By using a double-walled rotary kiln structure and efficient heat exchange technology, the problem of calcining small-particle-size limestone was solved, achieving the extraction of high-purity CO2 and zero emissions, thus improving the utilization rate of limestone mines.
Patent Information
- Application Number
- CN202310941848.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-28
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2043-07-28
AI Technical Summary
Existing rotary kilns are difficult to calcine small-diameter limestone, and the CO2 generated during limestone calcination mixes with the combustion flue gas, resulting in reduced CO2 purity and making it impossible to achieve zero emissions.
The kiln adopts a double-walled rotary kiln structure, including inner and outer sleeves and a jacketed heating space. It uses high-temperature gas to preheat raw materials and cool products, and achieves efficient heat exchange through swirl preheaters and swirl coolers. The kiln chamber is constructed with shaped bricks and steel structures to ensure the direction of gas flow and heat transfer.
This method enables efficient calcination of small-particle-size limestone, improves raw material utilization, obtains high-purity CO2 as a byproduct, and achieves zero carbon dioxide emissions.
Smart Images

Figure CN117308575B_ABST
Abstract
Description
Technical Field
[0001] This application belongs to the field of industrial kiln technology and provides a double-walled rotary kiln. Background Technology
[0002] The main types of kilns used for calcining limestone include vertical kilns and rotary kilns, and they generally use lumpy raw materials. Traditional rotary kilns can calcine limestone with a particle size of 10mm to 30mm, but they are not suitable for limestone raw materials with smaller particle sizes. Summary of the Invention
[0003] In view of this, this application provides a double-walled rotary kiln to solve the problem that current rotary kilns are unable to calcine small-diameter limestone.
[0004] According to a first aspect, embodiments of this application provide a double-walled rotary kiln, comprising: a first kiln chamber, a feeding device, and a discharging device. The first kiln chamber includes a first inner sleeve, a second inner sleeve, and an outer sleeve arranged in layers from the inside out. The interior of the first inner sleeve is a first heating space, the interlayer between the first inner sleeve and the second inner sleeve is a material channel, and the interlayer between the second inner sleeve and the outer sleeve is a second heating space.
[0005] The first kiln chamber has a kiln head burner at its kiln head. The kiln head burner faces the first heating space. The material passage is connected to the feeding equipment at the end near the kiln tail and to the discharge equipment at the end near the kiln head. The second heating space has an outer ring burner at the end near the kiln head.
[0006] In conjunction with the first aspect, in some embodiments of this application, a connecting channel for connecting the first heating space and the second heating space is provided at the kiln tail of the first kiln chamber.
[0007] In conjunction with the first aspect, in some embodiments of this application, a kiln head burner and a kiln tail burner are respectively provided at both ends of the first kiln chamber. Multiple outer ring burners are provided at both ends of the second heating space.
[0008] In conjunction with the first aspect, in some embodiments of this application, high-temperature gas generated in the material channel due to the decomposition of calcined materials enters the feeding equipment to preheat the raw materials. The high-temperature gas, after preheating the raw materials, cools down to become low-temperature gas. This low-temperature gas is then introduced into the discharging equipment to cool the product. The gas discharged from the discharging equipment is collected as a byproduct.
[0009] A heat collection hood is installed on the outside of the first kiln chamber.
[0010] A T-shaped fixing member is provided at intervals on the inner side of the outer sleeve. The fixing members are arranged along a straight line in the radial direction of the outer sleeve, and the shaped brick shaped like the Chinese character "Ri" is arranged on the inner wall of the outer sleeve through the fixing members. The cross section of the shaped brick shaped like the Chinese character "Ri" is in the shape of the Chinese character "Ri", which is composed of a first transverse plate, a second transverse plate and a third transverse plate arranged sequentially from top to bottom, with support columns respectively arranged at four corners. The first transverse plate is provided with a groove that fits with the fixing member, both ends of the second transverse plate are provided with a concave portion and a convex portion, and both ends of the third transverse plate are provided with a concave portion and a convex portion. After the masonry of the shaped bricks shaped like the Chinese character "Ri" is completed, the third transverse plates of the respective shaped bricks shaped like the Chinese character "Ri" are connected to each other to form a first heating space. The second transverse plates of the respective shaped bricks shaped like the Chinese character "Ri" are connected to each other to form a second heating space. The first transverse plates of the respective shaped bricks shaped like the Chinese character "Ri" are connected to each other and combined with the outer sleeve to form a heat insulation layer for protecting the outer sleeve. Grooves and turbulence rings are arranged on the inner wall of the shaped brick shaped like the Chinese character "Ri" to define the gas flow direction, increase the heat exchange time and enhance the heat exchange effect.
[0011] Alternatively, the first kiln chamber is composed of A structures and B structures that are alternately arranged in sequence along the radial direction. The A structure is composed of an outer sleeve and a steel structure body with an interlayer. A first inner sleeve and a second inner sleeve are formed by the steel structure body. A cooling air passage is arranged inside the steel structure body. A refractory material is arranged on the inner side of the outer sleeve, and a refractory material is arranged at the part of the steel structure body adjacent to the first heating space, the material passage and the second heating space. The B structure is composed of an outer sleeve and thin bricks. The thin bricks form two annular layers, constituting a first inner sleeve and a second inner sleeve. An air duct made of metal is arranged between the thin bricks, and the B structure is connected to the steel structure body in the A structure through the air duct, while the cooling air passages in each A structure are communicated with each other.
[0012] With reference to the first aspect, in some embodiments of the present application, the feeding equipment includes a plurality of cyclone preheaters connected in a circulating manner. The discharging equipment includes a plurality of cyclone coolers connected in a circulating manner.
[0013] With reference to the first aspect, in some embodiments of the present application, the feeding equipment includes a P1 cyclone preheater, a P2 cyclone preheater, a P3 cyclone preheater, a P4 cyclone preheater, a P5 cyclone preheater and a P6 cyclone preheater connected in a circulating manner.
[0014] The inlet and outlet at the top of the P5 cyclone preheater is connected to the P6 cyclone preheater through a riser pipe. The riser pipe connecting the P5 cyclone preheater and the P6 cyclone preheater is provided with a feeding port of the feeding equipment. The inlet and outlet at the top of the P6 cyclone preheater is the gas outlet of the feeding equipment.
[0015] The inlet and outlet at the bottom of the P6 cyclone preheater is connected to the P4 cyclone preheater through a blanking pipe. The inlet and outlet at the bottom of the P4 cyclone preheater is connected to the P2 cyclone preheater through a blanking pipe. The inlet and outlet at the bottom of the P2 cyclone preheater is connected to the material passage through a gas pipeline.
[0016] The inlet and outlet at the top of the P2 cyclone preheater are connected to the P3 cyclone preheater via riser pipes. The inlet and outlet at the top of the P3 cyclone preheater are connected to the P4 cyclone preheater via riser pipes. The inlet and outlet at the top of the P4 cyclone preheater are connected to the P5 cyclone preheater via riser pipes.
[0017] The inlet and outlet at the bottom of the P5 cyclone preheater are connected to the P3 cyclone preheater via a feed pipe. The inlet and outlet at the bottom of the P3 cyclone preheater are connected to the P1 cyclone preheater via a feed pipe. The inlet and outlet at the bottom of the P1 cyclone preheater are connected to the material channel via a conveying pipe.
[0018] In conjunction with the first aspect, in some embodiments of this application, the discharge device includes a C1 cyclone cooler, a C2 cyclone cooler, and a C3 cyclone cooler.
[0019] The inlet and outlet at the top of the C2 cyclone cooler are connected to the C3 cyclone cooler via riser pipes. The inlet and outlet at the bottom of the C2 cyclone cooler discharge the material to the outlet equipment via a discharge pipe. The riser pipe between the C2 and C3 cyclone coolers has a feed inlet for the outlet equipment. The inlet and outlet at the top of the C3 cyclone cooler are the gas outlets for the outlet equipment.
[0020] The inlet and outlet at the bottom of the C3 cyclone cooler are connected to the C1 cyclone cooler via a discharge pipe. The inlet and outlet at the top of the C1 cyclone cooler are connected to the C2 cyclone cooler via riser pipes. The inlet and outlet at the bottom of the C1 cyclone cooler serve as the cooling air inlet for the discharge equipment.
[0021] In conjunction with the first aspect, in some embodiments of this application, the kiln head burner, kiln tail burner, and outer ring burner are all regenerative burners. The kiln head burner and kiln tail burner utilize the high-temperature flue gas discharged from the first heating space to preheat the fuel and combustion-supporting gas. The outer ring burner utilizes the high-temperature flue gas discharged from the second heating space to preheat the fuel and combustion-supporting gas.
[0022] According to the second aspect, the present application provides a double-walled rotary kiln, including: a first kiln chamber, a second kiln chamber, a feeding device and a discharging device, wherein the first kiln chamber and the second kiln chamber respectively include a first inner sleeve, a second inner sleeve and an outer sleeve arranged in layers from the inside to the outside.
[0023] In the first kiln chamber and the second kiln chamber, the interior of the first inner sleeve is the first heating space, the interlayer between the first inner sleeve and the second inner sleeve is the material channel, and the interlayer between the second inner sleeve and the outer sleeve is the second heating space.
[0024] The first kiln chamber has a kiln tail burner at its tail end. The second kiln chamber has a kiln head burner at its head end. Both the kiln head burner and the kiln tail burner face the corresponding first heating space.
[0025] In the first kiln chamber, the material channel is connected to the feeding equipment at the end near the kiln tail, and the second heating space is equipped with multiple outer ring burners at the end near the kiln tail.
[0026] In the second kiln chamber, the material channel is connected to the discharge equipment at one end near the kiln head, and the second heating space is equipped with multiple outer ring burners at one end near the kiln head.
[0027] The first heating space of the first kiln chamber is connected to the first heating space of the second kiln chamber via a flue gas transfer channel. The material passage of the first kiln chamber is connected to the material passage of the second kiln chamber via a material transfer channel. The second heating space of the first kiln chamber is connected to the second heating space of the second kiln chamber via another flue gas transfer channel.
[0028] Heat collection covers are installed on the outside of the first and second kiln chambers, respectively.
[0029] According to a third aspect, embodiments of this application provide a double-walled rotary kiln, comprising: a partitioned calcining kiln chamber, a direct calcining kiln chamber, a feeding device, and a discharging device. The partitioned calcining kiln chamber includes a first inner sleeve, a second inner sleeve, and an outer sleeve. The interior of the first inner sleeve serves as a flue gas passage, the interlayer between the first and second inner sleeves serves as a material passage, and the interlayer between the second inner sleeve and the outer sleeve serves as a second heating space. Multiple outer ring burners are provided at both ends of the second heating space.
[0030] The kiln head of the direct-fired kiln is equipped with a kiln head burner. The kiln tail of the direct-fired kiln is connected to the flue gas passage through a flue gas transfer passage and the kiln head of the indirect-fired kiln. The material passage is connected to the kiln tail of the direct-fired kiln through the kiln head of the indirect-fired kiln and the material transfer passage. The material transfer passage is equipped with a double bell jar.
[0031] The material channel is connected to the feeding equipment via the kiln tail of the partitioned calcining kiln. The kiln head of the direct calcining kiln is connected to the discharge equipment.
[0032] In conjunction with the third aspect, some embodiments of this application also include a heat exchanger. High-temperature gas generated in the material channel due to the decomposition of the calcined material enters the heat exchanger to preheat the fuel.
[0033] Heat collection hoods are installed on the exterior of both the partition calcining kiln and the direct calcining kiln. The high-temperature gas generated by the decomposition of the calcined material enters the heat collection hood after heat exchange in a heat exchanger.
[0034] In conjunction with the third aspect, in some embodiments of this application, the high-temperature flue gas discharged from the flue gas channel is preheated to the raw material by means of indirect heat exchange or direct heat exchange after entering the feeding equipment.
[0035] According to a fourth aspect, this application provides a double-walled rotary kiln, comprising: a first kiln chamber, a feeding device, and a discharging device, characterized in that the first kiln chamber includes a first inner sleeve, a second inner sleeve, and an outer sleeve arranged in layers from the inside out. The interior of the first inner sleeve is a first heating space, the interlayer between the first inner sleeve and the second inner sleeve is a material channel, and the interlayer between the second inner sleeve and the outer sleeve is a second heating space.
[0036] A connecting channel for connecting the first heating space and the second heating space is provided near the kiln head of the first kiln chamber.
[0037] The kiln head of the first kiln chamber is equipped with a kiln head burner. The kiln head burner faces the first heating space. The material passage is connected to the feeding equipment at the end near the kiln tail and to the discharge equipment at the end near the kiln head.
[0038] In conjunction with the fourth aspect, in some embodiments of this application, T-shaped fasteners are provided at intervals on the inner side of the outer sleeve. The fasteners are arranged in a straight line along the radial direction of the outer sleeve, and the fan-shaped irregular bricks are disposed on the inner wall of the outer sleeve by means of the fasteners.
[0039] The fan-shaped irregular bricks include basic fan-shaped irregular bricks, Class A fan-shaped irregular bricks, and Class B1 fan-shaped irregular bricks. The front and rear ends and cross-sections of the basic, Class A, and Class B1 fan-shaped irregular bricks are all fan-shaped. Inside the basic, Class A, and Class B1 fan-shaped irregular bricks, a first through hole is provided along the circumferential direction corresponding to the fan shape; this first through hole serves as a material channel. Above the first through hole, a second through hole is provided, penetrating the front and rear ends of the fan shape; this second through hole serves as a gas channel. The first and second through holes are isolated from each other.
[0040] In the A-type fan-shaped irregular brick, in addition to the first through hole and the second through hole, there is also a discharge hole. The discharge hole is located on the front end face of the fan shape, and there are chamfers on both sides of the discharge hole. The discharge hole is connected to the first through hole.
[0041] In the B1 type fan-shaped special brick, in addition to the first through hole and the second through hole, there is also a first feed hole. The first feed hole is located on the rear end face of the fan shape, and there are chamfers on both sides of the first feed hole. The first feed hole is connected to the first through hole.
[0042] The top and bottom surfaces of the basic fan-shaped irregular bricks, Class A fan-shaped irregular bricks, and Class B1 fan-shaped irregular bricks are all arc-shaped, and the top surface has a groove that matches the "T"-shaped fastener.
[0043] After a circular brick layer is laid using base sector-shaped special bricks, Class A sector-shaped special bricks and Class B1 sector-shaped special bricks, the first through holes of each sector-shaped special brick in the brick layer are connected to each other to form a material passage. For two adjacent circular brick layers, the discharge hole of the Class A sector-shaped special brick in the upper brick layer corresponds to the first feed hole of the Class B1 sector-shaped special brick in the lower brick layer, so that the material passages are communicated. The chamfer directions of the discharge hole and the first feed hole are set according to the rotation direction of the first kiln chamber, so that the chamfer directions are adapted to the spiral downward flow direction of the material.
[0044] After the entire kiln chamber is laid, the second through holes on each layer of bricks are correspondingly communicated to form a second heating space. The inside of the circular brick layer is the first heating space.
[0045] The double-wall rotary kiln provided in the embodiments of the present application can calcine small-particle-size limestone, which improves the raw material utilization rate, increases the activity of the finished lime, and is conducive to resource conservation and environmental protection. Compared with the prior art, the present invention has the following advantages: ① High raw material utilization rate, which can calcine fine-grained limestone smaller than 1mm, improve the utilization rate of limestone mines, and make use of raw materials that cannot be used by vertical kilns and ordinary rotary kilns. ② The discharged material from the kiln is the finished product, no further crushing and screening is required. ③ High-purity CO₂ generated by the thermal decomposition of limestone can be directly obtained without separation treatment, realizing zero carbon dioxide emissions. Brief Description of the Drawings
[0046] In order to more clearly describe the technical solutions in the embodiments of the present application, the drawings that need to be used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present application, and for those of ordinary skill in the art, other drawings can also be obtained based on these drawings without any creative effort.
[0047] Figure 1 is a schematic structural diagram of the first double-wall rotary kiln provided in the embodiment of the present application; Figure 2 is a cross-sectional view of the first kiln chamber constructed using the "ri"-shaped special bricks; Figure 3 is another cross-sectional view of the first kiln chamber constructed using the "ri"-shaped special bricks; Figure 4 is a cross-sectional view of the "ri"-shaped special brick; Figure 5 is a schematic perspective structural view of the "ri"-shaped special brick; Figure 6 is a cross-sectional view of the first kiln chamber constructed jointly by a steel structure and a brick body; Figure 7 is Figure 6 a cross-sectional view of the first kiln chamber shown along the A-A direction; Figure 8 yes Figure 6 The first kiln chamber shown is a cross-sectional view along the BB direction. Figure 9 This is a schematic diagram of the structure of the second type of double-walled rotary kiln provided in the embodiments of this application; Figure 10 This is a schematic diagram of the structure of the third type of double-walled rotary kiln provided in the embodiments of this application; Figure 11 This is a schematic diagram of the structure of the fourth type of double-walled rotary kiln provided in the embodiments of this application; Figure 12 This is a schematic diagram of the fifth type of double-walled rotary kiln provided in the embodiments of this application; Figure 13 This is a three-dimensional structural diagram of a basic fan-shaped irregular brick; Figure 14 This is a three-dimensional structural diagram of a type A fan-shaped irregular brick; Figure 15 This is a three-dimensional structural diagram of a B1 type fan-shaped irregular brick; Figure 16 This is a cross-sectional three-dimensional structural diagram of the first kiln chamber constructed using fan-shaped irregular bricks; Figure 17 This is a three-dimensional structural diagram of a B2 type fan-shaped irregular brick; Figure 18 This is a three-dimensional structural diagram of an arched, irregularly shaped brick; Wherein, 1—first kiln chamber, 2—feeding equipment, 3—discharge equipment, 4—first inner sleeve, 5—second inner sleeve, 6—outer sleeve, 7—first heating space, 8—material channel, 9—second heating space, 10—kiln head burner, 11—kiln tail burner, 12—outer ring burner, 13—P1 cyclone preheater, 14—P2 cyclone preheater, 15—P3 cyclone preheater, 16—P4 cyclone preheater, 17—P5 cyclone preheater, 18—P6 cyclone preheater, 19—riser pipe, 20—feeding pipe, 21—material conveying pipe, 22—C1 cyclone cooler, 23—C2 cyclone cooler, 24—C3 cyclone cooler, 25—gas channel, 26—interval 27—Direct calcination kiln chamber; 29—Flue gas passage; 30—Flue gas transfer passage; 31—Material transfer passage; 32—Heat exchanger; 33—Double bell jar; 34—Heat collector hood; 35—Connecting passage; 36—Fixed component; 37—H-shaped special brick; 371—First horizontal plate; 372—Second horizontal plate; 373—Third horizontal plate; 374—Support column; 375—Groove; 376—Concave part; 377—Protrusion; 38—Structure A; 381—Cooling air passage; 39—Structure B; 391—Thin brick; 392—Air duct; 39—First through hole; 40—Second through hole; 41—Discharge hole; 42—First feed hole; 43—Second feed hole. Implementation
[0048] In the following description, specific details such as particular system architectures and techniques are set forth for illustrative purposes and not for limitation, in order to provide a thorough understanding of the embodiments of this application. However, those skilled in the art will understand that this application may also be implemented in other embodiments without these specific details. In other instances, detailed descriptions of well-known systems, apparatuses, circuits, and methods have been omitted so as not to obscure the description of this application with unnecessary detail.
[0049] To illustrate the technical solution described in this application, specific embodiments are provided below. Example 1
[0050] Embodiment 1 of this application provides a double-walled rotary kiln for calcining limestone, which can be used to calcine limestone with a particle size of less than 0.1 cm. Figure 1 The structure of the double-walled rotary kiln in Example 1 is shown. (As...) Figure 1 As shown, the double-walled rotary kiln includes a first kiln chamber 1, a feeding device 2, and a discharging device 3. The first kiln chamber 1 includes a first inner sleeve 4, a second inner sleeve 5, and an outer sleeve 6 arranged in layers from the inside out. The interior of the first inner sleeve 4 is a first heating space 7, the interlayer between the first inner sleeve 4 and the second inner sleeve 5 is a material channel 8, and the interlayer between the second inner sleeve 5 and the outer sleeve 6 is a second heating space 9. A connecting channel 35 for connecting the first heating space 7 and the second heating space 9 is provided at the kiln tail of the first kiln chamber 1.
[0051] The kiln head of the first kiln chamber 1 is equipped with a kiln head burner 10, which faces the first heating space 7. The second heating space 9 is equipped with multiple outer ring burners 12 at the end near the kiln head. The material channel 8 is connected to the feeding device 2 at the end near the kiln tail and to the discharging device 3 at the end near the kiln head.
[0052] A heat collection hood 34 can be installed outside the first kiln chamber 1 to collect the heat lost through the kiln shell. Nitrogen or carbon dioxide can be filled into the heat collection hood 34 to prevent overheating of the metal outer casing 6. The heat collection hood seals the gaps at the labyrinth seals at both ends of the rotary kiln to prevent air leakage from the labyrinth seal gaps. The gas pressure inside the heat collection hood should be slightly higher than the gas pressure inside the kiln to prevent gas leakage from the kiln.
[0053] High-temperature CO2 generated from the decomposition of calcined limestone in material channel 8 enters feeding device 2 to preheat the raw material; the high-temperature CO2 after preheating cools down to low-temperature CO2; the low-temperature CO2 is introduced into discharging device 3 to cool the product. The pure CO2 gas discharged from discharging device 3 can be collected as a by-product.
[0054] In material channel 8, limestone decomposes during calcination, generating high-temperature pure CO2. Feeding equipment 2 utilizes the pure CO2 discharged from material channel 8 to preheat the raw materials. Feeding equipment 2 includes a circulating P1 cyclone preheater 13, a P2 cyclone preheater 14, a P3 cyclone preheater 15, a P4 cyclone preheater 16, a P5 cyclone preheater 17, and a P6 cyclone preheater 18.
[0055] The inlet and outlet at the top of the P5 cyclone preheater 17 are connected to the P6 cyclone preheater 18 via riser pipe 19; the feed inlet of the feeding device 2 is provided on the riser pipe 19 connecting the P5 cyclone preheater 17 and the P6 cyclone preheater 18; the inlet and outlet at the top of the P6 cyclone preheater 18 are the gas outlets of the feeding device 2.
[0056] The inlet and outlet at the bottom of P6 cyclone preheater 18 are connected to P4 cyclone preheater 16 via feed pipe 20; the inlet and outlet at the bottom of P4 cyclone preheater 16 are connected to P2 cyclone preheater 14 via feed pipe 20; the inlet and outlet at the bottom of P2 cyclone preheater 14 are connected to material channel 8 via gas channel 25.
[0057] The inlet and outlet at the top of P2 swirl preheater 14 are connected to P3 swirl preheater 15 via riser pipe 19; the inlet and outlet at the top of P3 swirl preheater 15 are connected to P4 swirl preheater 16 via riser pipe; the inlet and outlet at the top of P4 swirl preheater 16 are connected to P5 swirl preheater 17 via riser pipe.
[0058] The inlet and outlet at the bottom of P5 cyclone preheater 17 are connected to P3 cyclone preheater 15 via feed pipe 20; the inlet and outlet at the bottom of P3 cyclone preheater 15 are connected to P1 cyclone preheater 13 via feed pipe 20; the inlet and outlet at the bottom of P1 cyclone preheater 13 are connected to material channel 8 via conveying pipe 21.
[0059] Feeding equipment 2 preheats the raw materials using the following method: Small-particle limestone material enters the riser pipe 19 of P5 cyclone preheater 17, where it remains suspended. It then enters P6 cyclone preheater 18 with the airflow, where heat exchange occurs simultaneously. In P6 cyclone preheater 18, the suspended limestone is preheated, and the cooled CO2 is extracted from the top of P6 cyclone preheater 18. The preheated suspended material in P6 cyclone preheater 18 settles from the gas and enters the gas riser pipe of P4 cyclone preheater 16 through feed pipe 20. After being preheated again in P4 cyclone preheater 16, most of the suspended material re-enters P5 cyclone preheater 17 with the airflow; a small portion settles and falls into P2 cyclone preheater 14. After being preheated again by the P2 cyclone preheater 14, most of the suspended material is carried by the airflow into the P3 cyclone preheater 15 and the P1 cyclone preheater 13; most of the suspended material will settle and fall into the conveying pipe 21 at the bottom of the P1 cyclone preheater 13. The small-diameter limestone material after multiple preheating is sent to the material channel 8 of the first kiln chamber 1 for calcination through the conveying pipe 21.
[0060] The pure CO2 discharged from material channel 8 has a high temperature and can be introduced into feeding device 2 through gas channel 25 for preheating the raw materials. After preheating the raw materials, the temperature of the pure CO2 decreases, and this low-temperature CO2 can be introduced into discharging device 3 for cooling the calcined lime. Discharging device 3 includes C1 cyclone cooler 22, C2 cyclone cooler 23, and C3 cyclone cooler 24. The inlet and outlet at the top of C2 cyclone cooler 23 are connected to C3 cyclone cooler 24 through riser pipe 19; the inlet and outlet at the bottom of C2 cyclone cooler 23 are discharged into discharging device 3 through discharge pipe 20; the riser pipe 19 between C2 cyclone cooler 23 and C3 cyclone cooler 24 is provided with the inlet of discharging device 3; the inlet and outlet at the top of C3 cyclone cooler 24 are the gas outlets of discharging device 3.
[0061] The inlet and outlet at the bottom of the C3 cyclone cooler 24 are connected to the C1 cyclone cooler 22 via the feed pipe 20; the inlet and outlet at the top of the C1 cyclone cooler 22 are connected to the C2 cyclone cooler 23 via the riser pipe 19; the inlet and outlet at the bottom of the C1 cyclone cooler 22 are the cooling air inlets of the discharge device 3.
[0062] The discharge equipment 3 uses the following method to cool the lime product obtained from calcination: The material passage 8 of the first kiln chamber 1 discharges the calcined lime, the high-temperature lime enters the discharging equipment 3 from the rising pipe of the C2 cyclone cooler 23, the material is in a suspended state, enters the C3 cyclone cooler 24 along with the air flow, and performs heat exchange at the same time. In the C3 cyclone cooler 24, the suspended lime is cooled, and the CO2 after cooling the lime is extracted from the top of the C3 cyclone cooler 24, which can be used as an auxiliary product. The suspended material after cooling treatment in the C3 cyclone cooler 24 settles down from the gas, and enters the gas rising pipe of the C1 cyclone cooler 22 through the discharging pipe 20. After being cooled again by the C1 cyclone cooler 22, most of the suspended material enters the C2 cyclone cooler 23 along with the air flow, and is discharged out of the discharging equipment 3 after being cooled by the C2 cyclone cooler 23.
[0063] Two methods can be adopted to construct the first kiln chamber with a double partition wall structure. The first method completely uses special-shaped bricks in the shape of the Chinese character "ri" to construct the double partition wall kiln chamber, as shown in Figures 2 to 5 ; the second method uses a steel structure and brick bodies to construct the double partition wall kiln chamber, as shown in Figures 6 to 8 .
[0064] When adopting the first method to construct the double partition wall kiln chamber, Figure 2 and Figure 3 show the sectional views of the first kiln chamber 1 in two directions. As shown in Figure 2 and Figure 3 , "T"-shaped fixing members 36 are arranged at intervals on the inner side of the outer sleeve 6. The fixing members 36 can be arranged inside the outer sleeve 6 made of steel plate by welding. The fixing members 36 are arranged along a straight line in the radial direction of the outer sleeve 6, so that the subsequent masonry of the special-shaped bricks in the shape of the Chinese character "ri" can be carried out smoothly. The special-shaped bricks 37 in the shape of the Chinese character "ri" can be arranged on the inner wall of the outer sleeve 6 through the fixing members 36. The cross section of the special-shaped brick 37 in the shape of the Chinese character "ri" is roughly in the shape of the Chinese character "ri", as shown in Figure 4 and Figure 5as shown. The H-shaped special-shaped brick 37 is composed of a first transverse plate 371, a second transverse plate 372 and a third transverse plate 373 arranged in sequence from top to bottom, with support columns 374 respectively arranged at four corners. The three transverse plates can be connected through the support columns to form a stable whole. The H-shaped special-shaped brick 37 can be fired by an integral molding method. The top first transverse plate 371 is provided with a groove 375 that fits with the "T"-shaped fixing member 36. A concave portion 376 and a convex portion 377 are provided at both ends of the second transverse plate 372. After the H-shaped special-shaped bricks are laid, the concave portions 376 and the convex portions 377 at both ends of the second transverse plate 372 can form a labyrinth seal structure, thereby avoiding air leakage. The third transverse plate 373 has a structure similar to that of the second transverse plate 372. After the H-shaped special-shaped bricks are laid, the third transverse plates of each H-shaped special-shaped brick are connected to each other to form a first heating space 7; the second transverse plates of each H-shaped special-shaped brick are connected to each other to form a second heating space 9; the first transverse plates of each H-shaped special-shaped brick are connected to each other and combined with the outer sleeve 6 to form a heat insulation layer for protecting the outer sleeve. Grooves and turbulence rings can be arranged on the inner wall of the H-shaped special-shaped brick to define the gas flow direction, increase the heat exchange time, and enhance the heat exchange effect.
[0065] When the second method is adopted to construct the double-wall kiln chamber, as Figure 6 shown, the first kiln chamber 1 is composed of A structures 38 and B structures 39 that are alternately arranged in sequence along the radial direction. The radial length of the A structure 38 is relatively short, which mainly plays a supporting role to enhance the strength of the entire kiln chamber; the radial length of the B structure 39 is relatively long, which mainly plays a heat conduction role to complete the calcination of materials.
[0066] Figure 7 shows the structure of the A structure 38. The A structure 38 is composed of an outer sleeve 6 and a steel structure body with a interlayer. A first inner sleeve and a second inner sleeve are formed by the steel structure body. The outer sleeve and the steel structure body are connected at the kiln head and / or the kiln tail of the entire kiln chamber. The steel structure body adopts a sandwich structure, in which a cooling air passage 381 is arranged to prevent the temperature of the steel structure body from being too high and improve the strength of the steel structure body. A refractory material is arranged on the inner side of the outer sleeve 6 to protect the outer sleeve made of metal. Refractory materials with relatively high thermal insulation performance are arranged at the parts of the steel structure body adjacent to the first heating space 7, the material passage 8 and the second heating space 9. The refractory materials and the cooling air jointly protect the steel structure body, preventing the temperature of the steel structure body from rising too high.
[0067] Figure 8The structure of structure B 39 is shown. Structure B 39 consists of an outer sleeve 6 and thin bricks 391. The thin bricks 391 form two annular layers, constituting a first inner sleeve and a second inner sleeve. The first and second inner sleeves of structure B 39, composed of thin bricks 391, are respectively connected to the steel structure in structure A 38. Specifically, a metal duct 392 can be installed between the thin bricks 391, and a refractory material with good thermal insulation properties can be installed on the outside of the duct 392. The duct 392 connects structure B 39 to the steel structure in structure A 38, and also connects the cooling air channels in each structure A 38. The metal duct has a certain strength, which can improve the stability and strength of structure B. The thin bricks 391 in structure B 39 are made of a material with good thermal conductivity and are relatively thin, so that the heat in the first heating space 7 and the second heating space 9 can be conducted to the material channel 8. In structure B 39, a refractory material is installed on the inner side of the outer sleeve 6.
[0068] The CO2 pressure in material channel 8 must be higher than the gas pressure in the first heating space 7 and the second heating space 9 to prevent gas from entering material channel 8, ensuring that pure CO2 is discharged from material channel 8. If the CO2 cooling air required by material channel 8 is less than that discharged by discharge device 3, the excess CO2 from discharge device 3 will directly enter feed device 2 for material preheating. When the kiln head burner 10 is burning, the outer ring burner 12 preheats, and vice versa. The flue gas temperature in the first heating space 7 and the second heating space 9 is 1200℃, the gas temperature for preheating the material in feed device 2 is less than 800℃, and the temperature of the CO2 discharged after cooling the product by discharge device 3 is less than 150℃. Example 2
[0069] Embodiment 2 of this application provides another double-walled rotary kiln for calcining limestone, which can be used to calcine limestone with a particle size of less than 0.1 cm. Figure 9 The structure of the double-walled rotary kiln in Example 2 is shown. (As...) Figure 9 As shown, the rotary kiln in Example 2 is largely the same as that in Example 1, except that... Figure 9 In the double-walled rotary kiln shown, the first kiln chamber 1 is equipped with a kiln head burner 10 and a kiln tail burner 11 at both ends, and the second heating space 9 is equipped with multiple outer ring burners 12 at both ends. In addition, the double-walled rotary kiln in Embodiment 2 eliminates the connecting channel 35 used to connect the first heating space 7 and the second heating space 9.
[0070] The kiln head burner 10, kiln tail burner 11, and outer ring burner 12 are all regenerative burners. The kiln head burner 10 and kiln tail burner 11 use the high-temperature flue gas discharged from the first heating space 7 to preheat the fuel and combustion-supporting gas. The outer ring burner 12 uses the high-temperature flue gas discharged from the second heating space 9 to preheat the fuel and combustion-supporting gas.
[0071] The fuel for the kiln head burner 10, kiln tail burner 11, and each outer ring burner 12 can be gaseous fuels such as hydrogen, natural gas, or coal gas; solid fuels such as pulverized coal or semi-coke; or liquid fuels such as gasoline or diesel; or a mixture of any two or three of the gaseous, liquid, and solid fuels. The combustion-supporting gas can be air, oxygen-enriched gas, or pure oxygen. When air is used as the combustion-supporting air, the high-temperature flue gas from combustion, containing nitrogen and a small amount of water vapor, operates in the first heating space 7 and the second heating space 9. The flue gas in the first heating space 7 and the second heating space 9 does not mix with the CO2 produced in the material channel 8 due to the calcination and decomposition of limestone. Pure CO2 can be obtained after calcining limestone. Separating the flue gas discharged from the first heating space 7 and the second heating space 9 yields nitrogen of very high purity.
[0072] Biomass conventional fuels can be used as Figure 9 The rotary kiln shown has a slag discharge port at one end of the kiln head, through which the ash produced during combustion is discharged.
[0073] In Example 2, hydrogen is used as fuel. The exhaust gas from combustion is cooled to 120°C after passing through a regenerative burner, and then fed into the Krupp power generation system, where it is ultimately converted into water and nitrogen at 20°C. The CO2 produced from the calcination and decomposition of lime is cooled to 150°C after passing through feeder 2, and then fed into the Krupp power generation system, where it is ultimately converted into CO2 at 20°C. Part of this 20°C CO2 is returned to the heat collection hood 34 to cool the kiln body, and the rest is collected directly as a byproduct.
[0074] The heat collector hood seals the gaps at both ends of the rotary kiln's labyrinth seals to prevent air leakage from these gaps. The gas pressure inside the heat collector hood should be slightly higher than the gas pressure inside the kiln to prevent gas leakage.
[0075] Figure 9 The process of calcining lime in the double-walled rotary kiln shown is as follows: The limestone material, preheated by the feeding device 2, enters the material channel 8 of the first kiln chamber 1. The first heating space 7 and the second heating space 9 on both sides of the material channel 8 provide heat to the limestone in the material channel 8, thereby causing the limestone in the material channel 8 to decompose and generate CaO and CO2. The CaO is cooled by the discharge device 3 and discharged as a product from the double-wall rotary kiln. This type of double-wall rotary kiln is suitable for calcining small-particle-size limestone, and the CO2 generated by the decomposition of limestone during the calcination process will not mix with the flue gas after fuel combustion. The CO2 generated by the decomposition of limestone has high purity and can be sold as a by-product, achieving zero carbon dioxide emissions.
[0076] In Example 2, the following is adopted: Figures 2 to 5 The first kiln chamber is constructed using a double-walled kiln structure, or by employing... Figures 6 to 8 The first kiln chamber is constructed using a double-walled kiln chamber as shown. Example 3
[0077] Embodiment 3 of this application provides a third type of double-walled rotary kiln for calcining limestone, which can be used to calcine limestone with a particle size of less than 0.1 cm. Figure 10 The structure of the double-walled rotary kiln in Example 3 is shown. Figure 10 As shown, the double-walled rotary kiln includes a first kiln chamber 1, a second kiln chamber 1', a feeding device 2, and a discharging device 3. The first kiln chamber 1 and the second kiln chamber 1' each include a first inner sleeve 4, a second inner sleeve 5, and an outer sleeve 6 arranged in layers from the inside to the outside.
[0078] In the first kiln chamber 1 and the second kiln chamber 1', the interior of the first inner sleeve 4 is the first heating space 7, the interlayer between the first inner sleeve 4 and the second inner sleeve 5 is the material channel 8, and the interlayer between the second inner sleeve 5 and the outer sleeve 6 is the second heating space 9.
[0079] The first kiln chamber 1 is equipped with a kiln tail burner 11 at the kiln tail, and the second kiln chamber 1' is equipped with a kiln head burner 10 at the kiln head. Both the kiln head burner 10 and the kiln tail burner 11 face the corresponding first heating space 7.
[0080] In the first kiln chamber 1, the material channel 8 is connected to the feeding device 2 at the end near the kiln tail, and the second heating space 9 is equipped with multiple outer ring burners 12 at the end near the kiln tail. In the second kiln chamber 1', the material channel 8 is connected to the discharge device 3 at the end near the kiln head, and the second heating space 9 is equipped with multiple outer ring burners 12 at the end near the kiln head. The kiln head burner 10, the kiln tail burner 11, and each outer ring burner 12 are all regenerative burners. The kiln head burner 10, the kiln tail burner 11, and each outer ring burner 12 utilize the high-temperature flue gas discharged from the first heating space 7 and / or the second heating space 9 to preheat the fuel and combustion-supporting gas. When the kiln head burner 10 is burning, the kiln tail burner 11 is preheated, and vice versa. When the outer ring burner 12 near the kiln tail is burning, the outer ring burner 12 near the kiln head is preheated, and vice versa.
[0081] The first heating space 7 of the first kiln chamber 1 is connected to the first heating space 7 of the second kiln chamber 1' via a flue gas transfer channel 30. The material channel 8 of the first kiln chamber 1 is connected to the material channel 8 of the second kiln chamber 1' via a material transfer channel 31. The second heating space 9 of the first kiln chamber 1 is connected to the second heating space 9 of the second kiln chamber 1' via another flue gas transfer channel. Heat collecting hoods 34 are respectively installed on the outside of the first kiln chamber 1 and the second kiln chamber 1'.
[0082] The heat collector hood seals the gaps at both ends of the rotary kiln's labyrinth seals to prevent air leakage from these gaps. The gas pressure inside the heat collector hood should be slightly higher than the gas pressure inside the kiln to prevent gas leakage.
[0083] High-temperature CO2 generated from the decomposition of calcined limestone in material channel 8 enters feeding device 2 to preheat the raw material; the high-temperature CO2 after preheating cools down to low-temperature CO2; the low-temperature CO2 is introduced into discharging device 3 to cool the product. The pure CO2 gas discharged from discharging device 3 can be collected as a by-product.
[0084] The flue gas in the first heating space 7 and the second heating space 9 does not mix with the CO2 produced by the calcination and decomposition of limestone in the material channel 8. After calcining the limestone, pure CO2 can be obtained. Separating the flue gas discharged from the first heating space 7 and the second heating space 9 yields nitrogen of very high purity.
[0085] Example 3 can use feeding and discharging equipment similar to that of Example 1, which will not be described in detail here.
[0086] Figure 10 The process of calcining lime in the double-walled rotary kiln shown is as follows: The limestone material, preheated by the feeding device 2, enters the material channel 8 of the first kiln chamber 1, and then enters the material channel 8 of the second kiln chamber 1' via the material transfer channel 31. In both kiln chambers, the first heating space 7 and the second heating space 9 on both sides of the material channel 8 provide heat to the limestone in the material channel 8, thereby causing the limestone in the material channel 8 to decompose and generate CaO and CO2. The CaO is cooled by the discharge device 3 and discharged as a product from the double-walled rotary kiln. Figure 10 The double-walled rotary kiln shown employs a continuous feeding method for raw materials. During calcination, the first kiln chamber 1 and the second kiln chamber 1' are calcined independently in separate cycles. In the first cycle, the kiln tail burner 11 and the outer ring burner 12 in the first kiln chamber 1 ignite, while the kiln head burner 10 and the outer ring burner 12 in the second kiln chamber 1' store heat. The high-temperature flue gas generated by combustion flows from the first kiln chamber 1 to the second kiln chamber 1', and the material also flows from the first kiln chamber 1 to the second kiln chamber 1', which is the parallel-flow calcination stage. In the second cycle, the kiln head burner 10 and the outer ring burner 12 in the second kiln chamber 1' ignite, while the kiln tail burner 11 and the outer ring burner 12 in the first kiln chamber 1 store heat. The high-temperature flue gas generated by combustion flows from the second kiln chamber 1' to the first kiln chamber 1, and the material still flows from the first kiln chamber 1 to the second kiln chamber 1', which is the counter-flow calcination stage. The two cycles are performed alternately to complete the lime calcination.
[0087] In Example 3, the following is adopted Figures 2 to 5 The double-walled kiln structure shown depicts the construction of the first and second kiln chambers, or employs... Figures 6 to 8The double-walled kiln chamber shown depicts the construction of the first and second kiln chambers. Example 4
[0088] Embodiment 4 of this application provides a double-walled rotary kiln for calcining cement clinker. For example... Figure 11 As shown, the double-wall rotary kiln includes a partition wall calcining kiln chamber 26, a direct calcining kiln chamber 27, a feeding device 2, a discharging device 3, and a heat exchanger 32.
[0089] The partitioned calcining kiln chamber 26 includes a first inner sleeve 4, a second inner sleeve 5, and an outer sleeve 6. The interior of the first inner sleeve 4 serves as a flue gas passage 29, the interlayer between the first inner sleeve 4 and the second inner sleeve 5 serves as a material passage 8, and the interlayer between the second inner sleeve 5 and the outer sleeve 6 serves as a second heating space 9. Multiple outer ring burners 12 are provided at both ends of the second heating space 9. The kiln head of the direct calcining kiln chamber 27 is equipped with a kiln head burner 10. The outer ring burners 12 at both ends of the second heating space 9 are regenerative burners, employing a counter-firing method and utilizing the high-temperature flue gas in the second heating space 9 to preheat the fuel and combustion-supporting gases.
[0090] The tail of the direct-fired kiln 27 connects to the flue gas passage 29 via the flue gas transfer passage 30 and the kiln head of the indirect-fired kiln 26. The material passage 8 connects to the tail of the direct-fired kiln 27 via the kiln head of the indirect-fired kiln 26 and the material transfer passage 31. The material transfer passage 31 is equipped with a double bell jar 33, which ensures that no air enters during material feeding. Because of the double bell jar 33, when material is transferred between the material passage 8 of the indirect-fired kiln 26 and the direct-fired kiln 27, the flue gas from the direct-fired kiln 27 will not enter the material passage 8 of the indirect-fired kiln 26.
[0091] Material channel 8 is connected to the feeding device 2 via the kiln tail of the partition calcining kiln chamber 26. The kiln head of the direct calcining kiln chamber 27 is connected to the discharge device 3.
[0092] Heat exchanger 32 uses the high-temperature gas generated by the decomposition of calcined materials in material channel 8 to preheat the fuel. Discharge device 3 uses ambient temperature air to cool the calcined product discharged from the kiln tail of direct calcination kiln 27. The preheated fuel and the high-temperature air discharged from discharge device 3 are then fed into the kiln head burner 10 of direct calcination kiln 27.
[0093] Heat collection covers 34 can be installed on the outside of the partition calcining kiln 26 and the direct calcining kiln 27 to collect the heat lost from the two kilns through the kiln shell. Nitrogen or carbon dioxide can be filled into the heat collection covers 34 to prevent the metal outer sleeve 6 from overheating.
[0094] Example 4 can use a feeding device similar to that of Example 1, which will not be described again here. It should be noted that in Example 4, the high-temperature flue gas discharged from flue gas passage 29 can preheat the raw material by means of indirect heat exchange or direct heat exchange after entering the feeding device 2. When direct heat exchange is used, the preheating temperature is below 850℃. When indirect heat exchange is used for raw material preheating, the feeding device provided in Example 1 needs to be modified. Specifically, the P1 cyclone preheater, P2 cyclone preheater, P3 cyclone preheater, P4 cyclone preheater, P5 cyclone preheater, and P6 cyclone preheater need to be modified into cyclone preheaters with indirect heat exchange structures, so that the high-temperature flue gas discharged from flue gas passage 29 is introduced into the indirect heat exchange structure of each cyclone preheater, thereby performing indirect heat exchange on the raw material in each cyclone preheater. The discharge device 3 in Example 4 is a grate cooler.
[0095] The working process of the cement rotary kiln shown in Example 4 is as follows: Preheated fuel and high-temperature air enter the kiln head burner 10 of the direct calcining kiln 27, where combustion produces high-temperature flue gas. This high-temperature flue gas flows sequentially through the direct calcining kiln 27, the flue gas transfer channel 30, and the flue gas channel 29 of the indirect calcining kiln 26, finally entering the feeding device 2 to preheat the raw materials and then being discharged. After being preheated to 800°C by the feeding device 2, the raw materials enter the material channel 8 of the indirect calcining kiln 26, where they undergo preliminary calcination using the heat from the flue gas channel 29 and the high-temperature flue gas in the second heating space 9. After preliminary calcination in the indirect calcining kiln 26, the residual CO2 content is below 0.1%, and the raw materials enter the direct calcining kiln 27 via the material transfer channel 31 for deep calcination at 1500°C to 1700°C. After deep calcination in the direct calcining kiln 27, the raw materials are discharged from the kiln head and enter the discharge device 3, where they are cooled using ambient temperature air. The 10 burners at the kiln head can use either an excess or a deficiency of hydrogen as fuel to reduce the nitrogen oxide content in the flue gas. When there is an excess of hydrogen, auxiliary burners can be added to burn off the excess hydrogen.
[0096] The heat collector hood seals the gaps at both ends of the rotary kiln's labyrinth seals to prevent air leakage from these gaps. The gas pressure inside the heat collector hood should be slightly higher than the gas pressure inside the kiln to prevent gas leakage.
[0097] During the initial calcination of the raw materials in the partition wall calcining kiln 26, pure CO2 is produced due to high-temperature decomposition. This CO2, with its high temperature, can be introduced into the heat exchanger 32 to preheat the fuel. After fuel preheating, the heat exchanger 32 discharges low-temperature pure CO2, which can be injected into the heat collection hood 34 to cool the metal outer sleeve 6. The CO2 discharged from the outer sleeve 6, with a certain temperature, can be sent into the partition wall structure of the feeding device 2 to enhance heat exchange for the raw materials. The CO2 in the heat collection hood is allowed to enter the material channel, thereby increasing the gas pressure in the material channel and facilitating heat transfer.
[0098] In Example 4, the following is adopted: Figures 2 to 5 The double-walled kiln chamber shown is constructed with a partitioned calcining kiln chamber 26, or by using... Figures 6 to 8 The double-walled kiln chamber shown is a double-walled calcining kiln chamber 26. The double-walled rotary kiln provided in Example 4 achieves complete recovery of cement clinker and CO2. Example 5
[0099] Embodiment 5 of this application provides a double-walled rotary kiln for calcining gangue. Gangue is an ore with an Al2O3 content greater than 30% and also contains SiO2 and water of crystallization. Figure 12 The structure of the double-walled rotary kiln provided in Embodiment 5 is shown. This double-walled rotary kiln includes a first kiln chamber 1, a feeding device 2, and a discharging device 3. The first kiln chamber 1 includes a first inner sleeve 4, a second inner sleeve 5, and an outer sleeve 6 arranged in layers from the inside out. The interior of the first inner sleeve 4 is a first heating space 7, the interlayer between the first inner sleeve 4 and the second inner sleeve 5 is a material channel 8, and the interlayer between the second inner sleeve 5 and the outer sleeve 6 is a second heating space 9. A connecting channel 35 for connecting the first heating space 7 and the second heating space 9 is provided at the kiln head of the first kiln chamber 1.
[0100] The kiln head of the first kiln chamber 1 is equipped with a kiln head burner 10, which faces the first heating space 7. The material channel 8 is connected to the feeding device 2 at one end near the kiln tail and to the discharging device 3 at the other end near the kiln head.
[0101] A heat collection hood 34 can be installed outside the first kiln chamber 1 to collect the heat lost through the kiln shell. Nitrogen or carbon dioxide can be filled into the heat collection hood 34 to prevent overheating of the metal outer casing 6. The heat collection hood seals the gaps at the labyrinth seals at both ends of the rotary kiln to prevent air leakage from the labyrinth seal gaps. The gas pressure inside the heat collection hood should be slightly higher than the gas pressure inside the kiln to prevent gas leakage from the kiln.
[0102] After being preheated by the feeding equipment 2, the gangue powder enters the material channel 8, where it undergoes double-sided calcination. Figure 12In the double-walled rotary kiln shown, the feeding device 2 is connected to the material channel 8 located between the first heating space 7 and the second heating space 9. The high-temperature flue gas discharged from the kiln head burner 10 is blown from the kiln head to the kiln tail in the first heating space 7, then turns back and is blown to the second heating space 9 through the connecting channel 35. In the second heating space 9, it is blown from the kiln head to the kiln tail, and finally the flue gas discharged from the second heating space 9 enters the feeding device 2, thereby preheating the material in the feeding device 2.
[0103] Ambient air enters the discharge device 3 to cool the calcined gangue powder. The high-temperature air after cooling the material can be used as combustion aid for the kiln head burner 10.
[0104] Example 5 uses fan-shaped irregular bricks to construct the first kiln chamber with a double-wall structure, such as... Figures 13 to 15 As shown. Example 5 uses the method of Example 1, with "T"-shaped fasteners 36 installed at intervals on the inner side of the outer sleeve 6. The fasteners 36 can be welded inside the steel outer sleeve 6. The fasteners 36 are arranged radially along a straight line in the outer sleeve 6, allowing for smooth subsequent laying of the fan-shaped irregular bricks. The fasteners 36 can be used to install the fan-shaped irregular bricks on the inner wall of the outer sleeve 6. There are four types of fan-shaped irregular bricks, namely basic fan-shaped irregular bricks (see...). Figure 13 ), Class A fan-shaped irregular bricks (see Figure 14 B1 type fan-shaped irregular bricks (see) Figure 15 ) and B2 type fan-shaped irregular bricks (see Figure 17 The front and rear ends and cross sections of the above four types of fan-shaped irregular bricks are all fan-shaped. Inside the above four types of fan-shaped irregular bricks, a first through hole 39 is provided along the circumferential direction corresponding to the fan shape. The first through hole 39 is a material channel. A second through hole 40 is provided above the first through hole 39. The second through hole 40 penetrates the front and rear ends of the fan shape and is a gas channel. The first through hole 39 and the second through hole 40 are isolated from each other.
[0105] like Figure 14 As shown, in the A-type fan-shaped irregular brick, in addition to the first through hole 39 and the second through hole 40, a discharge hole 41 is also provided. The discharge hole 41 is located on the front end face of the fan shape, and the two sides of the discharge hole 41 are chamfered. The discharge hole 41 is connected to the first through hole 39. In embodiment 5, the movement direction of the material in the first kiln chamber 1 is set to forward.
[0106] like Figure 15 As shown, in the B1 type fan-shaped special brick, in addition to the first through hole 39 and the second through hole 40, there is also a first feed hole 42. The first feed hole 42 is located on the rear end face of the fan shape. The two sides of the first feed hole 42 are chamfered. The first feed hole 42 is connected to the first through hole 39.
[0107] The top and bottom surfaces of the basic fan-shaped irregular bricks, Type A fan-shaped irregular bricks, and Type B1 fan-shaped irregular bricks are all curved, with a groove on the top surface that fits into the "T"-shaped fastener 36. After the above three types of irregular bricks are laid, a [structure / form] can be formed. Figure 16 The cross-sectional view of the double-walled rotary kiln is shown. Figure 16 In this system, each circular brick layer is composed of three types of irregularly shaped bricks: basic fan-shaped bricks, type A fan-shaped bricks, and type B1 fan-shaped bricks. After a circular brick layer is laid, the first through holes 39 of each fan-shaped brick in that layer are interconnected to form a material channel 8. For two adjacent circular brick layers, the discharge hole 41 of the type A fan-shaped brick in the upper layer corresponds to the first feed hole 42 of the type B1 fan-shaped brick in the lower layer, allowing the material channel 8 to be connected. The chamfer direction of the discharge hole 41 and the first feed hole 42 is set according to the rotation direction of the first kiln chamber 1, so that the chamfer direction is adapted to the spiral downward flow direction of the material.
[0108] After the entire kiln chamber is constructed, the second through holes 40 on each layer of bricks are connected to form the second heating space 9; the interior of the circular brick layer is the first heating space 7.
[0109] It should be noted that the first layer of circular bricks located at the kiln tail uses B2 type fan-shaped irregular bricks to receive the material conveyed by feeding equipment 2. For example... Figure 17 As shown, the B2 type fan-shaped special-shaped brick is provided with a first through hole 39, a second through hole 40, and a second feed hole 43. One side of the second feed hole 43 is chamfered, which is adapted to the direction of rotation of the kiln chamber.
[0110] In practical applications, it can be cancelled. Figures 13 to 17 The second through hole 40 of each of the fan-shaped irregular bricks shown is changed to include an additional one. Figure 18 The arched irregular brick shown. The concave surface of the arched irregular brick can form a second heating space 9.
[0111] The double-walled rotary kiln provided in Example 5 can also be used to calcine lime powder, producing a finished product with an activity level above 400 ml and a carbon content below 0.1%. When using pulverized coal as fuel to calcine lime, the heating temperature of the first heating space 7 is 1200℃, and the preheating temperature of the feeding device 2 does not exceed 800℃. When using gaseous fuel, high-temperature CO2 can be collected to preheat the gaseous fuel.
[0112] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application, and should all be included within the protection scope of this application.
Claims
1. A double-walled rotary kiln, comprising: A first kiln chamber (1), a feeding device (2) and a discharging device (3), characterized in that the first kiln chamber (1) comprises a first inner sleeve (4), a second inner sleeve (5) and an outer sleeve (6) which are arranged in layers from inside to outside; the interior of the first inner sleeve (4) is a first heating space (7), the interlayer between the first inner sleeve (4) and the second inner sleeve (5) is a material passage (8), and the interlayer between the second inner sleeve (5) and the outer sleeve (6) is a second heating space (9); Both ends of the first kiln chamber (1) are respectively provided with a kiln head burner (10) and a kiln tail burner (11), and the kiln head burner (10) and the kiln tail burner (11) face the first heating space (7); the end of the material passage (8) close to the kiln tail is connected with the feeding device (2), and the end of the material passage (8) close to the kiln head is connected with the discharging device (3); a plurality of outer ring burners (12) are arranged at both ends of the second heating space (9); A connecting passage (35) for communicating the first heating space (7) and the second heating space (9) is arranged at the kiln tail of the first kiln chamber (1); High-temperature gas generated by decomposition of calcined materials in the material passage (8) enters the feeding device (2) to preheat raw materials; the high-temperature gas after preheating the raw materials is cooled to become low-temperature gas; the low-temperature gas is introduced into the discharging device (3) to cool the product; the gas discharged from the discharging device (3) is collected as an auxiliary product; A heat collecting cover (34) is arranged outside the first kiln chamber (1); T-shaped fixing members (36) are arranged at intervals on the inner side of the outer sleeve (6); the fixing members (36) are arranged along a straight line in the radial direction of the outer sleeve (6), and special-shaped I-shaped bricks (37) are arranged on the inner wall of the outer sleeve (6) through the fixing members (36); the special-shaped I-shaped brick (37) has an I-shaped cross section, which is composed of a first transverse plate (371), a second transverse plate (372) and a third transverse plate (373) arranged sequentially from top to bottom, with support columns (374) respectively arranged at four corners; the first transverse plate (371) is provided with a groove (375) that fits with the fixing member (36), both ends of the second transverse plate (372) are provided with a concave portion (376) and a convex portion (377), and both ends of the third transverse plate (373) are provided with a concave portion (376) and a convex portion (377); after the masonry of the special-shaped I-shaped bricks is completed, the third transverse plates of each special-shaped I-shaped brick are connected to each other to form the first heating space (7); the second transverse plates of each special-shaped I-shaped brick are connected to each other to form the second heating space (9); the first transverse plates of each special-shaped I-shaped brick are connected to each other and combined with the outer sleeve (6) to form a heat insulation layer for protecting the outer sleeve; grooves and turbulence rings are arranged on the inner wall of the special-shaped I-shaped bricks to define the gas flow direction, increase the heat exchange time and enhance the heat exchange effect; Alternatively, the first kiln chamber (1) is composed of alternating A structure (38) and B structure (39) in a radial direction; A structure (38) is composed of an outer sleeve (6) and a steel structure with a sandwich layer; the steel structure forms a first inner sleeve and a second inner sleeve; a cooling air channel (381) is provided inside the steel structure; refractory material is provided on the inner side of the outer sleeve (6), and refractory material is provided in the part of the steel structure adjacent to the first heating space (7), the material channel (8) and the second heating space (9); B structure (39) is composed of an outer sleeve (6) and thin bricks (391); the thin bricks (391) form two rings, constituting the first inner sleeve and the second inner sleeve; a metal air duct (392) is provided between the thin bricks (391), and the B structure (39) is connected to the steel structure in the A structure (38) through the air duct (392), while connecting the cooling air channels in each A structure (38).
2. The double-walled rotary kiln of claim 1, wherein, The feeding device (2) includes multiple cyclone preheaters connected in a cycle; the discharging device (3) includes multiple cyclone coolers connected in a cycle.
3. The double-walled rotary kiln of claim 2, wherein, The feeding device (2) includes a P1 cyclone preheater (13), a P2 cyclone preheater (14), a P3 cyclone preheater (15), a P4 cyclone preheater (16), a P5 cyclone preheater (17), and a P6 cyclone preheater (18) connected in a cycle. The inlet and outlet at the top of the P5 cyclone preheater (17) are connected to the P6 cyclone preheater (18) via riser pipes (19); the feed inlet of the feeding device (2) is provided on the riser pipe (19) connecting the P5 cyclone preheater (17) and the P6 cyclone preheater (18); the inlet and outlet at the top of the P6 cyclone preheater (18) are the gas outlets of the feeding device (2). The inlet and outlet of the bottom of the P6 cyclone preheater (18) are connected to the P4 cyclone preheater (16) through the feed pipe (20); the inlet and outlet of the bottom of the P4 cyclone preheater (16) are connected to the P2 cyclone preheater (14) through the feed pipe (20); the inlet and outlet of the bottom of the P2 cyclone preheater (14) are connected to the material channel (8) through the gas channel (25). The inlet and outlet at the top of the P2 swirl preheater (14) are connected to the P3 swirl preheater (15) via riser pipes (19); the inlet and outlet at the top of the P3 swirl preheater (15) are connected to the P4 swirl preheater (16) via riser pipes; the inlet and outlet at the top of the P4 swirl preheater (16) are connected to the P5 swirl preheater (17) via riser pipes. The inlet and outlet of the bottom of the P5 cyclone preheater (17) are connected to the P3 cyclone preheater (15) through the feed pipe (20); the inlet and outlet of the bottom of the P3 cyclone preheater (15) are connected to the P1 cyclone preheater (13) through the feed pipe (20); the inlet and outlet of the bottom of the P1 cyclone preheater (13) are connected to the material channel (8) through the conveying pipe (21).
4. The double-walled rotary kiln of claim 3, wherein, The discharge equipment (3) includes a C1 cyclone cooler (22), a C2 cyclone cooler (23) and a C3 cyclone cooler (24). The inlet and outlet at the top of the C2 cyclone cooler (23) are connected to the C3 cyclone cooler (24) via a riser pipe (19); the inlet and outlet at the bottom of the C2 cyclone cooler (23) are discharged from the discharge device (3) via a discharge pipe (20); the riser pipe (19) between the C2 cyclone cooler (23) and the C3 cyclone cooler (24) is provided with the inlet of the discharge device (3); the inlet and outlet at the top of the C3 cyclone cooler (24) are the gas outlets of the discharge device (3); The inlet and outlet at the bottom of the C3 vortex cooler (24) are connected to the C1 vortex cooler (22) via the feed pipe (20); the inlet and outlet at the top of the C1 vortex cooler (22) are connected to the C2 vortex cooler (23) via the riser pipe (19); the inlet and outlet at the bottom of the C1 vortex cooler (22) are the cooling air inlets of the discharge device (3).
5. The double-walled rotary kiln of claim 4, wherein, The kiln head burner (10), kiln tail burner (11) and outer ring burner (12) are all regenerative burners; the kiln head burner (10) and kiln tail burner (11) use the high-temperature flue gas discharged from the first heating space (7) to preheat the fuel and combustion-supporting gas; the outer ring burner (12) uses the high-temperature flue gas discharged from the second heating space (9) to preheat the fuel and combustion-supporting gas.
6. A double-walled rotary kiln, comprising: The first kiln chamber (1), the feeding device (2), and the discharging device (3) are characterized in that the first kiln chamber (1) includes a first inner sleeve (4), a second inner sleeve (5), and an outer sleeve (6) arranged in layers from the inside to the outside; the interior of the first inner sleeve (4) is a first heating space (7), the interlayer between the first inner sleeve (4) and the second inner sleeve (5) is a material channel (8), and the interlayer between the second inner sleeve (5) and the outer sleeve (6) is a second heating space (9); A connecting channel (35) for connecting the first heating space (7) and the second heating space (9) is provided near the kiln head of the first kiln chamber (1); The kiln head of the first kiln chamber (1) is provided with a kiln head burner (10); the kiln head burner (10) faces the first heating space (7); the material channel (8) is connected to the feeding device (2) at one end near the kiln tail, and the material channel (8) is connected to the discharging device (3) at one end near the kiln head. T-shaped fasteners are provided at intervals on the inner side of the outer sleeve (6); the fasteners are arranged in a straight line along the radial direction of the outer sleeve (6), and the fan-shaped irregular bricks are set on the inner wall of the outer sleeve (6) through the fasteners; The fan-shaped special-shaped bricks include basic fan-shaped special-shaped bricks, type A fan-shaped special-shaped bricks, and type B1 fan-shaped special-shaped bricks; the front and rear ends and cross sections of the basic fan-shaped special-shaped bricks, type A fan-shaped special-shaped bricks, and type B1 fan-shaped special-shaped bricks are all fan-shaped; inside the basic fan-shaped special-shaped bricks, type A fan-shaped special-shaped bricks, and type B1 fan-shaped special-shaped bricks, a first through hole (39) is provided along the circumferential direction corresponding to the fan shape, and the first through hole (39) is a material channel; a second through hole (40) is provided above the first through hole (39), the second through hole (40) penetrates the front and rear ends of the fan shape, the second through hole (40) is a gas channel, and the first through hole (39) and the second through hole (40) are isolated from each other; In the A-type fan-shaped special brick, in addition to the first through hole (39) and the second through hole (40), there is also a discharge hole (41). The discharge hole (41) is set on the front end face of the fan shape. The two sides of the discharge hole (41) are chamfered. The discharge hole (41) is connected to the first through hole (39). In the B1 type fan-shaped special brick, in addition to the first through hole (39) and the second through hole (40), a first feed hole (42) is also provided. The first feed hole (42) is set on the rear end face of the fan shape. The two sides of the first feed hole (42) are chamfered. The first feed hole (42) is connected to the first through hole (39). The top and bottom surfaces of the basic fan-shaped irregular bricks, Class A fan-shaped irregular bricks and Class B1 fan-shaped irregular bricks are all arc-shaped, and the top surface is provided with a groove that fits into the "T"-shaped fastener. After a circular brick layer is built using basic fan-shaped special bricks, type A fan-shaped special bricks and type B1 fan-shaped special bricks, the first through holes (39) of each fan-shaped special brick in the brick layer are connected to each other to form a material channel (8); for two adjacent circular brick layers, the discharge hole (41) of type A fan-shaped special brick in the upper brick layer corresponds to the first feed hole (42) of type B1 fan-shaped special brick in the lower brick layer, so that the material channel (8) is connected; the chamfer direction of the discharge hole (41) and the first feed hole (42) is set according to the rotation direction of the first kiln chamber (1) so that the chamfer direction is adapted to the spiral downward flow direction of the material; After the entire kiln chamber is constructed, the second through holes (40) on each layer of bricks are connected to form a second heating space (9); the interior of the circular brick layer is the first heating space (7).
Citation Information
Patent Citations
Cement production rotary kiln device
CN105347702A
Rotary kiln combustion chamber heating device
CN201522189U
System and method for producing cement clinker by oxy-fuel combustion
WO2022236593A1