Construction method for earthwork external transportation of super-deep foundation pit
CN117328464BActive Publication Date: 2026-08-28THE SECOND CONSTR OF CHINA CONSTR EIGHTH ENG DIV
Patent Information
- Application Number
- CN202311306675.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-10
- Publication Date
- 2026-08-28
- Estimated Expiration
- 2043-10-10
AI Technical Summary
Technical Problem
[0003]为了解决基坑外土方外运的问题,本发明提供一种超深基坑土方外运的施工方法
✦ Generated by Eureka AI based on patent content.
Smart Images

Figure CN117328464B_ABST
Abstract
The present application relates to the field of building construction technology, especially to a construction method for earthwork external transportation of super-deep foundation pit. The construction method comprises the following steps: constructing a vertical retaining wall supporting structure at the position of the original slope top of the foundation pit; constructing a soil foundation ramp at one side edge of the foundation pit; and constructing a trestle ramp at the center of the foundation pit, which is connected with the soil foundation ramp and serves as the main outlet channel. The present application solves the problem of too large occupation of the earthwork ramp of the narrow deep foundation pit, which affects the subsequent process, by adopting the U-shaped earthwork ramp, i.e. the soil foundation plus the trestle earthwork mode. The problem of the earthwork ramp of the narrow foundation pit failing to reach the bottom at one time is solved by adopting the arrangement mode of the U-shaped ramp. The present application has the characteristics of high efficiency, excellent quality, safety and reliability, and provides a good experience reference for similar projects, and has received consistent good comments from the construction unit and the supervision unit. The present application also plays a standard demonstration role in the industry and has significant social benefits.
Need to check novelty before this filing date? Find Prior Art
Citation Information
Patent Citations
Rapid unearthing construction method by combining trestle with annular road in deep foundation pit
CN113502824A
Foundation pit earth excavation method
CN113699996A
Landing stage structure that fetches earth under deep basal pit annular supports
CN205475249U