Whole bathroom

By using an integrated bathroom chassis design and a U-shaped groove sealing connection, the problems of high construction difficulty and leakage risks in existing technologies have been solved, enabling precise installation and efficient construction of squat toilets.

CN117179607BActive Publication Date: 2026-03-24WANHUA ECOLOGICAL NEW HOME IMPROVEMENT (HEZE) CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-13
Publication Date
2026-03-24

AI Technical Summary

Technical Problem

The existing installation scheme for squat toilets in integrated bathrooms requires drilling holes on the construction site, which makes construction difficult, positioning inaccurate, and poses a risk of leakage.

Method used

The integrated bathroom chassis features a one-piece molding design, including a first mounting section and a U-shaped groove. The squat toilet is installed and connected to the connecting pipe via a U-shaped bracket, simplifying the installation process and improving positioning accuracy.

Benefits of technology

It improves the accuracy and efficiency of squat toilet installation, reduces the risk of leakage, simplifies the production and installation process, and reduces costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117179607B_ABST
    Figure CN117179607B_ABST
Patent Text Reader

Abstract

The whole bathroom provided by the present disclosure comprises a whole bathroom base, which is integrally formed and recessed downward to form a mounting space; a first mounting part arranged in the mounting space, one side of the first mounting part being provided with an opening, and opposite sides of the opening being provided with a U-shaped groove and a squat toilet, the opening of the U-shaped groove facing upward; a connecting pipeline in communication with the squat toilet at one end and with an external water pipe at the other end; and a U-shaped support connected with the connecting pipeline, two ends of the U-shaped support being respectively embedded in two U-shaped grooves, and the two ends of the U-shaped support abutting against the first mounting part and forming a sealed connection to avoid sewage on the top surface of the whole bathroom base from seeping into the lower part of the mounting part.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present disclosure relates to the technical field of home decoration, and particularly relates to a whole bathroom with a squatting toilet. BACKGROUND

[0002] In the whole bathroom market, the installation scheme of the squatting toilet is on-site construction, which needs to be manually drilled on the bathroom chassis, place the squatting toilet, and seal the periphery of the squatting toilet and the bathroom chassis by glue treatment. However, such scheme needs to be drilled on the construction site, which leads to great construction difficulty and inaccurate positioning of the drilling, and causes leakage hidden danger of the whole bathroom. SUMMARY

[0003] To solve the technical problems in the prior art, the present disclosure provides a whole bathroom with a squatting toilet, which is installed by on-site assembly, forms structural waterproofing, and simplifies the production and installation process of the whole bathroom chassis.

[0004] As an aspect of an embodiment of the present disclosure, a whole bathroom is provided, comprising:

[0005] a whole bathroom chassis, which is integrally formed and concave downward to form an installation space;

[0006] a first installation part, which is arranged in the installation space, and one side of the first installation part is provided with an opening, and two opposite sides of the opening are provided with:

[0007] a U-shaped groove, and an opening of the U-shaped groove is upward;

[0008] a squatting toilet, which is embedded in the first installation part;

[0009] a connecting pipeline, one end of which is communicated with the squatting toilet, and the other end of which is communicated with a water pipe outside; and

[0010] a U-shaped support, which is connected with the connecting pipeline, two ends of the U-shaped support are respectively embedded in two U-shaped grooves, and the two ends of the U-shaped support abut against the first installation part and form a sealed connection, so as to avoid sewage on the top surface of the whole bathroom chassis from seeping into the lower part of the first installation part.

[0011] According to the whole bathroom of the embodiment of the present disclosure, by integrally forming the first mounting part with the whole bathroom bottom disc, the installation position of the squatting toilet is accurately positioned, and the accuracy of the squatting toilet installation is improved. By connecting the U-shaped support with the connecting pipeline, the connecting pipeline can be installed on the squatting toilet, and then placed and installed on the whole bathroom bottom disc together with the squatting toilet, which is simple to install and improves the construction efficiency. By setting the U-shaped groove and the U-shaped support, the first mounting part forms a closed connection, reduces the leakage hidden danger, and can support part of the weight of the connecting pipeline, avoids the connection position of the connecting pipeline and the squatting toilet from being offset in the long-term use process, and further avoids the leakage hidden danger between the connecting pipeline and the squatting toilet. BRIEF DESCRIPTION OF DRAWINGS

[0012] Figure 1 A perspective view of the whole bathroom of the embodiment of the present disclosure is schematically shown;

[0013] Figure 2 An exploded view of the whole bathroom of the embodiment of the present disclosure is schematically shown;

[0014] Figure 3 A partial enlarged view of part A shown is schematically shown; Figure 2

[0015] A partial enlarged view of part B shown is schematically shown; Figure 4 Figure 2 A partial enlarged view of part C shown is schematically shown; and

[0016] Figure 5 Figure 4 A partial enlarged view of part B shown is schematically shown;

[0017] Figure 6 A partial enlarged view of part C shown is schematically shown; and Figure 4

[0018] Figure 7 A perspective view of the connecting pipeline of the embodiment of the present disclosure is schematically shown.

[0019] BRIEF DESCRIPTION OF DRAWINGS

[0020] 1-Whole bathroom bottom disc;

[0021] 2-First mounting part;

[0022] 21-First support platform;

[0023] 211-First flange;

[0024] 22-First mounting port;

[0025] 23-First recess;

[0026] 24-U-shaped groove; ​​​

[0027] 3 - squat toilet;

[0028] 31 - pedal;

[0029] 311 - first protrusions;

[0030] 312 - reinforcing ribs;

[0031] 32 - basin;

[0032] 33 - water inlet;

[0033] 34 - sewage outlet;

[0034] 35 - sealing ring;

[0035] 4 - connecting pipe;

[0036] 41 - first mounting frame;

[0037] 42 - second mounting frame;

[0038] 5 - U-shaped support;

[0039] 6 - second mounting portion;

[0040] 61 - second support platform;

[0041] 611 - second flange;

[0042] 62 - second mounting opening;

[0043] 63 - second groove;

[0044] 7 - protective cover;

[0045] 71 - through hole;

[0046] 72 - second protrusions;

[0047] 8 - first bolt;

[0048] 9 - second bolt;

[0049] 10 - water outlet connector;

[0050] 101 - guide portion;

[0051] 11 - sealing gasket;

[0052] 12 - sealing head. DETAILED DESCRIPTION

[0053] In order to make the objects, technical solutions and advantages of the present disclosure clearer, the following will further describe the present disclosure in detail with specific embodiments and with reference to the drawings. However, the present disclosure can be implemented in different forms and should not be interpreted as limited to the embodiments set forth herein. On the contrary, the embodiments are provided to make the disclosure fully and completely, and to fully convey the scope of the present disclosure to those skilled in the art. In the drawings, the sizes and relative sizes of layers and regions can be exaggerated for clarity, and the same reference numerals represent the same elements throughout.

[0054] In the following, embodiments of the present disclosure will be described with reference to the drawings. However, it should be understood that these descriptions are merely exemplary and are not intended to limit the scope of the present disclosure. In the following detailed description, numerous specific details are set forth in order to provide a thorough understanding of the embodiments of the present disclosure. However, it will be apparent to one of ordinary skill in the art that one or more embodiments can be practiced without these specific details. In addition, in the following description, descriptions of well-known structures and techniques have been omitted to avoid unnecessarily obscuring the concept of the present disclosure.

[0055] The terms used herein are merely used to describe specific embodiments and are not intended to limit the present disclosure. The terms "include", "comprise" and the like used herein indicate the presence of the described features, steps, operations and / or components, but do not exclude the presence or addition of one or more other features, steps, operations or components.

[0056] All terms used herein, including technical and scientific terms, have meanings commonly understood by one of ordinary skill in the art, unless otherwise defined. It should be noted that the terms used herein should be interpreted as having meanings consistent with the context of the specification, and should not be interpreted in an idealized or overly formal manner.

[0057] In order for those skilled in the art to understand the technical solutions of the present disclosure, the following technical terms are explained.

[0058] In the case of using expressions similar to "at least one of A, B, and C, etc.", it should be generally interpreted as having the meaning of including at least one of the items, but not limited to the items (for example, "a system having at least one of A, B, and C" should include a system having only A alone, a system having only B alone, a system having only C alone, a system having both A and B, a system having both A and C, a system having both B and C, and / or a system having all of A, B, and C, etc.). In the case of using expressions similar to "at least one of A, B, or C, etc.", it should be generally interpreted as having the meaning of including at least one of the items, but not limited to the items (for example, "a system having at least one of A, B, or C" should include a system having only A alone, a system having only B alone, a system having only C alone, a system having both A and B, a system having both A and C, a system having both B and C, and / or a system having all of A, B, and C, etc.).

[0059] In the process of realizing this disclosure, it was found that ceramic squat toilets 3 and stainless steel squat toilets 3 are generally used. Both of these squat toilet 3 processing schemes require prefabrication in the factory and then delivery to the site for installation.

[0060] The factory prefabrication process is as follows: The bathroom base is pre-cut with holes according to the shape of the squat toilet 3. After cutting, it is necessary to verify whether the opening matches the squat toilet 3, and to create fixtures for positioning the squat toilet 3 before installation. Then, the bathroom base is placed upside down, and the squat toilet 3 is also placed upside down, and fixed with the fixtures. The water inlet 33 of the squat toilet 3 is fixed in place. Then, 4 to 5 layers of fiberglass felt are impregnated with unsaturated resin adhesive, laid layer by layer, impregnated multiple times, repeatedly rolled and squeezed to remove air bubbles, and left to cure for 2 to 3 hours. After curing, the irregular edges of the fiberglass felt are sanded and polished. The bathroom base with the squat toilet 3 fixed is placed face up, and excess adhesive around the front of the squat toilet 3 and the bathroom base is cleaned. After cleaning, a grout sealant treatment or a coat of the same color is applied. After curing for 2-3 hours, it is inspected, packaged, and stored. However, this approach has several drawbacks, including long processing cycles, low production capacity, inability to guarantee product precision, unstable quality, difficulty in delivery, difficulty in on-site installation, high post-delivery costs, high installation costs, and potential leakage due to poor alignment with the drain hole.

[0061] Figure 1 A perspective view of an integrated bathroom according to an embodiment of the present disclosure is shown schematically. Figure 2 An exploded view of an integrated bathroom according to an embodiment of the present disclosure is shown schematically. Figure 3 Schematic illustration Figure 2 A magnified view of part A shown.

[0062] As one aspect of this disclosure, a complete bathroom is provided, such as... Figures 1 to 3 As shown, the bathroom includes an integrated bathroom base 1, a first mounting part 2, a squat toilet 3, a connecting pipe 4, and a U-shaped bracket 5. The integrated bathroom base 1 is integrally formed and recessed downwards to form an installation space. The first mounting part 2 is located within the installation space. One side of the first mounting part 2 has an opening, and the two opposite sides of the opening have U-shaped grooves 24, with the openings of the U-shaped grooves 24 facing upwards. The squat toilet 3 is embedded in the first mounting part 2. One end of the connecting pipe 4 is connected to the squat toilet 3, and the other end is connected to an external water pipe. The U-shaped bracket 5 is connected to the connecting pipe 4. Both ends of the U-shaped bracket 5 are respectively embedded in the two U-shaped grooves 24. The two ends of the U-shaped bracket 5 abut against the first mounting part 2 and form a sealed connection to prevent sewage from the top surface of the integrated bathroom base 1 from seeping into the bottom of the first mounting part 2.

[0063] According to the whole bathroom of the embodiment of the present disclosure, by integrally forming the first mounting part 2 with the whole bathroom base 1, the installation position of the squatting toilet 3 is accurately positioned, and the accuracy of the installation of the squatting toilet 3 is improved. By connecting the U-shaped support 5 with the connecting pipeline 4, the connecting pipeline 4 can be installed on the squatting toilet 3, and then placed and installed on the whole bathroom base 1 together with the squatting toilet 3, which is simple to install and improves the construction efficiency. By setting the U-shaped groove 24 and the U-shaped support 5, the first mounting part 2 forms a closed connection, reduces the leakage risk, and can support part of the weight of the connecting pipeline 4, avoiding the displacement of the connection position of the connecting pipeline 4 and the squatting toilet 3 in the long-term use process, and further avoiding the leakage risk between the connecting pipeline 4 and the squatting toilet 3. The squatting toilet is installed by on-site assembly, forming a structural waterproof, simplifying the production and installation process of the whole bathroom base.

[0064] According to the embodiment of the present disclosure, by setting the opening on the first mounting part 2, the connecting pipeline 4 can be connected with the squatting toilet 3 first, and then installed on the whole bathroom base 1 together with the squatting toilet 3, without the need to flip the whole bathroom floor and the squatting toilet 3, simplifying the installation steps and improving the construction efficiency.

[0065] According to the embodiment of the present disclosure, the U-shaped support 5 can be integrally formed with the connecting pipeline 4 or mounted on the connecting pipeline 4, and the mounting method can include any one of screwing, clamping and the like.

[0066] According to the embodiment of the present disclosure, the whole bathroom base 1 is prefabricated in the factory, and the first mounting part 2 and the second mounting part 6 are integrally formed with the whole bathroom base 1 as embedded parts during the production of the bathroom base. During the production process, the tool is used for positioning and fixing to ensure the installation strength and cooperation precision of the whole bathroom base 1, the first mounting part 2 and the second mounting part 6.

[0067] According to the embodiment of the present disclosure, the connecting pipeline 4 can be used as a standard part and be made of engineering plastic by injection molding.

[0068] According to the embodiment of the present disclosure, the squatting toilet 3 is made of a composite material by an integral molding process.

[0069] Figure 4 schematically shows Figure 2 schematically shows Figure 5 schematically shows Figure 4 schematically shows Figure 6 schematically shows Figure 4 schematically shows

[0070] According to the embodiment of the present disclosure, as Figures 1 to 6As shown, the first mounting portion 2 comprises a first support platform 21 and a first mounting opening 22. The first support platform 21 is arranged downwardly recessed along the whole bathroom base 1 and is suitable for supporting the step plate 31 of the squatting toilet 3. The first mounting opening 22 is arranged in the middle of the first support platform 21 and is suitable for accommodating the bowl 32 of the squatting toilet 3. The lower surface edge region of the step plate 31 extends downwardly to form a first protrusion 311, and a first groove 23 is arranged on the first support platform 21 and is connected to the first protrusion 311 in a concave-convex matching mode. The two ends of the first groove 23 are respectively arranged in the U-shaped bracket 5, so as to close the first groove 23 by means of the U-shaped bracket 5.

[0071] According to the embodiment of the present disclosure, the first groove 23 is arranged on the first support platform 21 and is connected to the first protrusion 311 in a concave-convex matching mode, so as to position the installation position of the squatting toilet 3 and avoid the position deviation of the squatting toilet 3 after installation. The U-shaped bracket 5 is arranged to form a ring-shaped closed groove structure of the first groove 23, so as to avoid the sewage flowing into the lower part of the mounting portion from the opening of the first groove 23.

[0072] According to the embodiment of the present disclosure, the first protrusion 311 is arranged on the lower surface edge region of the step plate 31 and extends downwardly, so as to increase the anti-deformation ability of the surface of the step plate 31 and play a limiting and structure sealing role after being assembled with the first groove 23.

[0073] According to the embodiment of the present disclosure, the first flange 211 is arranged on the first support platform 21, the first groove 23 is arranged between the first flange 211 and the whole bathroom base 1, the top surface of the first flange 211 is lower than the top surface of the whole bathroom base 1, and the top surface of the step plate 31 is substantially flush with the top surface of the whole bathroom base 1.

[0074] According to the embodiment of the present disclosure, the first flange 211 can also strengthen the first support platform 21 and improve the supporting strength of the first support platform 21.

[0075] According to the embodiment of the present disclosure, as shown, Figure 4 The bottom of the step plate 31 of the squatting toilet 3 can also be provided with a plurality of reinforcing ribs 312, so as to improve the supporting strength of the step plate 31.

[0076] According to the embodiment of the present disclosure, the bottom of the first support platform 21 extends downwardly to form a plurality of reinforcing ribs, so as to enhance the supporting strength of the first support platform 21.

[0077] According to the embodiment of the present disclosure, as shown, Figures 1 to 6As shown, the whole bathroom further comprises a second mounting portion 6, which is arranged adjacent to the first mounting portion 2 and is adapted to support and accommodate the connecting pipe 4. In this embodiment, the U-shaped groove 24 is formed on the adjacent side surfaces of the first mounting portion 2 and the second mounting portion 6, and the two ends of the U-shaped bracket 5 abut against the first mounting portion 2 and the second mounting portion 6 to form a sealed connection between the first mounting portion 2 and the second mounting portion 6.

[0078] According to the embodiment of the present disclosure, the U-shaped bracket 5 is installed between the first mounting portion 2 and the second mounting portion 6 to form a sealed connection between the first mounting portion 2 and the second mounting portion 6, thereby avoiding the sewage on the whole bathroom pan 1 from flowing into the lower part of the first mounting portion 2 and the second mounting portion 6 through the opening between the first mounting portion 2 and the second mounting portion 6, and eliminating the leakage risk.

[0079] Figure 7 A perspective view of the connecting pipe 4 according to the embodiment of the present disclosure is schematically shown;

[0080] According to the embodiment of the present disclosure, as shown in Figure 1 , Figure 4 and Figure 7 , the connecting pipe 4 is a curved pipe, one end of the connecting pipe 4 is upwardly open to facilitate the connection with an external water pipe, and the other end extends to the first mounting portion 2 and is installed on the water inlet 33 of the squatting pan 3. In this embodiment, the U-shaped bracket 5 is installed on the pipe of the connecting pipe 4 close to the water inlet 33 and suspends the connecting pipe 4 below the U-shaped groove 24.

[0081] In one exemplary embodiment, as shown in Figure 7 , the connecting pipe 4 is an L-shaped pipe, and the U-shaped bracket 5 is integrally formed with the connecting pipe 4. Further, a plurality of connecting ribs are formed between the side walls of the U-shaped bracket 5 and the connecting pipe 4 to firmly connect the U-shaped bracket 5 and the connecting pipe 4.

[0082] In one exemplary embodiment, as shown in Figure 7 , four connecting ribs are formed between the two side walls of the U-shaped bracket 5 and the connecting pipe 4.

[0083] According to the embodiment of the present disclosure, the whole bathroom further comprises a protective cover 7, which is installed in the second mounting portion 6 and is adapted to close the second mounting portion 6 to form a sealed connection with the whole bathroom pan 1. In this embodiment, a through hole 71 is formed in the protective cover 7, and the through hole 71 is adapted to allow the connecting pipe 4 to pass through.

[0084] According to the embodiment of the present disclosure, a sealing ring is further arranged on the through hole 71 of the protective cover 7, and the through hole 71 of the protective cover 7 is sealingly connected with the connecting pipe 4 through the sealing ring to prevent sewage from seeping in.

[0085] According to the embodiment of the present disclosure, the second mounting portion 6 comprises a second supporting platform 61 and a second mounting opening 62. The second supporting platform 61 is arranged downwardly recessed along the whole bathroom bottom plate 1 and is suitable for supporting the connecting pipe 4. The second mounting opening 62 is arranged in the middle of the second supporting platform 61 and is communicated with the first mounting opening 22 through the opening and is suitable for accommodating the connecting pipe 4. The edge area of the lower surface of the protective cover 7 is extended downwardly to form a second convex strip 72. A second groove 63 is arranged on the second supporting platform 61 and is connected with the second convex strip 72 in a concave-convex matching mode. The two ends of the second groove 63 are arranged in the opening of the U-shaped groove 24 respectively so as to be closed by the U-shaped support 5.

[0086] According to the embodiment of the present disclosure, the first mounting portion 2 and the second mounting portion 6 are integrally molded by a composite material molding process. The strength is high. The first mounting portion 2 and the second mounting portion 6 are molded by a mold. The size is accurate. The back of the first mounting portion 2 and the second mounting portion 6 is formed with a reinforcing rib. The load capacity of the first mounting portion 2 and the second mounting portion 6 is improved. The first mounting portion 2 and the second mounting portion 6 are firm and reliable.

[0087] According to the embodiment of the present disclosure, the first mounting portion 2 and the second mounting portion 6 are integrally molded by a composite material molding process. The strength is high. The first mounting portion 2 and the second mounting portion 6 are molded by a mold. The size is accurate. The back of the first mounting portion 2 and the second mounting portion 6 is formed with a reinforcing rib. The load capacity of the first mounting portion 2 and the second mounting portion 6 is improved. The first mounting portion 2 and the second mounting portion 6 are firm and reliable.

[0088] According to the embodiment of the present disclosure, the first mounting portion 2 and the second mounting portion 6 are integrally molded by a composite material molding process. The strength is high. The first mounting portion 2 and the second mounting portion 6 are molded by a mold. The size is accurate. The back of the first mounting portion 2 and the second mounting portion 6 is formed with a reinforcing rib. The load capacity of the first mounting portion 2 and the second mounting portion 6 is improved. The first mounting portion 2 and the second mounting portion 6 are firm and reliable.

[0089] According to the embodiment of the present disclosure, the second mounting portion 6 can be integrally formed with the first mounting portion 2.

[0090] According to the embodiment of the present disclosure, the second groove 63 is arranged to limit the mounting position of the protective cover 7. The through hole 71 on the protective cover 7 is prevented from being misaligned with the connecting pipe 4. The construction quality is ensured. The hidden danger of leakage is further avoided.

[0091] According to the embodiment of the present disclosure, the bottom of the second supporting platform 61 is extended downwardly to form a plurality of reinforcing ribs so as to enhance the supporting strength of the second supporting platform 61.

[0092] According to an embodiment of the present disclosure, the protective cover 7 is removable for maintenance during later use.

[0093] According to an embodiment of the present disclosure, the two ends of the connecting pipe 4 are respectively circumferentially mounted with the first mounting bracket 41 and the second mounting bracket 42, and the integrated bathroom further comprises a plurality of first bolts 8 and a plurality of second bolts 9. The plurality of first bolts 8 pass through the first mounting holes on the first mounting bracket 41 to mount the first mounting bracket 41 on the toilet bowl 32, so that the connecting pipe 4 is aligned with the water inlet 33, and the plurality of second bolts 9 pass through the second mounting holes on the second mounting bracket 42 to mount the second mounting bracket 42 on the second support platform 61.

[0094] According to an embodiment of the present disclosure, as shown in Figure 3 The second recess 63 is formed between the second flange 611 and the edge of the integrated bathroom base 1 close to the second mounting portion 6. By providing the second flange 611, the mounting plane of the second bolt 9 is lower than the upper surface of the second flange 611, which provides mounting space for the second bolt 9, avoids the contact between the nut of the second bolt 9 and the protective cover 7, and avoids the sewage on the integrated bathroom base 1 flowing into the gap between the protective cover 7 and the second mounting portion 6. At the same time, the second flange 611 strengthens the second support platform 61, improving the support strength of the second support platform 61.

[0095] In an illustrative embodiment, at least one of the first mounting bracket 41 and the second mounting bracket 42 is integrally formed with the connecting pipe 4.

[0096] According to an embodiment of the present disclosure, by providing the first mounting bracket 41 and the second mounting bracket 42, the displacement and shaking of the connecting pipe 4 can be prevented, and the sealing effect between the connecting pipe 4 and the water inlet 33 can be improved.

[0097] According to an embodiment of the present disclosure, the second mounting bracket 42 overlaps the second support platform 61, and the second mounting bracket 42 is connected with the second support platform 61 through the second bolt 9.

[0098] According to an embodiment of the present disclosure, the integrated bathroom further comprises a plurality of third bolts suitable for mounting the U-shaped bracket 5 in the U-shaped groove 24.

[0099] In an illustrative embodiment, at least one of the first bolt 8, the second bolt 9 and the third bolt is a self-tapping screw.

[0100] According to an embodiment of the present disclosure, the number of the first bolt 8, the second bolt 9 and the third bolt can include any one of 1, 2, 3, 4, etc.

[0101] According to an embodiment of the present disclosure, the whole bathroom further comprises a sealing gasket 11 installed between the connecting pipe 4 and the water inlet 33, which is suitable for sealingly connecting the connecting pipe 4 and the water inlet 33.

[0102] According to an embodiment of the present disclosure, the whole bathroom further comprises a water outlet joint 10, one end of which is communicated with the connecting pipe 4, and the other end of which is formed with a downwardly open guiding portion 101 passing through the water inlet 33, which is suitable for guiding the water from the connecting pipe 4 to the bottom of the squatting pan 3 to flush the squatting pan 3.

[0103] According to an embodiment of the present disclosure, the sewage outlet 34 of the squatting pan 3 is formed by being recessed downward along the bottom of the bowl 32, which is suitable for sewage discharge, wherein a sealing ring 35 is arranged at the lower portion of the sewage outlet 34 in a circumferential direction to sealingly connect the sewage outlet 34 with a sewage pipe of the bathroom.

[0104] According to an embodiment of the present disclosure, the whole bathroom further comprises a sealing head 12 installed at the sewage outlet 34 of the squatting pan 3, which is suitable for plugging the sewage outlet 34 of the squatting pan 3 before or during installation of the whole bathroom.

[0105] According to an embodiment of the present disclosure, at least one of the two side walls of the bowl 32 in the longitudinal direction is provided with a hole position of the water inlet 33, so that the water inlet 33 can be opened on site according to actual needs to meet the needs of different projects.

[0106] According to an embodiment of the present disclosure, the sealing glue can comprise a sealant.

[0107] As another aspect of the embodiment of the present disclosure, a use method of the whole bathroom is provided, which comprises:

[0108] The leveling and installation fixing of the whole bathroom base plate 1 are performed according to the installation process of the base plate, and a work tool is made to limit the position of the squatting pan.

[0109] The connecting pipe 4 and the squatting pan 3 are sealingly connected through the sealing gasket 11 and fixedly connected through the first bolt 8.

[0110] The first groove 23 and the second groove 63 are filled with sealing glue.

[0111] The sealing ring 35 is sleeved on the periphery of the sewage outlet 34 of the squatting pan 3 to sealingly connect with a sewage pipe reserved on site.

[0112] The first protruding strip 311 of the squatting pan 3 connected with the connecting pipe 4 is clamped in the first groove 23, the U-shaped bracket 5 on the connecting pipe 4 and the first groove 23 form a ring-shaped space, and the interface between the U-shaped bracket 5 and the first groove 23 is filled with sealing glue.

[0113] The second bolt 9 is fixedly connected with the second support platform 61 by penetrating the second mounting hole on the second mounting frame 42, and sealing glue is applied.

[0114] The protective cover 7 is installed into the second groove 63.

[0115] The end of the water outlet joint 10 connected with the connecting pipeline 4 is coated with glue (for example, PVC glue) and is sleeved with the connecting pipeline 4 through the water inlet 33 of the squatting toilet 3, and the direction is adjusted so that the opening of the guide portion 101 is downward.

[0116] The squatting toilet 3 and the protective cover 7 are subjected to caulking treatment with the gaps around the whole bathroom base plate 1.

[0117] After the external water pipe is installed, sanitary cleaning is performed, water test is conducted, and the installation is completed.

[0118] According to the embodiment of the present disclosure, the positioning is based on the site-reserved sewage pipe, the shape of the tool is consistent with the shape of the squatting toilet 3, and the positioning is ensured to be correct.

[0119] According to the embodiment of the present disclosure, when the squatting toilet 3 and the protective cover 7 are subjected to caulking treatment with the gaps around the whole bathroom base plate 1, a sealant can be used for caulking treatment. The whole bathroom provided by the present disclosure uses the factory pre-buried first mounting portion 2 and second mounting portion 6, so that the squatting toilet 3 can be assembled on site. The squatting toilet 3 and the first mounting portion 2 and the second mounting portion 6 can be integrally molded by using a composite material, which has good strength, light weight, easy to transport, and easy to process structure.

[0120] According to the embodiment of the present disclosure, the first mounting portion 2 and the second mounting portion 6 can be integrally formed by engineering injection molding. The first mounting portion 2 and the second mounting portion 6 are pre-buried in the whole bathroom base plate 1 during factory production, and are integrally formed with the whole bathroom base plate 1 by high-density foaming, so that the strength is guaranteed, the sealing performance is reliable, the production is easy, and the quality is stable and controllable.

[0121] After arriving at the site, the connecting pipeline 4 is installed at the water inlet 33 of the squatting toilet 3, and the sealing gasket 11 is installed, and then the first convex strip 311 of the squatting toilet 3 is matched with the first groove 23, so that an annular closed groove structure is formed around the squatting toilet 3, and the U-shaped bracket 5 and the U-shaped groove 24 are treated with sealing glue to ensure good sealing performance and no leakage. The installation process is environmentally friendly, the production process is simple, the production capacity is improved, the squatting toilet 3 and the whole bathroom base plate 1 can be installed on site, the goods are easy to deliver, and the production cost, transportation cost, on-site transportation cost and installation cost are effectively reduced.

[0122] Thus far, the embodiments of the present disclosure have been described in detail with reference to the accompanying drawings. Note that the implementation that is not illustrated or described in the drawings or the description is a known form in the technical field and is not described in detail. In addition, the definitions of the components and the methods described above are not limited to the various specific structures, shapes, or manners mentioned in the embodiments, and can be easily changed or replaced by those skilled in the art.

[0123] Note that the directions such as "up", "down", "front", "back", "left", "right", and the like mentioned in the embodiments are directions with reference to the drawings and do not limit the scope of the present disclosure. Throughout the drawings, the same elements are denoted by the same reference numerals. Whenever possible, the conventional structures or configurations are omitted, and the shapes and the dimensions of the components in the drawings do not reflect actual ones and only illustrate the content of the embodiments of the present disclosure.

[0124] Unless otherwise known as the opposite, the numerical parameters in the specification and the attached claims are approximate values and can be changed according to the desired characteristics obtained by the content of the present disclosure. Specifically, all the numbers used in the specification and the claims to express the content of the composition, the reaction conditions, and the like are understood to be modified by the term "about" in all cases. Generally, it means that it includes a variation of ±10% in some embodiments, ±5% in some embodiments, ±1% in some embodiments, ±0.5% in some embodiments from the specific number.

[0125] The ordinal numbers such as "first", "second", and "third" used in the specification and the claims are used to modify the corresponding elements and do not mean their sequence or order or the sequence or order of manufacturing the elements, and are used to clearly distinguish an element having a certain name from another element having the same name.

[0126] In addition, unless the steps are particularly described or must occur in sequence, the order of the steps described above is not limited to the above and can be changed or rearranged according to the desired design. Also, the above embodiments can be mixed and used with each other or with other embodiments based on the design and reliability considerations, that is, the technical features in different embodiments can be freely combined to form more embodiments.

[0127] The above-described specific embodiments further illustrate the purpose, technical solutions and beneficial effects of the present disclosure, and it should be understood that the above are only specific embodiments of the present disclosure and are not intended to limit the present disclosure. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present disclosure shall be included in the protection scope of the present disclosure.

Claims

1. A complete bathroom unit, characterized in that, include: The integrated bathroom base (1) is integrally molded and recessed downwards to form an installation space; A first mounting part (2) is disposed within the mounting space, and the first mounting part (2) includes: A first support platform (21) is recessed downward along the overall bathroom chassis (1) and is suitable for supporting the footrest (31) of the squat toilet (3); and The first mounting port (22) is located in the middle of the first support platform (21) and is suitable for accommodating the toilet bowl (32) of the squat toilet (3); one side of the first mounting part (2) is provided with an opening, and the two sides opposite the opening are provided with a U-shaped groove (24), the opening of the U-shaped groove (24) facing upward; A squat toilet (3) is installed in the first mounting part (2); Connecting pipe (4), one end of which is connected to the squat toilet (3), and the other end of which is connected to the external water pipe; The U-shaped bracket (5) is connected to the connecting pipe (4). The two ends of the U-shaped bracket (5) are respectively embedded in the two U-shaped grooves (24). The two ends of the U-shaped bracket (5) abut against the first mounting part (2) and form a sealed connection to prevent sewage from the top surface of the integrated bathroom chassis (1) from seeping into the bottom of the first mounting part (2). The lower surface edge area of ​​the pedal (31) extends downward to form a first protrusion (311). The first support platform (21) is provided with a first groove (23) that is in convex-concave-convex connection with the first protrusion (311). The two ends of the first groove are respectively located in the U-shaped bracket (5) so as to close the first groove (23) through the U-shaped bracket (5). The second mounting part (6) is disposed adjacent to the first mounting part (2) and is adapted to support and accommodate the connecting pipe (4). The U-shaped groove (24) is formed on the adjacent side of the first mounting part (2) and the second mounting part (6). The two ends of the U-shaped bracket (5) abut against the first mounting part (2) and the second mounting part (6) to form a sealed connection between the first mounting part (2) and the second mounting part (6). The protective cover (7) is installed inside the second mounting part; The second mounting part (6) includes: The second support platform (61) is recessed downward along the overall bathroom chassis (1) and is suitable for supporting the connecting pipe (4). The second mounting port (62) is located in the middle of the second support platform (61) and communicates with the first mounting port (22) through the opening, and is suitable for accommodating the connecting pipe (4); wherein, the edge area of ​​the lower surface of the protective cover (7) extends downward to form a second protrusion (72), and the second support platform (61) is provided with a ring of second grooves (63) that are in concave-convex contact with the second protrusion (72), and the two ends of the second groove (63) are respectively located in the opening of the U-shaped groove (24) so ​​as to close the second groove (63) by the U-shaped bracket (5).

2. The integrated bathroom according to claim 1, characterized in that, The first support platform (21) is provided with a first flange (211), and the first groove (23) is formed between the first flange (211) and the integrated bathroom chassis (1). The top surface of the first flange (211) is lower than the top surface of the integrated bathroom chassis (1), so that the top surface of the pedal (31) is flush with the top surface of the integrated bathroom chassis (1).

3. The integrated bathroom according to claim 1, characterized in that, The connecting pipe (4) is a bend. One end of the connecting pipe (4) faces upward to facilitate connection to an external water pipe. The other end extends to the first mounting part (2) and is installed on the water inlet (33) of the squat toilet (3). The U-shaped bracket (5) is installed on the connecting pipe (4) near the water inlet (33) and the connecting pipe (4) is suspended below the U-shaped groove (24).

4. The integrated bathroom according to claim 3, characterized in that, The protective cover (7) is suitable for closing the second mounting part (6) to form a sealed connection with the integral bathroom chassis (1); The protective cover (7) has a through hole (71) which is adapted to allow the connecting pipe (4) to pass through.

5. The integrated bathroom according to claim 3, characterized in that, The two ends of the connecting pipe (4) are respectively equipped with a first mounting bracket (41) and a second mounting bracket (42) along the circumferential direction. The integrated bathroom also includes: Multiple first bolts (8) pass through first mounting holes on the first mounting bracket (41) to mount the first mounting bracket (41) onto the toilet bowl (32), aligning the connecting pipe (4) with the water inlet (33); and Multiple second bolts (9) pass through the second mounting holes on the second mounting bracket (42) to mount the second mounting bracket (42) onto the second support platform (61).

6. The integrated bathroom according to claim 5, characterized in that, Also includes: A sealing gasket (11) is installed between the connecting pipe (4) and the inlet (33) to seal the connection between the connecting pipe (4) and the inlet (33).

7. The integrated bathroom according to any one of claims 3-6, characterized in that, Also includes: The water outlet connector (10) is connected to the connecting pipe (4) at one end and passes through the water inlet (33) to form a downward-opening guide part (101). The guide part (101) is adapted to guide water from the connecting pipe (4) to the bottom of the squat toilet (3) to flush the squat toilet (3).

Citation Information

Patent Citations

  • Feeding hole structure, system for opening and plugging feeding hole structure and using method

    CN109339102A

  • Whole bathroom surface-mounted water tank squatting pan structure

    CN216787347U

  • Squatting pan

    CN218990355U

  • Overall bathroom

    CN221030501U