Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

456results about How to "Ensure coordination" patented technology

Intelligent production management method and system for pharmaceutical workshop

The invention discloses an intelligent production management method and system for a pharmaceutical workshop, and relates to the technical field of pharmaceutical production, and the system achieves the intelligent optimization of a production plan, material flow and inventory management through three core modules. The production plan intelligent scheduling module dynamically adjusts the production plan by calculating a first scheduling coefficient Ddxs1 and a second scheduling coefficient Ddxs2; the material flow and equipment state association module monitors the supply speed, the circulation path and the equipment state in real time, so that coordination and consistency of material flow and equipment operation are ensured, and the production efficiency is optimized; the inventory early warning and supplement mechanism module dynamically monitors the inventory state by calculating the first inventory coefficient Kcxs1 and the second inventory coefficient Kcxs2, and timely adjusts the strategy when the inventory is insufficient or overstocked, thereby ensuring the production stability and the rationality of the inventory structure, and improving the refinement level of inventory management.
Owner:NANTONG HENGLUNTONG TECHNOLOGY CO LTD

Power grid fault emergency rescue method

The invention relates to the technical field of power grid fault repair, in particular to a power grid fault emergency rescue method. The method comprises the following steps: acquiring topological structure data, key equipment parameters and real-time operation state data of a power grid; constructing a power grid digital twin model according to the power grid topological structure data, the key equipment parameters and the real-time operation state data, and performing real-time state evaluation to obtain fault risk early warning data and real-time fault condition data; when the real-time fault condition data shows that a fault occurs, performing fault point positioning and fault type determination based on deep learning according to the fault risk early warning data and the real-time operation state data to obtain fault diagnosis data; and constructing a fault influence range model according to the fault diagnosis data and a preset FACTS and HVDC characteristic model. According to the method, deep learning, a graph theory and a multi-objective optimization technology are fused, and intelligent fault identification, influence range modeling and accurate emergency disposal scheme optimization are realized.
Owner:STATE GRID BEIJING ELECTRIC POWER CO +1

Centralized intelligent control method and system for air purifier

The invention relates to the technical field of air purification control, in particular to a centralized intelligent control method and system for an air purifier. The method comprises the following steps that an air pollutant concentration monitor and a temperature and humidity sensor are installed and deployed, and air quality data are collected in real time, so that pollutant concentration real-time data and temperature and humidity real-time data of the area where each air purifier is located are obtained; time sequence synchronization processing and pollutant distribution trend correction analysis are carried out on the corresponding pollutant concentration real-time data and the corresponding temperature and humidity real-time data, air pollution degree evaluation calculation and priority purification area screening processing are carried out, and a serious pollution priority purification area is obtained; and acquiring a pollutant distribution change trend corresponding to the seriously polluted preferential purification area, performing centralized intelligent control treatment, and generating a centralized intelligent control strategy of the preferential purification area so as to execute corresponding centralized purification control work. According to the invention, comprehensive purification control management of all air purifiers can be realized.
Owner:HUNAN KUINIU E-COMMERCE CO LTD

Editable condition printing image generation method

The invention discloses an editable condition printing image generation method, and belongs to the field of image generation. The method comprises the following steps: constructing a printing image generation model, and training the model to obtain a generation model with editable conditions; and generating a printing design image meeting the condition requirements by using the model. According to the method, different advanced features of each element of the printed plane image are extracted through downsampling, element and style information in the printed plane image is captured through multi-scale feature extraction and information exchange, then hidden space vectors corresponding to different printed plane image features are analyzed, fusion of specific styles is achieved in the hidden space, and the image quality is improved. And the decoding of the printing design image is realized through the decoder, the decoupling of the element information is realized, the personalized design and diversified requirements can be met, and the expansibility is realized.
Owner:JIANGNAN UNIV

Door body device and refrigeration equipment

The invention relates to the technical field of refrigeration equipment, and provides a door body device and refrigeration equipment, and the door body device comprises a box door, a cabinet door, a sliding door mechanism and a guide rail. The box door is rotationally connected to the box body; the cabinet door is slidably arranged on the outer side of the box door; the sliding door mechanism comprises a traction assembly and a sliding door assembly, the sliding door assembly comprises a winding assembly, a sliding piece and a rope assembly, the winding assembly comprises a wire spool and a reversing wheel, the rope assembly comprises a first rope and a second rope, and the traction assembly is configured to drive the wire spool to rotate in the opening or closing process of the box door; the guide rail is arranged on the box door, the sliding piece is movably arranged on the guide rail, and the sliding piece is connected with the box door. After the door body device is installed on a box body of the refrigeration equipment, in the condition that the refrigeration equipment and a cabinet are placed in an embedded mode, interference between a cabinet door and the cabinet can be avoided in the process of opening the box door under the condition that coordination and attractiveness are guaranteed and the use experience of a user is not affected.
Owner:TOSHIBA HA MANUFACTURING (NANHAI) CO LTD

Construction land scale prediction method based on territorial space planning

The invention relates to the technical field of territorial space planning, in particular to a construction land scale prediction method based on territorial space planning. The method comprises the following steps: acquiring historical construction land data, regional economic index data and control line space data of different regions; performing potential development turning point identification according to historical construction land data and regional economic index data, and performing stage trend analysis to obtain dynamic stage trend data; multi-scene prediction is carried out according to the dynamic stage trend data, so that multi-scene prediction data are obtained, and multiple scenes comprise a reference scene, a transformation scene and an innovation scene; and constructing an industry-land demand sensitivity analysis model according to the regional economic index data and the historical construction land data. According to the method, through development turning point identification and stage trend analysis, the dynamic characteristics of construction land change can be better grasped.
Owner:JIANGSU YINWULICHENG TECHNOLOGY CO LTD

Charging pile construction planning method and system based on artificial intelligence

The invention relates to the technical field of artificial intelligence, in particular to a charging pile construction planning method and system based on artificial intelligence. The method comprises the following steps: acquiring existing power infrastructure data and multi-source heterogeneous data, wherein the multi-source heterogeneous data comprises traffic data, geographic data, vehicle data and charging behavior data; performing time sequence feature extraction on the multi-source heterogeneous data, and performing cross-time scale fusion on different data source features by using a preset hierarchical attention network model to obtain factor weight data; and constructing a long-term charging demand prediction model through a sequence-to-sequence model according to the factor weight data and the multi-source heterogeneous data. According to the site selection method based on the risk minimum set coverage problem, initial site selection scheme data is generated by combining multi-objective optimization of the coverage rate, the service radius and the accessibility, and more scientific charging pile layout is achieved.
Owner:北京首兴安成电力工程有限公司

Reservoir group scheduling interval multi-objective optimization method under uncertain condition

The invention discloses a reservoir group scheduling interval multi-target optimization method under an uncertain condition, and belongs to the technical field of reservoir optimization scheduling. The method comprises the following steps: firstly, establishing an innovative cascade reservoir group interval multi-target scheduling model; secondly, providing a double-population dynamic coordination interval optimization method for solving the interval multi-target scheduling model, and further obtaining an optimal scheduling scheme of the reservoir group; and finally, outputting an optimal scheduling scheme set of the reservoir group. According to the optimization method, through organic combination of a chaos-order mapping initialization strategy, a dynamic adaptive mutual promotion updating strategy and an elite guidance optimization strategy, optimization is rapidly and efficiently carried out to obtain a group of reliable and accurate scheduling scheme sets considering runoff uncertainty; an effective decision-making technical means for solving the cascade reservoir group optimization multi-target complex engineering problem is provided for a scheduling decision maker, the intelligent level and comprehensive benefits of water resource management are improved, and the capacity of a water resource system for coping with complex environments and uncertain factors is further enhanced.
Owner:HOHAI UNIV

Character animation generation method and device based on voice driving, equipment and medium

The embodiment of the invention provides a character animation generation method and device based on voice driving, equipment and a medium, and belongs to the technical field of financial science and technology. The method comprises the following steps: acquiring an audio signal input by a user, a target human portrait picture and a target scene reference video; encoding the audio signal to obtain an audio code; generating a three-dimensional face model motion coefficient according to the portrait picture of the target person and the audio code; extracting blink information and head posture information from the target scene reference video; correcting the motion coefficient of the three-dimensional face model according to the blinking information and the head posture information to obtain a corrected motion coefficient of the three-dimensional face model; and taking a three-dimensional deformable head model as a potential vector, mapping the three-dimensional deformable head model to the corrected three-dimensional face model motion coefficient frame by frame, converting the three-dimensional face model motion coefficient into a video frame, and generating a head speech video of the target person. According to the embodiment of the invention, the quality and reality of character animation generation driven by voice can be improved.
Owner:PING AN TECH (SHENZHEN) CO LTD

Cluster unmanned aerial vehicle control method based on cloud side-end architecture

The invention relates to the technical field of unmanned aerial vehicle control, and provides a cluster unmanned aerial vehicle control method based on a cloud side-end architecture, which comprises the following steps of: determining a general task framework, a global edge node and a local edge node through a cloud platform, and dividing an operation area into a plurality of sub-areas; a general task framework is divided into sub-task modules corresponding to sub-regions through global edge nodes, and the sub-task modules are refined through local edge nodes to obtain a to-be-executed instruction, so that hierarchical cooperative control of a terminal unmanned aerial vehicle is realized, a single-point bottleneck of centralized control is broken through, and centralized processing of data is avoided; edge computing nodes are dynamically adjusted to prevent node abnormity from influencing task proceeding, then terminal unmanned aerial vehicles in a sub-region range are dynamically and locally scheduled to ensure coordination of task completion, and a terminal unmanned aerial vehicle cluster is dynamically and globally scheduled to realize macroscopic resource allocation of the terminal unmanned aerial vehicles; the terminal unmanned aerial vehicle collects and uploads task execution data, and a reliable data basis is provided for scheduling of the terminal unmanned aerial vehicle.
Owner:CHENGDU LINGCHUAN SPECIAL IND

Unmanned aerial vehicle cluster cooperative combat method and system

The invention discloses an unmanned aerial vehicle cluster cooperative combat method and system, and relates to the technical field of unmanned aerial vehicles. The method specifically comprises the steps that a plurality of unmanned aerial vehicles establish an unmanned aerial vehicle cluster, initialization is carried out through a preset communication protocol, and a communication network in the unmanned aerial vehicle cluster is established; allocating tasks to each unmanned aerial vehicle by using a task allocation algorithm based on artificial intelligence; a distributed path planning algorithm is adopted to plan an optimal flight path for each unmanned aerial vehicle, collision is avoided, and task execution efficiency is optimized; executing a task by applying a collaborative mechanism, and dynamically adjusting a self flight path and a task execution strategy to realize collaborative combat; and learning is carried out through real-time data and historical data, the cooperative combat strategy of the unmanned aerial vehicle cluster is optimized, and the capability of coping with a complex environment is improved. According to the method, intelligent distribution, path planning and communication coordination technologies are utilized, the combat effect of the unmanned aerial vehicle cluster is optimized, and the method has real-time performance, adaptability and high efficiency and can effectively deal with various challenges in a complex battlefield environment.
Owner:CHINESE PEOPLES LIBERATION ARMY UNIT 73106

Method for quickly building new energy automobile factory building

The invention provides a method for rapidly building a new energy automobile plant, and relates to the technical field of construction engineering management, and the method comprises the steps: obtaining scanning point cloud data generated after a three-dimensional laser scanner carries out the actual measurement of a to-be-built plant site, and obtaining a BIM design model of the to-be-built plant in a BIM model library; matching the scanning point cloud data with the BIM design model, and generating a three-dimensional actual measurement model of the to-be-built plant; according to the three-dimensional actual measurement model, the BIM design model is optimized, and a target BIM design model is generated; and according to the target BIM design model, generating a construction plan of each construction work type, and according to the construction plan of each construction work type, carrying out resource allocation on each construction work type. The method has the technical effects that the situation that design changes frequently occur in the construction process of the BIM model is avoided, and therefore the construction progress is accelerated.
Owner:ZHEJIANG TIANYUN ARCHITECTURAL DESIGN CO LTD

Virtual character efficient generation system based on multi-modal large model

The invention discloses an efficient virtual role generation system based on a multi-modal large model. The system comprises the following steps that S1, a user inputs preliminary description of a role through an interactive interface; s2, the preliminary description input by the user is analyzed through GTP-4, detailed role description is generated, and the role description comprises appearance features, costume styles, postures, expressions and background scenes of roles; s3, analyzing, optimizing and combining the role description generated by the GPT-4 through an automatic processing module, and converting the role description into an input format of a Stable Diffusion model; s4, generating a role image on the basis of a Stable Diffusion model; s5, providing a user evaluation feedback interface, and commenting and feeding back the generated role image by the user through the evaluation feedback interface; and S6, through a feedback optimization system, analyzing comments and feedback of the user, and adjusting and improving a generation process. According to the method, the GPT-4 model and the Stable Diffusion model are combined, and the automatic processing module is designed, so that the high-quality personalized role image is generated.
Owner:TUOYUAN (GUANGZHOU) SMART TECH CO LTD

High-speed high-precision multi-axis parallel control system for electromechanical servo

The invention discloses a high-speed high-precision multi-axis parallel control system for electromechanical servo, particularly relates to the field of multi-axis parallel control systems, and is used for solving the problem of asynchronous feedback gain mismatching in the multi-axis parallel control system by integrating four core units, namely a feedback monitoring unit, a coupling analysis unit, a gain adjustment unit and a priority distribution unit. Firstly, synchronism of feedback data of each axis is monitored in real time, and potential synchronization problems are identified and quantified in time. Then, an accurate gain mismatch early warning index is generated through coupling analysis, a system is guided to conduct self-adaptive dynamic gain adjustment, and it is ensured that gain parameters are highly matched with the actual operation state of each shaft. And finally, the coordination and high-efficiency operation of the multi-axis system in a complex dynamic environment is realized by optimizing the distribution of control priorities. According to the method, the stability, the response speed and the resource utilization efficiency of the multi-axis cooperative control system are remarkably improved, and the reliability and the precision of the system under variable operation conditions are ensured.
Owner:GUANGDONG NEW ENG EDUCATION EQUIP TECH CO LTD

Assembling process method for airplane pulse type final assembly production line

The invention discloses an aircraft pulse type general assembly production line assembly process method, and relates to the technical field of large production line assembly. The aircraft pulse type general assembly production line assembly process method comprises the steps of determining an aircraft general assembly production line assembly task and the required yield, planning the aircraft pulse type production line layout and process, reasonably dividing system assembly process separation surfaces in all stations, designing detailed assembly process flows in all the stations, and measuring and calculating station assembly periods. Establishing an aircraft final assembly pulse type production line, and verifying and improving the aircraft final assembly production line. According to the aircraft pulse type general assembly production line assembly process method, the whole process from task determination to production line verification implementation is systematically planned in detail, the assembly period is shortened by reasonably planning the general assembly production line assembly process flow and resource allocation, the aircraft general assembly efficiency is improved, and double improvement of the production efficiency and the product quality is ensured.
Owner:AVIC GENERAL HUANAN AIRCRAFT IND CO LTD

Integrated processing method and device for batch data and streaming data, equipment and medium

The invention relates to the technical field of data processing and the field of financial science and technology, and discloses an integrated processing method for batch data and streaming data, which comprises the following steps of: acquiring to-be-processed data from a data source, and configuring proper processing logic based on metadata information of the data, and applying the processing logic to a batch processing engine and a stream processing engine using an adaptation layer. Historical batch data is processed through a batch processing engine, real-time streaming data is processed through a streaming processing engine, and the historical batch data and the real-time streaming data generate respective processing results. And then, the two types of results are merged through an adaptation layer to generate a comprehensive data set, so that subsequent unified query and analysis are facilitated. According to the method and the system, integrated processing of batch data and streaming data is realized by establishing a unified framework. Through the adaptation layer, the data processing logic is respectively adapted to the batch processing engine and the stream processing engine for processing the data, so that the independent processing logic of two types of data through the same architecture is realized, and two sets of independent systems do not need to be maintained.
Owner:PING AN BANK CO LTD

Self-adaptive switching method and system of current transformer

The invention relates to the technical field of equipment control, in particular to a self-adaptive switching method and system of a current transformer. The method comprises the following steps: collecting primary side parameters and secondary side parameters of a current transformer to obtain primary side collection parameters of the current transformer and secondary side collection parameters of the current transformer; performing current transformer state segmentation initialization according to the current transformer primary side acquisition parameters and the current transformer secondary side acquisition parameters so as to generate a current transformer operation state classification result; switching result judgment is conducted on the current transformers according to the current transformer operation state classification result, and when the current transformer operation state classification result is a current transformer critical state section, parallel buffering is conducted on the current transformers, and critical current transformer switching data are generated. According to the invention, through accurate state classification, a dynamic switching mechanism, time sequence optimization and visual display, the switching sensitivity and stability of the current transformer are improved.
Owner:SHENZHEN RUIQIZHENG TECH CO LTD

Centralized intelligent control method and system for air purifier

The invention relates to the technical field of air purification control, in particular to a centralized intelligent control method and system for an air purifier. The method comprises the following steps that a preassembled filter screen assembly, a UV assembly and a wall control assembly are integrated in the air purifier; the running process of a filter screen on the filter screen assembly is monitored in real time through the filter screen assembly, and a real-time parameter set of the running process of the filter screen assembly is obtained; the illumination output intensity of a UV indicating lamp on a UV assembly is monitored in real time through the UV assembly, meanwhile, operation resistance accounting and assembly remaining service life estimation are conducted, the remaining service life of a filter screen assembly and the remaining service life of the UV assembly are obtained, visual display processing and centralized intelligent control processing are conducted, and a centralized intelligent control strategy of the system assembly is generated. Therefore, the centralized control work of the corresponding air purifier system components is executed. According to the invention, all components of the air purifier can be controlled and managed in a centralized manner.
Owner:SHENZHEN AIRGLE CORP LTD

Land space planning risk assessment method based on multi-dimensional analysis

The invention discloses a territorial space planning risk assessment method based on multi-dimensional analysis, relates to the technical field of Internet, and aims to obtain and pre-process data from different sources, ensure the consistency and reliability of the data, simulate city expansion, predict future expansion areas and trends, and combine ecological environment data to evaluate the risk of territorial space planning. According to the method, an ecological sensitive area is further marked, necessary space information is provided for subsequent risk assessment, in a multi-dimensional risk assessment model, a comprehensive risk assessment index ZR is obtained by comprehensively considering multiple aspects of biological habitats, ecological connectivity and water resource flow, the possible influence of urban expansion on the ecological environment is comprehensively reflected, and the risk assessment efficiency is improved. Through comparison with a preset risk assessment threshold value Zth, the risk level of urban expansion is effectively assessed, potential ecological crisis is found in time, the model is optimized through continuous verification and assessment, and sustainability of urban expansion and protection of the ecological environment are ensured.
Owner:CHENGDU XINHAI HANTU DIGITAL TECHNOLOGY CO LTD

Gene detection data cleaning method based on artificial intelligence

The invention relates to the technical field of biological information data processing, in particular to a gene detection data cleaning method based on artificial intelligence. The method comprises the following steps: acquiring an original gene detection data set; performing detection quality feature recognition on the original gene detection data set to obtain detection quality feature data; performing quality screening on the detection quality characteristic data to obtain detection quality screening data; denoising the original gene detection data set according to the detection quality screening data to obtain a preliminary gene detection data set; and performing high-throughput sequencing analysis on the preliminary gene detection data set to generate high-throughput sequencing data. Therefore, sequencing error correction, adaptive batch effect correction and redundant data intelligent elimination of the gene detection data are realized through a data analysis technology, an artificial intelligence technology and an adaptive correction technology, so that the cleaning effect of the gene detection data is better.
Owner:SHENZHEN RAPHA BIOTECHNOLOGY CO LTD

Tendon rope driven underwater dexterous hand

The invention discloses an underwater dexterous hand driven by a tendon rope, and relates to the technical field of underwater dexterous hands. In order to overcome the defects that in the prior art, an existing operation type underwater robot is single in grabbing mode and poor in flexibility, and the technical problem that a conventional underwater mechanical arm is difficult to conduct efficient, lossless and self-adaptive grabbing on underwater creatures, the technical scheme is that the tendon rope driven underwater dexterous hand is provided. Which comprises a palm, a thumb, an index finger, a middle finger, a ring finger and a little finger, and is characterized in that the index finger, the middle finger, the ring finger and the little finger comprise far knuckles, middle knuckles and near knuckles and simulate human knuckles; the thumb comprises near knuckles and far knuckles and simulates knuckles of human beings; the palm simulates the shape of a human palm and is respectively connected with the near knuckles of the thumb, the index finger, the middle finger, the ring finger and the little finger. The self-adaptive grabbing device is suitable for being applied to efficient and lossless self-adaptive grabbing work of underwater organisms through a mechanical arm.
Owner:HARBIN ENG UNIV

Door body device and refrigeration equipment

The invention relates to the technical field of refrigeration equipment, and provides a door body device and refrigeration equipment, the door body device comprises a box door, a cabinet door, a driven guide rail mechanism and a sliding door mechanism, the box door is rotationally connected to a box body through a hinge, and the box door is suitable for opening or closing a storage space of the box body; the driven guide rail mechanism is configured to be arranged between the box door and the cabinet door, and the driven guide rail mechanism is used for guiding the cabinet door to move relative to the box door; the sliding door mechanism comprises a traction assembly and a sliding door assembly which are connected, and the traction assembly is configured to drive the sliding door assembly to act in the opening or closing process of the box door so as to drive the cabinet door to move relative to the width direction of the box door. Therefore, when the box door rotates relative to the box body, the sliding door assembly can be driven by the traction assembly to enable the cabinet door to move relative to the box door, and therefore when the refrigeration equipment is placed in a cabinet in an embedded mode, the refrigeration equipment can be placed in the cabinet in an embedded mode under the condition that coordination and attractiveness are ensured and the use experience of a user is not affected. Interference between the cabinet door and the cabinet can be avoided.
Owner:HEFEI MIDEA REFRIGERATOR CO LTD +2

Automatic raw sheet feeding machine for glass processing

The invention relates to the technical field of raw glass sheet storage and transportation, and discloses an automatic raw sheet feeding machine for glass processing, the automatic raw sheet feeding machine comprises a mechanism main body, a driving mechanism and a lifting mechanism are separately mounted in the mechanism main body, and the driving mechanism comprises a left limiting block, a right limiting block and a lower gear; and the driving mechanism can drive the left limiting block, the right limiting block and the lower gear to rotate synchronously during working. According to the raw glass sheet storage device, raw glass sheets are lifted through the lifting clamping blocks, the raw glass sheets can be moved to the storage clamping blocks from the conveying mechanism when the lifting clamping blocks move up and down, the raw glass sheets can be driven to ascend by one storage clamping block when the lifting clamping blocks move each time, and each raw glass sheet is independently stored on the corresponding storage clamping block during storage; and in the conveying process, the raw glass sheets are independently conveyed in a horizontal mode all the time, and the raw glass sheets can be effectively prevented from colliding with one another or being damaged by touching other hard objects in the conveying or storing process.
Owner:江苏上玻玻璃有限公司

Data accurate matching analysis method based on machine learning

The invention discloses an accurate data matching analysis method based on machine learning, and relates to the technical field of data matching, and the method comprises the following specific steps: dividing data to be processed into a plurality of sub-data sets, dividing the size of each sub-data set according to the performance index and data characteristic of a computational node, and obtaining a data set; according to the method, the to-be-processed data is divided into a plurality of sub-data sets through a distributed parallel processing technology, the sub-data sets are distributed to a plurality of computing nodes for parallel processing, each computing node can independently process the sub-data set distributed to the computing node, and therefore the parallelism of computing resources is fully utilized, and the computing efficiency is improved. Compared with the prior art, the method has the advantages that the data processing efficiency and speed are remarkably improved, meanwhile, an optimized synchronization mechanism is adopted, coordination work among the computing nodes is ensured, the processing bottleneck caused by waiting or communication delay is avoided, and the overall processing performance is further improved.
Owner:SHIJIAZHUANG UNIVERSITY

Mechanical arm and simulation robot

The mechanical arm comprises a shoulder structure, an arm structure, a wrist structure and a palm structure, the shoulder structure, the arm structure, the wrist structure and the palm structure are sequentially connected, the wrist structure comprises an installation support assembly, a first rotation driving piece, a second rotation driving piece and a third rotation driving piece, and the installation support assembly is rotationally connected with the arm structure. The output end of the first rotary driving piece is in transmission connection with the mounting support assembly so as to drive the mounting support assembly to rotate around the axis of the mounting support assembly, and the second rotary driving piece and the third rotary driving piece are in transmission connection with the palm structure through the first connecting rod assembly and the second connecting rod assembly respectively so as to control movement of the palm structure; the first rotary driving piece, the second rotary driving piece and the third rotary driving piece are sequentially stacked from bottom to top in the vertical direction, the structure is compact, the space of the wrist structure in the vertical direction can be reduced, and therefore the space utilization rate of the wrist structure is increased, and the coordination of the whole structure is guaranteed.
Owner:LEJU (SHENZHEN) ROBOTICS TECH CO LTD

Autonomous moving control method and control system for heading machine

The invention belongs to the technical field of automatic moving control of heading machines, and particularly relates to an automatic moving control method and system of a heading machine. Comprising the following steps: S1, acquiring a current position coordinate (X1, Y1, alpha1) of the heading machine; s2, according to the real-time machine body coordinates (X, Y, alpha) of the heading machine, calculating the swinging times, position information and angle information of the heading machine when the heading machine swings to the target coordinates (Xn, Yn, alpha n); and S3, controlling the crawler action of the heading machine according to the calculation result. By integrating the positioning system, the display system, the control system and the execution system, the automatic moving of the heading machine is realized.
Owner:TAIYUAN INST OF CHINA COAL TECH & ENG GROUP +1

Dance formation self-organization control method based on robot group

The invention discloses a dance formation self-organization control method based on a robot group. The method comprises the following steps: S1, obtaining dynamic changes of light frequency, color and intensity through a spectrum camera; s2, judging an effective light source and an invalid light source, and removing the invalid light source to form a target light signal; s3, converting the optical signal into a digital signal through a photoelectric converter and a digital signal processor, and extracting the characteristics of the digital signal to form a characteristic instruction; s4, comparing the feature instruction with a predefined action matching database in real time, and outputting a robot action instruction; s5, analyzing the characteristics of the received digital signal, predicting an action instruction at the next moment, and generating the next action instruction in advance; s6, generating a robot action track by using a path planning algorithm; and S7, adopting a distributed control strategy, dynamically adjusting the motion track, and completing dance arrangement. According to the invention, dance arrangement of the robot group is controlled through light, and diversity of dance of the robot group is realized.
Owner:YANTAI ZODIAC NETWORK TECHNOLOGY CO LTD

Frame anchor rod or anchor cable forward design method and system based on BIM

The invention provides a BIM (Building Information Modeling)-based frame anchor rod or anchor cable forward design method and system. The method comprises the following steps: creating a slope BIM model; determining slope protection engineering design parameters according to project geological survey data and specification requirements; according to the slope protection engineering design parameters, inversely calculating a slope safety coefficient design value of each level, and carrying out normative analysis on the slope safety coefficient design value and a safety coefficient standard value in the design specifications; parameters of frame beams, steps and other ancillary facilities of each stage of slope are obtained, and a frame anchor rod or anchor cable design model of each stage of slope is created based on the slope BIM model; based on the BIM collaborative design management platform, multi-specialty examination is conducted on the frame anchor rod or anchor cable model, whether the model conflicts with other specialty models or not is checked, and model review, structural analysis and model optimization are conducted; according to the method, standardized, parameterized, refined and collaborative anchor rod or anchor cable modeling is realized based on the BIM technology, and the modeling efficiency and precision are improved.
Owner:CHINA COMM INFORMATION TECH GRP CO LTD HANGZHOU BRANCH

Control method and system for motor

The invention relates to the technical field of motor control, in particular to a control method and system for a motor. The method comprises the following steps that a motor main control unit MCU obtains a motor angle parameter by obtaining a corresponding target motor rotating speed set by a receiving user and carrying out angle parameter reverse solution endowing; obtaining a direct axis direction current and a cross axis direction current and carrying out motor load control calculation to obtain a direct axis voltage control quantity and a cross axis voltage control quantity; transmitting the motor angle parameter, the direct axis voltage control quantity and the cross axis voltage control quantity to a space vector pulse width modulation (SVPWM) module and carrying out SVPWM modulation processing to generate a motor rotor control SVPWM waveform; and determining a phase voltage control value applied to each motor winding, carrying out control duty ratio adjustment analysis, and controlling the corresponding rotating speed and direction of each motor at the same time. The operation efficiency and the response speed of the motor can be improved.
Owner:SHENZHEN YONGYIHAO ELECTRONICS CO LTD