due to steps such as designing pilot excavation and continuous tunnel excavation. Vibrations can easily increase the stress on the surrounding rock walls, and this stress can easily concentrate in the surrounding rock near the tunnel, potentially causing bulging, fracturing, or even collapse of the tunnel's sides and roof. Therefore, how to release this stress is particularly important for construction safety. Methods such as drilling or blasting are commonly used to actively release stress and stabilize the surrounding rock. Among these methods, drilling stress relief is currently a widely used technique. First, the stress condition of the surrounding rock needs to be detected. Then, a drilling plan is designed, and drilling equipment is used to drill holes in the surrounding rock around the tunnel to achieve localized stress release. This method is convenient, quick, and has good construction efficiency.

[0004] However, in actual drilling and pressure relief processes, the frequency of borehole blowouts increases as the borehole impacts high-stress areas. Under the effect of high stress release, a large fracture zone is generated around the borehole, at which point the surrounding rock may suddenly fracture, impacting the support structure and damaging the entire support structure. This poses a significant danger to construction equipment and personnel, indicating that the impact resistance of the support structure still has considerable room for improvement. Summary of the Invention

[0005] In order to improve the impact resistance of the pressure relief protection structure, this application provides a pressure relief protection structure and construction method for roadways affected by mining.

[0006] On the one hand, the pressure relief protection structure for roadways affected by mining provided in this application adopts the following technical solution: A pressure relief protection structure for a roadway affected by mining includes a support frame and a support net. The support frames are spaced apart within the roadway, and the support net is located between the support frames and fixedly connected to any two adjacent support frames. Each support frame includes a bottom rail assembly fixedly installed at the bottom of the roadway; two vertically arranged support columns with their bottom ends slidably connected to the bottom rail assembly; a telescopic beam located above the support columns, with both ends slidably connected to the support columns; and a connecting rod assembly connected to the telescopic beam and the two support columns, comprising at least two states. In a first state, when the telescopic beam moves under pressure, the connecting rod assembly pushes the two support columns towards the sides, causing them to press against each other, and the telescopic beam extends. In a second state, when the support columns are subjected to lateral pressure from the sides, the connecting rod assembly pushes the telescopic beam upwards to press against the top of the roadway, and the telescopic beam shortens.

[0007] By adopting the above technical solution, the support frame and the support net form a three-dimensional support structure. During the drilling and decompression process, if the surrounding rock breaks rapidly due to stress, the impact force will directly act on the telescopic beam or support column. At this time, the impact force will push the telescopic beam to move downward or push the support column to move inward. Under the action of the linkage assembly, the impact force can be diffused to the other unimpacted support structures. In this process, the telescopic beam and guide rail provide the freedom of movement for structural offset adjustment. The pressure can be evenly distributed to each component of the support frame through the linkage assembly, so that the overall force is distributed and mechanical fatigue is not easily concentrated in local areas, thus improving the impact resistance of the support protection structure.

[0008] Preferably, the telescopic beam includes a sleeve; two telescopic rods, one end of which is simultaneously slidably sleeved in the sleeve, and the other end of which is slidably engaged with the support column; and elastic elements, which are respectively connected to the two telescopic rods and are used to apply elastic forces to the two telescopic rods as they move closer to each other and further apart.

[0009] By adopting the above technical solution, the sleeve provides assembly space for the two telescopic rods, enabling the two telescopic rods to move coaxially. During this process, the elastic element can apply buffering force to the displacement of the two telescopic rods, thereby further realizing the pressure relief function and further improving the support effect.

[0010] Preferably, the linkage assembly includes three linkages, one end of which is rotatably connected to each other, and the other end of which is rotatably connected to the telescopic beam and the two support columns, respectively.

[0011] By adopting the above technical solution, the three connecting rods form a three-dimensional transmission system. When one side is subjected to pressure displacement, the pressure can be transferred simultaneously to the parts acted upon by the other two connecting rods, realizing the linkage of the structure and making the structure's movement efficient and fast.

[0012] Preferably, the connecting rod includes an adjusting screw, which is fixedly connected to a rotating adjusting seat; and two sleeves, which are respectively sleeved on both ends of the adjusting screw and rotatably connected to the adjusting screw, and the ends of the sleeves are rotatably connected to the telescopic beam, the support column or another sleeve.

[0013] By adopting the above technical solution, the adjusting seat can be driven to rotate, which in turn drives the adjusting screw to rotate. Under the action of thread engagement, the sleeve slides relative to the adjusting screw, thereby adjusting the length of the connecting rod to adapt to various sizes of roadway space. In addition, when the support frame is subjected to pressure displacement, the pressure-bearing support column or telescopic beam can be returned to its original position by adjusting the length of the connecting rod, making the structure flexible in use.

[0014] Preferably, the bottom rail assembly includes a rail body laid at the bottom of the tunnel; and a first anchor rod that passes through the rail body and extends to the foundation.

[0015] By adopting the above technical solution, the first anchor rod plays the role of fixing the track body. Since the track body needs to withstand a large pressure, the track body fixed by the first anchor rod is not easy to shift. The track body can be slidably assembled with the support column, resulting in good structural stability and high structural precision.

[0016] Preferably, it also includes a traction rod, which is located between any two adjacent sets of the support frames, and its two ends are respectively movably connected to the two sets of the support frames.

[0017] By adopting the above technical solution, the traction rod plays a role in enhancing the support. When a local support frame is impacted and shifts, the traction rod can distribute some of the pressure to the adjacent support frame, thereby achieving the effect of stress relief.

[0018] Preferably, there are multiple traction rods, which are arranged at intervals from top to bottom.

[0019] By adopting the above technical solution, multiple traction rods can play a role in multi-point interconnected traction, thereby improving the overall stability of the structure.

[0020] Preferably, the elastic element includes a compression spring, with both ends connected to the two telescopic rods respectively; and a tension spring, with both ends connected to the two telescopic rods respectively.

[0021] By adopting the above technical solution, the compression spring and the tension spring provide elastic support for the two telescopic rods when they are extending or retracting, achieving bidirectional buffer balance. The structure is simple and highly practical.

[0022] Preferably, it also includes a second anchor bolt, which is inserted into the surrounding rock and fixedly connected to the support mesh.

[0023] By adopting the above technical solution, the second anchor bolt plays the role of reinforcing the support net, which is conducive to further improving the impact resistance of the structure.

[0024] On the other hand, the construction method for a pressure relief protection structure for roadways affected by mining provided in this application adopts the following technical solution: A construction method for a pressure relief protection structure for a roadway affected by mining includes the following steps; S1: Tunnel excavation to form the main tunnel structure, leveling the site, including the sides, top, and bottom;

[0025] S2: Excavate a receiving trench at the bottom of the tunnel. The receiving trench is parallel to the excavation face and has a depth of about 20-30cm. It extends to both sides. S3: Place the track body in the receiving groove along the extension direction of the receiving groove, and drive the first anchor rod into the surrounding rock at the bottom of the tunnel to fix the track body. S4: Install the two support columns to the track assembly respectively. During the installation process, measure the verticality to ensure that the two support columns are parallel to each other. S5: Lift the telescopic beam with a forklift to install it on top of the two support columns, and install vertical bracing between the telescopic beam and the bottom of the aisle. S6: Install a connecting rod assembly between the telescopic beam and the support column, and adjust the connecting rod assembly so that the telescopic beam is attached to the top of the tunnel and the support column is attached to both sides of the tunnel. S7: Repeat steps S2-S6 in the tunnel until the support frames are spaced out in the tunnel. S8: Install a support net between any two adjacent support frames. The support net needs to cover the top of the tunnel and both sides. S9: Install second anchor bolts at the top and sides of the tunnel, and anchor the support net to the tunnel wall. S10: Install a traction rod between any two adjacent support frames.

[0026] By adopting the above technical solution, the installation process is relatively convenient, assembly can be carried out using conventional equipment, construction efficiency is good, it can bring good economic benefits, and it is easy to promote.

[0027] In summary, this application includes at least one of the following beneficial technical effects: 1. The support frame and the support net form a three-dimensional support structure. During the drilling and decompression process, if the surrounding rock breaks rapidly due to stress, the impact force will directly act on the telescopic beam or support column. At this time, the impact force will push the telescopic beam to move downward or push the support column to move inward. Under the action of the linkage assembly, the impact force can be diffused to the other unimpacted support structures. During this process, the telescopic beam and guide rail provide the freedom of movement for structural offset adjustment. The pressure can be evenly distributed to each component of the support frame through the linkage assembly, so that the overall force is distributed and mechanical fatigue is not easily concentrated in local areas, thus improving the impact resistance of the support protection structure. 2. By driving the adjusting seat to rotate, the adjusting screw can be driven to rotate. Under the action of thread engagement, the sleeve slides relative to the adjusting screw, thereby adjusting the length of the connecting rod to adapt to various sizes of roadway space. In addition, when the support frame is displaced by pressure, the pressure-bearing support column or telescopic beam can be returned to its original position by adjusting the length of the connecting rod. The operation is flexible and convenient. 3. The construction method is relatively convenient and can be assembled using conventional equipment. The construction efficiency is good, which can bring good economic benefits and is easy to promote. Attached Figure Description

[0028] Figure 1 This is a schematic diagram of the pressure relief protection structure in a preferred embodiment of this application.

[0029] Figure 2 This is a structural schematic diagram of multiple sets of support frames in a preferred embodiment of this application.

[0030] Figure 3 This is a schematic diagram of the support frame in a preferred embodiment of this application.

[0031] Figure 4 This is a structural schematic diagram of the bottom rail assembly and support column in a preferred embodiment of this application.

[0032] Figure 5 This is a structural schematic diagram of the telescopic beam and support column in a preferred embodiment of this application.

[0033] Figure 6 This is a schematic diagram of the structure of the telescopic beam after the sleeve rod is removed in a preferred embodiment of this application.

[0034] Figure 7 This is a schematic diagram of the linkage assembly in a preferred embodiment of this application.

[0035] Figure 8 This is a structural schematic diagram of the support frame, support net, second anchor rod, and traction rod in a preferred embodiment of this application.

[0036] Explanation of reference numerals in the attached figures: 1. Supporting framework; 2. Bottom rail assembly; 21. Rail body; 22. First anchor bolt; 3. Telescopic beam; 31. Sleeve rod; 32. Elastic element; 321. Compression spring; 322. Tension spring; 33. Telescopic rod; 331. Sliding sleeve; 4. Connecting rod assembly; 41. Connecting rod member; 411. Adjusting screw; 412. Adjusting seat; 413. Sleeve; 5. Support column; 51. Slider; 6. Support netting; 7. Traction rod; 8. Second anchor bolt. Detailed Implementation

[0037] The following is in conjunction with the appendix Figure 1-8 This application will be described in further detail.

[0038] This application discloses a pressure relief protection structure for roadways affected by mining.

[0039] Reference Figure 1 as well as Figure 2 The pressure relief protection structure includes a support frame 1, a support net 6, and a traction rod 7. The support frame 1 is set in multiple sets, which are spaced apart along the length of the roadway to play the main role in supporting the force. At the same time, the traction rod 7 is connected to two adjacent support frames 1 to form a three-dimensional force-bearing frame structure. The support net 6 is also connected to two adjacent support frames 1. At this time, the support net 6 covers the gap between two adjacent support frames 1, and then wraps the top and sides of the roadway with the support net 6 to further enhance the protection capability of the support structure.

[0040] Reference Figure 3 and Figure 4 Specifically, the support frame 1 includes a bottom rail assembly 2, a telescopic crossbeam 3, a connecting rod assembly 4, and two support columns 5. The bottom rail assembly 2, laid at the bottom of the tunnel, provides support for the support columns 5. The bottom rail assembly 2 includes a rail body 21 and a first anchor rod 22. To facilitate the installation of the rail body 21, a receiving groove is provided at the bottom of the tunnel. This receiving groove is a long, narrow groove extending from one side of the tunnel to the other. The opening of the receiving groove is larger than the width of the rail body 21, allowing the rail body 21 to be placed along its length. Furthermore, a through hole is provided on the rail body 21 for the first anchor rod 22 to pass through. The first anchor rod 22 penetrates the rail body 21 through the through hole and inserts into the surrounding rock of the foundation, thereby anchoring the rail body 21 within the tunnel. The rail body 21, laid at the bottom of the tunnel, provides robust support for the support columns 5.

[0041] Here, the support column 5 is made of steel to ensure structural strength. The support column 5 is set vertically, and the bottom end is slidably set at the track body 21. Specifically, in order to realize the sliding installation of the support column 5, a slider 51 is fixedly installed at the bottom of the support column 5. The track body 21 is provided with a sliding groove that slides with the slider 51. At this time, with the cooperation of the slider 51 and the sliding groove, the support column 5 can move laterally along the length direction of the track body 21. When the side walls of the tunnel bulge, the support column 5 can be pressed to slide, and the two support columns 5 will move closer to each other. The degree of freedom of movement is obtained by sliding.

[0042] At the same time, continue to refer to Figure 3 The telescopic beam 3 is located above the two support columns 5. The telescopic beam 3 is telescopic in length, and both ends of the telescopic beam 3 are connected to the two support columns 5 respectively. The telescopic beam 3 slides on the support columns 5 in the vertical direction. At this time, the connecting rod assembly 4 is connected to the telescopic beam 3 and the two support columns 5 respectively. The telescopic beam 3 and the two support columns 5 are connected by motion through the connecting rod assembly 4. Under the action of the connecting rod assembly 4, because the tunnel usually breaks inward from the sides or top when drilling and depressurizing, it will impact the telescopic beam 3 and the support columns 5 respectively.

[0043] At this time, the telescopic beam 3 and the two support columns 5 include at least two states. In the first state, when the telescopic beam 3 moves under pressure, the two support columns 5 are pushed towards the two sides and pressed together via the linkage assembly 4, and the telescopic beam 3 extends. In the second state, when the support columns 5 are subjected to lateral pressure from the two sides, the telescopic beam 3 is pushed upward via the linkage assembly 4 and pressed against the top of the roadway, and the telescopic beam 3 shortens, thereby distributing the pressure to the remaining unpressurized components, achieving overall pressure, significantly improving the pressure-bearing capacity, and reducing the risk of structural deformation.

[0044] Here, the telescopic beam 3 is set to be telescopic, which is to satisfy the degree of freedom of movement during the pressure relief process. It can adapt to the offset of the two support columns 5 by telescopic movement. The specific implementation method is as follows.

[0045] Reference Figure 5 and Figure 6 The telescopic beam 3 includes a sleeve rod 31, an elastic element 32, and two telescopic rods 33. The sleeve rod 31 is a long rod structure with an internally controlled center and open ends, and the cross-section of the sleeve rod 31 has a rectangular closed-loop profile. In addition, the outer edge profile of the telescopic rod 33 is adapted to the inner edge of the sleeve rod 31. The two telescopic rods 33 are respectively inserted into the two ends of the sleeve rod 31, and the telescopic rods 33 are slidably sleeved in the sleeve rod 31. At the same time, the end of the telescopic rod 33 away from the sleeve rod 31 is slidably engaged with the support column 5. Specifically, a sliding sleeve 331 is welded and fixed to the end of the telescopic rod 33, and the support column 5 is movably inserted into the sliding sleeve 331 to achieve sliding installation.

[0046] At this time, when the support column 5 is subjected to pressure from both sides, it will move closer to each other. At this time, the telescopic rod 33 can retract to adapt to its movement. Furthermore, the elastic element 32 is connected to the two telescopic rods 33 respectively, and is used to apply elastic force to the two telescopic rods 33 when they move closer to each other and further apart. During the extension and retraction of the telescopic rods 33, the elastic element 32 also plays a role in buffering and absorbing energy.

[0047] Continue to refer to Figure 6 To achieve the effect of buffering and absorbing energy, the elastic element 32 includes a compression spring 321 and a tension spring 322. Both the compression spring 321 and the tension spring 322 are located between the opposite ends of the two telescopic rods 33. The two ends of the compression spring 321 are fixedly connected to the two telescopic rods 33 respectively; and the two ends of the tension spring are also fixedly connected to the two telescopic rods 33 respectively.

[0048] Here, when the two telescopic rods 33 move closer or further apart, under the action of the compression spring 321 and the extension spring 322, elastic force can be applied to the compression and extension actions respectively. Whether it is the extension or retraction action, it can play a role in buffering and absorbing energy, and the pressure relief effect is further improved.

[0049] Reference Figure 7 Based on the telescopic adaptability of the telescopic beam 3, the motion connection between the telescopic beam 3 and the support column 5 is mainly achieved through the linkage assembly 4. Specifically, the linkage assembly 4 includes three connecting rods 41 with identical structures. One end of each connecting rod 41 is hinged to the other via a pin and a thrust bearing, allowing the three rods to rotate relative to each other. The other end of each connecting rod 41 forms a free end, which is rotatably connected to the telescopic beam 3 and the two support columns 5, forming a triangular arrangement. During installation, a hinge seat can be integrally installed at the sleeve rod 31 and the support column 5, and the free end of the connecting rod 41 can be hinged to the hinge seat. Under the action of the three triangular connecting rods 41, if the telescopic beam 3 is subjected to downward pressure from the tunnel, it will push the connecting rod 41 at the top, thereby pushing the connecting rods 41 on both sides to move to the sides, and thus pushing the support column 5 to press against the two sides of the tunnel, achieving uniform force relief. Conversely, if the two sides bulge towards the inside of the tunnel, they will push the telescopic beam 3 upward through the support column 5 and the connecting rod 41, thereby pressing against the top of the tunnel.

[0050] Furthermore, to optimize the ease of installation of the connecting rod 41, the connecting rod 41 specifically includes an adjusting screw 411, an adjusting seat 412, and two sleeves 413. The adjusting seat 412 is fixedly installed in the middle of the adjusting screw 411, and its outer edge contour can have a hexagonal shape to facilitate wrench turning. Additionally, the adjusting screw 411 is provided on the inner wall of the sleeve 413, and the two sleeves 413 are respectively fitted onto both ends of the adjusting screw 411 and mesh with it. The other end of the sleeve 413 is rotatably connected to the telescopic beam 3, the support column 5, or another sleeve 413.

[0051] At this time, by rotating the adjusting seat 412 with a tool, the adjusting screw 411 can be rotated. Under the action of thread engagement, the sleeve 413 slides relative to the adjusting screw 411, thereby adjusting the length of the connecting rod 41 to adapt to various sizes of tunnel space. In addition, when the support frame 1 is displaced by pressure, the pressure-bearing support column 5 or telescopic beam 3 can be returned to its original position by adjusting the length of the connecting rod 41.

[0052] It should be noted that after the support frame 1 is installed to the support column 5, it still needs to be vertically supported and fixed. Based on this, vertical bracing (not shown in the figure) can also be installed between the support column 5 and the bottom of the tunnel. The vertical bracing adopts a steel rod support structure. In addition, if the bottom of the tunnel bulges, it will squeeze the bottom rail assembly 2 upward. At this time, under the three connecting rods 41, the support column 5 can also be driven to press against the two sides, and the telescopic beam 3 can be pressed against the top of the tunnel, achieving all-round support with significant support effect.

[0053] Reference Figure 8 After several support frames 1 are fixedly installed, the support net 6 can be installed at the support frames 1. The support net 6 can be laid along the top and sides of the roadway, and then the support net 6 can be welded and fixed to the support frames 1 by welding or binding. At this time, the support net 6 is located between the support frames 1 and can be fixedly connected to any two adjacent support frames 1 to protect the gap between the two support frames 1.

[0054] Furthermore, to enhance the structural stability of the support net 6, the pressure relief protection structure also includes second anchor bolts 8. These second anchor bolts 8 can be inserted into the surrounding rock and fixedly connected to the support net 6, typically by welding. Additionally, multiple second anchor bolts 8 can be arranged in a rectangular array, providing multi-point fixation for the support net 6. This improves the support effect of the support net 6 and further enhances the structure's impact resistance. It should be noted that the specific number of second anchor bolts 8 can be set according to actual needs; no limit is placed on the specific number of second anchor bolts 8 used here.

[0055] Continue to refer to Figure 8 After the support net 6 is assembled, a traction rod 7 can be installed on any two adjacent support frames 1. The traction rod 7 is located between any two adjacent sets of support frames 1 and is placed horizontally. Both ends of the traction rod 7 have ball heads. A ball head hinge seat for assembling the ball head is fixedly installed on the side of the support column 5. The two ends of the traction rod 7 are movably connected to the two sets of support frames 1 respectively. If the surrounding rock breaks rapidly due to stress, the impact force will directly act on the support column 5. When a local support frame 1 is impacted and shifts, part of the pressure can be distributed to the adjacent support frame 1 through the traction rod 7, thereby achieving the stress relief effect and improving the safety of the structure.

[0056] Furthermore, the traction rod 7 can be configured as multiple rods, arranged at intervals from top to bottom. The traction rod 7 can be two, three, or four rods, etc. The specific number can be adjusted according to the height support requirements of the roadway, and no specific restrictions are imposed here. Based on this, multiple traction rods 7 can play a role in multi-point connection traction, and the overall stability of the structure can be further improved.

[0057] This embodiment also discloses a construction method for a pressure relief protection structure in a roadway affected by mining, including the following steps: S1: Tunnel excavation. Based on the construction drawings, drilling and blasting methods and mechanical tunneling methods are used for development to form the main body of the tunnel. The cross-sectional outline of the main body of the tunnel is a rectangular structure, which constitutes the flat ground at the bottom of the tunnel. At this time, the tunnel has a flat top, top, and two sides.

[0058] S2: After the tunnel is excavated, an impact drill can be used to excavate a receiving trench at the bottom of the tunnel. The receiving trench is parallel to the excavation face and extends to both sides. The receiving trench must be straight and free of bends. The outline of the receiving trench should preferably be a rectangular opening. After the impact operation, the rubble inside the receiving trench should also be cleaned in time. Its depth is about 20-30cm, such as 21cm, 25cm or 29cm, which is enough to accommodate the track body 21. No specific restrictions are made here.

[0059] S3: Place the track body 21 into the receiving groove along its extension direction. Keep the track body 21 as level as possible. After laying, use a level to test its levelness. If the track body 21 is not level enough, place wooden blocks under the track for quick adjustment. After the track body 21 is laid, use a drilling rig to pass the first anchor rod 22 through the track body 21 and drive it into the surrounding rock at the bottom of the tunnel to fix the track body 21.

[0060] S4: Use a forklift to lift the two support columns 5 onto the track body 21. At this time, a construction worker assists in the installation by sliding the bottom end of the support to the track body 21. This mainly involves aligning the slider 51 with the slide rail by supporting it and pushing the slider 51 into the slide rail. At this time, the support column 5 is installed at the track assembly. During the installation process, the verticality is measured. If the verticality of the support column 5 is insufficient, the installation of the support column 5 is suspended, and the horizontality of the track body 21 is adjusted until the two support columns 5 are parallel to each other.

[0061] S5: Lift the telescopic beam 3 with a forklift, adjust the position of the telescopic beam 3 so that the sliding sleeve 331 in the telescopic beam 3 is aligned with the top of the support column 5, and install the sliding sleeve 331 onto the top of the two support columns 5. Then, to facilitate the subsequent assembly of the connecting rod assembly 4, install vertical supports between the telescopic beam 3 and the bottom of the tunnel, and the vertical supports support the telescopic beam 3.

[0062] S6: Install the connecting rod assembly 4 between the telescopic beam 3 and the support column 5. In the specific installation process, firstly, the three connecting rods 41 can be rotated and connected to each other, and firstly, one of the connecting rods 41 is installed at the telescopic beam 3. Then, the other two connecting rods 41 are connected to the two support columns 5 respectively. Finally, by rotating the adjusting seat 412, the connecting rods 41 are tensioned. By adjusting the connecting rod assembly 4, the telescopic beam 3 is attached to the top of the tunnel, and the support column 5 is attached to both sides of the tunnel.

[0063] S7: Repeat steps S2-S6 in the tunnel until the support frames 1 are spaced out in the tunnel.

[0064] S8: Install the support net 6 between any two adjacent support frames 1. First, attach the support net 6 to the two sides or top of the roadway. The support net 6 covers the top and two sides of the roadway. Then, fix the support net 6 to the support frame 1 by welding or binding.

[0065] S9: The second anchor rod 8 is driven into the top and both sides of the tunnel using a drilling rig, and the second anchor rod 8 is fixed to the support net 6. The second anchor rod 8 anchors the support net 6 to the tunnel wall, thus achieving fixed installation of the support net 6.

[0066] S10: Install traction rods 7 between any two adjacent support frames 1. Specifically, connect both ends of the traction rods 7 to the hinge seats of the support frames 1 by means of ball joints. When installing multiple sets of traction rods 7, install them sequentially from bottom to top until the traction rods 7 fill the gap between the two support frames 1.

[0067] After the pressure relief and protection structure is completed, for high-stress areas in the roadway, internal stress can be reduced by drilling to relieve pressure. During this process, the impact generated when the surrounding rock breaks can act on the supporting beam or supporting column 5. At this time, under the linkage of the connecting rod assembly 4, the pressure can be transmitted to the unpressurized area, and the support is achieved through the rest of the roadway, and the overall stability of the structure is significantly improved.

[0068] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.

Claims

1. A pressure relief protection structure for roadways affected by mining, characterized in that: It includes a support frame (1) and a support net (6). The support frames (1) are spaced apart in the roadway, and the support net (6) is located between the support frames (1) and is fixedly connected to any two adjacent support frames (1). The support frame (1) includes a bottom rail assembly (2), which is fixedly installed at the bottom of the tunnel; Two support columns (5) are vertically arranged, and their bottom ends are slidably arranged with the bottom rail assembly (2); The telescopic beam (3) is located above the support column (5), and its two ends are slidably connected to the support column (5); The connecting rod assembly (4) is connected to the telescopic beam (3) and the two support columns (5) respectively, and includes at least two states. In the first state, when the telescopic beam (3) is pressed down and moves, the connecting rod assembly (4) pushes the two support columns (5) to press against the two sides respectively, and the telescopic beam (3) extends. In the second state, when the support columns (5) are subjected to lateral pressure from the two sides, the connecting rod assembly (4) pushes the telescopic beam (3) to move upward and press against the top of the roadway, and the telescopic beam (3) shortens.

2. The pressure relief protection structure for roadways affected by mining as described in claim 1, characterized in that: The telescopic beam (3) includes Sleeve (31); The telescopic rod (33) consists of two rods, one end of which is simultaneously slidably sleeved inside the sleeve rod (31), and the other end is slidably engaged with the support column (5); And an elastic element (32), which is connected to the two telescopic rods (33) respectively, to apply elastic force to the two telescopic rods (33) as they move closer to each other and further apart.

3. The pressure relief protection structure for roadways affected by mining as described in claim 1, characterized in that: The linkage assembly (4) includes three linkages (41), one end of which is rotatably connected to each other, and the other end of which is rotatably connected to the telescopic beam (3) and the two support columns (5), respectively.

4. The pressure relief protection structure for roadways affected by mining as described in claim 3, characterized in that: The connecting rod (41) includes The adjusting screw (411) is fixedly connected to the rotating adjusting seat (412); And two sleeves (413) are respectively sleeved on both ends of the adjusting screw (411) and rotatably connected to the adjusting screw (411). The end of the sleeve (413) is rotatably connected to the telescopic beam (3), the support column (5) or another sleeve (413).

5. The pressure relief protection structure for a roadway affected by mining as described in claim 1, characterized in that: The bottom rail assembly (2) includes The track body (21) is laid at the bottom of the tunnel; And the first anchor rod (22) penetrates the track body (21) and extends to the foundation.

6. The pressure relief protection structure for a roadway affected by mining as described in claim 1, characterized in that: It also includes a traction rod (7), which is located between any two adjacent sets of the support frames (1), and its two ends are movably connected to the two sets of the support frames (1) respectively.

7. A pressure relief protection structure for a roadway affected by mining, as described in claim 6, characterized in that: The traction rod (7) consists of multiple rods, which are arranged at intervals from top to bottom.

8. A pressure relief protection structure for a roadway affected by mining, as described in claim 2, characterized in that: The elastic element (32) includes A compression spring (321) is connected at both ends to two telescopic rods (33); And a tension spring (322), with its two ends connected to the two telescopic rods (33) respectively.

9. A pressure relief protection structure for a roadway affected by mining, as described in claim 1, characterized in that: It also includes a second anchor rod (8), which is inserted into the surrounding rock and fixedly connected to the support net (6).

10. The construction method for a pressure relief protection structure for a roadway affected by mining, according to any one of claims 1-9, is characterized in that: Includes the following steps; S1: Tunnel excavation, forming the main tunnel structure, leveling the site, including the two sides, top and bottom; S2: Excavate a receiving trench at the bottom of the tunnel. The receiving trench is parallel to the excavation face and has a depth of 20-30cm, extending to both sides. S3: Place the track body (21) in the receiving groove along the extension direction of the receiving groove, and drive the first anchor rod (22) into the surrounding rock at the bottom of the tunnel to fix the track body (21); S4: Install the two support columns (5) to the track assembly respectively. During the installation process, measure the verticality to ensure that the two support columns (5) are parallel to each other. S5: Lift the telescopic beam (3) with a forklift, install the telescopic beam (3) on the top of the two support columns (5), and install vertical bracing between the telescopic beam (3) and the bottom of the aisle. S6: Install a connecting rod assembly (4) between the telescopic beam (3) and the support column (5), and adjust the connecting rod assembly (4) so ​​that the telescopic beam (3) is attached to the top of the tunnel and the support column (5) is attached to both sides of the tunnel. S7: Repeat steps S2-S6 in the tunnel until the support frame (1) is arranged at intervals in the tunnel; S8: Install a support net (6) between any two adjacent support frames (1). The support net (6) needs to cover the top of the tunnel and the two sides. S9: Install second anchor bolts (8) at the top and sides of the tunnel, and anchor the support net (6) to the tunnel wall; S10: Install a traction rod (7) between any two adjacent support frames (1).

Citation Information

Patent Citations

  • Flexible support integrated equipment for complex roadway

    CN113090287A

  • Protect strutting arrangement in pit

    CN208578576U