A large-section tunneling, filling and lane-keeping integrated method and system

Through the integrated method of large-section excavation, filling and lane retention, the problem of waste of coal pillar resources and difficulty in mining connection between underground coal mines has been solved, the coal recovery rate and laneway stability have been improved, and efficient coal mining operations have been achieved.

CN117365474BActive Publication Date: 2024-10-01XIAN UNIV OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311031001.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-20
Publication Date
2024-10-01
Estimated Expiration
2043-11-20

AI Technical Summary

Technical Problem

The existing long-wall fully mechanized mining method in underground coal mines results in a waste of coal pillar resources between faces and difficulty in mining connections. Moreover, the existing coal pillar-less coal mining technology with reserved lanes has problems such as low filling stability, high maintenance costs, and low degree of mechanization.

Method used

Adopt an integrated method of large-section excavation, filling, and retaining, including planning a large-section excavation area outside the coal pillar of the main roadway, arranging an integrated system for large-section excavation, filling, and retaining, and using U-shaped self-moving hydraulic baffle bracket clusters and hydraulic telescopic Type support clusters are used for supporting and filling to achieve continuous coal cutting and safe support.

Benefits of technology

It improves the coal resource recovery rate, relieves the tension of mining continuity, enhances the stability and mechanization of the tunnel, reduces maintenance costs, realizes the separation of excavation and filling operations, and improves coal mining efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117365474B_ABST
    Figure CN117365474B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of coal mine tunnel excavation and coal pillar-free mining, and specifically relates to an integrated method and system for large-section tunneling, filling and retaining tunnels. In the area outside the coal pillars of the large tunnel, a large-section tunneling area is planned perpendicular to the large tunnel interval, and a U-shaped self-moving hydraulic baffle support cluster is used to build a filling space in the middle of the large-section tunnel, and the variable empty top area is supported by the self-extension of the system; the U-shaped self-moving hydraulic baffle support cluster is sealed at the top and a telescopic flexible wind barrier is arranged on the outer edge of the hydraulic telescopic support cluster to ensure full negative pressure ventilation of the tunneling face; the present invention has the advantages of separating the tunneling and filling processes, and the tunneling operation does not need to wait for the filling body to be cured to the designed strength, thereby greatly improving the tunneling efficiency, while achieving full negative pressure ventilation and greatly improving the working environment of the tunneling face.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of coal mine tunnel excavation and coal pillar-free mining, and specifically relates to a large-section tunneling, filling and lane-retaining integrated method and system. Background Art

[0002] At present, my country's underground coal mines mainly use longwall comprehensive mining methods for mining. A 10-40m wide inter-face coal pillar is generally left between adjacent longwall working faces, and its length is consistent with the excavation length of the adjacent longwall working face. On the one hand, after the longwall working face is mined, both sides of the inter-face coal pillar are collapsed goaf areas, and the coal resources of the inter-face coal pillar cannot be recovered. The coal loss accounts for about 7.5%-20% of the coal volume of the longwall working face. Literature shows that my country loses about 300 million tons of coal resources every year due to inter-face coal pillars, and the waste of coal resources is very serious; on the other hand, a single longwall working face needs to be equipped with at least 2 mining tunnels for coal mining working face transportation and return air, and the coal mining rate and automation degree of tunnel excavation are higher than those of tunnel excavation, which leads to difficulties in the connection between coal mining and tunnel excavation operations, and even imbalance, which seriously restricts the improvement of mine safety level and output.

[0003] The existing mining technologies of leaving lanes and no coal pillars, such as "leaving lanes along the goaf" and "digging lanes along the goaf", require excavation of large-section lanes, and the width of the filling body left along one side of the goaf or the coal wall of the lane is relatively narrow, generally about 2m, resulting in low filling stability. From the perspective of the coal mining cycle, large-section lanes and narrow filling bodies need to serve two adjacent longwall working faces with a long service time. There are generally problems such as high lane maintenance costs and poor working environment. In addition, there is also a slow lane formation speed, which can easily lead to imbalance in mining and excavation, low degree of mechanization, and problems of manual labor intensity that need to be urgently addressed. Summary of the invention

[0004] In order to solve the above problems, the present invention adopts the following technical solutions: In the first aspect, the present invention provides a large-section tunneling, filling and lane-keeping integrated method, comprising the following steps:

[0005] Step 1): In the area outside the coal pillar of the main tunnel, plan the large-section excavation area vertically at the interval of the main tunnel;

[0006] Step 2): Arrange a large-section excavation, filling and lane-keeping integrated system in the large-section excavation area;

[0007] Step 3): After the large-section excavation cuts the coal body for a certain distance, a U-shaped self-moving hydraulic baffle support cluster is added to the large-section excavation filling and lane retention integrated system toward the rear of the large-section excavation area;

[0008] Step 4): During the process of the large-section tunneling, filling and lane-keeping integrated system gradually advancing toward the coal wall of the working face, the large-section tunneling, filling and lane-keeping integrated system supports the variable empty top area by self-extension, and performs filling and maintenance in the rectangular filling space formed by the immobile U-shaped self-moving hydraulic baffle support cluster and the rear coal wall;

[0009] Step 5): When the filling body strength is maintained to the designed strength, the large-section excavation filling lane retention integrated system shrinks itself and moves toward the coal wall of the excavation working face at the same time. The U-shaped self-moving hydraulic baffle support cluster and the filling body wall of the previous stage form a closed filling space for the next stage of filling operation;

[0010] Step 6): Repeat steps 4) to 5) to achieve integrated synchronous operations of continuous coal cutting and excavation, safe support of the roof of the large-section excavation area, and intermittent filling when the large-section excavation and filling integrated system is creeping forward.

[0011] Furthermore, in step 1), a transport tunnel and a return air tunnel are excavated within the coal pillar of the tunnel, and tunnels are excavated and set up along the inter-face coal pillars in the vertical direction of the transport tunnel and the return air tunnel, respectively, to cut the coal seams at the inter-face coal pillars and the tunnels set up on both sides thereof to form an initial large-section excavation area.

[0012] Furthermore, the large-section excavation, filling and lane retaining integrated system includes a large-section coal cutting unit, a coal transportation unit and a lane retaining support unit. In step 2), a lane retaining is cut in the vertical direction on one side and connected with the lane retaining on the other side. Then, the large-section coal cutting unit, the coal transportation unit and the lane retaining support unit are arranged. The lane retaining support units are arranged in the lane retaining on both sides.

[0013] Furthermore, the large-section excavation, filling and tunnel-retaining integrated system also includes a telescopic support unit for the empty top area. In step 3), the large-section coal cutting unit advances forward, and the tunnel-retaining support unit connected to the rear end of the large-section coal cutting unit in the space with tunnels left on both sides moves forward progressively as coal mining advances. The telescopic support unit for the empty top area installed behind the empty top space at the rear of the large-section coal cutting unit supports the roof of the large-section excavation area. The U-shaped self-moving hydraulic baffle support cluster is in contact and sealed with the roof of the large-section excavation area, and a telescopic flexible wind barrier is connected to the outer side of the telescopic support unit for the empty top area.

[0014] Furthermore, in step 4), the width of the rectangular filling space is calculated as follows:

[0015] According to formula (1), d0 is preliminarily calculated:

[0016] d0=min{d 01 ,d 02 ,d 03} (1)

[0017] Among them, d 01 ,d 02 ,d 03 The calculation formula is,

[0018]

[0019] Where, k is the support area ratio coefficient, ranging from 2 to 4, which is determined based on the extension capacity of the hydraulic telescopic support cluster; h is the thickness of the old top rock layer, m; R s is the shear strength of the old top rock layer, MPa; q0 is the deadweight of the rock layer and its upper load, MPa; q1 is the average support resistance of the large-section tunneling, filling and lane-keeping integrated system, MPa; R T is the tensile strength of the old top rock, MPa; Q is the single-shift filling capacity, m 3 ;h c The average mining height of the filling area is m; l is the excavation width, m; l1 and l2 are the widths of the tunnels left on both sides, m.

[0020] According to formula (3), check whether d0 meets the plate stability condition:

[0021]

[0022] Where μ is the Poisson's ratio of the old top rock layer.

[0023] Finally, determine d0 according to formula (4):

[0024]

[0025] In a second aspect, the present invention provides a large-section excavation filling and lane-retaining integrated system applied to the large-section excavation filling and lane-retaining integrated system described in the first aspect, comprising:

[0026] Large-section coal cutting unit: It includes a coal cutter, a shielded hydraulic support and an end hydraulic support. The coal cutter shuttles through the coal pillars between the cutting faces and the coal seams with lanes left on both sides under the cover of the shielded hydraulic support to form the initial large-section excavation area;

[0027] Coal transportation unit: including scraper, transfer machine and belt conveyor located in the reserved tunnel, used to transport the cut coal to the transportation tunnel;

[0028] Filling unit: It includes a U-shaped self-moving hydraulic baffle support cluster, which is constructed together with the top plate and bottom plate of the large-section excavation area to form a rectangular filling space, and is used to construct a filling body supporting the top plate of the large-section excavation area along the middle of the large-section tunnel, and the filling body is adjacent to the two reserved tunnels;

[0029] The reserved tunnel support unit includes a forward support shed, which is connected to the rear side of the end hydraulic support along the reserved tunnel;

[0030] Telescopic support unit for empty top area: a hydraulic telescopic support cluster is composed of multiple rows of hydraulic telescopic supports. The front end of the hydraulic telescopic support cluster is connected to the shielding hydraulic support through a hydraulic cylinder, and the rear end of the hydraulic telescopic support cluster is connected to the U-shaped self-moving hydraulic baffle support cluster through a hydraulic cylinder. It is used to support the variable empty top area between the shielding hydraulic support and the U-shaped self-moving hydraulic baffle support. The hydraulic telescopic support cluster can synchronize the front end excavation and coal cutting process and the rear end filling process through self-extension;

[0031] Ventilation unit: It is formed by two reserved tunnels, a U-shaped self-moving hydraulic baffle support cluster and a telescopic flexible wind barrier. The U-shaped self-moving hydraulic baffle support cluster is in contact and sealed with the top plate of the large-section excavation area. The telescopic flexible wind barrier is connected to the side of the hydraulic telescopic support cluster and deforms with the folding and expansion of the hydraulic telescopic support, forming full negative pressure ventilation on the excavation face.

[0032] Furthermore, the telescopic flexible wind barrier is provided with wind gates on both sides of the reserved lane.

[0033] Furthermore, the U-shaped self-moving hydraulic baffle support cluster is composed of three-side self-moving hydraulic baffle support connections, including a front row of self-moving hydraulic baffle support assemblies located at the rear side of the hydraulic telescopic support cluster and two side self-moving hydraulic baffle support assemblies located at the reserved lanes.

[0034] Furthermore, the self-moving hydraulic baffle support includes a baffle support base, a baffle hydraulic column is arranged on the upper side of the baffle support base, the upper side of the baffle hydraulic column is connected to the baffle support top beam, a retractable side panel is arranged on the rear side of the baffle support base, and hydraulic cylinders are connected to the two ends of the front side of the baffle support base for connecting adjacent self-moving hydraulic baffle supports in the same direction. The self-moving hydraulic baffle supports located at the corners of the lanes on both sides are connected to hydraulic cylinders at both ends of the side of the baffle support base, and the hydraulic cylinder at one end is used for laterally connecting to the adjacent self-moving hydraulic baffle supports, and the hydraulic cylinder at the other end is used for laterally connecting to the hydraulic telescopic support cluster.

[0035] Furthermore, the front row self-moving hydraulic baffle support assembly is provided with air gates on the end faces where the lanes are provided on both sides.

[0036] Compared with the prior art, the present invention has the following beneficial effects:

[0037] 1. Compared with the existing longwall mining technology, the large-section excavation, filling and lane retention integrated method of the present invention does not require the setting of inter-face coal pillars and the excavation of mining lanes, has a high coal resource recovery rate, and effectively alleviates the problem of tense mining and excavation continuity.

[0038] 2. Compared with the existing back-up filling technology, the integrated method of large-section excavation and filling lane retention of the present invention has a telescopic support unit in the empty top area installed in the rear empty top space that will self-extend to support the top plate of the large-section excavation area. During the filling operation, the U-shaped self-moving hydraulic baffle support cluster is fixed until the strength of the filling body increases to the design strength, and then the telescopic support unit in the empty top area self-contracts and cooperates to continuously advance, thereby realizing the separation of excavation and filling operations, solving the problem of difficulty in connection, and greatly improving the excavation speed.

[0039] 3. Compared with the existing filling and lane retaining technology, the large-section tunneling and filling lane retaining integrated system of the present invention adopts an overall self-propelled system, that is, the coal cutter, scraper, hydraulic support, hydraulic telescopic support cluster, and U-shaped self-moving hydraulic baffle support cluster as a whole constitute a self-propelled system. The overall comprehensive mining system has a high degree of mechanization and great potential for electro-hydraulic intelligent transformation, and can realize unmanned tunneling.

[0040] 4. Compared with the filling bodies of the existing "leaving lanes along the goaf" and "driving lanes along the goaf" technologies, the large-section excavation and filling lane-retaining integrated method of the present invention has a wider filling body built in the middle of the goaf and better lane stability. In addition, the ventilation unit set up in the large-section excavation and filling lane-retaining integrated method is less likely to leak air and has low subsequent maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] The drawings in the specification of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0042] Figure 1 A schematic diagram of opening a cutting hole and arranging a coal cutter, a scraper, a shield hydraulic support, an end hydraulic support and a forward support shed for an embodiment of the present invention;

[0043] Figure 2 A schematic diagram of a cluster of hydraulically retractable supports arranged in accordance with an embodiment of the present invention;

[0044] Figure 3 A schematic diagram of arranging a U-shaped self-moving hydraulic baffle support cluster and building a filling space according to an embodiment of the present invention;

[0045] Figure 4 This is a schematic diagram of the intermediate filling process in the first stage of an embodiment of the present invention;

[0046] Figure 5 It is a schematic diagram of the forward mining of the coal cutter, the migration of the shielding hydraulic support, and the extension and expansion of the support area by the cluster of hydraulic telescopic supports during the curing of the filling body in the first stage of the filling process of the embodiment of the present invention;

[0047] Figure 6It is a schematic diagram of the intermediate process in which the filling body reaches the design strength, the hydraulic telescopic support cluster shrinks toward the coal mining face, and the U-shaped self-moving hydraulic baffle support cluster moves forward during the first stage of filling in an embodiment of the present invention;

[0048] Figure 7 This is a schematic diagram of filling in the second stage of an embodiment of the present invention;

[0049] Figure 8 It is a schematic diagram of the lateral connection of a U-shaped self-moving hydraulic baffle support cluster according to an embodiment of the present invention;

[0050] Fig. 9 It is a front view of the self-moving hydraulic baffle support according to an embodiment of the present invention;

[0051] Fig.10 It is a side view of the self-moving hydraulic baffle support according to an embodiment of the present invention;

[0052] Fig.11 A top view of a self-moving hydraulic baffle support according to an embodiment of the present invention;

[0053] Fig.12 This is a schematic diagram of the forward movement of the U-shaped self-moving hydraulic baffle support cluster according to an embodiment of the present invention (I);

[0054] Fig.13 This is a schematic diagram of the forward movement of the U-shaped self-moving hydraulic baffle support cluster according to an embodiment of the present invention (II);

[0055] Fig.14 This is a schematic diagram of the forward movement of the U-shaped self-moving hydraulic baffle support cluster according to an embodiment of the present invention (III);

[0056] Fig.15 Schematic diagram of the forward movement of the U-shaped self-moving hydraulic baffle support cluster according to an embodiment of the present invention (IV);

[0057] Fig.16 It is a side view of the forward support shed according to an embodiment of the present invention;

[0058] Fig.17 It is a front view of the forward support shed according to an embodiment of the present invention;

[0059] Fig.18 A top view of the forward support shed according to an embodiment of the present invention;

[0060] Fig.19 A top view of a telescopic flexible wind barrier according to an embodiment of the present invention;

[0061] Fig. 20 It is a front view of the telescopic flexible wind barrier according to an embodiment of the present invention.

[0062] Among them, 1. Return air lane; 2. Transport lane; 3. Reserved lane; 4. Reserved lane; 5. Cutting eye; 6. Coal cutter; 7. Shielded hydraulic support; 8. End hydraulic support; 9. Scraper; 10. Transfer machine; 11. Belt conveyor; 12. Forward support shed; 121. Support shed top beam; 122. Support shed base; 123. Support shed hydraulic column; 13. Hydraulic telescopic support cluster; 130. Hydraulic telescopic support; 14. Telescopic flexible wind barrier; 15. Rectangular filling space; 16. U-shaped self-moving hydraulic baffle support cluster; 160. Self-moving hydraulic baffle support; 161. Baffle support top beam; 162. Baffle hydraulic column; 163. Oblique hydraulic column; 164. Baffle support base; 165. Hydraulic cylinder; 166. Retractable side panel; 17. Large-section excavation area; 18. Filling body. DETAILED DESCRIPTION

[0063] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0064] It should be noted that the following detailed descriptions are all illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0065] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0066] Embodiment 1:

[0067] like Figure 1-Figure 7 As shown, this embodiment provides a large-section tunneling and filling lane-keeping integrated method, which specifically includes the following steps:

[0068] Step 1): Figure 1As shown, in the area outside the coal pillar of the main tunnel, a large-section excavation area is planned vertically at the interval of the main tunnel, specifically, a transportation main tunnel 2 and a return air main tunnel 1 are excavated in the coal pillar of the main tunnel, and tunnels 3 and 4 are excavated and reserved along the coal pillars between the faces in the vertical direction of the transportation main tunnel 2 and the return air main tunnel 1, respectively, to cut the coal pillars between the faces and the coal seams where the tunnels are reserved on both sides, to form an initial large-section excavation area 17; wherein, the width of the large-section excavation area 17 is obtained by adding the width of the coal pillars between the cut faces and the width of the tunnels 3 and 4 reserved on both sides, and the length of the large-section excavation area 17 is determined according to the adjacent planned longwall working faces and the geological conditions of the coal seams, and the spacing between adjacent large-section excavation areas 17 is the planned pushing width of the longwall working faces;

[0069] Step 2): Arrange a large-section excavation, filling and lane-keeping integrated system in the large-section excavation area, specifically:

[0070] Step 2.1): Figure 1 As shown, a tunnel 3 is reserved on one side and a cut 5 is opened in the vertical direction, which is connected with the tunnel 4 reserved on the other side, and then a coal cutter 6, a shielding hydraulic support 7, an end hydraulic support 8, a scraper 9, a transfer machine 10 and a belt conveyor 11 are installed, wherein the coal cutter 6, the shielding hydraulic support 7 and the end hydraulic support 8 are large-section coal cutting units of the large-section excavation filling and tunneling integrated system, which are located at the front end of the excavation face, and the scraper 9 and the transfer machine 10 and the belt conveyor 11 located in the reserved tunnels 3 and 4 are coal transportation units of the large-section excavation filling and tunneling integrated system;

[0071] Step 2.2): Figure 1 As shown, the coal cutter 6 cooperates with the scraper 9, the end hydraulic support 8, and the shielding hydraulic support 7 to advance in the tunneling. At the same time, a forward support shed 12 is arranged from the rear end of the end hydraulic support 8 to the direction 1 of the transport tunnel 2 and the return air tunnel in the space reserved for tunnels 3 and 4 on both sides. Among them, the forward support shed 12 is a tunnel support unit for the integrated system of large-section tunneling, filling and tunneling.

[0072] Step 3): After the large-section excavation filling and lane-keeping integrated system has cut the coal body for a certain distance, a U-shaped self-moving hydraulic baffle support cluster 16 is added to the system toward the rear of the large-section excavation area 17, specifically:

[0073] Step 3.1): Figure 2As shown, the forward support shed 12 is progressively moved forward with the advancement of coal mining, and multiple rows of hydraulic telescopic supports 130 are installed behind the empty top space at the rear of the shielding hydraulic support 7, forming a hydraulic telescopic support cluster 13 behind the shielding hydraulic support 7 to support the top plate of the large-section excavation area 17, wherein the hydraulic telescopic support cluster 13 is an empty top area telescopic support unit of the large-section excavation filling and lane-keeping integrated system, and the telescopic flexible wind barrier 14 is connected to the side of the hydraulic telescopic support cluster 13, and the telescopic flexible wind barrier 14 is folded and unfolded as the hydraulic telescopic support cluster 13 self-expands, forming full negative pressure ventilation of the excavation face;

[0074] Step 3.2): Figure 3 As shown, the coal cutter 6 continues to advance, and the shielding hydraulic support 7 drives the hydraulic telescopic support cluster 13 to move toward the coal wall of the excavation working face through the hydraulic cylinder; after excavating a certain distance, a U-shaped self-moving hydraulic baffle support cluster 16 is arranged behind the hydraulic telescopic support cluster 13, and the U-shaped self-moving hydraulic baffle support cluster 16 contacts and seals with the top plate of the large-section excavation area 17;

[0075] Step 4): Figure 4 As shown, during the process of the large-section excavation filling and lane-keeping integrated system gradually advancing toward the coal wall of the working face, the large-section excavation filling and lane-keeping integrated system supports the variable empty top area by self-extension, and the immobile U-shaped self-moving hydraulic baffle support cluster 16 forms a rectangular filling space 15 with the rear coal wall, and the cementing filling material filling body 18 is used for filling and maintenance;

[0076] In this step, the coal cutter 6, the scraper 9, the end hydraulic support 8, the shield hydraulic support 7, and the hydraulic telescopic support cluster 13 move gradually in coordination, and the hydraulic telescopic supports 130 of the hydraulic telescopic support cluster 13 extend outward one by one to support the newly formed empty top area, such as Figure 5 As shown, the U-shaped self-moving hydraulic baffle support cluster 16 can remain stationary during filling and maintenance.

[0077] Step 5): Figure 6 and Figure 7 As shown, when the filling body strength is maintained to the design strength, the hydraulic telescopic supports 130 of the hydraulic telescopic support cluster 13 are retracted inwards one by one, and the retraction of the hydraulic telescopic support cluster 13 synchronously drives the U-shaped self-moving hydraulic baffle support cluster 16 to move toward the excavation working face, until the U-shaped self-moving hydraulic baffle support cluster 16 is close to the hydraulic telescopic support cluster 13, and the U-shaped self-moving hydraulic baffle support cluster 16 and the filling body wall of the previous stage form a closed filling space, and the next stage of filling operation is carried out;

[0078] Step 6): Repeat steps 4) to 5). When the large-section excavation, filling and lane retention integrated system is creeping forward, the coal cutter 6, scraper 9, shielding hydraulic support 7, hydraulic telescopic support cluster 13, U-shaped self-moving hydraulic baffle support cluster 16 and forward support shed 12 are controlled to work in coordination to achieve integrated synchronous operations of continuous coal cutting and excavation, safe support of the roof of the large-section excavation area 17, and intermittent filling.

[0079] Furthermore, in order to better calculate the filling step distance, i.e., the width of each filling, and ensure the filling effect, in step 4), the calculation method of the width of the rectangular filling space 15 is:

[0080] According to formula (1), d0 is preliminarily calculated:

[0081] d0=min{d 01 ,d 02 ,d 03} (1)

[0082] Among them, d 01 d 02 d 03 The calculation formula is,

[0083]

[0084] Where, k is the support area ratio coefficient, ranging from 2 to 4, which is determined based on the extension capacity of the hydraulic telescopic support cluster; h is the thickness of the old top rock layer, m; R s is the shear strength of the old top rock layer, MPa; q0 is the deadweight of the rock layer and its upper load, MPa; q1 is the average support resistance of the large-section tunneling, filling and lane-keeping integrated system, MPa; R T is the tensile strength of the old top rock, MPa; Q is the single-shift filling capacity, m 3 ;h c The average mining height of the filling area is m; l is the excavation width, m; l1 and l2 are the widths of the tunnels left on both sides, m.

[0085] According to formula (3), check whether d0 meets the plate stability condition:

[0086]

[0087] Where μ is the Poisson's ratio of the old top rock layer.

[0088] Finally, determine d0 according to formula (4):

[0089]

[0090] Embodiment 2

[0091] The invention discloses a large-section tunneling, filling and lane-keeping integrated system, comprising the following units:

[0092] The large-section coal cutting unit includes a coal cutter 6, a shielding hydraulic support 7 and an end hydraulic support 8. The coal cutter 6 shuttles through the coal pillars between the cutting faces and the coal seams with lanes left on both sides thereof under the cover of the shielding hydraulic support 7 to form an initial large-section excavation area 17;

[0093] Coal transport unit: It is composed of a scraper 9 at the excavation face, a transfer machine 10 and a belt conveyor 11 located in the reserved tunnels 3 and 4, and is used to transport the cut coal to the transport tunnel 2;

[0094] Filling unit: including a U-shaped self-moving hydraulic baffle support cluster 16, a feeding pipe, an exhaust pipe and a filling body 18, wherein the U-shaped self-moving hydraulic baffle support cluster 16 and the top plate and bottom plate of the large-section excavation area 17 are jointly constructed into a rectangular filling space 15, which is used to construct a filling body 18 supporting the top plate of the large-section excavation area 17 along the middle of the large-section tunnel, and the filling body 18 is adjacent to the two reserved tunnels 3 and 4;

[0095] Ventilation unit: It is formed by two reserved lanes 3 and 4, a U-shaped self-moving hydraulic baffle support cluster 16 and a telescopic flexible wind barrier 14. The U-shaped self-moving hydraulic baffle support cluster 16 is in contact and sealed with the top plate of the large-section excavation area 17. The telescopic flexible wind barrier 14 is connected to the side of the hydraulic telescopic support cluster 10 and is folded and deformed with the hydraulic telescopic support 130, forming full negative pressure ventilation of the excavation face, which is used for ventilation of the large-section excavation working face, timely taking out dust and toxic and harmful gases from the working face, and forming a good working environment;

[0096] The reserved tunnel support unit is composed of a forward support shed 12, an anchor trolley or a combination of the two, and is used for the anchoring operation of the tunnel roof and the control of the periodic mine pressure caused by the under-connection of the roof and the settlement of the filling body in the filling area. The forward support shed 12 is connected to the rear side of the end hydraulic support 8 along the reserved tunnels 3 and 4, and the anchor trolley is a commonly used device in this field and will not be described in detail here;

[0097] Specifically, Figure 16-18 The forward-type supporting shed 12 is composed of a supporting shed top beam 121, two supporting shed hydraulic pillars 123 connected at the lower side, and a supporting shed base 122 connected to the lower side of the supporting shed hydraulic pillars 123.

[0098] Telescopic support unit for empty top area: a hydraulic telescopic support cluster 13 is formed by multiple rows of hydraulic telescopic supports 130. The front end of the hydraulic telescopic support cluster 13 is connected to the shielding hydraulic support 7 through a hydraulic cylinder, and the rear end of the hydraulic telescopic support cluster 13 is connected to the U-shaped self-moving hydraulic baffle support cluster 16 through a hydraulic cylinder, and is used to support the variable empty top area between the shielding hydraulic support 7 and the U-shaped self-moving hydraulic baffle support 16. The hydraulic telescopic support cluster 13 can synchronize the front end excavation and coal cutting process and the rear end filling process by self-expansion;

[0099] Among them, the U-shaped self-moving hydraulic baffle support cluster 16 is composed of three-side self-moving hydraulic baffle supports 160 connected together, including a front row of self-moving hydraulic baffle support combinations located on the rear side of the hydraulic telescopic support cluster 13 and two side self-moving hydraulic baffle support combinations located in the reserved lanes 3 and 4.

[0100] Further, such as Figure 8-11 As shown, the self-moving hydraulic baffle support 160 includes a baffle support base 164, a baffle hydraulic column 162 is arranged on the upper side of the baffle support base 164, and the upper side of the baffle hydraulic column 162 is connected to the baffle support top beam 161, and a retractable side plate 166 is arranged on the rear side of the baffle support base 164. Hydraulic cylinders 165 are arranged at both ends of the front side of the baffle support base 164 for connecting adjacent self-moving hydraulic baffle supports 160 in the same direction, as shown in FIG. Figure 8 As shown, the self-moving hydraulic baffle support 160 located at the turns of lanes 3 and 4 on both sides is provided with hydraulic cylinders 165 at both ends of the side of the baffle support base 164. The hydraulic cylinder 165 at one end is used to laterally connect the adjacent self-moving hydraulic baffle support 160, and the hydraulic cylinder 165 at the other end is used to laterally connect the hydraulic telescopic support cluster 13.

[0101] Among them, the bottom of the retractable side panel 166 is hingedly connected to the upper side of the baffle bracket base 164, the middle part of the retractable side panel 166 is connected to the retractable end of the inclined hydraulic column 163, and the fixed end of the inclined hydraulic column 163 is connected to the baffle bracket base 164.

[0102] like Figure 12-15 , the moving process of the U-shaped self-moving hydraulic baffle support cluster 16 is:

[0103] Step 1): The hydraulic cylinder 165 connected to the front self-moving hydraulic baffle support assembly and the hydraulic telescopic support cluster is extended first, and then the baffle hydraulic column 162 of the front self-moving hydraulic baffle support assembly descends, and then the hydraulic cylinder 165 connected to the front self-moving hydraulic baffle support assembly and the hydraulic telescopic support cluster contracts, and at the same time, the hydraulic cylinder 165 at the front end of the self-moving hydraulic baffle support assembly on both sides connected to the front self-moving hydraulic baffle support assembly is extended, and then, the baffle hydraulic column 162 of the front self-moving hydraulic baffle support assembly rises and returns to the original height, completing the first step of advancing the front end while the rear end of the U-shaped self-moving hydraulic baffle support cluster 16 remains stationary.

[0104] Step 2): The baffle hydraulic column 162 of the frontmost self-moving hydraulic baffle support of the self-moving hydraulic baffle support combination on both sides is lowered, then the hydraulic cylinder 165 connected to the front self-moving hydraulic baffle support is retracted, and at the same time, the hydraulic cylinder 165 connected to the rear self-moving hydraulic baffle support is extended, and then the baffle hydraulic column 162 of the frontmost self-moving hydraulic baffle support of the self-moving hydraulic baffle support combination on both sides is raised to restore the original height, completing the second step of the U-shaped self-moving hydraulic baffle support cluster 16, with the rear end of the cluster 16 remaining stationary and the front end advancing;

[0105] Step 3): The baffle hydraulic column 162 of the self-moving hydraulic baffle support connected to the rear side of the last self-moving hydraulic baffle support that has been lifted is lowered, and then the hydraulic cylinder 165 connected to the rear side of the last self-moving hydraulic baffle support that has been lifted is contracted, and at the same time, the hydraulic cylinder 165 connected to the rear self-moving hydraulic baffle support is extended, and then the baffle hydraulic column 162 is raised to restore the original height, completing the third step of the U-shaped self-moving hydraulic baffle support cluster 16, with the rear end remaining stationary and the front end advancing;

[0106] Step 4): Continue the operation in the manner of step 3) to achieve continuous and gradual advancement of the front end position of the U-shaped self-moving hydraulic baffle support cluster 16 while keeping the rear end stationary.

[0107] It should be noted that the hydraulic telescopic support cluster 13 is also composed of a number of hydraulic telescopic supports 130 connected by a hydraulic cylinder combination, and its propulsion method is the same as that of the U-shaped self-moving hydraulic baffle support cluster 16, which will not be repeated here.

[0108] For better effect, the front row self-moving hydraulic baffle support assembly is provided with air gates on the end faces of the lanes 3 and 4 on both sides.

[0109] The shape of the telescopic flexible wind barrier 14 is as follows: Fig.19 and Fig. 20 As shown, the four sides of the hydraulic telescopic support cluster 13 are closed by a telescopic flexible wind barrier 14, as shown in FIG. Figure 1-7As shown, the top and bottom of the telescopic flexible wind barrier 14 can be fixed to the upper and lower ends of the hydraulic telescopic support cluster 13 respectively to prevent air leakage from the excavation working face and prevent personnel from entering the area of ​​the hydraulic telescopic support cluster 13;

[0110] Furthermore, the extension and retraction of the telescopic flexible wind barrier 14 is coordinated with the movement of the hydraulic telescopic support cluster 13, specifically including two aspects of coordinated movement. On the one hand, when the hydraulic telescopic support cluster 13 moves toward the coal wall or the main lane of the excavation working face and the hydraulic telescopic support 130 extends outward, the telescopic flexible wind barrier 13 is synchronously extended toward the coal wall or the main lane of the excavation working face; on the other hand, when the mining height of the working face changes, the hydraulic telescopic support 130 rises and falls, and the telescopic flexible wind barrier 14 is synchronously extended at the height;

[0111] In order to achieve better results, dampers are provided on the two retractable flexible wind barriers 14 on the sides of the lanes 3 and 4. When the harmful gas inside the retractable flexible wind barrier 14 exceeds the standard, or personnel need to enter the retractable flexible wind barrier 14 to inspect the equipment, the two flexible dampers on the sides of the lanes 3 and 4 are opened at the same time to ventilate the interior and ensure safety.

[0112] The present invention discloses an integrated method and system for large-section excavation, filling and retaining lanes. A coal cutter shuttles through the coal pillars between the cutting faces and the coal seams with lanes on both sides to form an initial large-section excavation area 17, a scraper 9 is used to transport coal, a shielding hydraulic support 7 is used to shield the operation of the coal cutter 6, a hydraulic telescopic support cluster 13 is used to support the changing empty top area, a U-shaped self-moving hydraulic baffle support cluster 16 is used to build a filling space in the middle of the large-section lane, and a U-shaped self-moving hydraulic baffle support cluster is used to seal the top and a telescopic flexible wind barrier 14 is arranged on the outer edge of the hydraulic telescopic support cluster 13 to ensure full negative pressure ventilation of the excavation face, and the filling body 1 8 The two side walls and the two side walls of the large-section tunnel form two reserved tunnels 3 and 4, and the tunnels 3 and 4 are anchored on both sides and a forward support shed 12 is arranged. The forward support shed 12 moves forward with the movement of the rock stratum in the filling area. The present invention avoids the traditional comprehensive mechanized coal mining and leaves coal pillars between faces, which wastes resources. It realizes two tunnels at a time by large-section excavation and middle filling, which can greatly improve the excavation efficiency. The excavation face can achieve full negative pressure ventilation, which greatly improves the working environment of the excavation face. It realizes the separation of excavation and filling processes, and the excavation operation does not need to wait for the filling body to be cured to the designed strength, thereby greatly improving the excavation efficiency.

[0113] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.

Claims

1. A large-section tunneling and filling lane-keeping integrated method, characterized in that: The following steps are involved: Step 1): In the area outside the coal pillar of the main tunnel, plan the large-section excavation area vertically at the interval of the main tunnel; Step 2): Arrange a large-section excavation, filling and lane-keeping integrated system in the large-section excavation area; Step 3): After the large-section excavation cuts the coal body for a certain distance, a U-shaped self-moving hydraulic baffle support cluster is added to the large-section excavation filling and lane retention integrated system toward the rear of the large-section excavation area; Step 4): During the process of the large-section tunneling, filling and lane-keeping integrated system gradually advancing toward the coal wall of the working face, the large-section tunneling, filling and lane-keeping integrated system supports the variable empty top area by self-extension, and performs filling and maintenance in the rectangular filling space formed by the immobile U-shaped self-moving hydraulic baffle support cluster and the rear coal wall; The calculation method for the width of the rectangular filling space is: According to formula (1), d0 is preliminarily calculated: (1) Among them, d 01 d 02 d 03 The calculation formula is, (2) Where, k is the support area ratio coefficient, ranging from 2 to 4, which is determined based on the extension capacity of the hydraulic telescopic support cluster; h is the thickness of the old top rock layer, m; R s is the shear strength of the old top rock layer, MPa; q0 is the deadweight of the rock layer and its upper load, MPa; q1 is the average support resistance of the large-section tunneling, filling and lane-keeping integrated system, MPa; R T is the tensile strength of the old top rock layer, MPa; Q is the filling capacity of a single shift, m³; h c The average mining height of the filling area is m; l is the excavation width, m; l1 and l2 are the widths of the tunnels left on both sides, m; According to formula (3), check whether d0 meets the plate stability condition: (3) Where, μ is the Poisson’s ratio of the old top rock layer; Finally, d0 is determined according to formula (4): (4); Step 5): When the filling body strength is maintained to the designed strength, the large-section tunneling filling and lane-keeping integrated system shrinks itself and moves toward the coal wall of the tunneling working face. The U-shaped self-moving hydraulic baffle support cluster and the filling body wall of the previous stage form a closed filling space for the next stage of filling operation; Step 6): Repeat steps 4) to 5), and when the large-section excavation filling and lane retention integrated system creeps forward, the integrated synchronous operation of continuous coal cutting and excavation, safe support of the roof of the large-section excavation area, and intermittent filling is realized.

2. A large-section tunneling, filling and lane-retaining integrated method according to claim 1, characterized in that: In step 1), a transport tunnel and a return air tunnel are excavated in the coal pillar of the tunnel, and tunnels are excavated and set up along the inter-face coal pillars in the vertical direction of the transport tunnel and the return air tunnel respectively, and the coal seams at the inter-face coal pillar and the tunnels on both sides thereof are cut to form an initial large-section excavation area.

3. A large-section tunneling, filling and lane-retaining integrated method according to claim 1, characterized in that: The large-section excavation, filling and lane retaining integrated system includes a large-section coal cutting unit, a coal transportation unit and a lane retaining support unit. In step 2), a lane retaining is cut in the vertical direction on one side and connected with the lane retaining on the other side. Then, the large-section coal cutting unit, coal transportation unit and lane retaining support unit are arranged. The lane retaining support units are arranged in the lane retaining on both sides.

4. A large-section tunneling, filling and lane-retaining integrated method according to claim 3, characterized in that: The large-section excavation, filling and tunnel-retaining integrated system also includes a telescopic support unit for the empty top area. In step 3), the large-section coal cutting unit advances forward, and the tunnel-retaining support unit connected to the rear end of the large-section coal cutting unit in the space with tunnels on both sides moves forward progressively as coal mining advances. The telescopic support unit for the empty top area installed behind the empty top space at the rear of the large-section coal cutting unit supports the roof of the large-section excavation area. The U-shaped self-moving hydraulic baffle support cluster is in contact and sealed with the roof of the large-section excavation area, and a telescopic flexible wind barrier is connected to the outer side of the telescopic support unit for the empty top area.

5. A large-section excavation filling lane-retaining integrated system applied to the large-section excavation filling lane-retaining integrated method as described in any one of claims 1 to 4, characterized in that: include: Large-section coal cutting unit: It includes a coal cutter, a shielded hydraulic support and an end hydraulic support. The coal cutter shuttles through the coal pillars between the cutting faces and the coal seams in the tunnels on both sides under the cover of the shielded hydraulic support to form the initial large-section excavation area; Coal transportation unit: including scraper, transfer machine and belt conveyor located in the reserved tunnel, used to transport the cut coal to the transportation tunnel; Filling unit: It includes a U-shaped self-moving hydraulic baffle support cluster, which is constructed together with the top plate and bottom plate of the large-section excavation area to form a rectangular filling space, and is used to construct a filling body supporting the top plate of the large-section excavation area along the middle of the large-section tunnel, and the filling body is adjacent to the two reserved tunnels; The reserved tunnel support unit includes a forward support shed, which is connected to the rear side of the end hydraulic support along the reserved tunnel; Telescopic support unit for empty top area: a hydraulic telescopic support cluster is composed of multiple rows of hydraulic telescopic supports. The front end of the hydraulic telescopic support cluster is connected to the shielding hydraulic support through a hydraulic cylinder, and the rear end of the hydraulic telescopic support cluster is connected to the U-shaped self-moving hydraulic baffle support cluster through a hydraulic cylinder. It is used to support the variable empty top area between the shielding hydraulic support and the U-shaped self-moving hydraulic baffle support. The hydraulic telescopic support cluster can synchronize the front end excavation and coal cutting process and the rear end filling process through self-extension; Ventilation unit: It is formed by two reserved tunnels, a U-shaped self-moving hydraulic baffle support cluster and a telescopic flexible wind barrier. The U-shaped self-moving hydraulic baffle support cluster is in contact and sealed with the top plate of the large-section excavation area. The telescopic flexible wind barrier is connected to the side of the hydraulic telescopic support cluster and deforms with the folding and expansion of the hydraulic telescopic support, forming full negative pressure ventilation on the excavation face.

6. A large-section tunneling, filling and lane-retaining integrated system according to claim 5, characterized in that: The telescopic flexible wind barrier is provided with wind gates on both sides of the reserved lane.

7. The large-section tunneling, filling and lane-retaining integrated system according to claim 5 is characterized in that: The U-shaped self-moving hydraulic baffle support cluster is composed of three side self-moving hydraulic baffle supports connected together, including a front row self-moving hydraulic baffle support assembly located at the rear side of the hydraulic telescopic support cluster and two side self-moving hydraulic baffle support assemblies located at the reserved lane.

8. The large-section tunneling, filling and lane-retaining integrated system according to claim 7 is characterized in that: The self-moving hydraulic baffle support includes a baffle support base, a baffle hydraulic column is arranged on the upper side of the baffle support base, the upper side of the baffle hydraulic column is connected to the baffle support top beam, a retractable side panel is arranged on the rear side of the baffle support base, and hydraulic cylinders are connected to the two ends of the front side of the baffle support base for connecting adjacent self-moving hydraulic baffle supports in the same direction. The self-moving hydraulic baffle supports located at the corners of the lanes on both sides are connected to hydraulic cylinders at both ends of the side of the baffle support base, and the hydraulic cylinder at one end is used for laterally connecting to the adjacent self-moving hydraulic baffle supports, and the hydraulic cylinder at the other end is used for laterally connecting to the hydraulic telescopic support cluster.

9. A large-section tunneling, filling and lane-retaining integrated system according to claim 7, characterized in that: The front row of self-moving hydraulic baffle support assemblies are provided with air doors on the end faces where lanes are left on both sides.