A method and system for predicting pollutants in receiving areas of water diversion and regulation projects

By collecting water supply and use data and sewage treatment facilities concentration, the waste sewage entering the river coefficient is determined and pollutants entering the river are predicted, which solves the problem of inaccurate prediction of pollutants in water diversion and diversion projects, and realizes the amount of waste sewage entering the river and pollutants The direct connection between the inflow volume ensures the accuracy and rationality of pollutant prediction.

CN117473223BActive Publication Date: 2024-11-26YANGTZE RIVER WATER RESOURCES PROTECTION SCI RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311508046.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-14
Publication Date
2024-11-26
Estimated Expiration
2043-11-14

AI Technical Summary

Technical Problem

After the implementation of the water diversion and diversion project, the existing pollutant prediction methods cannot accurately reflect the discharge characteristics of waste sewage and major pollutants in the water-receiving area, and the determination of the river entry coefficient lacks a basis for calculation, resulting in the calculation value of waste sewage and pollutants entering the river entry. There is a large deviation from the actual value.

Method used

A method for predicting pollutants in the water-receiving area of ​​the water diversion and diversion project is proposed. By collecting water supply and consumption data, calculating the water consumption rate and waste sewage discharge in different industries, determining the waste sewage entering the river coefficient, and combining the inlet and outlet water concentration of sewage treatment facilities , predict the amount of pollutants entering the river, and adjust the amount of river entering the river by increasing water but not increasing pollution to ensure the rationality of the forecast.

Benefits of technology

It reflects the natural-social circulation characteristics of water resources, ensures the coordination between water consumption and waste sewage entering the river, avoids the contradiction between pollutant concentration and reality, and provides a systematic method for calculating pollutant entering the river. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117473223B_ABST
    Figure CN117473223B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for predicting pollutants in the receiving area of ​​a water diversion project, comprising the following steps: (1) surveying water consumption by industry in the receiving area; (2) surveying water consumption levels and sewage treatment facilities in the receiving area; (3) calculating the coefficient of wastewater entering the river and predicting the amount of wastewater entering the river; (4) predicting and analyzing the amount of major pollutants entering the river in the receiving area; and (5) determining the reduction target of major pollutants in the receiving area. Based on the natural-social cycle characteristics of water resources, the present invention proposes a method for calculating the coefficient of wastewater entering the river, establishes a direct connection between the amount of wastewater entering the river and the amount of pollutants entering the river, and systematically and innovatively constructs a pollutant prediction system for the receiving area of ​​a water diversion project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of pollutant prediction, and more specifically to a method and system for predicting pollutants in a water receiving area of ​​a water diversion and regulation project. Background Art

[0002] Water diversion and regulation projects are generally composed of water source projects, water transmission projects, control and cross-buildings, regulating reservoirs, and terminal supporting projects. They are generally divided into water source areas and water source downstream areas, water transmission line areas, and water receiving areas. Large-scale water diversion and regulation projects generally span two or more river basins or water resource zones, and have the characteristics of wide coverage and diverse environmental impacts. The construction and operation of water diversion and regulation projects will inevitably affect the surface water environment while solving the problem of water shortage.

[0003] The receiving area is an important part of the water diversion project. The prediction of its pollution sources is an important part of the prediction of the water environment impact of the rivers (lakes and reservoirs) diverted into the receiving area. At present, it is mainly based on the investigation of the status of pollutants, and through the prediction of social and economic indicators such as population and industrial development in the receiving area, combined with the wastewater and pollutant emission quotas, the wastewater and major pollutant emissions and the amount of river discharge are predicted, hereinafter referred to as the "pollution production and discharge coefficient method". However, due to the level of economic and social development, there are differences in wastewater and pollutant emission quotas in different regions.

[0004] Organic and inorganic matter enter the natural environment from the social environment through the water cycle, which has an impact on the surface water environment. Therefore, water flow is an important carrier of the social-natural migration and transformation of pollutants. The implementation of the water diversion project will increase the water supply for production and life in the receiving area, improve the level of water supply security for production and life in the receiving area, and may increase the discharge of wastewater and the amount of sewage entering the river in the receiving area. Compared with the use conditions of the production and discharge coefficient method, the implementation of the water diversion project will change the wastewater discharge quota in the receiving area, and the pollutant discharge quota in the receiving area will also change due to the improvement of the level of wastewater collection and centralized treatment. Therefore, under the influence of the additional water supply of the water diversion project, the prediction results of the production and discharge coefficient method cannot accurately reflect the characteristics of wastewater and major pollutants in the receiving area. However, by investigating and statistically analyzing the water supply and use volume and the pollutant emission concentration of sewage treatment facilities in the receiving area, considering the regional production and life water consumption level, predicting the discharge and amount of wastewater and major pollutants in the receiving area, the relationship between water volume and pollutant concentration can be considered in a coordinated manner, making the pollutant prediction results more reasonable. Among them, the river inflow coefficient is a key parameter for calculating the amount of wastewater and pollutants entering the river. It varies due to the different characteristics of wastewater confluence and migration in different regions. Its value is crucial to reflect the characteristics of pollutant migration. However, the current river inflow coefficient uses empirical values ​​and lacks a calculation basis. During use, it may cause a large deviation between the calculated value of wastewater and pollutants entering the river and the actual value. Summary of the invention

[0005] The purpose of the present invention is to consider the impact of the implementation of water diversion and regulation projects on the water supply and consumption and waste water discharge quotas of different industries in the receiving area, propose a method for calculating the waste water inflow coefficient, establish a connection between the amount of waste water and pollutants entering the river, and propose a method and system for predicting pollutants in the receiving area of ​​a water diversion and regulation project.

[0006] Based on the above problems, the present invention adopts the following technical solutions:

[0007] A method for predicting pollutants in a water receiving area of ​​a water diversion project comprises the following steps:

[0008] Step 1. Collect the results of water supply and water consumption of different industries in the water receiving area in the current base year and the design level year after the implementation of the water diversion project;

[0009] Step 2. Calculate the water consumption rate of different industries in each administrative district based on the statistical data of water supply and consumption in each administrative district of the water receiving area; sort out the sewage treatment scale and capacity in the current base year of the water receiving area, the influent concentration and effluent concentration of the sewage treatment facilities, and determine the sewage collection rate, treatment rate and sewage discharge concentration in the water receiving area in the design level year;

[0010] Step 3. Based on the water supply and use results of different industries in the water receiving area, calculate the wastewater discharge of different industries according to the water consumption rate; consider the sewage collection level of each administrative district in the water receiving area, the leakage of drainage channels and the evaporation loss characteristics, determine the wastewater inflow coefficient of different industries, and use it to calculate the wastewater inflow into the river in the current base year and the design level year after the project is implemented;

[0011] Step 4. Combined with the current influent concentration and effluent concentration of centralized sewage treatment facilities in each administrative district of the receiving area, the pollutant concentrations entering the river from different industries in the receiving area are predicted and analyzed, and the amount of major pollutants entering the river is calculated based on the current base year and the design level year after the project is implemented. The survey results of pollutant inflows in the current base year of each administrative district in the receiving area are collected, and the rationality of the pollutant prediction method and results are analyzed by comparing them with the calculation results of pollutant inflows in the current base year. When the deviation value is greater than the set threshold, it should return to step 2 to check and adjust the calculation parameters of the inflow coefficient until it is reasonable; keep the adjusted parameters unchanged, and re-predict the inflow coefficients and inflows of major pollutants in the design level year;

[0012] Step 5. Compare the amount of major pollutants entering the river in the current base year and the design level year after the project is implemented in each administrative district of the receiving area. When the amount of major pollutants entering the river in the design level year is greater than that in the current base year, in accordance with the principle of increasing water without increasing pollution, the difference between the amount of pollutants entering the river in the design level year and the current base year shall be determined as the pollutant inflow reduction target for the receiving area of ​​the water diversion project.

[0013] Furthermore, in step 1, the specific method for investigating water supply and consumption in the water receiving area is:

[0014] Collect the results of scale demonstration of water diversion and regulation projects, and determine the water supply and consumption of different industries in the receiving area in the current base year and the design level year after the implementation of the water diversion and regulation projects.

[0015] Furthermore, the different industries in step 1 include urban life, rural life, industrial production, and agricultural irrigation industry.

[0016] Furthermore, in step 2, the water consumption rate of different industries in each administrative area of ​​the water receiving area is calculated as follows:

[0017]

[0018] In the formula, i The possible values ​​are 1, 2, 3 or 4, representing urban life, rural life, industrial production or agricultural irrigation industry respectively; H i Indicates water consumption by industry, m 3 ; Q i Indicates water supply by industry, m 3 .

[0019] Furthermore, in step 3, the calculation formula for the amount of wastewater entering the river from the receiving area is as follows:

[0020]

[0021]

[0022] In the formula, W Represents the sum of wastewater discharged into the river by various industries in the receiving area, m 3 ; W i Indicates the amount of wastewater entering the river by industry, m 3 ; or i Indicates water consumption rate by industry; s i The wastewater collection rate by industry; l i It indicates the coefficient of waste water entering the river by industry.

[0023] Furthermore, in step 3, according to the water flow characteristics, the wastewater inflow coefficient l i It can be expressed as follows:

[0024]

[0025] In the formula, x i It is the difficulty of wastewater confluence, which is used to describe the possibility of wastewater entering the water flow channel, and its value range is between 0 and 1; ϛi The flow retention degree of wastewater is used to describe the degree of obstruction of wastewater in channels or pipes, and the value range is between 0 and 1; d i The leakage rate of pipeline networks or channels by industry; f i is the regional evaporation loss rate; t i is the water reuse rate; ϕ i It is the adjustment coefficient for waste water entering the river by industry.

[0026] Furthermore, the leakage rate of the pipeline network or channel d i According to industry differences, it is divided into channel leakage rate and pipeline leakage rate;

[0027] The channel leakage rate is expressed as:

[0028]

[0029] In the formula, W is the amount of irrigation water returned to farmland, m 3 ; L is the total length of the channel, km; a , b , c is the coefficient; d is the channel lining rate;

[0030] The pipeline leakage rate is expressed as:

[0031]

[0032] In the formula, Q n is the allowable water seepage of the pipeline, m 3 / (km·h); L is the total length of the pipeline network, km; T For statistical time, it is calculated as 1 year; W is the total amount of water entering the sewage pipeline by industry, m 3 ; f Adjust parameters for pipeline leakage rate; Q n Affected by the pipe diameter and pipe material, it can be expressed as:

[0033]

[0034] In the formula, K is the pipe water seepage coefficient; d is the inner diameter of the pipe, mm.

[0035] Furthermore, the regional evaporation loss rate fi It is expressed as:

[0036]

[0037] In the formula, w and t The annual average wind speed (m 3 / s) and water temperature (℃); w 0 and t 0 are the reference wind speed (m 3 / s) and reference water temperature (℃); x , y and n is an empirical constant; g Adjust parameters for regional evaporation loss rate.

[0038] Furthermore, in step 4, the formula for calculating the amount of pollutants entering the river in the receiving area is as follows:

[0039]

[0040]

[0041] In the formula, M It represents the sum of the same pollutant entering the river from various industries in the receiving area, g; M i It indicates the amount of the same pollutant entering the river by industry, g; x i Sewage treatment rate of urban sewage treatment facilities; C af is the pollutant concentration in the effluent of urban sewage treatment facilities, mg / L; C be is the pollutant concentration of the influent of urban sewage treatment facilities, mg / L; C ir It is the concentration of pollutants in agricultural irrigation wastewater entering the river, mg / L.

[0042] Furthermore, in step 4, when the relative error between the calculation results of the current base year pollutant inflow into the river in each administrative district of the receiving area and its survey results is within 30%, it is considered that the value of the inflow coefficient in the process of calculating the pollutant inflow into the river is reasonable. Otherwise, the relevant parameters of the inflow coefficient of different industries should be adjusted, and the calculation should be recalculated based on the adjusted parameters until they are reasonable; the adjusted parameters should be kept unchanged, and the inflow of major pollutants into the river in the design level year should be re-predicted.

[0043] The present invention also provides a pollutant prediction system for a water receiving area of ​​a water diversion and regulation project, comprising:

[0044] Module 1. It is used to determine the water supply and consumption of different industries in the receiving area in the current base year and the design level year after the implementation of the water diversion project;

[0045] Module 2. It is used to calculate the water consumption rate of different industries in each administrative district according to the statistical data of water supply and consumption in each administrative district of the water receiving area; sort out the sewage treatment scale and capacity of the water receiving area in the current base year, the influent concentration and effluent concentration of the sewage treatment facilities, and determine the sewage collection rate, treatment rate and sewage discharge concentration of the water receiving area in the design level year;

[0046] Module 3. It is used to calculate the wastewater discharge of different industries based on the water consumption results of different industries in the water receiving area according to the water consumption rate; considering the sewage collection level of each administrative district in the water receiving area, the leakage of drainage channels and the evaporation loss characteristics, determine the wastewater inflow coefficient of different industries, and use it to calculate the wastewater inflow into the river in the current base year and the design level year after the project is implemented;

[0047] Module 4. It is used to combine the current inlet concentration and outlet concentration of centralized sewage treatment facilities in each administrative district of the water receiving area, predict and analyze the concentration of pollutants entering the river in different industries in the water receiving area, and calculate the amount of major pollutants entering the river based on the current base year and the design level year after the project is implemented; collect the survey results of pollutants entering the river in the current base year of each administrative district in the water receiving area, and analyze the rationality of the pollutant prediction method and results by comparing them with the calculation results of pollutants entering the river in the current base year. When the deviation value is greater than the set threshold, it should return to module 2 to check and adjust the calculation parameters of the inlet coefficient until it is reasonable; keep the adjusted parameters unchanged, and re-predict the inlet coefficient and inlet amount of major pollutants in the design level year;

[0048] Module 5. It is used to compare the amount of major pollutants entering the river in the current base year and the design level year after the implementation of the project in each administrative district of the receiving area. When the amount of major pollutants entering the river in the design level year is greater than that in the current base year, in accordance with the principle of increasing water without increasing pollution, the difference between the amount of pollutants entering the river in the design level year and the current base year is determined as the pollutant inflow reduction target for the receiving area of ​​the water diversion project.

[0049] Compared with the prior art, the present invention has the following beneficial effects:

[0050] 1) Considering the consumption law of wastewater during its migration, a method for determining the pollutant inflow coefficient is proposed. The amount of wastewater inflow from different industries is calculated in combination with the amount of pollutant emissions, which reflects the natural-social cycle characteristics of water resources and ensures the coordination between water consumption in the receiving area and the amount of wastewater inflow;

[0051] 2) Based on the calculation results of wastewater discharge into rivers from different industries, combined with the monitoring results of pollutant concentrations in the inlet and outlet water of sewage treatment facilities and planning targets, the pollutant discharge into rivers in the current base year and the design level year were calculated, and a direct connection between wastewater discharge and pollutant discharge was established, reflecting the natural characteristics of water pollutants migrating with water flow, avoiding the contradiction between the pollutant concentration in wastewater and the actual situation when the production and discharge coefficient method was used to calculate the wastewater discharge and pollutant discharge respectively;

[0052] 3) A pollutant prediction system for the receiving areas of water diversion projects was proposed, providing a systematic, novel and applicable methodology for calculating the amount of wastewater and pollutants entering rivers in the region (watershed). BRIEF DESCRIPTION OF THE DRAWINGS

[0053] Figure 1 This is a flow chart for predicting pollutants in the receiving area of ​​the water diversion project of the present invention. DETAILED DESCRIPTION

[0054] In order to facilitate those skilled in the art to understand and implement the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the implementation examples described herein are only used to illustrate and explain the present invention and are not used to limit the present invention.

[0055] Taking into account the changes in the conditions for using the pollution production and emission coefficient method and the uncertainties in the use of this method, a method and system for predicting pollutants in the receiving area of ​​water diversion and regulation projects are proposed. The production and living wastewater discharge is calculated based on the production and living water supply in the receiving area and the regional water consumption level. At the same time, based on the regional sewage treatment level, the pollutant discharge and the amount of pollutants entering the river in the receiving area are calculated, providing a new calculation idea and method for pollutant prediction in the receiving area.

[0056] The present invention divides point source pollution industries into urban life and industrial production, and non-point source pollution industries into rural life and agricultural irrigation; firstly, the water supply and consumption of different industries in the current base year and after the implementation of the water diversion project are collected and determined; by investigating the water consumption of different industries in the water receiving area in the current base year, the water consumption levels of different industries are calculated, and the wastewater discharge of different industries in the water receiving area in the current base year and the design level year after the implementation of the water diversion project are calculated in combination with the water supply and consumption of different industries; by investigating the sewage treatment facilities in the water receiving area, the collection rate and treatment rate of point source pollution such as urban life and industrial production, as well as the sewage treatment facilities in the water receiving area are mastered. The inlet and outlet water concentrations of water treatment facilities are used to identify the scale of concentrated and dispersed emissions from urban life and industrial production, as well as the sewage discharge concentration under treatment and non-treatment conditions; the wastewater inflow coefficients of different industries are calculated based on the construction of urban life pipelines in the receiving area and the regional natural geographical profile (topography) and hydrological and meteorological conditions; combined with the results of determining the wastewater inflow coefficients by industry, the amount of wastewater and pollutants entering the river in the receiving area is calculated; finally, in accordance with the principle of "increasing water without increasing pollution", the amount of pollutants entering the river in the design level year and the current base year are compared to determine the pollutant inflow reduction target for the receiving area of ​​the water diversion project.

[0057] In general, the present invention uses water flow as a carrier, calculates the amount of waste water discharged from different industries and determines the pollutant emission concentration of waste water from different industries, combines the waste water entering river coefficients of different industries to determine the amount of pollutants entering the river from different industries, and establishes a direct connection between the amount of waste water entering the river and the amount of pollutants entering the river, which to a certain extent reflects the mechanism process of pollutants entering the natural cycle from the social cycle.

[0058] Example 1

[0059] The present invention is now described in detail by taking the application of the present invention to the prediction of pollutants in the receiving area of ​​the second phase of the water resources allocation project in northern Hubei Province (hereinafter referred to as the "Northern Hubei Phase II Project") as an example. The present invention also has a guiding role in the application of the present invention to the prediction of pollutants in the receiving area of ​​other water diversion projects.

[0060] The development task of the second phase of the Hubei North project is to provide water for urban and rural life, industry and agriculture in the eastern Tang region, and improve the water conditions for agricultural irrigation and ecological environment in the water receiving area. With the Danjiangkou Reservoir as the water source and the Qingquangou water diversion tunnel entrance as the starting point, the trunk line crosses the Hubei North hills from northwest to southeast and ends at the Wangjiachong Reservoir near Dawu County. The average annual water diversion volume of the project in the design level year (2035) is 794 million m 3 The project’s water receiving area involves Xiangyang City’s Xiangzhou District, Zaoyang City, Yicheng City, Suizhou City’s Sui County, Zengdu District, Guangshui City, Xiaogan City’s Dawu County, Xiaochang County, Anlu City, Yunmeng County, Xiaonan District, a total of 3 cities and 11 counties (cities, districts), with a total area of ​​13,500 km 2 .

[0061] In this embodiment, the following steps are mainly included:

[0062] Step 1. Survey on water supply and consumption by industry in the receiving area;

[0063] Collect the results of the water resource allocation plan for the receiving area in the feasibility study report of the second phase of the northern Hubei project, and determine the water supply and consumption of different industries in the receiving area, such as urban life, rural life, industrial production, and agricultural irrigation, in the current base year and the design level year after the implementation of the water diversion project.

[0064] Table 1 Evaluation scope of design level year and current benchmark year under multi-year average conditions Water supply and consumption Unit: 10,000 m 3

[0065]

[0066] Step 2. Survey of water consumption levels and wastewater treatment facilities by industry in the water receiving area

[0067] 1) Statistics on water consumption by industry

[0068] According to the 2018 or 2019 water resources bulletins of Xiangyang City, Suizhou City and Xiaogan City, the water supply and consumption of each administrative district in the water receiving area are counted, and the water consumption rates of residents' lives, industrial production, agricultural irrigation and other industries in each administrative district are calculated as the calculation parameters for production and living water consumption and drainage in each administrative district in the water receiving area in the design level year after the implementation of the project.

[0069] Table 2 Statistics of water supply and water consumption in each administrative area of ​​the water receiving area in the current base year Water volume: billion m 3 Water consumption rate:%

[0070]

[0071] 2) Inlet and outlet concentrations of sewage treatment facilities

[0072] According to the National List of Centralized Sewage Treatment Facilities, the names, treatment scales and treatment standards of sewage treatment facilities within the receiving area are sorted out; according to the Urban Drainage Statistical Yearbook, the inlet and outlet concentrations of sewage treatment facilities are counted. According to statistics, under the current conditions, the design treatment scale of urban sewage treatment plants in the receiving areas of Xiangyang City, Suizhou City and Xiaogan City reached 308,400 t / d, 247,400 t / d and 265,200 t / d respectively, and the sewage discharge standards mainly implemented the Level A standard of "Pollutant Discharge Standard for Urban Sewage Treatment Plants" (GB18918-2002); the inlet concentrations of COD, ammonia nitrogen and total phosphorus of sewage treatment plants in various counties and cities were between 70.22~235.52 mg / L, 13.12~26.75 mg / L and 1.21~5.43 mg / L respectively, and the effluent concentrations of COD, ammonia nitrogen and total phosphorus were between 20.00~28.30 mg / L, 0.20~2.80 mg / L and 0.22~0.60 mg / L respectively.

[0073] Table 3 Statistical data of inlet and outlet water concentrations of sewage treatment plants in the receiving area in the current base year Unit: mg / L

[0074]

[0075] 3) Collection and treatment rates of urban domestic and industrial wastewater

[0076] Taking into account economic and social development and the improvement of pollution control level, after the implementation of the Phase II project in northern Hubei, the urban domestic sewage collection rate in various cities in the water-receiving area will be between 90% and 95%, the industrial wastewater collection rate will be between 95% and 100%, and the sewage treatment rate will be between 95% and 100%.

[0077] Table 4 Collection and treatment rates of urban domestic and industrial wastewater in the receiving area in the current base year

[0078]

[0079] Table 5 Collection and treatment rates of urban domestic and industrial wastewater in the receiving area in the design level year after the project is implemented

[0080]

[0081] Step 3. Prediction of wastewater discharge into the river in the receiving area

[0082] 1) Forecast of wastewater discharge

[0083] Based on the water supply results of different industries such as urban life, rural life, industrial production, agricultural irrigation, etc. in the receiving area, the wastewater discharge of different industries is calculated according to the wastewater water consumption rate (Table 2), see Table 6.

[0084] Table 6 Prediction of wastewater discharge in different levels in the receiving area Unit: 10,000 m3

[0085]

[0086] 2) Wastewater inflow coefficient

[0087] Wastewater inflow coefficient l i It is related to many factors, such as the degree of sewage collection, drainage channel leakage and evaporation conditions; according to the characteristics of water flow, the coefficient of wastewater entering the river l i It can be expressed as follows:

[0088]

[0089] In the formula, x i The difficulty of wastewater confluence; ϛ i It is the degree of flow retention of wastewater; d i The leakage rate of pipeline networks (channels) by industry; f i is the regional evaporation loss rate; t i is the water reuse rate; ϕ i It is the adjustment coefficient for waste water entering the river by industry.

[0090] Based on the construction of urban domestic pipelines in the receiving area, the regional natural geographical profile (topography) and hydrological and meteorological conditions, and in accordance with the planning objectives and requirements of the regional urban sewage treatment quality improvement and efficiency enhancement action plan and the urban sewage treatment and recycling facility construction plan, the design level annual wastewater inflow into the river coefficient is determined (Table 7).

[0091] Table 7 Wastewater inflow coefficients of different industries in different years in the receiving area

[0092]

[0093] 3) Amount of wastewater entering the river

[0094] Considering the planned targets for sewage collection rates in each administrative district of the receiving area (Table 5), the amount of wastewater entering the river from different industries was calculated (Table 8).

[0095] Table 8 Prediction of annual wastewater inflow into rivers at different levels in the receiving area Unit: 10,000 m 3

[0096]

[0097] Step 4. Prediction and analysis of the amount of major pollutants entering the river in the receiving area

[0098] Based on the current influent concentration and effluent concentration of centralized sewage treatment facilities in each administrative district of the receiving area, the concentration of major pollutants entering the river from different industries in the receiving area is determined.

[0099] ① Pollutant concentration entering the river

[0100] ——Concentration of wastewater discharged from sewage treatment plants into rivers

[0101] The design annual concentration of urban domestic and industrial pollutants for the Phase II project in northern Hubei is based on the requirements of the "Action Plan for Water Pollution Prevention and Control": the pollution emission standards of new, modified and expanded sewage treatment plants should meet the Level A standard of the "Pollutant Emission Standards for Urban Sewage Treatment Plants", that is, the emission concentration limits of COD, ammonia nitrogen and total phosphorus are 50mg / L, 5mg / L and 0.5mg / L respectively.

[0102] On the basis of determining the pollutant emission concentration limit, the annual pollutant emission concentration of urban domestic and industrial wastewater is compared with the current level. For cities and prefectures where the emission concentration is lower than the local emission concentration limit target, the annual pollutant emission concentration in the design level shall remain the same; for cities and prefectures where the emission concentration is higher than the local emission concentration limit target, the annual pollutant emission concentration in the design level shall not be higher than the emission concentration limit target.

[0103] ——Concentration of wastewater entering the river without being treated by the sewage treatment plant

[0104] Due to the restrictions of sewage collection, sewage treatment scale and sewage priority level, there may be direct discharge in the region. In such cases, the concentration of urban domestic, industrial production and rural domestic wastewater entering the river is determined by referring to the influent water quality of urban sewage treatment plants. According to the current level of sewage treatment plant survey data, the inlet concentrations of COD, ammonia nitrogen and total phosphorus of sewage treatment plants in various counties and cities are between 70.22~235.52mg / L, 13.12~26.75mg / L and 1.21~5.43mg / L respectively.

[0105] According to the second national pollution source census and the water quality monitoring data of agricultural irrigation areas by the environmental monitoring station, the COD, ammonia nitrogen and total phosphorus concentrations of irrigation discharge water in Suizhou City were 38.3 mg / L, 1.79 mg / L and 0.60 mg / L respectively; the COD, ammonia nitrogen and total phosphorus concentrations of irrigation discharge water in Xiaogan City were 26.9 mg / L, 1.2 mg / L and 0.67 mg / L respectively; the COD, ammonia nitrogen and total phosphorus concentrations of irrigation discharge water in Xiangyang City were 44.4 mg / L, 1.56 mg / L and 0.87 mg / L respectively.

[0106] ②Amount of pollutants entering the river

[0107] Based on the amount of wastewater entering the river (Table 8) and the concentration of wastewater entering the river from different industries, the amount of major pollutants entering the river is calculated (Table 9~Table 10).

[0108] Based on the results of the second national pollution source census and combined with the water resources bulletins of various cities, the survey unit was taken as the county (city, district), and the amount of major pollutants entering the river in each administrative area and each industry in the water receiving area in the current base year was investigated and analyzed (Table 11).

[0109] By comparing the results of the current base year pollutant inflow survey with the results of the pollutant inflow calculation, the rationality of the pollutant prediction method is analyzed. According to statistics, the relative error between the current base year pollutant inflow survey results and the pollutant inflow calculation results of each administrative region is mainly between 0.6% and 29.9%, which meets the requirements for pollutant prediction accuracy.

[0110] Step 5. Determine the reduction targets for major pollutants in the water receiving area

[0111] The amount of major pollutants entering the river in the current base year and the design level year after the project is implemented in each administrative district of the water receiving area is compared. When the amount of major pollutants entering the river in the design level year is greater than the current base year, the difference between the design level year and the current base year is determined as the reduction target of pollutants entering the river in the water receiving area of ​​the water diversion project in accordance with the principle of "increasing water without increasing pollution". Based on the above principles, the reduction targets of major pollutants in each administrative district of the water receiving area are determined as shown in Table 12.

[0112] This embodiment adopts the pollutant prediction method and system for the water diversion project receiving area described in the present invention to predict the amount of waste water and major pollutants entering the river in the water receiving area of ​​the Hubei North Phase II project. By calculating the waste water discharge of different industries and determining the pollutant emission concentration of waste water from different industries, the amount of pollutants entering the river from different industries is determined in combination with the waste water inflow coefficients of different industries, and a direct connection between the amount of waste water entering the river and the amount of pollutants entering the river is established.

[0113] Table 9 Calculation results of the amount of major pollutants entering the river in the receiving area in the current base year Unit: t / a

[0114]

[0115] Table 10 Prediction results of the amount of main pollutants entering the river after the implementation of the second phase of the project in northern Hubei in the design level year Unit: t / a

[0116]

[0117] Table 11 Survey results of the amount of major pollutants entering the river in the water receiving areas in the current base year Unit: t / a

[0118]

[0119] Note: Dongjin New District is not an administrative division and is therefore not listed separately.

[0120] Table 12 Current Base Year Major Pollutant Reduction Targets in the Water Receiving Areas and Administrative Regions Unit: t / a

[0121]

[0122] Note: Dongjin New District is not an administrative division and is therefore not listed separately.

[0123] Example 2

[0124] This embodiment provides a pollutant prediction system for a water receiving area of ​​a water diversion project, including:

[0125] Module 1. It is used to determine the water supply and consumption of different industries in the receiving area in the current base year and the design level year after the implementation of the water diversion project;

[0126] Module 2. It is used to calculate the water consumption rate of different industries in each administrative district according to the statistical data of water supply and consumption in each administrative district of the water receiving area; sort out the sewage treatment scale and capacity of the water receiving area in the current base year, the influent concentration and effluent concentration of the sewage treatment facilities, and determine the sewage collection rate, treatment rate and sewage discharge concentration of the water receiving area in the design level year;

[0127] Module 3. It is used to calculate the wastewater discharge of different industries based on the water consumption results of different industries in the water receiving area according to the water consumption rate; considering the sewage collection level of each administrative district in the water receiving area, the leakage of drainage channels and the evaporation loss characteristics, determine the wastewater inflow coefficient of different industries, and use it to calculate the wastewater inflow into the river in the current base year and the design level year after the project is implemented;

[0128] Module 4. It is used to combine the current influent concentration, effluent concentration and planning and control requirements of centralized sewage treatment facilities in each administrative area of ​​the water receiving area, predict and analyze the concentration of pollutants entering the river in different industries in the water receiving area, and calculate the amount of major pollutants entering the river based on the current base year and the design level year after the project is implemented. The survey results of pollutant inflows in the current base year of each administrative area in the water receiving area are collected, and the rationality of the pollutant prediction method and results are analyzed by comparing them with the calculation results of pollutant inflows in the current base year. When the deviation value is greater than the set threshold, it should return to Module 2 to check and adjust the calculation parameters of the inflow coefficient until it is reasonable; keep the adjusted parameters unchanged, and re-predict the inflow coefficient and inflow of major pollutants in the design level year;

[0129] Module 5. It is used to compare the amount of major pollutants entering the river in the current base year and the design level year after the implementation of the project in each administrative district of the receiving area. When the amount of major pollutants entering the river in the design level year is greater than that in the current base year, in accordance with the principle of increasing water without increasing pollution, the difference between the amount of pollutants entering the river in the design level year and the current base year is determined as the pollutant inflow reduction target for the receiving area of ​​the water diversion project.

Claims

1. A method for predicting pollutants in the receiving area of ​​a water diversion project. It is characterized in that The steps include: Step 1. Collect the water supply and consumption of different industries in each administrative district of the receiving area in the current base year and the design level year after the implementation of the water diversion project; Step 2. Calculate the water consumption rate of different industries in each administrative district of the water receiving area based on the statistical data of water supply and consumption of different industries in each administrative district of the water receiving area; sort out the sewage treatment scale and capacity of each administrative district in the water receiving area in the current base year, the influent concentration and effluent concentration of sewage treatment facilities, and determine the sewage collection rate, treatment rate and sewage discharge concentration of each administrative district in the water receiving area in the design level year; Step 3. Based on the water supply and water consumption results of different industries in each administrative district of the water receiving area, calculate the wastewater discharge of different industries in each administrative district of the water receiving area according to the water consumption rate of different industries in each administrative district of the water receiving area; considering the sewage collection level, drainage channel leakage and evaporation loss characteristics of each administrative district of the water receiving area, determine the wastewater inflow coefficient of different industries in each administrative district of the water receiving area, and use it to calculate the wastewater inflow into the river of different industries in each administrative district of the water receiving area in the current base year and the design level year after the project is implemented; The calculation formula for the amount of wastewater entering the river from different industries in each administrative district of the receiving area is as follows: Where W represents the sum of wastewater entering the river from different industries in each administrative area of ​​the receiving area, m 3 ; W i Indicates the amount of wastewater entering the river from different industries in each administrative area of ​​the receiving area, m 3 ; i takes the value of 1, 2, 3 or 4, representing urban life, rural life, industrial production or agricultural irrigation industry respectively; Q i It indicates the water supply of different industries in each administrative area of ​​the water receiving area; η i represents the water consumption rate of different industries in each administrative area of ​​the water receiving area; σ i is the wastewater collection rate of different industries in each administrative district of the water receiving area; i It indicates the coefficient of waste water entering the river from different industries in each administrative area of ​​the receiving area; According to the water flow characteristics, the wastewater inflow coefficients of different industries in each administrative area of ​​the receiving area are i It is expressed as follows: In the formula, ξ i It is the difficulty of wastewater confluence, which is used to describe the possibility of wastewater entering the water flow channel, and its value range is between 0 and 1; The flow retention degree of wastewater is used to describe the degree of obstruction of wastewater in channels or pipes, and its value range is between 0 and 1; i The leakage rate of pipelines or channels in different industries in each administrative area of ​​the water receiving area; is the regional evaporation loss rate; τ i is the water reuse rate; φ i It is the adjustment coefficient of waste water entering the river from different industries in each administrative area of ​​the receiving area; Pipeline network or channel leakage rate δ i According to industry differences, it is divided into channel leakage rate and pipeline leakage rate; The channel leakage rate is expressed as: Where A is the amount of irrigation water discharged from farmland, m 3 ; L is the total length of the channel, km; a, b, c are coefficients; d is the channel lining rate; The pipeline leakage rate is expressed as: In the formula, Q n is the allowable water seepage of the pipeline, m 3 / (km·h); L is the total length of the pipe network, km; T is the statistical time, calculated as 1 year; B is the total amount of water entering the sewage pipes of different industries in each administrative district of the water receiving area, m 3 ; f is the pipeline leakage rate adjustment parameter; Q n Affected by the pipe diameter and pipe material, it can be expressed as: Where, K is the pipe water seepage coefficient; d is the inner diameter of the pipe, mm; Regional evaporation loss rate It is expressed as: Where w and t are the annual average wind speed (m 3 / s) and water temperature (℃); w 0 and t 0 The reference wind speed (m 3 / s) and reference water temperature (℃); x, y and n are empirical constants; g is the regional evaporation loss rate adjustment parameter; Step 4. Combined with the current influent concentration and effluent concentration of centralized sewage treatment facilities in each administrative district of the water receiving area, the concentration of pollutants entering the river in different industries in each administrative district of the water receiving area is predicted and analyzed, and the amount of wastewater entering the river in the current base year and the design level year after the project is implemented is calculated; the survey results of pollutants entering the river in the current base year of each administrative district of the water receiving area are collected, and the rationality of the pollutant prediction method and results is analyzed by comparing with the calculation results of pollutants entering the river in the current base year and calculating the deviation value. When the deviation value is greater than the set threshold, it should return to step 2 to check and adjust the calculation parameters of the inflow coefficient until it is reasonable; keep the adjusted parameters unchanged, and re-predict the inflow coefficient and inflow amount of major pollutants in the design level year; The formula for calculating the amount of pollutants entering the river from different industries in each administrative area of ​​the receiving area is as follows: Where M represents the sum of the same pollutant entering the river from different industries in each administrative area of ​​the receiving area, g; M i It represents the amount of the same pollutant entering the river from different industries in each administrative area of ​​the receiving area, g; χ i Sewage treatment rate of urban sewage treatment facilities; C af is the pollutant concentration in the effluent from urban sewage treatment facilities, mg / L; C be is the pollutant concentration in the influent of urban sewage treatment facilities, mg / L; C ir is the concentration of pollutants entering the river from agricultural irrigation wastewater, mg / L; Step 5. Compare the amount of major pollutants entering the river in the current base year and the design level year after the implementation of the project in each administrative district of the receiving area. When the amount of major pollutants entering the river in the design level year is greater than that in the current base year, in accordance with the principle of increasing water without increasing pollution, the difference between the amount of pollutants entering the river in the design level year and the current base year shall be determined as the pollutant inflow reduction target for the receiving area of ​​the water diversion project.

2. According to the method for predicting pollutants in the receiving area of ​​a water diversion project according to claim 1, Features: In step 1, the specific method for investigating water supply and use in the receiving area is: Collect the results of scale demonstration of water diversion and regulation projects, and determine the water supply and use of different industries in each administrative district of the receiving area in the current base year and the design level year after the implementation of the water diversion and regulation project; the different industries include urban life, rural life, industrial production, and agricultural irrigation industries.

3. According to the method for predicting pollutants in the receiving area of ​​a water diversion project as described in claim 1, Features: In step 2, the water consumption rate of different industries in each administrative area of ​​the water receiving area is calculated as follows: the i =H i / Q i Where i is 1, 2, 3 or 4, representing urban life, rural life, industrial production or agricultural irrigation industry respectively; H i Indicates the water consumption of different industries in each administrative area of ​​the water receiving area, m 3 ;Q i Indicates the water supply of different industries in each administrative area of ​​the water receiving area, m 3 .

4. According to the method for predicting pollutants in the receiving area of ​​a water diversion project as described in claim 1, Features: In step 4, when the relative error between the calculation results of the current base year pollutant inflow into the river in each administrative district of the receiving area and its survey results is within 30%, it is considered that the value of the river inflow coefficient in the process of calculating the pollutant inflow into the river is reasonable. Otherwise, the relevant parameters of the river inflow coefficient of different industries should be adjusted, and the calculation should be recalculated based on the adjusted parameters until they are reasonable; keep the adjusted parameters unchanged, and re-predict the river inflow coefficient and inflow amount of major pollutants in the design level year.

5. A pollutant prediction system for water receiving areas of water diversion projects, It is characterized in that include: Module 1. It is used to determine the water supply and consumption of different industries in each administrative area of ​​the receiving area in the current base year and the design level year after the implementation of the water diversion project; Module 2. It is used to calculate the water consumption rate of different industries in each administrative district according to the statistical data of water supply and consumption of different industries in each administrative district of the water receiving area; sort out the sewage treatment scale and capacity of the current base year of each administrative district in the water receiving area, the influent concentration and effluent concentration of sewage treatment facilities, and determine the sewage collection rate, treatment rate and sewage discharge concentration of each administrative district in the water receiving area in the design level year; Module 3. It is used to calculate the wastewater discharge of different industries based on the water consumption results of different industries in each administrative district of the water receiving area according to the water consumption rate; considering the sewage collection level, drainage channel leakage and evaporation loss characteristics of each administrative district of the water receiving area, determine the wastewater inflow coefficient of different industries, and use it to calculate the wastewater inflow of different industries in each administrative district of the water receiving area in the current base year and the design level year after the implementation of the project; Module 4. It is used to combine the current influent concentration and effluent concentration of centralized sewage treatment facilities in each administrative district of the water receiving area, predict and analyze the concentration of pollutants entering the river in different industries in each administrative district of the water receiving area, and calculate the amount of major pollutants entering the river based on the current base year and the design level year after the project is implemented. The survey results of pollutant inflows in the current base year of each administrative district in the water receiving area are collected, and the rationality of the pollutant prediction method and results are analyzed by comparing them with the calculation results of pollutant inflows in the current base year. When the deviation value is greater than the set threshold, it should return to module 2 for inspection and adjust the calculation parameters of the inflow coefficient until it is reasonable; Keep the adjusted parameters unchanged and re-predict the coefficients and amounts of major pollutants entering the river in the design level year; Module 5. It is used to compare the amount of major pollutants entering the river in the current base year and the design level year after the implementation of the project in each administrative area of ​​the water receiving area. When the amount of major pollutants entering the river in the design level year is greater than that in the current base year, the difference between the amount of pollutants entering the river in the design level year and the current base year is determined as the reduction target of pollutants entering the river in the water receiving area of ​​the water diversion project in accordance with the principle of increasing water but not increasing pollution; The pollutant prediction system for the receiving area of ​​a water diversion and regulation project is used to execute the steps in the pollutant prediction method for the receiving area of ​​a water diversion and regulation project described in any one of claims 1-4.