A method for comprehensive optimization of building electromechanical systems based on BIM model

Through the comprehensive optimization method of building electromechanical and electromechanical design steps based on BIM model, the process of deepening electromechanical design is simplified, intelligent pipe layout databases and automated pipeline layout are formed, and the problem of design reliance on manpower and material resources in the existing technology is solved, and the quality of deepening electromechanical and electromechanical design and efficiency.

CN117216996BActive Publication Date: 2024-11-19HUBEI CONSTR ENG TECH CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202311182734.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-14
Publication Date
2024-11-19
Estimated Expiration
2043-09-14

AI Technical Summary

Technical Problem

At this stage, BIM technology lacks mature auxiliary methods and global processing methods in the deepening design of building electromechanical pipelines, resulting in the design relying on manpower and material resources and consuming a lot of resources.

Method used

The comprehensive optimization method of building electromechanical and electromechanical design arrangement knowledge is sorted through classification and sorting, forming a mechanical and electromechanical design rule library, extracting the first-level BIM model, splitting it into a secondary model, applying the deepening design rules, and generating optimized calculations The results are formed through a comprehensive evaluation algorithm to form a calculation result analysis system, and finally a BIM model that meets the design requirements is generated.

Benefits of technology

The deepening of mechanical and electrical design steps have been simplified, an intelligent pipe layout database has been formed, and the pipeline layout has been automated, which has improved the design quality and efficiency, and reduced the influence of human factors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117216996B_ABST
    Figure CN117216996B_ABST
Patent Text Reader

Abstract

The present invention discloses a comprehensive optimization method for building electromechanical based on BIM model, which classifies and stores the original BIM model according to the subsystem information related to the building electromechanical specialty to form a first-level BIM model, splits the first-level BIM model according to the current building space type to form a second-level BIM model, applies the completed electromechanical in-depth design rules in different building space types to the second-level BIM model, obtains multiple optimized calculation results, and obtains a third-level BIM model; combines the third-level BIM model with the current model building electromechanical subsystem information to form the relevant system avoidance priority; and generates the BIM model of the corresponding modeling software with the calculation results. The present invention has the beneficial effects of simplifying the building electromechanical in-depth design steps in the modeling software, forming an intelligent pipe layout database by extracting the building electromechanical in-depth design standard specification atlas and related knowledge and experience, automating the pipeline layout according to the needs of users, improving the quality of building electromechanical in-depth design, and improving work efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building electromechanical pipeline in-depth design, and in particular to a building electromechanical comprehensive optimization method based on a BIM model. Background Art

[0002] Building Information Modeling (BIM) is a technology that digitally represents the physical and functional characteristics of buildings or infrastructure. By creating and managing a collaborative database throughout the life cycle of a construction project, BIM technology enables information sharing and collaborative management during the construction implementation process. In the construction industry, it can improve project construction efficiency, reduce errors and conflicts, and provide comprehensive information support for building design, construction, and maintenance.

[0003] 1. For example, a Chinese patent discloses a building electromechanical automation design system and method (application number: CN202310836968.7). By constructing a building information model library, an electromechanical equipment parameter information library, an electromechanical point layout principle and a standard space point library, the plane in each space can be scanned according to the design profession to be designed, and the arranged electromechanical points and the corresponding equipment parameters and electromechanical equipment point connection points can be obtained. According to the connection principles in the database system, electromechanical points and electromechanical equipment pipelines are generated. Finally, according to the number of loops obtained by the loop connection, the system database is matched to generate various electromechanical professional systems, realizing the modularization of building electromechanical standards, automated equipment layout, and intelligent design, reducing the workload of designers' repetitive work, reducing the probability of errors, improving design efficiency, and making the design drawings more standardized and reasonable, reducing the impact of designers' personal factors on design results.

[0004] 2. For example, a Chinese patent discloses a BIM-based collaborative design platform for building prefabricated electromechanical systems (application number: CN202210900028.5), which includes an prefabricated electromechanical system design module, an in-factory production deepening module and a project site construction module; the prefabricated electromechanical system design module transmits the design data of each discipline to the in-factory production deepening module, performs deepening processing to obtain production data, and transmits the production data to the production line for production and processing; the project site construction module performs on-site construction of integrated pipelines and ceilings based on the design data of each discipline; closely links the design party, factory production party and project construction party, realizes instant sharing of design data, production deepening data and construction data, real-time transmission, and project information sharing, ensures the accuracy and completeness of the data, and is conducive to improving the construction quality of building prefabricated electromechanical systems and improving the quality of buildings.

[0005] For building projects with a wide variety of mechanical and electrical pipelines and complex spatial areas, BIM technology is widely used in the in-depth design of mechanical and electrical pipelines. However, due to the immaturity of BIM technology at this stage, there are no mature and available auxiliary methods for in-depth mechanical and electrical design and no global processing methods that conform to the logic of in-depth design of building mechanical and electrical pipelines. The comprehensive design of BIM building mechanical and electrical pipelines still relies on designers to carry out according to a large number of in-depth design standard drawings and construction experience, resulting in the in-depth design of building mechanical and electrical pipelines still consuming a lot of manpower and material resources.

[0006] Therefore, it is necessary to propose a building electromechanical comprehensive optimization method based on BIM model to address the above problems. Summary of the invention

[0007] In view of the deficiencies in the above-mentioned prior art, the purpose of the present invention is to provide a building electromechanical comprehensive optimization method based on the BIM model to solve the above-mentioned problems.

[0008] A building electromechanical comprehensive optimization method based on BIM model, the method steps are as follows:

[0009] S1. According to different types of buildings and different building spaces, classify and organize the knowledge of mechanical and electrical detailed design arrangement, list all mechanical and electrical systems and subsystems under the mechanical and electrical systems in the area, and form a single detailed design rule according to a certain system order priority and detailed design parameters of each system;

[0010] S2. Summarize the priority order of multiple systems and the detailed design parameters of multiple systems to form a detailed mechanical and electrical design rule base for different spaces under different building types;

[0011] S3. Classify and store the original BIM model according to the subsystem information related to the building mechanical and electrical specialty to form a first-level BIM model;

[0012] S4, extracting information of the first-level BIM model based on the secondary development of the modeling software from the first-level BIM model described in step S3, and storing it as a general, open data type;

[0013] S5. Split the primary BIM model described in step S4 according to the current building space type to form a secondary BIM model. Different electromechanical detailed design rules will be applied to pipelines in different building space types.

[0014] S6. Apply the completed electromechanical detailed design rules for different building space types to the secondary BIM model described in step S5, where the rules include avoidance priority and detailed design avoidance optimization parameters; obtain multiple optimized calculation results by building N types of electromechanical detailed design rules for different building spaces, and obtain the tertiary BIM model;

[0015] S7, forming a calculation result analysis system by analyzing relevant parameter indicators of the various calculation results obtained in step S6, and comprehensively evaluating the advantages and disadvantages of the calculation results for reference by users;

[0016] S8. The calculation results obtained in step S7 are matched with the information of each component in the original model through secondary development of the modeling software, and the calculation results are generated into a BIM model of the corresponding modeling software.

[0017] In a building space of a type of building described in step S1, it is necessary to list all the electromechanical systems and subsystems in the area and prioritize all the systems. The priority ranking is combined with the order of small pipes giving way to large pipes, pressurized pipes giving way to unpressurized pipes, and general giving way to special rules commonly used in electromechanical in-depth design rules, and can be sorted in multiple ways.

[0018] The detailed design parameters of each system described in step S1 include pipeline minimum spacing, pipeline bending height, pipeline bending combined distance, pipeline bending type, pipeline bending angle, pipeline bending width, and pipeline bending height.

[0019] The original BIM model in step S3 must contain subsystem information related to building mechanical and electrical engineering, and each subsystem must be relatively independent.

[0020] The data type described in step S4 may adopt the ifc and json general data format types.

[0021] The model described in step S5 is divided according to the building space type in order to apply different electromechanical detailed design rules to the models of different areas.

[0022] The extracted model in step S6 will apply N kinds of mechanical and electrical detailed design rules for this type of building space under this type of building type to generate multiple calculation results.

[0023] The method for avoiding the cross collision of building electromechanical pipelines in step S6 is to use obstacle avoidance parts including a "J" bend and a "B" bend, and its related parameter indicators include length, angle and height. Parallel collision adopts parallel modulus movement, and its related parameters include modulus, single mode distance, and

[0024] The comprehensive evaluation algorithm parameter indicators in step S7 include the number of electromechanical pipeline bends, the number of remaining collisions, the number of pipe fittings, the total length of the pipeline, and the bend concentration.

[0025] The BIM model obtained in step S7 should be checked to confirm that the building mechanical and electrical detailed design plan meets the design requirements through analysis of relevant indicators.

[0026] Compared with the prior art, the present invention has the following beneficial effects: the present invention can simplify the steps of building mechanical and electrical in-depth design in the modeling software, and form an intelligent pipe layout database by extracting standard specification drawings of building mechanical and electrical in-depth design and related knowledge and experience. The pipeline layout can be automatically performed according to user needs, which effectively improves the quality of building mechanical and electrical in-depth design and improves the efficiency of in-depth design work. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 The present invention is a flow chart of the comprehensive design method for building mechanical and electrical pipelines. DETAILED DESCRIPTION

[0028] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0029] The embodiments of the present invention are described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways as defined and covered by the claims.

[0030] like Figure 1 As shown, a building electromechanical comprehensive optimization method based on BIM model, the method steps are as follows:

[0031] S1. According to different types of buildings and different building spaces, classify and organize the knowledge of mechanical and electrical detailed design arrangement, list all mechanical and electrical systems and subsystems under the mechanical and electrical systems in the area, and form a single detailed design rule according to a certain system order priority and detailed design parameters of each system;

[0032] S2. Summarize the priority order of multiple systems and the detailed design parameters of multiple systems to form a detailed mechanical and electrical design rule base for different spaces under different building types;

[0033] S3. Classify and store the original BIM model according to the subsystem information related to the building mechanical and electrical specialty to form a first-level BIM model;

[0034] S4, extracting information of the first-level BIM model based on the secondary development of the modeling software from the first-level BIM model described in step S3, and storing it as a general, open data type;

[0035] S5. Split the primary BIM model described in step S4 according to the current building space type to form a secondary BIM model. Different electromechanical detailed design rules will be applied to pipelines in different building space types.

[0036] S6. Apply the completed electromechanical detailed design rules for different building space types to the secondary BIM model described in step S5, where the rules include avoidance priority and detailed design avoidance optimization parameters; obtain multiple optimized calculation results by building N types of electromechanical detailed design rules for different building spaces, and obtain the tertiary BIM model;

[0037] S7, forming a calculation result analysis system by analyzing relevant parameter indicators of the various calculation results obtained in step S6, and comprehensively evaluating the advantages and disadvantages of the calculation results for reference by users;

[0038] S8. The calculation results obtained in step S7 are matched with the information of each component in the original model through secondary development of the modeling software, and the calculation results are generated into a BIM model of the corresponding modeling software.

[0039] The building mechanical and electrical comprehensive optimization method based on BIM model described in the present invention can simplify the building mechanical and electrical in-depth design steps in the modeling software, and form an intelligent pipe layout database by extracting the building mechanical and electrical in-depth design standard specification drawings and related knowledge and experience, which can automatically arrange pipelines according to user needs, effectively improving the quality of building mechanical and electrical in-depth design and improving the efficiency of in-depth design work.

[0040] In a building space of a type of building described in step S1, it is necessary to list all the electromechanical systems and subsystems in the area and prioritize all the systems. The priority ranking is combined with the order of small pipes giving way to large pipes, pressurized pipes giving way to unpressurized pipes, and general giving way to special rules commonly used in electromechanical in-depth design rules, and can be sorted in multiple ways.

[0041] The detailed design parameters of each system described in step S1 include pipeline minimum spacing, pipeline bending height, pipeline bending combined distance, pipeline bending type, pipeline bending angle, pipeline bending width, and pipeline bending height.

[0042] The original BIM model in step S3 must contain subsystem information related to building mechanical and electrical engineering, and each subsystem must be relatively independent.

[0043] The data type described in step S4 may adopt the ifc and json general data format types.

[0044] The model described in step S5 is divided according to the building space type in order to apply different electromechanical detailed design rules to the models of different areas.

[0045] The extracted model in step S6 will apply N kinds of mechanical and electrical detailed design rules for this type of building space under this type of building type to generate multiple calculation results.

[0046] Among them, step S6 is used to avoid the cross collision of building mechanical and electrical pipelines by using obstacle avoidance parts including "J" bends and "B" bends, and its related parameter indicators include length, angle and height. Parallel collision adopts parallel modulus movement, and its related parameters include modulus and single-mode distance.

[0047] The comprehensive evaluation algorithm parameter indicators in step S7 include the number of electromechanical pipeline bends, the number of remaining collisions, the number of pipe fittings, the total length of the pipeline, and the bend concentration.

[0048] The BIM model obtained in step S7 should be checked to confirm that the building mechanical and electrical detailed design plan meets the design requirements through analysis of relevant indicators.

[0049] Working principle:

[0050] 1. Formulation of rules for in-depth electromechanical design

[0051] According to different types of buildings and different building spaces, the knowledge of mechanical and electrical detailed design arrangement is classified and sorted, and all mechanical and electrical systems and subsystems under the mechanical and electrical systems in the area are listed. According to a certain system sequence priority and the detailed design parameters of each system, a single detailed design rule is formed.

[0052] The process of forming electromechanical in-depth design rules is: list all electromechanical systems and subsystems in the area, and prioritize all systems. The priority ranking is combined with the order of small pipes giving way to large pipes, pressurized pipes giving way to unpressurized pipes, and general giving way to special rules commonly used in electromechanical in-depth design rules, and multiple rankings can be made.

[0053] 2. Construction of electromechanical design rule library

[0054] Summarize the priority order of multiple systems and the detailed design parameters of multiple systems to form a rule base for mechanical and electrical detailed design of different spaces under different building types.

[0055] 3. Classification of original BIM models

[0056] The original BIM model is classified and stored according to the subsystem information related to the building mechanical and electrical specialty to form a first-level BIM model;

[0057] 4. Original BIM Model Storage

[0058] In step S1, the information of the first-level BIM model is extracted based on the secondary development method of the current modeling software, and stored as a general and open data type.

[0059] 5. Data Space Splitting

[0060] The primary BIM model described in step S4 is split according to the current building space type to form a secondary BIM model. Different electromechanical detailed design rules will be applied to pipelines in different building space types.

[0061] 6. Calculation of mechanical and electrical design rules

[0062] The secondary BIM model described in step S5 is applied to the completed electromechanical detailed design rules in different building space types, where the rules include avoidance priority and detailed design avoidance optimization parameters; by building N types of electromechanical detailed design rules under different building spaces, a variety of optimized calculation results are obtained to obtain a tertiary BIM model.

[0063] VII. Comprehensive index analysis and calculation

[0064] The various calculation results obtained in step S6 are analyzed by analyzing relevant parameter indicators such as the number of bends, the number of remaining collisions, the number of pipes, the length of the pipeline, the concentration of bends, etc., to form a calculation result analysis system to comprehensively evaluate the advantages and disadvantages of the calculation results for user reference.

[0065] 8. Calculation Results Generation

[0066] The calculation results obtained in step S7 are matched with the information of each component in the original model through secondary development of the modeling software, and the calculation results are generated into a BIM model of the corresponding modeling software.

[0067] In step S1, the original BIM model needs to include system information related to building mechanical and electrical engineering, and each system is relatively independent.

[0068] In a building space of a type of building described in step S1, it is necessary to list all the electromechanical systems and subsystems in the area and prioritize all the systems. The priority ranking is combined with the order of small pipes giving way to large pipes, pressurized pipes giving way to unpressurized pipes, and general giving way to special rules commonly used in electromechanical in-depth design rules, and can be sorted in multiple ways.

[0069] The detailed design parameters of each system described in step S1 include pipeline minimum spacing, pipeline bending height, pipeline bending combined distance, pipeline bending type, pipeline bending angle, pipeline bending width, and pipeline bending height.

[0070] The original BIM model in step S3 must contain subsystem information related to building mechanical and electrical engineering, and each subsystem must be relatively independent.

[0071] The data type described in step S4 may adopt the ifc and json general data format types.

[0072] The model described in step S5 is divided according to the building space type in order to apply different electromechanical detailed design rules to the models of different areas.

[0073] The extracted model in step S6 will apply N kinds of mechanical and electrical detailed design rules for this type of building space under this type of building type to generate multiple calculation results.

[0074] Among them, step S6 is used to avoid the cross collision of building mechanical and electrical pipelines by using obstacle avoidance parts including "J" bends and "B" bends, and its related parameter indicators include length, angle and height. Parallel collision adopts parallel modulus movement, and its related parameters include modulus and single-mode distance.

[0075] Parallel collisions should be resolved before cross collisions. According to the priority strategy formulated according to the electromechanical in-depth design rules, the lower priority ones will be moved accordingly. The moving modulus and single-mode distance are related to the electromechanical in-depth design rule parameters of the area.

[0076] The specific steps for pipeline cross collision bending are:

[0077] (1) The priority of the electromechanical system pipelines shall be determined according to the electromechanical detailed design rules. The systems with lower priority shall give way to the systems with higher priority.

[0078] (2) According to the current electromechanical design rules, select "upward turn" or "downward turn" and determine the calculation angle, length and height;

[0079] (3) traversing the distribution of "upward turning bend" or "downward turning bend" in the current system; further optimizing at the end or adjacent part, optimizing the "upward turning bend" or "downward turning bend" to "upward turning bend" or "downward turning bend";

[0080] (4) Traverse the distribution of "upward turning curve" or "downward turning curve" in the current system, and merge adjacent "upward turning curve", "downward turning curve", "upward turning curve" or "downward turning curve".

[0081] The comprehensive evaluation algorithm parameter indicators in step S7 include the number of electromechanical pipeline bends, the number of remaining collisions, the number of pipe fittings, the total length of the pipeline, and the bend concentration.

[0082] The BIM model obtained in step S7 should be checked to confirm that the building mechanical and electrical detailed design plan meets the design requirements through analysis of relevant indicators.

[0083] In step S8, if the inspection does not meet the requirements, it is necessary to return to modify and optimize the electromechanical detailed design rules, and update the electromechanical detailed design rule library.

[0084] In step S8, if the inspection meets the requirements, the BIM model is output to complete the comprehensive pipeline design.

[0085] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A comprehensive optimization method of building electromechanical system based on BIM model. Features: The method steps are: S1. According to different types of buildings and different building spaces, classify and organize the knowledge of mechanical and electrical detailed design arrangement, list all mechanical and electrical systems and subsystems under the mechanical and electrical systems in the building space, and form a single mechanical and electrical detailed design rule according to a certain system order priority and the detailed design parameters of each system; S2. Summarize the priority order of multiple systems and the detailed design parameters of multiple systems to form the detailed mechanical and electrical design rules for different building spaces under different building types; S3. Classify and store the original BIM model according to the subsystem information related to the building mechanical and electrical specialty to form a first-level BIM model; S4, extracting information of the first-level BIM model based on the secondary development of the modeling software from the first-level BIM model described in step S3, and storing it as a general, open data type; S5. Split the primary BIM model described in step S4 according to the current building space type to form a secondary BIM model. Different electromechanical detailed design rules will be applied to pipelines in different building space types. S6. Apply the completed electromechanical detailed design rules in different building space types to the secondary BIM model described in step S5. The electromechanical detailed design rules include avoidance priority and detailed design avoidance optimization parameters. By building N types of electromechanical detailed design rules in different building spaces, multiple optimized calculation results are obtained to obtain a tertiary BIM model. S7, forming a calculation result analysis system by analyzing the number of bends, the number of remaining collisions, the number of pipes, the length of pipelines, and the bend concentration related parameter indicators of the various calculation results obtained in step S6, and comprehensively evaluating the advantages and disadvantages of the calculation results for reference by users; S8. The calculation results obtained in step S7 are matched with the information of each component in the original model through secondary development of the modeling software, and the calculation results are generated into a BIM model of the corresponding modeling software.

2. A building electromechanical comprehensive optimization method based on a BIM model as claimed in claim 1, Features: In a building space of a type of building described in step S1, it is necessary to list all the electromechanical systems and subsystems in the building space, and prioritize all the systems. The priority ranking is combined with the order of small pipes giving way to large pipes, pressurized pipes giving way to unpressurized pipes, and general giving way to special rules commonly used in electromechanical in-depth design rules, and can be divided into multiple rankings.

3. A building electromechanical comprehensive optimization method based on a BIM model as claimed in claim 1, Features: The detailed design parameters of each system described in step S1 include pipeline minimum spacing, pipeline bending height, pipeline bending combined distance, pipeline bending type, pipeline bending angle, pipeline bending width, and pipeline bending height.

4. A building electromechanical comprehensive optimization method based on a BIM model as claimed in claim 1, Features: The original BIM model in step S3 includes subsystems related to building mechanical and electrical engineering, and each subsystem is relatively independent.

5. A building electromechanical comprehensive optimization method based on a BIM model as claimed in claim 1, Features: The data type described in step S4 may adopt the ifc and json general data format types.

6. A building electromechanical comprehensive optimization method based on a BIM model as claimed in claim 1, Features: The first-level BIM model described in step S5 is split according to the building space type.

7. A building electromechanical comprehensive optimization method based on a BIM model as claimed in claim 1, Features: The method for avoiding the cross collision of the building's electromechanical pipelines in step S6 is to use obstacle avoidance parts including a "J" bend and a "B" bend, the optimization parameters of which include length, angle and height, and parallel collision adopts parallel modulus movement.

8. A building electromechanical comprehensive optimization method based on a BIM model as claimed in claim 1, Features: The relevant parameter indicators in step S7 include the number of electromechanical pipeline bends, the number of remaining collisions, the number of pipe fittings, the total length of the pipeline, and the bend concentration.

9. A building electromechanical comprehensive optimization method based on a BIM model as claimed in claim 1, Features: The BIM model obtained in step S7 should be checked to confirm that the building mechanical and electrical detailed design plan meets the design requirements through analysis of relevant indicators.

Citation Information

Patent Citations

  • Building assembly type electromechanical system collaborative design platform based on BIM

    CN115270260A

  • Building electromechanical automation design system and method

    CN116561878A

  • Assembled building deepening design method based on BII software

    CN107967399A

  • BIM-based concrete fabricated building construction method

    CN110929328A

  • Same-model multi-person cooperative operation method for BIM pipe integration deepening design

    WO2022052250A1