Preheating scrap steel device using dual preheating furnaces

By using a dual preheating furnace device to heat scrap steel in stages using converter flue gas and coal gas, the problem of insufficient utilization of converter flue gas is solved, and uniform preheating of scrap steel and continuity of converter steelmaking are achieved, reducing energy waste and improving the utilization rate of scrap steel resources.

CN117308614BActive Publication Date: 2026-11-17BAOSHAN IRON & STEEL CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202210712058.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-22
Publication Date
2026-11-17
Estimated Expiration
2042-06-22

AI Technical Summary

Technical Problem

During the converter steelmaking process, the combustible gases in the converter flue gas are not fully utilized, resulting in energy waste. Furthermore, existing scrap steel preheating technology fails to effectively utilize converter flue gas as a heat source.

Method used

The system employs a dual preheating furnace, utilizing converter flue gas and coal gas from the converter flue gas treatment pipeline system. The scrap steel is heated in stages through a porous media combustion device and burners, ensuring uniform preheating of the scrap steel and buffering the preheating process to guarantee the continuity of converter steelmaking.

Benefits of technology

It improves the recovery and utilization rate of converter flue gas, reduces energy waste, enhances the preheating efficiency of scrap steel and the operating efficiency of converter steelmaking, and improves the utilization rate of scrap steel resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117308614B_ABST
    Figure CN117308614B_ABST
Patent Text Reader

Abstract

This invention discloses a scrap preheating device employing dual preheating furnaces. The scrap preheating device (1) is based on a converter flue gas treatment pipeline system, including a first preheating furnace (11) and a second preheating furnace (12), with the first preheating furnace located above the second preheating furnace. The first preheating furnace includes a first furnace body (111), a first upper furnace cover (113), a first lower furnace cover (114), and a first gas combustion device. The combustion flue gas outlet of the first gas combustion device is connected to the inner furnace chamber at the bottom of the first furnace body, and the gas inlet introduces converter flue gas. The second preheating furnace includes a second furnace body (121), a second upper furnace cover (123), a second lower furnace cover (124), and a second gas combustion device. The combustion flue gas outlet of the second gas combustion device is connected to the inner furnace chamber at the top of the second furnace body, and the gas inlet introduces converter flue gas. The scrap preheating device of this invention utilizes the combustion heat of converter flue gas to uniformly preheat scrap steel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a converter flue gas / coal gas recovery and utilization technology in the converter steelmaking process of the iron and steel industry, and more particularly to a preheating scrap steel device using a dual preheating furnace. Background Technology

[0002] Converter steelmaking is currently the most commonly used steelmaking process. When using a converter, a large amount of flue gas is emitted from the converter mouth. This flue gas contains a significant amount of carbon monoxide, a combustible gas and an important recyclable energy source for steel enterprises. To recover these combustible gases, a converter flue gas treatment pipeline system is installed. This system includes various modules such as a vaporization cooling flue, a flue gas cooling device, a coarse dust removal device, a fine dust removal device, an induced draft fan, a flue gas analyzer, and a gas storage and venting system. After passing through this system, the converter flue gas with acceptable carbon monoxide content is collected in a gas storage tank as converter gas, while other flue gas that does not meet the requirements is burned in a venting tower and released into the atmosphere.

[0003] In actual production practice, converter gas stored in gas storage tanks is often not fully utilized. When the gas storage tank is full, even if the carbon monoxide content of the converter flue gas discharged from the converter meets the requirements, it cannot be stored in the gas storage tank and can only be released into the atmosphere through the venting tower, resulting in a waste of energy. In addition, some enterprises set a higher carbon monoxide content value that meets the requirements for gas storage tank collection. That is, some converter gas with carbon monoxide content that does not meet the requirements but has utilization value is released through the venting tower, which also results in a waste of energy.

[0004] High scrap steel ratio smelting is a future development trend. Currently, the main scrap steel preheating technologies used include tunnel kiln scrap steel preheating technology and oxy-fuel technology. For example, Chinese patent (CN107653356B) discloses a rotary scrap steel heating system, specifically disclosing that scrap steel is added to a torpedo-shaped rotary furnace through a side opening using a feeding trolley. Subsequently, a baking trolley moves to the side opening of the rotary furnace to replace the feeding trolley for scrap steel baking and preheating. After preheating, the rotary furnace tilts to pour the scrap steel into a discharging trolley. The feeding, baking, and discharging processes are repeated continuously to achieve continuous operation. However, this patented technology does not consider using converter flue gas as a heat source. Summary of the Invention

[0005] The purpose of this invention is to provide a scrap steel preheating device using a dual preheating furnace. This scrap steel preheating device makes full use of the energy of converter flue gas to preheat scrap steel, thereby reducing energy waste and ensuring that the scrap steel is heated completely and uniformly.

[0006] To achieve the above-mentioned technical objectives, the present invention adopts the following technical solution: A scrap steel preheating device employing dual preheating furnaces is disclosed. This device, based on a converter flue gas treatment pipeline system, includes a first preheating furnace and a second preheating furnace, with the first preheating furnace located above the second preheating furnace. The first preheating furnace comprises a first furnace body, a first upper furnace cover, a first lower furnace cover, and a first gas combustion device. An upper furnace opening is provided at the upper part of the first furnace body, and a lower furnace opening is provided at the lower part of the first furnace body. The first upper furnace cover is located at the upper furnace opening of the first furnace body, and the first lower furnace cover is located at the lower furnace opening of the first furnace body. The combustion flue gas outlet of the first gas combustion device is connected to the inner furnace chamber at the lower part of the first furnace body. The gas inlet of the first gas combustion device introduces converter flue gas, and the air inlet of the first gas combustion device introduces air. The upper part of the furnace body is provided with a first flue gas outlet; the second preheating furnace includes a second furnace body, a second upper furnace cover, a second lower furnace cover, and a second gas combustion device; the upper part of the second furnace body is provided with an upper furnace opening, and the lower part of the second furnace body is provided with a lower furnace opening. The upper furnace opening of the second furnace body is directly opposite the lower furnace opening of the first furnace body. The second upper furnace cover is located at the upper furnace opening of the second furnace body, and the second lower furnace cover is located at the lower furnace opening of the second furnace body; the combustion flue gas outlet of the second gas combustion device is connected to the inner furnace chamber of the upper part of the second furnace body, the gas inlet of the second gas combustion device introduces converter flue gas, and the air inlet of the second gas combustion device introduces air; the lower part of the second furnace body is provided with a second flue gas outlet; the converter flue gas is drawn from the converter flue gas treatment pipeline system.

[0007] Furthermore, the gas inlet of the first gas combustion device introduces converter gas and converter flue gas in parallel.

[0008] Furthermore, the gas inlet of the second gas combustion device introduces converter gas and converter flue gas in parallel.

[0009] Furthermore, the first gas combustion device is a porous medium combustion device or a burner.

[0010] Furthermore, the second gas combustion device is a porous medium combustion device or a burner.

[0011] Furthermore, a protrusion is provided above the connection between the combustion flue gas outlet of the first gas combustion device and the inner furnace chamber of the first furnace body.

[0012] Furthermore, the first preheating furnace includes two first gas combustion devices, and the second preheating furnace includes two second gas combustion devices.

[0013] The preheating scrap steel device of the present invention is based on the existing converter flue gas treatment pipeline system. The preheating scrap steel device introduces converter flue gas and converter gas from the converter flue gas treatment pipeline system to burn and heat the scrap steel. It effectively utilizes the combustion heat of converter flue gas to preheat the scrap steel, including converter flue gas that meets the requirements but cannot be stored in the gas storage tank, as well as converter flue gas with carbon monoxide content that does not meet the requirements in the initial and final stages of converter blowing. This improves the recovery and utilization rate of converter flue gas, thereby reducing energy waste. It also solves the problem of preheating scrap steel in converter steelmaking, effectively increasing the scrap steel ratio in converter steelmaking and improving the utilization rate of scrap steel resources.

[0014] In the scrap preheating device of this invention, a dual preheating furnace is employed, consisting of a first preheating furnace and a second preheating furnace. The first preheating furnace is located above the second preheating furnace. Scrap steel intended for converter steelmaking is first preheated in the first preheating furnace and then preheated again in the second preheating furnace. In the first preheating furnace, the combustion flue gas outlet of the first gas combustion device is connected to the inner furnace chamber at the bottom of the first furnace body. The high-temperature flue gas generated by the combustion of the first gas combustion device preferentially preheats the scrap steel in the lower part of the first furnace body. In the second preheating furnace, the combustion flue gas outlet of the second gas combustion device is connected to the inner furnace chamber at the top of the second furnace body. The high-temperature flue gas generated by the combustion of the second gas combustion device preferentially preheats the scrap steel in the upper part of the second furnace body. In the first preheating furnace, the lower scrap steel is preferentially heated, while in the second preheating furnace, the upper scrap steel is preferentially heated, ensuring that all scrap steel is heated completely and uniformly.

[0015] The preheating scrap steel device of the present invention employs two preheating furnaces, one above the other. This arrangement can also buffer the preheating of scrap steel, thereby ensuring the continuity of converter steelmaking operations and improving the efficiency of converter steelmaking operations.

[0016] Compared with the prior art, the preheating scrap steel device of the present invention has the following advantages: it fully utilizes the combustion heat of converter flue gas to preheat scrap steel, including converter flue gas that meets the requirements but cannot be stored in the gas storage tank, as well as converter flue gas with carbon monoxide content that does not meet the requirements in the initial and final stages of converter blowing, thereby reducing energy waste; the scrap steel in the lower part of the first preheating furnace is preferentially heated, and the scrap steel in the upper part of the second preheating furnace is preferentially heated, so that the scrap steel can be fully and uniformly heated; using two preheating furnaces to preheat scrap steel can buffer the preheating of scrap steel and ensure the continuity of converter steelmaking operations; in addition, the preheating scrap steel device introduces converter flue gas and converter gas from the converter flue gas treatment pipeline system to burn and heat scrap steel, which can help regulate the gas tank level. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of the converter flue gas treatment pipeline system involved in the preheating scrap steel device using dual preheating furnaces of the present invention. Figure 2This is a general schematic diagram of the preheating scrap steel device of the present invention; Figure 3 This is a schematic diagram of the structure of the first preheating furnace in the preheating scrap steel device of the present invention; Figure 4 This is a schematic diagram of the structure of the second preheating furnace in the preheating scrap steel device of the present invention.

[0018] In the diagram: 1-Preheating scrap steel device, 11-First preheating furnace, 111-First furnace body, 112-Porous media combustion device, 113-First upper furnace cover, 114-First lower furnace cover, 115-First flue gas outlet, 116-Protrusion, 12-Second preheating furnace, 121-Second furnace body, 122-Burn, 123-Second upper furnace cover, 124-Second lower furnace cover, 125-Second flue gas outlet, 2-Converter, 3-Vaporization cooling flue, 4-Flue gas cooling device, 5-Coarse dust removal device, 6-Fine dust removal device, 7-Induced draft fan, 8-Flue gas analyzer, 9-Gas storage and venting system, 91-Venting tower, 92-Gas cooling device, 93-Gas storage tank. Detailed Implementation

[0019] The present invention will be further described below with reference to the accompanying drawings and specific embodiments: See Figures 1 to 4 This embodiment provides a preheating scrap steel device using a dual preheating furnace.

[0020] See Figure 1 The preheating scrap steel device 1 is based on the existing converter flue gas treatment pipeline system. The preheating scrap steel device 1 obtains converter flue gas and converter gas from the converter flue gas treatment pipeline system to burn and heat the scrap steel.

[0021] See Figure 1The existing converter flue gas treatment pipeline system consists of a vaporization cooling flue 3, a flue gas cooling device 4, a coarse dust removal device 5, a fine dust removal device 6, an induced draft fan 7, a flue gas analyzer 8, and a gas storage and venting system 9 connected in series. The flue gas inlet of the vaporization cooling flue 3 is located above the converter 2 and faces the converter 2. When the converter 2 is in the blowing state, the converter flue gas discharged from the converter 2 enters through the flue gas inlet of the vaporization cooling flue 3 and flows sequentially through the vaporization cooling flue 3, the flue gas cooling device 4, the coarse dust removal device 5, the fine dust removal device 6, the induced draft fan 7, the flue gas analyzer 8, and the gas storage and venting system 9. The gas storage and venting system 9 is located at the end of the entire converter flue gas treatment pipeline system and includes a venting tower 91, a gas cooling device 92, and a gas storage tank 93. The function of the venting tower 91 is to release non-recoverable converter flue gas into the atmosphere. The function of the gas cooling device 92 is to cool and lower the temperature of the finally collected converter gas. The gas storage tank 93 is used to store and contain the converter gas. When the carbon monoxide content in the converter flue gas reaches the prescribed storage standard and is stored in the gas storage tank 93, the converter flue gas stored in the gas storage tank 93 is called converter gas.

[0022] See Figure 2 The preheating scrap steel device 1 includes a first preheating furnace 11 and a second preheating furnace 12, with the first preheating furnace 11 arranged above the second preheating furnace 12.

[0023] See Figure 3 The first preheating furnace 11 includes a first furnace body 111, a first upper furnace cover 113, a first lower furnace cover 114, and two porous media combustion devices 112.

[0024] The first furnace body 111 is provided with furnace openings at both the upper and lower parts. The furnace opening at the upper part is called the upper furnace opening, and the furnace opening at the lower part is called the lower furnace opening. The upper furnace opening of the first furnace body 111 can be referred to as the upper furnace opening of the first preheating furnace 11, and the lower furnace opening of the first furnace body 111 can be referred to as the lower furnace opening of the first preheating furnace 11.

[0025] The first upper furnace cover 113 is fitted onto the upper furnace opening of the first furnace body 111, and the first lower furnace cover 114 is fitted onto the lower furnace opening of the first furnace body 111. Both the first upper furnace cover 113 and the first lower furnace cover 114 can be flipped to open or close the furnace opening.

[0026] The two porous media combustion devices 112 are disposed on both sides of the first furnace body 111 and located at the lower part of the first furnace body 111. The flue gas outlet of the porous media combustion device 112 is connected to the inner furnace chamber at the lower part of the first furnace body 111, and the gas inlet of the porous media combustion device 112 introduces converter gas and converter flue gas in parallel through a three-way pipe. In this embodiment, the number of porous media combustion devices 112 is set to two, while in other embodiments, the number of porous media combustion devices 112 can be set as needed.

[0027] In addition, a protrusion 116 is provided above the "connection between the flue gas outlet of the porous media combustion device 112 and the inner furnace chamber of the first furnace body 111". This arrangement can prevent scrap steel loaded into the first preheating furnace 11 (inside the first furnace body 111) from blocking the flue gas outlet of the porous media combustion device 112.

[0028] It should be noted that the phrase "the gas inlet of the porous media combustion device 112 introduces converter gas and converter flue gas in parallel through a three-way pipeline" specifically refers to the installation of a three-way pipeline at the gas inlet of the porous media combustion device 112. One port of this three-way pipeline is the main port, and the other two ports are auxiliary ports. Valves (controlled by the production control computer in the work area) are installed on both auxiliary ports. The main port of the three-way pipeline is connected to the gas inlet of the porous media combustion device 112, and the two auxiliary ports are respectively connected to the flue gas pipeline of the converter flue gas treatment pipeline system and the gas storage tank 93. In this way, the converter flue gas or converter gas can be controlled to enter the porous media combustion device 112 for combustion by controlling the valves in the three-way pipeline. Combustion can be carried out using either converter flue gas or converter gas alone, or the converter flue gas and converter gas can be mixed and then burned. Both the converter gas and converter flue gas are drawn from the existing converter flue gas treatment pipeline system.

[0029] It should be noted that introducing converter gas for combustion heating on top of converter flue gas is done to prevent the converter flue gas combustion heat from failing to meet the preheating requirements of scrap steel. Specifically, during converter blowing, the carbon monoxide content in the discharged converter flue gas is unstable, resulting in an unstable calorific value. This is especially true in the early and late stages of converter blowing, when carbon monoxide concentrations are low, making combustion difficult using conventional methods. If the calorific value of the converter flue gas remains consistently low, it may fail to meet the preheating requirements of scrap steel. Appropriately introducing converter gas for combustion heating to increase the calorific value can avoid this situation. Alternatively, converter gas can be used alone for combustion heating.

[0030] Those skilled in the art will understand that the porous media combustion device 112 is a prior art device, which has a gas inlet, an air inlet and a flue gas outlet. The porous media combustion device 112 introduces gas and air into its interior for combustion through the gas inlet and air inlet, respectively. The high-temperature flue gas generated by combustion is discharged from the flue gas outlet and used to heat materials.

[0031] The upper part of the first furnace body 111 is provided with a flue gas outlet, which is called the first flue gas outlet 115. The first flue gas outlet 115 is connected to the external chimney, so as to discharge the flue gas after the preheating of scrap steel in the first preheating furnace 11.

[0032] See Figure 4 The second preheating furnace 12 is located below the first preheating furnace 11. The second preheating furnace 12 includes a second furnace body 121, a second upper furnace cover 123, a second lower furnace cover 124, and two burners 122.

[0033] The second furnace body 121 has furnace openings at both its upper and lower parts. The furnace opening at the upper part is called the upper furnace opening, and the furnace opening at the lower part is called the lower furnace opening. The upper furnace opening of the second furnace body 121 can be referred to as the upper furnace opening of the second preheating furnace 12, and the lower furnace opening of the second furnace body 121 can be referred to as the lower furnace opening of the second preheating furnace 12. The upper furnace opening of the second preheating furnace 12 faces upwards and is directly opposite the lower furnace opening of the first preheating furnace 11.

[0034] The second upper furnace cover 123 is fitted onto the upper furnace opening of the second furnace body 121, and the second lower furnace cover 124 is fitted onto the lower furnace opening of the second furnace body 121. Both the second upper furnace cover 123 and the second lower furnace cover 124 can be flipped to open or close the furnace opening.

[0035] The two burners 122 are disposed on both sides of the second furnace body 121 and located on the upper part of the second furnace body 121. The nozzles of the burners 122 are directed into and towards the inner furnace chamber on the upper part of the second furnace body 121. The gas inlets of the burners 122 introduce converter gas and converter flue gas in parallel through a three-way pipe. In this embodiment, the number of burners 122 is set to two, while in other embodiments, the number of burners 122 can be set as needed.

[0036] It should be noted that the phrase "the gas inlet of burner 122 introduces converter gas and converter flue gas in parallel through a three-way pipeline" specifically refers to the installation of a three-way pipeline at the gas inlet of burner 122. One port of this three-way pipeline is the main port, and the other two ports are auxiliary ports. Valves (controlled by the production control computer in the work area) are installed on both auxiliary ports. The main port of the three-way pipeline is connected to the gas inlet of burner 122, and the two auxiliary ports are respectively connected to the flue gas pipeline of the converter flue gas treatment pipeline system and the gas storage tank 93. In this way, the flow of converter flue gas or converter gas into burner 122 for combustion can be controlled by controlling the valves in the three-way pipeline. Combustion can be carried out using either converter flue gas or converter gas alone, or a mixture of converter flue gas and converter gas can be controlled for combustion. Both converter gas and converter flue gas are drawn from existing converter flue gas treatment pipeline systems.

[0037] Those skilled in the art will understand that the burner 122 is a prior art device having a gas inlet, an air inlet and a flame nozzle. The burner 122 introduces gas and air into its interior for combustion through the gas inlet and air inlet, respectively, and the flame generated by combustion is ejected from the flame nozzle and used to heat the material.

[0038] The lower part of the second furnace body 121 is provided with two flue gas outlets, which are referred to as the second flue gas outlets 125. Both of the second flue gas outlets 125 are connected to the external chimney, so as to discharge the flue gas after the preheating of scrap steel in the second preheating furnace 12.

[0039] Those skilled in the art will understand that the preheating scrap steel device 1 is equipped with various controllable valves in the pipelines that introduce converter flue gas and converter gas from the converter flue gas treatment pipeline system. These valves are all controlled by the production control computer of the work area. By controlling these valves through the production control computer of the work area, the introduction of converter flue gas and converter gas into the preheating scrap steel device 1 can be controlled.

[0040] The preheating scrap steel device 1 of this embodiment operates as follows: Under normal circumstances, when converter 2 is in the blowing state, both the first preheating furnace 11 and the second preheating furnace 12 are filled with and preheat the scrap steel required for one heat of steelmaking. After one heat of steelmaking in converter 2 is completed, and before the next heat begins blowing, the second preheating furnace 12 is controlled to open its second lower furnace cover 124 to unload the preheated scrap steel for use in the next heat of steelmaking in converter 2. Then, the second preheating furnace 12 is controlled to close its second lower furnace cover 124 and open its second upper furnace cover 123. The first preheating furnace 11 is controlled to open its first lower furnace cover 114 to unload the partially preheated scrap steel into the second preheating furnace 12. Then, the control... The second preheating furnace 12 is closed with the second upper furnace cover 123. The first preheating furnace 11 is closed with the first lower furnace cover 114 and opened with the first upper furnace cover 113. Scrap steel is loaded into the first preheating furnace 11 from the upper furnace opening of the first furnace body 111 using scrap steel hoisting equipment. The first preheating furnace 11 is then closed with the first upper furnace cover 113. Then, the converter 2 begins blowing. Both the first preheating furnace 11 and the second preheating furnace 12 introduce converter flue gas and converter gas from the converter flue gas treatment pipeline system to burn and heat the scrap steel.

[0041] The preheating scrap steel device 1 of this embodiment is based on the existing converter flue gas treatment pipeline system. The preheating scrap steel device 1 introduces converter flue gas and converter gas from the converter flue gas treatment pipeline system to burn and heat the scrap steel. This includes converter flue gas that meets the requirements but cannot be stored in the gas storage tank, as well as converter flue gas whose carbon monoxide content does not meet the requirements in the initial and final stages of converter blowing. In this way, the recovery and utilization rate of converter flue gas is improved, and the chemical combustion heat of converter flue gas is effectively used to preheat the scrap steel, thereby reducing energy waste. It also solves the problem of preheating scrap steel in converter steelmaking, effectively increasing the scrap steel ratio in converter steelmaking and improving the utilization rate of scrap steel resources.

[0042] In the preheating scrap steel device 1 of this embodiment, the first preheating furnace 11 is located above the second preheating furnace 12. The scrap steel used for steelmaking in the converter 2 is first preheated in the first preheating furnace 11 and then preheated in the second preheating furnace 12. In the first preheating furnace 11, the flue gas outlet of the porous media combustion device 112 is connected to the inner furnace chamber at the lower part of the first furnace body 111. The high-temperature flue gas generated by the combustion of the porous media combustion device 112 preferentially preheats the scrap steel in the lower part of the first furnace body 111. In the second preheating furnace 12, the burner nozzle 122 is introduced into and faces the inner furnace chamber at the upper part of the second furnace body 121. The high-temperature flame and flue gas generated by the combustion of the burner 122 preferentially preheat the scrap steel in the upper part of the second furnace body 121. In the first preheating furnace 11, the lower scrap steel is preferentially heated, while in the second preheating furnace 12, the upper scrap steel is preferentially heated. In this way, all the scrap steel can be heated completely and uniformly.

[0043] The preheating scrap unit 1 employs two preheating furnaces, one above the other. This setup also serves as a buffer for preheating the scrap, thereby improving the efficiency of converter steelmaking. Specifically, if there is only one preheating furnace in the preheating scrap unit, after the converter blowing process is completed, scrap required for the next heat of steelmaking needs to be added to the converter (the scrap preheated in the preheating furnace). If the temperature of the preheated scrap in the preheating furnace is not yet up to standard and further preheating is required, the converter must wait until the preheating furnace reaches the target temperature, which affects the subsequent steelmaking operation in the converter. In this embodiment, the preheating scrap steel device 1 uses two preheating furnaces, one above the other. The scrap steel required for the next heat of steelmaking in the converter is preheated in the second preheating furnace 12, while the scrap steel preheated in the first preheating furnace 11 is the scrap steel required for the next heat of steelmaking in the converter. The scrap steel in the second preheating furnace 12 is preheated in the second preheating furnace 12 after being preheated in the first preheating furnace 11. This ensures that the preheated scrap steel can reach the target preheating temperature before the converter finishes blowing, thereby ensuring the continuity of converter steelmaking operations and improving the efficiency of converter steelmaking operations.

[0044] It should be noted that in other embodiments, a burner can be used to replace the porous medium combustion device 112 at the lower part of the first furnace body 111 in the first preheating furnace 11, and the burner can be set at the lower part of the first furnace body 111. Alternatively, a porous medium combustion device can be used to replace the burner 122 at the upper part of the second furnace body 121 in the second preheating furnace 12, and the porous medium combustion device can be set at the upper part of the second furnace body 121. That is, the porous medium combustion device and the burner can be interchanged.

[0045] Based on the aforementioned concept that "the porous media combustion device and the burner can be interchangeably arranged," if both the porous media combustion device and the burner are considered as a type of gas combustion device, and the flue gas outlet of the porous media combustion device and the flame nozzle of the burner are considered as the combustion flue gas outlet of the gas combustion device, then the porous media combustion device 112 in the first preheating furnace 11 is summarized as the first gas combustion device, and the burner 122 in the second preheating furnace 12 is summarized as the second gas combustion device, then, based on the technical solution provided in this embodiment, the following summary can be made: The first preheating furnace 11 includes two first gas combustion devices, which can be porous media combustion devices, burners, or other types of gas combustion devices. The two first gas combustion devices are arranged on both sides of the first furnace body 111 and located at the lower part of the first furnace body 111. The combustion flue gas outlet of the first gas combustion device is connected to the inner furnace chamber at the lower part of the first furnace body 111, and the gas inlet of the first gas combustion device introduces converter gas and converter flue gas in parallel through a three-way pipe.

[0046] The second preheating furnace 12 includes two second gas combustion devices, which can be porous media combustion devices, burners, or other types of gas combustion devices. The two second gas combustion devices are arranged on both sides of the second furnace body 121 and located at the upper part of the second furnace body 121. The combustion flue gas outlet of the second gas combustion device is connected to the inner furnace chamber at the upper part of the second furnace body 121, and the gas inlet of the second gas combustion device introduces converter gas and converter flue gas in parallel through a three-way pipe.

[0047] The above are merely preferred embodiments of the present invention and are not intended to limit the scope of protection of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A scrap preheating device employing a dual preheating furnace, wherein the scrap preheating device (1) is based on a converter flue gas treatment pipeline system, characterized in that: It includes a first preheating furnace (11) and a second preheating furnace (12), with the first preheating furnace (11) located above the second preheating furnace (12); The first preheating furnace (11) includes a first furnace body (111), a first upper furnace cover (113), a first lower furnace cover (114), and a first gas combustion device; The first furnace body (111) has an upper furnace opening at its upper part and a lower furnace opening at its lower part. The first upper furnace cover (113) is located at the upper furnace opening of the first furnace body (111), and the first lower furnace cover (114) is located at the lower furnace opening of the first furnace body (111). The combustion flue gas outlet of the first gas combustion device is connected to the inner furnace chamber at the lower part of the first furnace body (111). The gas inlet of the first gas combustion device introduces converter flue gas, and the air inlet of the first gas combustion device introduces air. The first exhaust port (115) is located at the upper part of the first furnace body (111). The second preheating furnace (12) includes a second furnace body (121), a second upper furnace cover (123), a second lower furnace cover (124), and a second gas combustion device; The second furnace body (121) has an upper furnace opening at its upper part and a lower furnace opening at its lower part. The upper furnace opening of the second furnace body (121) is directly opposite the lower furnace opening of the first furnace body (111). The second upper furnace cover (123) is located at the upper furnace opening of the second furnace body (121), and the second lower furnace cover (124) is located at the lower furnace opening of the second furnace body (121). The combustion flue gas outlet of the second gas combustion device is connected to the inner furnace chamber at the upper part of the second furnace body (121). The gas inlet of the second gas combustion device introduces converter flue gas, and the air inlet of the second gas combustion device introduces air. The second exhaust port (125) is located at the lower part of the second furnace body (121). The converter flue gas is drawn from the converter flue gas treatment pipeline system.

2. The preheating scrap steel device using a dual preheating furnace according to claim 1, characterized in that: The gas inlet of the first gas combustion device introduces converter gas and converter flue gas in parallel.

3. The preheating scrap steel device using a dual preheating furnace according to claim 1, characterized in that: The second gas combustion device introduces converter gas and converter flue gas in parallel through its gas inlet.

4. The preheating scrap steel device using a dual preheating furnace according to claim 1, characterized in that: The first gas combustion device is a porous medium combustion device or a burner.

5. The preheating scrap steel device using a dual preheating furnace according to claim 1, characterized in that: The second gas combustion device is a porous medium combustion device or a burner.

6. The preheating scrap steel device using a dual preheating furnace according to claim 1, characterized in that: A protrusion (116) is provided above the connection between the combustion flue gas outlet of the first gas combustion device and the inner furnace chamber of the first furnace body (111).

7. The preheating scrap steel device using a dual preheating furnace according to claim 1, characterized in that: The first preheating furnace (11) includes two first gas combustion devices, and the second preheating furnace (12) includes two second gas combustion devices.

Citation Information

Patent Citations

  • A rotary scrap heating system

    CN107653356B

  • High-temp. pot-string type waste steel preheating device

    CN2177925Y

  • Equipment for preheating waste steel using flue gas from vertical kiln-electric furnace combination

    CN2405174Y