A real-time monitoring and early warning system and method for roadbed settlement in goaf areas
By designing a real-time monitoring and early warning system for subsidence in goaf, using sensor modules and cloud service subsystems to collect and process data in real time, and generate risk alarm instructions, the problem that the existing technology cannot realize automated real-time risk monitoring and early warning is solved, and the engineering has been improved Security of construction.
Patent Information
- Application Number
- CN202311194842.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-15
- Publication Date
- 2024-11-05
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology cannot achieve automated real-time risk monitoring and early warning of high-grade highway pavement subgrades, and cannot effectively prevent geological safety problems such as ground collapse and cracks caused by underground goaf.
A real-time monitoring and early warning system for subsidence settlement in goaf is designed, including sensor modules, field terminal modules and cloud service subsystems. By collecting and processing section settlement data, soil pressure data, weather data and working conditions data in real time, risk alarms are generated. Instructions to realize automated risk warning.
It has achieved more accurate settlement predictions for actual on-site projects, improved the safety of engineering construction, and effectively prevented accidents.
Smart Images

Figure CN117308867B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of road subsidence monitoring, and in particular to a real-time monitoring and early warning system for subsidence in a goaf area and a method thereof. Background Art
[0002] my country is rich in mineral resources. The large-scale development and utilization of minerals have laid the foundation for the development of my country's society. It has also caused a large number of goafs in the deep strata, which can easily lead to geological safety problems such as ground collapse and cracks. Especially for high-grade highways, the impact and loss caused by underground goafs on the road pavement and subgrade will be more significant. At present, most platforms can only realize automatic settlement monitoring, but cannot realize prediction and early warning. Therefore, it is necessary to combine the control standards of road pavement and subgrade settlement to carry out automatic real-time risk monitoring and early warning of the high-grade road pavement and subgrade in the underlying goaf to achieve risk control. Therefore, how to combine actual projects, propose a method suitable for automatic real-time risk warning of road pavement and subgrade, and establish a complete system is very important. At the same time, how to achieve this goal is also the main research issue at present. Summary of the invention
[0003] The purpose of the present invention is to overcome the deficiency in the prior art that the existing platform can only realize automatic settlement monitoring but cannot realize prediction and early warning, and to provide a real-time monitoring and early warning system and method for roadbed settlement in a goaf area.
[0004] In order to achieve the above-mentioned object of the invention, the present invention provides the following technical solutions:
[0005] A real-time monitoring and early warning system for roadbed settlement in goaf areas, comprising: a sensor module, a field terminal module, a cloud service subsystem, and a receiving terminal;
[0006] The sensor module is used to collect cross-sectional settlement data, soil pressure data, weather data, and working condition data in real time, and transmit the collected cross-sectional settlement data, soil pressure data, weather data, and working condition data to the on-site terminal;
[0007] The cloud service subsystem includes a cloud service module and a database module, which are used for storing the section settlement data, the earth pressure data, the weather data, and the working condition data, and processing the section settlement data, the earth pressure data, the weather data, and the working condition data to obtain a risk alarm instruction;
[0008] The receiving terminal is used to receive the risk warning instruction.
[0009] The adoption of the above technical solution can more accurately predict the settlement of actual on-site projects and compile an automated roadbed settlement monitoring and early warning system, which can further realize automated risk warnings, improve the safety of project construction, and effectively prevent accidents.
[0010] As a preferred solution of the present invention, the sensor module includes: an array displacement meter and an earth pressure sensor. The array displacement meter and the earth pressure sensor are both arranged at the roadbed monitoring site and transmit data through the Internet of Things 4G signal.
[0011] As a preferred solution of the present invention, the real-time monitoring and early warning system for roadbed settlement in goaf areas further comprises a Beidou base station, and the Beidou base station is used for transmitting the cross-section settlement data collected by the sensor module to the on-site terminal module in real time.
[0012] As a preferred solution of the present invention, the Beidou base station includes: a battery, a column, an electrical box, a solar panel, a 4G Internet of Things card, and a GDM integrated GNSS receiver; the solar panel is arranged above the electrical box, the electrical box and the solar panel are both arranged on the column, the battery, the 4G Internet of Things card, and the GDM integrated GNSS receiver are all arranged inside the electrical box, the GDM integrated GNSS receiver is electrically connected to the sensor module through the 4G Internet of Things card, and the GDM integrated GNSS receiver is used to receive the cross-sectional settlement data collected by the array displacement meter.
[0013] On the other hand, a method for real-time monitoring and early warning of subsidence in a goaf area applied to any of the above-mentioned real-time monitoring and early warning systems for subsidence in a goaf area is disclosed, comprising the following steps:
[0014] S1: Real-time collection of cross-section settlement data, earth pressure data, weather data, and working condition data;
[0015] S2: fitting the accumulated strain and dynamic stress of the roadbed using a theoretical prediction algorithm based on the cross-section settlement data, the earth pressure data, the weather data, and the working condition data, and obtaining the state variables, characteristic strains, and characteristic parameters of the roadbed after fitting;
[0016] S3: predicting the future cumulative settlement deformation of the roadbed through the state variable, the characteristic strain and the characteristic parameter, and comparing the predicted value with the risk threshold to obtain a risk alarm instruction;
[0017] S4: The system receives the risk alarm instruction and completes automatic alarm.
[0018] The adoption of the above technical solution can more accurately predict the settlement of actual on-site projects and compile an automated roadbed settlement monitoring and early warning system, which can further realize automated risk warnings, improve the safety of project construction, and effectively prevent accidents.
[0019] As a preferred embodiment of the present invention, the risk threshold is:
[0020] First-class highway: ≤0.10m between bridge abutment and embankment, ≤0.20m at culverts, box culverts and passages, ≤0.30m on general sections;
[0021] Secondary highway: ≤0.20m at the adjacent part of bridge abutment and embankment; ≤0.30m at culverts, box culverts and passages; ≤0.50m on general road sections.
[0022] Compared with the prior art, the beneficial effects of the present invention are: it can more accurately realize the settlement prediction of actual on-site projects, and compile it into an automated roadbed settlement monitoring and early warning system, which can further realize automated risk warning, improve the safety of engineering construction, and effectively prevent the occurrence of accidents. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is a structural block diagram of a real-time monitoring and early warning system for subsidence in goaf areas according to Embodiment 1 of the present invention;
[0024] Figure 2 A schematic diagram of a Beidou base station of a real-time monitoring and early warning system for roadbed settlement in a goaf area according to Example 1 of the present invention;
[0025] Figure 3 This is a flow chart of a real-time monitoring and early warning method for roadbed settlement in a goaf area described in Example 2 of the present invention. DETAILED DESCRIPTION
[0026] The present invention is further described in detail below in conjunction with test examples and specific implementation methods. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
[0027] Example 1
[0028] A real-time monitoring and early warning system for roadbed settlement in goaf areas, such as Figure 1 As shown, it includes: sensor module, field terminal module, cloud service subsystem, and receiving terminal;
[0029] The sensor module is used to collect cross-sectional settlement data, soil pressure data, weather data, and working condition data in real time, and transmit the collected cross-sectional settlement data, soil pressure data, weather data, and working condition data to the on-site terminal;
[0030] The cloud service subsystem includes a cloud service module and a database module, which are used for storing the section settlement data, the earth pressure data, the weather data, and the working condition data, and processing the section settlement data, the earth pressure data, the weather data, and the working condition data to obtain a risk alarm instruction;
[0031] The receiving terminal is used to receive the risk warning instruction.
[0032] The sensor module includes: an array displacement meter and an earth pressure sensor. The array displacement meter and the earth pressure sensor are both arranged at the roadbed monitoring site and transmit data through the Internet of Things 4G signal.
[0033] The model of the array displacement meter is: JX-CX02-1000 array displacement meter.
[0034] The real-time monitoring and early warning system for roadbed settlement in goaf areas also includes a Beidou base station, which is used to transmit the cross-section settlement data collected by the sensor module to the on-site terminal module in real time.
[0035] like Figure 2 As shown, the Beidou base station includes: a battery, a column, an electrical box, a solar panel, a 4G Internet of Things card, and a GDM integrated GNSS receiver; the solar panel is arranged above the electrical box, the electrical box and the solar panel are both arranged on the column, the battery, the 4G Internet of Things card, and the GDM integrated GNSS receiver are all arranged inside the electrical box, the GDM integrated GNSS receiver is electrically connected to the sensor module through the 4G Internet of Things card, and the GDM integrated GNSS receiver is used to receive the cross-section settlement data collected by the array displacement meter.
[0036] It can more accurately predict the settlement of actual on-site projects and compile an automated roadbed settlement monitoring and early warning system, which can further realize automated risk warnings, improve the safety of project construction, and effectively prevent accidents.
[0037] Example 2
[0038] A method for real-time monitoring and early warning of subsidence in goaf area applied to the real-time monitoring and early warning system for subsidence in goaf area described in Example 1, such as Figure 3 As shown, the following steps are included:
[0039] S1: Real-time collection of cross-section settlement data, earth pressure data, weather data, and working condition data;
[0040] S2: fitting the accumulated strain and dynamic stress of the roadbed using a theoretical prediction algorithm based on the cross-section settlement data, the earth pressure data, the weather data, and the working condition data, and obtaining the state variables, characteristic strains, and characteristic parameters of the roadbed after fitting;
[0041] S3: predicting the future cumulative settlement deformation of the roadbed through the state variable, the characteristic strain and the characteristic parameter, and comparing the predicted value with the risk threshold to obtain a risk alarm instruction;
[0042] S4: The system receives the risk alarm instruction and completes automatic alarm.
[0043] The risk threshold is: for first-class highways: ≤0.10m between abutments and embankments, ≤0.20m for culverts, box culverts and passages, and ≤0.30m for general sections;
[0044] Secondary highway: ≤0.20m at the adjacent part of bridge abutment and embankment; ≤0.30m at culverts, box culverts and passages; ≤0.50m on general road sections.
[0045] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A real-time monitoring and early warning system for roadbed settlement in goaf areas, characterized in that: include: Sensor module, field terminal module, cloud service subsystem, receiving terminal; The sensor module is used to collect cross-sectional settlement data, soil pressure data, weather data, and working condition data in real time, and transmit the collected cross-sectional settlement data, soil pressure data, weather data, and working condition data to the on-site terminal; The cloud service subsystem includes a cloud service module and a database module, which are used to store the section settlement data, the earth pressure data, the weather data, and the working condition data, and process the section settlement data, the earth pressure data, the weather data, and the working condition data, specifically including: Based on the cross-section settlement data, the earth pressure data, the weather data, and the working condition data, a theoretical prediction algorithm is used to fit the accumulated strain and dynamic stress of the roadbed, and after fitting, the state variables, characteristic strains, and characteristic parameters of the roadbed are obtained; Predicting the future cumulative settlement deformation of the roadbed through the state variables, the characteristic strains and the characteristic parameters, and comparing the predicted value with the risk threshold to obtain a risk alarm instruction; The receiving terminal is used to receive the risk warning instruction.
2. A real-time monitoring and early warning system for subsidence in goaf areas according to claim 1, characterized in that: The sensor module includes: an array displacement meter and an earth pressure sensor. The array displacement meter and the earth pressure sensor are both arranged at the roadbed monitoring site and transmit data through the Internet of Things 4G signal.
3. A real-time monitoring and early warning system for roadbed settlement in goaf area according to claim 2, characterized in that: The real-time monitoring and early warning system for roadbed settlement in goaf areas also includes a Beidou base station, which is used to transmit the cross-section settlement data collected by the sensor module to the on-site terminal module in real time.
4. A real-time monitoring and early warning system for subsidence in goaf areas according to claim 3, characterized in that: The Beidou base station includes: a battery, a column, an electrical box, a solar panel, a 4G Internet of Things card, and a GDM integrated GNSS receiver; the solar panel is arranged above the electrical box, the electrical box and the solar panel are both arranged on the column, the battery, the 4G Internet of Things card, and the GDM integrated GNSS receiver are all arranged inside the electrical box, the GDM integrated GNSS receiver is electrically connected to the sensor module through the 4G Internet of Things card, and the GDM integrated GNSS receiver is used to receive the cross-sectional settlement data collected by the array displacement meter.
5. The real-time monitoring and early warning system for roadbed settlement in goaf area according to claim 1 is characterized in that: The risk thresholds are: First-class highway: ≤0.10m between bridge abutment and embankment, ≤0.20m at culverts, box culverts and passages, ≤0.30m on general sections; Secondary highway: ≤0.20m at the adjacent part of bridge abutment and embankment; ≤0.30m at culverts, box culverts and passages; ≤0.50m on general road sections.
Citation Information
Patent Citations
Stability monitoring and early warning system and method for roadbed of worked-out region of road
CN107767625A
Expressway soft foundation intelligent processing and monitoring system and monitoring and early warning method
CN111896049A
Air-space-ground monitoring side slope system and an instability risk assessment method thereof
CN113554849A
Strip mine slope stability prediction device and prediction method thereof
CN113639651A
Engineering settlement deformation monitoring system and method based on digital twinning
CN115601008A
