Method, system and excavator for leveling construction sites based on laser guidance

Through a method based on laser guidance, the ruler and guidance laser are used to perform 0-position calibration and coordinate system establishment of the excavator to ensure that the bucket and stick move together at a preset angle, which solves the problem of complex equipment and cost in the existing technology. It solves the problem of abnormal operation in high and poor signal areas, and achieves efficient and accurate construction site leveling.

CN117449388BActive Publication Date: 2024-10-18EXWAY INTELLIGENT TECH (SUZHOU) CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202311687880.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-11
Publication Date
2024-10-18
Estimated Expiration
2043-12-11

AI Technical Summary

Technical Problem

In the current intelligent development of construction site leveling methods, the equipment is complex, the cost is high, and there are operating abnormalities or errors in poor signal areas. It is difficult to achieve unmanned site leveling operations, and excavators are prone to errors during the leveling process. Problems such as 'going uphill and downhill', 'digging deep and shallow', 'falling into holes', and 'gnawing holes in the ground'.

Method used

Using a method based on laser guidance, the excavator is calibrated to the 0 position through the ruler and guidance laser, and the excavator's loading coordinate system is established to ensure that the bucket and bucket arm move together at the preset angle, and the boom and bucket are calculated. The extension and contraction angles of the rod and bucket ensure that the bucket tooth tips run on the leveling surface to achieve unmanned site leveling.

Benefits of technology

It effectively avoids the problems of excavator ground tilt and unevenness during leveling operations, improves leveling accuracy and construction efficiency, reduces equipment complexity and cost, avoids abnormal operation in areas with poor signal, and achieves seamless construction. Process connection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117449388B_ABST
    Figure CN117449388B_ABST
Patent Text Reader

Abstract

The present invention discloses a method, system and excavator for leveling a construction site based on laser guidance, which are equipped with a laser generator, an angle sensor and a ruler. A ruler is set at a construction site, and the height difference between the excavator and the design elevation horizontal plane is determined by the ruler and the laser guidance equipment. The horizontal position of the excavator is determined by means of the inclination sensor on the excavator vehicle frame, and the rotation angle is determined by the angle sensor on the vehicle slewing platform. The angle sensors on the boom, dipper rod and bucket determine the trajectory of the bucket tooth tip. By calculating the height difference of the elevation horizontal plane, the extension and contraction angles of the boom, dipper rod and bucket are adjusted to ensure that the excavator works on the leveling plane. It has the characteristics of automation, low cost, simple operation, etc., and can complete the leveling of the construction site in an unmanned state, thereby improving construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of excavation machinery operations, and in particular to a construction site leveling operation method, system, excavator, computer medium and computer based on laser guidance. Background Art

[0002] Before the construction of a building, it is usually necessary to level the ground of the building. Only after the leveling work is completed, can subsequent construction processes such as foundation pit excavation begin. Site leveling is to level the construction site into the design plane required for construction, among which the design plane required for construction is the plane where the site design elevation is determined in advance.

[0003] In the process of site leveling, the traditional practice is: first conduct elevation measurement, then locate and lay out the lines, and then the excavator uses the laid out lines as the standard to perform leveling operations; during the leveling operation, the excavator operator needs to be quite skilled in the coordinated movements of the excavator boom, dipper arm, and bucket, and the excavator must be in a horizontal position without tilting in the front, back, left, or right directions, to ensure that the bucket teeth maintain a horizontal path when the site is leveled. If the excavator operation is not mastered well, it will cause ground tilt, unevenness, and other problems such as "uphill and downhill", "deep digging and shallow digging", "landing and smashing holes", and "biting potholes".

[0004] At present, with the development of intelligent engineering operations, some intelligent site leveling methods have emerged. This method requires a GNSS system, which uses the satellite positioning system GPS to position the excavator. In order to improve the positioning accuracy, an RTK base station differential device is added to determine the real-time horizontal position of the excavator, guide the excavator's leveling operation, and improve the efficiency and accuracy of the leveling operation; however, the current disadvantages of this method are that the equipment is complex, the settings are cumbersome, the cost is high, and in some areas with poor signals, the excavator may not operate normally or there may be operating errors or even mistakes.

[0005] Therefore, there is an urgent need for a construction site leveling method that can enable an excavator to complete the construction site leveling operation without human operation and avoid abnormal operation problems caused by the excavator. Summary of the invention

[0006] In order to overcome the above shortcomings, the purpose of the present invention is to provide a method, system, computer medium and computer for leveling construction sites based on laser guidance. The equipment is simple to use and low in cost. It can assist the excavator in leveling operations and can effectively avoid problems such as "uphill and downhill", "deep digging and shallow digging", "falling into holes", and "biting holes in the ground" when the excavator is performing site leveling operations. The ground is tilted and uneven.

[0007] To solve the above technical problems, the present invention provides a method for leveling a construction site based on laser guidance, comprising: calibrating the excavator and the elevation at 0 position according to a ruler and a guiding laser, so as to determine the height difference between the excavator to be operated and the elevation horizontal plane, and at the same time establishing the excavator's on-vehicle coordinate system; moving the excavator to an initial posture for the leveling operation; performing a leveling operation, comprising: a first leveling operation action, comprising: causing the excavator's boom and arm to perform a first coordinated action; a second leveling operation action, comprising: causing the excavator's boom and arm to perform a second coordinated action; wherein, when performing the first leveling operation action and the second leveling operation action, the excavator's bucket and arm are at a preset angle.

[0008] By adopting the above technical scheme, the extension and retraction angles of the boom, dipper arm and bucket can be calculated according to the height difference of the elevation horizontal plane of the excavator, ensuring that the tip of the excavator bucket tooth moves on the level plane of the construction site; thereby achieving the leveling work of the construction site by the excavator through its own control without human operation, which can effectively avoid the problems of ground inclination, unevenness, such as "uphill and downhill", "deep digging and shallow digging", "falling into holes", and "biting potholes" when the excavator is leveling the site.

[0009] As a preferred method of the present invention, establishing the coordinate system of the excavator includes: setting the center of the excavator's upper rotating platform as the coordinate origin O, setting the horizontal direction of the excavator as the X-axis, setting the vertical direction of the excavator to be operated as the Y-axis, and then setting the distance from the coordinate origin O to the ground contact of the excavator's lower crawler track as ; Set the excavator's boom shaft axis, arm shaft axis, bucket shaft axis, boom cylinder shaft axis, arm cylinder shaft axis, and bucket cylinder shaft axis as A, B, C, D, E, and F respectively; set the boom shaft axis A to be on the Y axis, and its vertical distance from the coordinate origin O to be ; Set the excavator's boom length to , so that the arm rotates around the A axis, and the angle between the arm and the positive direction of the Y axis is set to ; Set the excavator's arm length to , so that the bucket arm rotates around the B axis, and the angle between the bucket arm and the negative direction of the Y axis is set to ; Set the length from the bucket shaft axis C to the top of the excavator bucket as , so that the excavator bucket rotates around the C-axis.

[0010] As a preferred embodiment of the present invention, the excavator to be operated is moved to the initial posture of the leveling operation, which includes: extending the bucket and the dipper arm of the excavator from the vertical position of the dipper arm to the front of the excavator. Angle: adjust the excavator's boom and the upper vehicle's rotating platform Angle; insert the excavator bucket to a preset depth relative to the design elevation.

[0011] As a preferred embodiment of the present invention, in performing the first leveling operation or the second leveling operation, the method further comprises: Decompose into X direction and Y direction Movement: ,in, is the motion trajectory of the bucket in the X direction, is the motion trajectory of the bucket in the Y direction; the rotation equation for the boom to return to A is: ,in, is the rotation angle position of the boom in the initial posture, is the motion trajectory of the boom; the equation for calculating the rotation of the boom back to B is: ,in, is the rotation angle position of the stick in the initial posture, is the motion trajectory of the bucket arm; the rotation equation for the bucket to return to C is: ,in, is the rotation angle position of the bucket in the initial posture, and , is the movement trajectory of the bucket.

[0012] As a preferred embodiment of the present invention, in the execution of the leveling operation, the method further comprises: taking the B axis as the rotation axis, calculating and The motion trajectory is: , ,in, is the motion trajectory of B in the X direction, is the motion trajectory of B in the Y direction; taking the A axis as the rotation axis, the motion trajectory of B is calculated as: , , calculate the motion trajectory of A as: ,in, is the motion trajectory of A in the X direction, is the motion trajectory of A in the X direction.

[0013] As a preferred embodiment of the present invention, when performing the leveling operation, the method further includes: making the bucket teeth of the excavator run on a preset elevation level of the construction site to be operated, making the displacement of the bucket teeth in the Y direction 0, and the calculation process is: , where before the preset critical surface, the amount of the arm descending in the Y-axis direction is balanced by the amount of the arm lifting in the Y-axis direction when the boom rotates around the A-axis; after the preset critical surface, the amount of the arm rising in the Y-axis direction is balanced by the amount of the arm descending in the Y-axis direction when the boom rotates around the A-axis. The calculation process is: .

[0014] As a preferred embodiment of the present invention, when performing the leveling operation, the excavator is kept stopped and the rotating shaft A stays at Moments, where: , where for the excavator's onboard coordinate system, the position coordinate of A is ;thus, and The rotation relationship is:

[0015] .

[0016] As a preferred embodiment of the present invention, after the excavator completes a preset number of leveling operations at the same position, the method includes: moving the excavator along a preset leveling route to the position of the next continuous operation; redetermining the height difference between the excavator to be operated and the elevation plane based on a ruler and a guide laser; moving the excavator back to the initial posture of the leveling operation; and executing the next leveling operation.

[0017] By adopting the above technical solution, through continuous construction at multiple locations, seamless connection of leveling operations can be achieved, which helps to improve the continuity of the construction process and avoid unnecessary interruptions and pauses; and, by re-determining the height difference and resetting the operation, the leveling state of the excavator is ensured to be accurate at different working positions, and the excavator is always in an appropriate working posture, so as to maintain the consistency and stability of the leveling, thereby improving the accuracy of the leveling operation.

[0018] The present invention also provides an excavator, comprising: an excavator body; a sensing unit, comprising a laser transmitter, an angle sensor, and an inclination sensor, wherein the laser transmitter is installed on the excavator to be operated, and is used to identify the height difference between the excavator and the elevation horizontal plane; the angle sensor is installed on the upper rotating platform of the excavator to be operated, and the rotation angle of the excavator is identified through the angle sensor; the inclination sensor is respectively installed on the body, boom, dipper arm and bucket of the excavator to be operated, and the horizontal angle of the excavator and the extension and contraction angles of the boom, dipper arm and bucket are identified through the inclination sensor; a control unit is used to control the cooperation between the excavator and the sensing unit to perform the construction site leveling operation.

[0019] The present invention also provides a construction site leveling operation system based on laser guidance, including the above-mentioned excavator, and also including: a ruler, a plurality of rulers are arranged in an array along a preset track in the construction site, and each ruler is provided with a scale mark; an operation adjustment module, used to calibrate the excavator and the elevation at 0 position according to the ruler and the guiding laser, so as to determine the height difference between the above-mentioned excavator and the elevation horizontal plane, and at the same time establish the on-vehicle coordinate system of the excavator; move the excavator to the initial posture of the leveling operation; an operation action module, used to perform the leveling operation operation, including: a first leveling operation action, including: making the boom and the boom of the excavator perform a first coordinated action; a second leveling operation action, including: making the boom and the boom of the excavator perform a second coordinated action; wherein, when performing the first leveling operation action and the second leveling operation action, the bucket and the boom of the excavator are at a preset angle; a device driving module, used to drive the excavator to move.

[0020] The above technical solution of the present invention has the following advantages compared with the prior art:

[0021] 1. It can ensure that the tip of the excavator bucket moves on the level surface of the construction site, so that the excavator can complete the leveling of the construction site through its own control without human operation.

[0022] 2. It can effectively prevent the excavator from experiencing problems such as "uphill and downhill", "deep digging and shallow digging", "falling into holes", and "biting holes in the ground" when leveling the site.

[0023] 3. The equipment has a simple structure and flexible application. It does not use the GNSS satellite navigation system, which reduces costs and reduces the problem that the excavator cannot operate normally or has operating errors or even mistakes in some areas with poor GNSS satellite navigation system signals. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0025] Figure 1 It is a first schematic diagram of the excavator of the present invention.

[0026] Figure 2 It is a three-dimensional schematic diagram of an excavator of the present invention.

[0027] Figure 3 It is a schematic diagram of an excavator and a ruler of the present invention.

[0028] Figure 4 It is a connection relationship diagram of the construction site leveling operation system based on laser guidance of the present invention.

[0029] Figure 5 It is a connection relationship diagram between the control unit of the present invention and the excavator.

[0030] Figure 6 It is a connection relationship diagram between the control unit and the sensor unit of the present invention.

[0031] Figure 7 It is a hydraulic control schematic diagram of the control unit of the present invention and the hydraulic structure of the excavator.

[0032] Figure 8 The present invention is a flow chart of a construction site leveling method based on laser guidance.

[0033] Fig. 9 It is a flow chart of the method for establishing the on-vehicle coordinate system of the excavator according to the present invention.

[0034] Fig.10 It is a schematic diagram of the on-vehicle coordinate system of the excavator of the present invention.

[0035] Fig.11 It is a flow chart of the method of the present invention for moving the excavator to the initial posture for leveling operation.

[0036] Fig.12 It is a schematic diagram of the first state of the excavator of the present invention moving to the leveling operation.

[0037] Fig.13 It is a schematic diagram of the second state of the excavator of the present invention moving to the leveling operation.

[0038] Fig.14 It is a schematic diagram of the bucket movement state of the excavator of the present invention from action to leveling operation.

[0039] Fig.15 It is a schematic diagram of the motion state of the ground leveling operation segments of the present invention.

[0040] Fig.16 It is a flow chart of the operating method of the excavator of the present invention for performing the next continuous leveling operation.

[0041] Fig.17 It is a module connection relationship diagram of the construction site leveling operation system based on laser guidance of the present invention. DETAILED DESCRIPTION

[0042] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0043] The excavator 1 involved in the present invention refers to Figure 1-Figure 2 As shown, it at least includes a lower mobile chassis 10, an upper rotating platform 11, a boom 12, a stick 13, a bucket 14, a hydraulic structure, and an electrical unit.

[0044] As long as the dismounted mobile chassis 10 can support the entire excavator 1 body and enable it to move on the work site, it can be any form of dismounted mobile chassis 10, including but not limited to a crawler chassis and a wheeled chassis. The crawler chassis uses a set of crawler chains to support and move the excavator 1 body, and these chains are driven and positioned by driving wheels and guide wheels on the chassis; the wheeled chassis uses four or more wheels to support and move the excavator 1 body, and these wheels are usually made of rubber or metal; the specific type of dismounted mobile chassis 10 usually depends on the specific needs of the work project and the terrain conditions of the work site.

[0045] The upper vehicle slewing platform 11 is installed on the lower vehicle movable chassis 10, so that the upper vehicle body 16 of the excavator 1 can rotate 360 ​​degrees, thereby facilitating the flexible operation of the excavator 1 on the construction site.

[0046] The boom 12 is usually composed of multiple telescopic arms, which can be extended and rotated. The extension and retraction can adjust the length of the boom 12 to meet the requirements of different excavation depths, which enables the excavator 1 to complete excavation tasks at different depths and heights without moving the fuselage; the rotation can enable the boom 12 to rotate 360 ​​degrees, which provides a wider working range, allowing the excavator 1 to complete the excavation work without changing its position.

[0047] The boom 13 is usually composed of multiple articulated sections, which enable the bucket 14 to move in different directions and adapt to different excavation depths and heights. The design of the boom 13 enables the excavator 1 to flexibly adjust the position and angle of the bucket 14 to complete various excavation tasks; the boom 13 usually has telescopic and supporting functions. Telescopic movement enables the boom 13 to adjust the distance of the bucket 14 to adapt to excavation work at different depths; support enables the boom 13 to withstand various forces in excavation operations, including excavation, grabbing and carrying.

[0048] The bucket 14 is connected to the boom 13 of the excavator 1, and the excavation and transportation operations are achieved through the movement of the boom 13. The specific shape and capacity of the bucket 14 are set according to the operating purpose of the excavator 1, including but not limited to a standard bucket, a bird-beak bucket, a trough cleaning bucket, etc. Each type of bucket is suitable for different excavation tasks; the front edge of the bucket 14 is usually equipped with bucket teeth for cutting and penetrating the excavated materials, thereby improving the excavation efficiency and the durability of the bucket.

[0049] Furthermore, the bucket 14 is usually designed with a rotation function, so that it can handle materials more flexibly during operation and improve work efficiency.

[0050] The hydraulic structure is respectively installed on the boom 12 , the arm 13 , and the bucket 14 , and transmits energy through hydraulic oil, so that the excavator 1 can perform precise and efficient operation.

[0051] The electrical unit includes at least batteries, cables, motors, communication equipment, controllers, instruments, and emergency brake structures. These electrical unit components work together to enable the excavator 1 to operate efficiently and safely under various working conditions. Depending on the model of the excavator 1, the specific electrical unit configuration can be increased or decreased according to actual needs.

[0052] In some embodiments, the excavator 1 of the present invention can be configured as an unmanned excavator 1 with a cab 17, or can be configured as an unmanned excavator 1 without a cab 17. Figure 1 As shown, the excavator 1 is an unmanned excavator 1 with a cab 17 , so that an operator can monitor the operation of the excavator 1 in the cab 17 and manually operate the excavator 1 in abnormal situations.

[0053] Specifically, if the unmanned excavator 1 is provided with a cab 17 , a display screen is provided in the cab 17 , and an animation is displayed showing the movement track of the bucket teeth 140 of the excavator 1 on the horizontal plane of the leveling design elevation of the construction site.

[0054] In some embodiments, a remote controller can also be provided, which can remotely take over the excavator 1 through the remote controller when the excavator 1 is operating abnormally or after the work is completed, so that the excavator 1 is placed in a remote control operation state; the remote controller is also provided with a display screen, which uses an animation to display the movement trajectory of the bucket teeth 140 on the horizontal plane of the design elevation of the construction site leveling. When the excavator 1 is remotely controlled, the positional relationship of the bucket teeth 140 relative to the horizontal plane of the design elevation of the site leveling can be observed. By controlling the movement of the boom 12 and the stick 13, the movement trajectory of the tooth tip of the bucket 14 is adjusted, thereby realizing the function of remote leveling operation.

[0055] In some embodiments, reference Figure 3As shown, the ruler 2 is set in the construction site, and the ruler 2 is provided with scale marks 20.

[0056] In some embodiments, the ruler 2 is set to be multiple, and several rulers 2 are arranged in an array along the track set by the workers in the construction site. At the same time, a scale mark 20 is set for each ruler 2, and the scale mark 20 of each ruler 2 is at the same elevation.

[0057] refer to Figure 4-Figure 7 As shown, in some embodiments, one aspect of the present invention further provides a construction site leveling system based on laser guidance, wherein the system is composed of at least a sensor unit 3, a control unit 4 and the excavator 1 described above.

[0058] <Sensor Unit 3>

[0059] The sensing unit 3 includes a laser emitter 30, an angle sensor 31, and an inclination sensor 32. The laser emitter 30 is installed on the excavator 1, the angle sensor 31 is installed on the upper vehicle rotating platform 11 of the excavator 1, and the inclination sensor 32 is installed on the lower vehicle frame 100, the boom 12, the dipper arm 13 and the bucket 14 of the excavator 1.

[0060] Specifically, the emitting end of the laser emitter 30 faces the scale mark 20 of the ruler 2, and the laser emitter 30 cooperates with the ruler 2 to calibrate the excavator 1 and the elevation at 0 position, so as to determine the height difference between the excavator 1 and the elevation horizontal plane.

[0061] The specific models of the angle sensor 31 and the inclination sensor 32 are selected by the operator according to the actual operation requirements. Thus, the rotation angle of the excavator 1 is identified through the angle sensor 31; the horizontal angle of the excavator 1 and the extension and retraction angles of the boom 12, the dipper arm 13 and the bucket 14 of the excavator 1 are identified through the inclination sensor 32.

[0062] <Control Unit 4>

[0063] refer to Figure 5 , Figure 7 As shown, the control unit 4 is connected to the excavator 1, and the operation of the bucket 14 cylinder, the boom 12 cylinder and the arm 13 cylinder is realized by respectively adjusting the coordinated work of the pilot solenoid valve 150 and the hydraulic main valve 151 of the excavator 1, thereby realizing efficient and accurate construction site leveling operations.

[0064] Specifically, the pilot solenoid valve 150 of the excavator 1 is responsible for controlling the pilot oil circuit of the hydraulic system. By adjusting the pilot solenoid valve 150, the control unit 4 can guide a small amount of hydraulic oil to flow into the corresponding pilot oil circuit to initialize or prepare the hydraulic system and create conditions for subsequent specific operations.

[0065] The hydraulic main valve 151 is the main control element of the hydraulic system of the excavator 1. It determines the movement of each hydraulic actuator of the excavator 1 by controlling the flow direction and flow rate of the hydraulic oil. The adjustment of the hydraulic main valve 151 is completed by the control unit 4, including opening or closing the hydraulic channel, adjusting the flow rate and pressure of the hydraulic oil, and ensuring the synchronous movement of each hydraulic actuator.

[0066] The bucket 14 cylinder, the boom 12 cylinder and the arm 13 cylinder are respectively connected to the bucket 14, the boom 12 and the arm 13 of the excavator 1, and are responsible for performing corresponding actions. By adjusting the hydraulic main valve 151, the control unit 4 can accurately control the flow direction and flow of the hydraulic oil, thereby realizing various operating actions of the excavator 1 such as digging, lifting, and swinging.

[0067] Exemplary, reference Figure 7 As shown, the control unit 4 is connected to a plurality of pilot solenoid valves 150, which are connected to a hydraulic main valve 151 through the plurality of pilot solenoid valves 150, and further connected to the bucket 14 cylinder, the boom 12 cylinder and the arm 13 cylinder through the hydraulic main valve 151, so as to realize various operating actions of the excavator 1 such as digging, lifting and swinging.

[0068] refer to Figure 8 As shown, in some embodiments, one aspect of the present invention provides a construction site leveling method based on laser guidance, the method comprising the following working steps:

[0069] Step S1: calibrate the excavator 1 and the elevation at position 0 according to the ruler 2 and the guide laser, so as to determine the height difference between the excavator 1 to be operated and the elevation horizontal plane, and at the same time establish the vehicle coordinate system of the excavator 1.

[0070] Specifically, when the excavator 1 is working, the excavator 1 to be operated is moved along a preset leveling route to a position to be operated, wherein the preset leveling route is set by the operator according to the actual leveling operation requirements of the construction site.

[0071] Then, the excavator 1 and the elevation are calibrated at 0 position according to the ruler 2 and the guide laser, so as to determine the height difference between the excavator 1 to be operated and the elevation horizontal plane.

[0072] Specifically, refer to Fig. 9 , Fig.10 As shown, in order to control the leveling operation of the excavator 1, the method of establishing the upper coordinate system of the excavator 1 is as follows:

[0073] Step S10: The center of the upper vehicle rotary platform 11 is taken as the coordinate origin O, the horizontal direction of the excavator 1 is the X axis, and the vertical upward direction of the excavator 1 is the Y axis, and then the distance from the coordinate origin O to the ground contact of the lower vehicle crawler of the excavator 1 is set as .

[0074] Step S11: Set the axis of rotation of the boom 12 of the excavator 1 to A, set the axis of rotation of the arm 13 of the excavator 1 to B, set the axis of rotation of the bucket 14 of the excavator 1 to C, set the axis of rotation of the boom 12 cylinder of the excavator 1 to D, set the axis of rotation of the arm 13 cylinder of the excavator 1 to E, and set the axis of rotation of the bucket 14 cylinder of the excavator 1 to F.

[0075] Step S12: A is located on the Y axis, and its vertical distance from the coordinate origin O is .

[0076] Step S13: Set the length of the boom 12 of the excavator 1 to , so that the movable arm 12 rotates around the A axis, and the angle between the movable arm 12 and the positive direction of the Y axis is set to .

[0077] Step S14: Set the length of the dipper arm 13 of the excavator 1 to , so that the arm 13 rotates around the B axis, and the angle between the arm 13 and the negative direction of the Y axis is set to .

[0078] Step S15: The length from the axis C of the bucket 14 to the top of the bucket 14 of the excavator 1 is set to , causing the bucket 14 of the excavator 1 to rotate around the C-axis.

[0079] Step S2: Move the excavator 1 to an initial posture for leveling operation.

[0080] Specifically, the initial posture is set by the operator according to the requirements of the actual construction site leveling operation.

[0081] Exemplary, reference Figure 11-Figure 14 As shown, in this embodiment, the initial posture is:

[0082] Step S20: The bucket tooth 140 and the arm 13 of the excavator 1 are arranged on a straight line at an angle of 180°.

[0083] Step S21: Extend the bucket 14 and the arm 13 of the excavator 1 to the front of the excavator 1 at a vertical position from the arm 13. horn.

[0084] Step S22: Angle the boom 12 of the excavator 1 and the upper rotating platform 11 horn.

[0085] Step S23: inserting the bucket 14 of the excavator 1 to a preset depth relative to the design elevation, wherein the preset depth is set by the operator according to the requirements of the actual construction site leveling operation.

[0086] Step S3: Perform leveling operation.

[0087] Specifically, refer to Fig.15 As shown, in this embodiment, the leveling operation includes at least two actions to complete, the vertical position of the dipper arm 13 of the excavator 1 is the critical surface, wherein: the displacement before the critical surface is , in displacement The above action is to make the boom 12 and the arm 13 of the excavator 1 perform a first coordinated action.

[0088] Exemplarily, in this embodiment, the first coordinated action is to lift the boom 12 of the excavator 1, retract the dipper arm 13 of the excavator 1, and keep the bucket teeth 140 of the excavator 1 and the dipper arm 13 at a preset angle.

[0089] The lifting speed of the boom 12 and the retracting speed of the arm 13 are controlled by the control unit 4, so as to ensure that the bucket teeth 140 of the excavator 1 run on the horizontal plane of the leveling design elevation of the construction site.

[0090] After passing the critical surface, the arm 13 and the bucket 14 move in the displacement On, in displacement The above action is to make the boom 12 and the arm 13 of the excavator 1 perform a second coordinated action.

[0091] Exemplarily, in this embodiment, the second coordinated action is to lower the boom 12 of the excavator 1, while continuing to retract the boom 13 of the excavator 1, and keeping the bucket teeth 140 of the excavator 1 and the boom 13 at a preset angle.

[0092] The lowering speed of the boom 12 and the retraction speed of the dipper arm 13 are also controlled by the control unit 4, so as to ensure that the bucket teeth 140 of the excavator 1 travel on the horizontal plane of the leveling design elevation of the construction site.

[0093] Specifically, the preset angle can be set by the operator according to the actual construction site leveling work requirements.

[0094] For example, the preset angle may be configured as 180°, even if the bucket teeth 140 of the excavator 1 and the dipper arm 13 are at 180°, the angle remains unchanged.

[0095] For example, the preset angle may be configured as 160°, even if the bucket teeth 140 of the excavator 1 and the dipper arm 13 are at 160°, the angle remains unchanged.

[0096] Specifically, the movement trajectory of the bucket 14 of the excavator 1 Decompose into X direction and Y direction Movement:

[0097] ,

[0098] in, is the motion trajectory of the bucket 14 in the X direction, is the motion trajectory of the bucket 14 in the Y direction;

[0099] The rotation equation for calculating the arm 12 around A is:

[0100] ,

[0101] in, is the rotation angle position of the boom 12 in the initial posture, is the motion trajectory of the boom 12;

[0102] The rotation equation for calculating the arm 13 around B is:

[0103] ,

[0104] in, is the rotation angle position of the bucket arm 13 in the initial posture, is the motion trajectory of the stick 13;

[0105] The rotation equation for calculating the bucket 14 around C is:

[0106] ,

[0107] in, is the rotation angle position of the bucket 14 in the initial posture, and , It is the movement trajectory of the bucket 14.

[0108] Taking the B axis as the rotation axis, calculate and The motion trajectory is:

[0109] ,

[0110] ,

[0111] in, is the motion trajectory of B in the X direction, is the motion trajectory of B in the Y direction;

[0112] Taking A axis as the rotation axis, the motion trajectory of B is calculated as:

[0113] ,

[0114] ,

[0115] Calculate the motion trajectory of A as:

[0116] ,

[0117] in, is the motion trajectory of A in the X direction, is the motion trajectory of A in the X direction.

[0118] Specifically, the leveling operation is mainly the coordinated action of the boom 12 and the arm 13 of the excavator 1 to ensure that the bucket teeth 140 run on the horizontal plane of the design elevation of the construction site leveling. To ensure that the displacement of the bucket teeth 140 in the Y direction is 0, the calculation process is:

[0119] ,

[0120] That is, the arm 13 rotates around the B-axis, and the amount of descent in the Y-axis direction before the critical surface of the arm 13 perpendicular to the ground needs to be balanced by the amount of lift in the Y-axis direction of the boom 12 rotating around the A-axis.

[0121] After the critical surface of the boom 13 vertical to the ground, the rise of the boom 13 in the Y-axis direction also needs to be balanced by the Y-axis drop of the boom 12 rotating around the A-axis. The calculation process is:

[0122] .

[0123] In this embodiment, during a single leveling operation, the excavator 1 does not move, that is, the excavator 1 remains stationary, and the rotating shaft A remains at At this moment, for the upper coordinate system of excavator 1, the position coordinate of A is ;

[0124] in:

[0125] ,

[0126] From this we can get and The rotation relationship is:

[0127] .

[0128] When the control unit 4 controls the movement of the boom 12 oil cylinder and the bucket 14 oil cylinder, it ensures that the boom 12 and the dipper arm 13 follow the movement according to the above-mentioned rotation relationship, so that the leveling action can be completed.

[0129] In some embodiments, a single leveling operation can be divided into a rough leveling operation and a fine leveling operation.

[0130] Specifically, both the rough leveling operation and the rough leveling operation include the first leveling operation and the second leveling operation. The difference is that the rough leveling operation involves a larger amount of excavation and filling. The angle is smaller than that of the fine leveling operation; at the same time, the insertion depth of the bucket tooth 140 relative to the design elevation, the rough leveling operation is greater than the fine leveling operation.

[0131] During the actual implementation process, looking down at the excavator 1 to be operated, the boom 12, arm 13 and bucket 14 of the excavator 1 are in a straight line, the excavator 1 is in the initial leveling posture, the boom 12, arm 13 and bucket 14 are placed in a straight line directly in front of the excavator 1, and the boom 12, arm 13 and bucket 14 are placed in a straight line directly in front of the excavator 1. After completing a leveling operation, the excavator 1 rotates left or right to a set angle, and at this angle in front of the left side of the excavator 1, the first leveling operation and the second leveling operation are performed again. The leveling operation requires the excavator 1 to get on the vehicle and rotate at the same time to ensure that the leveling trajectory is parallel; among them, the angle of rotation of the excavator 1 left and right needs to ensure that one or two tooth marks of the bucket teeth of the excavator 1 overlap.

[0132] In some embodiments, reference Fig.16 As shown, after the excavator 1 completes a preset number of leveling operations at the same position, the method includes the following steps:

[0133] Step S4: Move the excavator 1 along the preset leveling route to the position of the next continuous operation.

[0134] Step S5: adjust the excavator 1 to a horizontal position, and redetermine the height difference between the excavator 1 to be operated and the elevation level according to the ruler 2 and the guide laser.

[0135] Step S6: Move the excavator 1 back to the initial posture for the leveling operation.

[0136] Step S7: Execute the next leveling operation.

[0137] Specifically, the preset number of times is set by the operator according to the actual needs of the construction site leveling operation.

[0138] Exemplarily, after the excavator 1 completes a single leveling operation at the same position, step S4 to step S7 are executed.

[0139] Exemplarily, after the excavator 1 completes at least two leveling operations at the same location, step S4 to step S7 are performed.

[0140] Therefore, reference Fig.17 As shown, in some embodiments, the present invention relates to a construction site leveling system based on laser guidance, further comprising:

[0141] The operation adjustment module 5 is used to calibrate the excavator and the elevation at 0 position according to the ruler 2 and the guide laser, so as to determine the height difference between the excavator 1 and the elevation horizontal plane, and at the same time establish the vehicle coordinate system of the excavator 1; move the excavator 1 to the initial posture of the leveling operation.

[0142] The operation action module 6 is used to perform the leveling operation, including:

[0143] The first leveling operation includes: making the boom 12 and the arm 13 of the excavator 1 perform a first coordinated action.

[0144] The second leveling operation includes: making the boom 12 and the arm 13 of the excavator 1 perform a second coordinated action; wherein, when performing the first leveling operation and the second leveling operation, the bucket 14 and the arm 13 of the excavator 1 are at a preset angle.

[0145] The device driving module 7 is used to drive the excavator 1 to move.

[0146] In the actual implementation process, the construction site leveling operation is performed by using the above-mentioned laser-guided construction site leveling operation system and the above-mentioned laser-guided construction site leveling operation method.

[0147] Therefore, in some embodiments, one aspect of the present invention further provides a computer medium having a computer program stored thereon, and the computer program is executed by a processor to implement the above-mentioned laser-guided construction site leveling method.

[0148] Therefore, in some embodiments, one aspect of the present invention further provides a computer, comprising a computer medium based on the above.

[0149] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0150] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

[0151] Description of reference numerals:

[0152] 1...excavator, 2...ruler, 3...sensor unit, 4...control unit, 5...operation adjustment module, 6...operation action module, 7...equipment drive module, 10...mobile chassis for dismounting, 11...slewing platform for mounting, 12...boom, 13...arm, 14...bucket, 16...body for mounting, 17...cab, 20...scale mark, 30...laser transmitter, 31...angle sensor, 32...tilt sensor, 100...dismounting frame of excavator, 140...bucket tooth, 150...pilot solenoid valve, 150a...pilot solenoid valve a, 150b...pilot solenoid valve b, 150c...pilot solenoid valve c, 150d...pilot solenoid valve d, 151...hydraulic main valve, 151a...hydraulic main valve a, 151b...hydraulic main valve b , 152...bucket cylinder, 153...boom cylinder, 153a...boom cylinder a, 153b...boom cylinder b, 154...arm cylinder.

Claims

1. A method for leveling a construction site based on laser guidance, characterized in that: The method comprises: According to the ruler and the guide laser, the excavator and the elevation are calibrated at 0 position, so as to determine the height difference between the excavator to be operated and the elevation horizontal plane, and at the same time establish the vehicle coordinate system of the excavator; Move the excavator to an initial posture for leveling operation; Perform leveling operations, including: The first leveling operation action: causing the boom and the dipper arm of the excavator to perform a first coordinated action; The second leveling operation action: causing the boom and the dipper arm of the excavator to perform a second coordinated action; Wherein, when performing the first leveling operation and the second leveling operation, the bucket and the dipper arm of the excavator are placed at a preset angle; In performing the first leveling operation or the second leveling operation, the method further includes: The motion trajectory S of the bucket flat Decompose into X direction X f (t) and Y direction Y f (t) Movement: S flat =S f (t)=X f (t)+Y f (t), Among them, X f (t) is the motion trajectory of the bucket in the X direction, Y f (t) is the motion trajectory of the bucket in the Y direction; The rotation equation for calculating the arm's rotation back to A is: i Aboom =θ A0 +θ A (t), Among them, θ A0 is the rotation angle position of the boom at the initial posture, θ A (t) is the motion trajectory of the movable arm; The rotation equation for calculating the arm around B is: i Barm =θ B0 +θ B (t), Among them, θ B0 is the rotation angle position of the stick at the initial posture, θ B (t) is the motion trajectory of the arm; The rotation equation for calculating the bucket's rotation back to C is: i Cbucket =θ C0 +θ C (t), Among them, θ C0 is the rotation angle position of the bucket in the initial posture, and θ C0 =θ B0 ,θ C (t) is the motion trajectory of the bucket; In performing the leveling operation, the method further comprises: With the B axis as the rotation axis, calculate X f (t) and Y f The motion trajectory of (t) is: X f (t)=(L arm +L bucket )×sinθ Barm +X B (t), Y f (t)=(L arm +L bucket )×cosθ Barm +Y B (t), Among them, X B (t) is the motion trajectory of B in the X direction, Y B (t) is the motion trajectory of B in the Y direction; Taking A axis as the rotation axis, the motion trajectory of B is calculated as: X B (t)=L boom ×sinθ Aboom +X A (t), Y B (t)=L boom ×cosθ Aboom +Y A (t), Calculate the motion trajectory of A as: S A (t)=X A (t)+Y A (t), Among them, X A (t) is the motion trajectory of A in the X direction, Y A (t) is the motion trajectory of A in the X direction; When performing the leveling operation, the method further includes: The bucket teeth of the excavator are made to move on the preset elevation level of the construction site to be operated, and the displacement of the bucket teeth in the Y direction is made 0. The calculation process is: Y f (t)=(L arm +L bucket )×cosθ Barm +Y B (t)=0, Among them, before the preset critical surface, the amount of the bucket arm descending in the Y-axis direction is balanced by the amount of the boom lifting in the Y-axis direction rotating around the A-axis; After the preset critical surface, the rise of the bucket arm in the Y-axis direction is balanced by the drop of the boom in the Y-axis direction when it rotates around the A-axis. The calculation process is: Y B (t)=L boom ×cosθ Aboom +Y A (t); When performing the leveling operation, the excavator remains stationary, and the rotating shaft A remains at time t0, wherein: Y A (t)=Y A (t0)=H A , Among them, for the excavator's onboard coordinate system, the position coordinate of A is (H A , 0); Therefore, θ Aboom and θ Barm The rotation relationship is:

2. The construction site leveling method according to claim 1, characterized in that: Establishing the vehicle coordinate system of the excavator includes: The center of the upper rotating platform of the excavator is set as the coordinate origin O, the horizontal direction of the excavator is set as the X axis, the vertical direction of the excavator to be operated is set as the Y axis, and the distance from the coordinate origin O to the contact ground of the lower crawler of the excavator is set as H. track ; The axis of the boom shaft, the arm shaft, the bucket shaft, the boom cylinder shaft, the arm cylinder shaft, and the bucket cylinder shaft of the excavator are set as A, B, C, D, E, and F respectively; The axis A of the movable arm is located on the Y axis, and the vertical distance from the coordinate origin O is set to H A ; The boom length of the excavator is set to L boom , so that the movable arm rotates around the A axis, and the angle between the movable arm and the positive direction of the Y axis is set to θ Aboom ; The arm length of the excavator is set to L arm , so that the bucket arm rotates around the B axis, and the angle between the bucket arm and the negative direction of the Y axis is set to θ Barm ; The length from the bucket shaft axis C to the top of the excavator bucket is L. bucket , so that the bucket of the excavator rotates around the C-axis.

3. The construction site leveling method according to claim 2, characterized in that: The process of moving the excavator to the initial position for leveling operation includes: The bucket and the dipper arm of the excavator are extended θ from the vertical position of the dipper arm to the front of the excavator. B0 horn; The angle θ between the boom of the excavator and the rotating platform of the vehicle is set A0 horn; The bucket of the excavator is inserted to a preset depth relative to the design elevation.

4. The construction site leveling method according to claim 1, characterized in that: After the excavator completes a preset number of leveling operations at the same position, the method includes: The excavator is moved to the position of the next continuous operation along a preset leveling route; Re-determine the height difference between the excavator to be operated and the elevation level according to the ruler and the guide laser; Resetting the excavator to an initial posture for leveling operation; Perform the next leveling operation.

5. An excavator for executing the method according to any one of claims 1 to 4, characterized in that: include: Excavation of the fuselage; The sensing unit includes a laser transmitter, an angle sensor, and an inclination sensor. The laser transmitter is installed on the excavator to be operated and is used to identify the height difference between the excavator and the elevation horizontal plane; the angle sensor is installed on the upper rotating platform of the excavator to be operated and the rotation angle of the excavator is identified through the angle sensor; the inclination sensors are respectively installed on the lower frame, boom, arm and bucket of the excavator to be operated and the horizontal angle of the excavator and the extension and contraction angles of the boom, arm and bucket are identified through the inclination sensors; The control unit is used to control the excavator and the sensor unit to cooperate and perform the construction site leveling operation.

6. A construction site leveling system based on laser guidance, characterized in that: An excavator according to claim 5, further comprising: A plurality of rulers are arranged in an array along a preset track in the construction site, and each ruler is provided with a scale mark; The operation adjustment module is used to calibrate the excavator and the elevation at zero position according to the ruler and the guide laser, so as to determine the height difference between the excavator and the elevation horizontal plane, and establish the vehicle coordinate system of the excavator; move the excavator to the initial posture of the leveling operation; The operation action module is used to perform leveling operations, including: The first leveling operation action: causing the boom and the dipper arm of the excavator to perform a first coordinated action; The second leveling operation action: the boom and the dipper arm of the excavator perform a second coordinated action; wherein, When performing the first leveling operation and the second leveling operation, the bucket and the dipper arm of the excavator are placed at a preset angle; The device driver module is used to drive the excavator to move.

Citation Information

Patent Citations

  • Semi-automatic excavator digitized earthwork site elevation control construction method

    CN111749243A

  • Excavator operation track planning method and device

    CN112925329A

  • Flat ground control method and device and excavator

    CN114411840A