A material carrying device for tunnel construction with the function of breaking stones

By setting a combination of second and first crushing blades in the material handling device for tunnel construction, the problems of blade uniformity and inconvenient replacement in the existing device are solved. This achieves efficient crushing of stones of different sizes and safe and quick replacement of blades, extending service life and reducing noise pollution.

CN117531591BActive Publication Date: 2025-11-04STATE GRID BEIJING ELECTRIC POWER CO +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311519367.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-14
Publication Date
2025-11-04
Estimated Expiration
2043-11-14

AI Technical Summary

Technical Problem

In existing material handling devices for tunnel construction, the crushing blades are relatively simple. Larger blades cannot completely crush smaller stones, while smaller blades suffer severe wear when crushing large stones and are inconvenient to replace. Exposed blades are prone to wear, affecting their service life.

Method used

It adopts a combination of two types of blades, a second crushing blade and a first crushing blade, which are used to crush large and small pieces of gravel respectively. The blades can be quickly changed through a motor-driven adjustment mechanism, and it is equipped with a protection and buffer mechanism to extend the blade life.

Benefits of technology

It enables targeted crushing of stones of different sizes, improves replacement efficiency, extends blade life, and reduces noise pollution and equipment wear.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117531591B_ABST
    Figure CN117531591B_ABST
Patent Text Reader

Abstract

The application discloses a material carrying device with a stone crushing function for tunnel construction and relates to the technical field of tunnel construction.The material carrying device with the stone crushing function for the tunnel construction is provided with a driving mechanism facilitating material crushing on a crushing box body, is provided with an adjusting mechanism facilitating adjustment of the driving mechanism on the crushing box body, is provided with a protection mechanism facilitating material crushing on a carrying supporting plate, and the driving mechanism comprises a box cover and a first motor, and the box cover is movably arranged on the upper end of the crushing box body.The second crushing blade and the first crushing blade are arranged, the second crushing blade is used to crush large stone materials in preliminary crushing, the first crushing blade is used to further crush small stone materials after the large stone materials are crushed, different stone materials are crushed in a targeted manner, and the crushing of the materials is guaranteed to be complete.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of tunnel construction, in particular to a material carrying device with gravel function for tunnel construction. BACKGROUND

[0002] Tunnel is a buried engineering building in stratum, which is a form of human utilization of underground space. Tunnel can be divided into traffic tunnel, water tunnel, municipal tunnel and mine tunnel. In the construction of tunnel, materials in the tunnel need to be transported out or raw materials from outside are transported into the tunnel for construction to consolidate the tunnel. In the existing transportation of gravel materials, in order to improve the construction efficiency, a crushing device is arranged in the transportation device to crush the gravel materials.

[0003] However, at least the following technical problems are found in the implementation of the above technical solution:

[0004] 1. The existing gravel materials contain large and small gravel materials. The existing crushing blade is relatively single. The large blade can crush large gravel but not completely crush small gravel. The small blade can completely crush gravel but may be severely worn or even insufficient in crushing force when crushing large gravel, thereby having certain limitations.

[0005] 2. The gravel function arranged in the existing carrying device needs to manually replace the crushing blade when crushing gravel of different sizes. The blade needs to be disassembled by using auxiliary tools and then a new blade needs to be installed, which is inconvenient and inefficient.

[0006] 3. The existing gravel device exposes the blade when not in use, which is inconvenient for storage and protection, thereby increasing the wear of the blade during daily use and reducing the service life of the blade. SUMMARY

[0007] (I) Technical problems solved

[0008] In view of the deficiencies of the prior art, the present application provides a material carrying device with gravel function for tunnel construction, which solves the technical problem that the existing crushing blade is relatively single, the large blade can crush large gravel but not completely crush small gravel, the small blade can completely crush gravel but may be severely worn or even insufficient in crushing force when crushing large gravel, thereby having certain limitations.

[0009] (II) Technical solution

[0010] To achieve the above purpose, the present application is implemented by the following technical solution:

[0011] The utility model provides a kind of material handling device with tunnel construction with broken stone function, including carrying support plate and broken box, the drive mechanism for facilitating material is pulverized is equipped on the broken box, the adjusting mechanism for facilitating the drive mechanism is adjusted is equipped on the broken box, the protection mechanism for facilitating material pulverization is equipped on the carrying support plate, the drive mechanism includes box cover and first motor, the box cover is movably sleeved and installed in the upper end of broken box, the upper end of box cover is penetrated and is equipped with installation round hole, first motor is fixedly installed in the inner side wall of installation round hole, the output of first motor is fixedly installed with transmission rotating rod, the lower end of carrying support plate is fixedly installed with gyro wheel, the upper end of carrying support plate is fixedly installed with shockproof foam board, the upper end of shockproof foam board is fixedly installed with two side edge vertical rods, two side edge vertical rods are also fixedly installed with push rod between, the adjusting mechanism includes rectangular mounting plate, movable push plate, second rotating rod and first rotating rod, the lower segment of transmission rotating rod inner side wall is fixedly installed with rectangular mounting plate, the upper end of rectangular mounting plate is fixedly installed with second motor, the output of second motor is fixedly installed with threaded rod, movable push plate is slidably installed in transmission rotating rod inner side wall, the upper end of movable push plate is penetrated and is equipped with screw groove, the upper end of movable push plate is also penetrated and is equipped with two limit sliding slots, the upper end of rectangular mounting plate is fixedly installed with two limit rods, two limit rods are slidably installed in the inner side wall of two limit sliding slots, the upper end of movable push plate uses at least two back-shaped rods, at least two back-shaped rods are fixedly installed with connecting plate between, the lower end two back-shaped rods are fixedly installed in the both sides of movable push plate, the inner side wall of each back-shaped rod is fixedly installed with second push rod, the inner side wall of each back-shaped rod is fixedly installed with first push rod, each first push rod is below each second push rod, the number of second rotating rod is at least two, the circumferential end of each second rotating rod is fixedly installed with second broken blade, the side end of each second rotating rod is fixedly installed with first L-shaped side rod, the side end of each first L-shaped side rod is penetrated and is equipped with first rectangular notch,

[0012] Preferably: the number of first rotating rod is at least two, the side end of each first rotating rod is fixedly installed with at least two first broken blades, the side end of each first rotating rod is fixedly installed with second L-shaped side rod, each second push rod is slidably installed in the inner side wall of second rectangular notch, the both sides ends of transmission rotating rod are equipped with second storage groove, the end of each second storage groove inner side wall is penetrated and is equipped with second sliding slot, the both sides ends of transmission rotating rod are also equipped with first storage groove, the side end of each first storage groove is also penetrated and is equipped with first sliding slot, each second rotating rod is rotatably installed in the inner side wall of second storage groove, each first rotating rod is rotatably installed in the inner side wall of first storage groove.

[0013] Preferably, the protection mechanism comprises damping pads and soundproof cotton, at least two soundproof cottons are fixedly installed between the crushing box and the shockproof foam board, an annular installation groove is formed in the upper end of each crushing box, and a soundproof cotton is fixedly installed on the inner side wall of each annular installation groove.

[0014] (Three) beneficial effects

[0015] 1、The second crushing blade and the first crushing blade are set, the second crushing blade is used for crushing large stone materials in preliminary crushing, the shape of the second crushing blade is a whole blade, the volume is large, and the rigidity is high, and the second crushing blade has better crushing force when crushing large stones.

[0016] 2、After preliminary crushing is completed, the first crushing blade is used for further crushing of small stone materials, the first crushing blade is combined by a plurality of blade pieces, the first crushing blade can ensure complete crushing when crushing small stone materials, and the second crushing blade and the first crushing blade are set, so that the crushing is more targeted when different sizes of stone materials are crushed.

[0017] 3、The second motor, the movable push plate, the first push rod and the second push rod are matched, when different blades need to be adjusted and replaced, the first L-shaped side rod or the second L-shaped side rod can be driven to rotate by starting the second motor to drive the threaded rod to rotate forward or reversely, so that the second crushing blade and the first crushing blade are adjusted and replaced, and the safety and efficiency during replacement of the blades are improved.

[0018] 4、The transmission rotating rod, the first storage groove and the second storage groove are matched, when the first crushing blade or the second crushing blade is not used, the first crushing blade or the second crushing blade can be stored in the first storage groove or the second storage groove respectively, the first crushing blade or the second crushing blade is not used to avoid contact with the stone to cause abrasion, and the service life is prolonged.

[0019] 5、The lower end of the crushing box is provided with a plurality of damping pads, which has a good protection and buffering effect on the crushing box, avoids rigid contact between the crushing box and the carrying plate, causes large vibration during crushing, causes damage to the crushing box and the carrying plate, and the shockproof foam board is arranged, so that the user is less affected by the vibration of the crushing box during transportation.

[0020] 6、The device is provided with sound insulation cotton in the annular mounting groove in the crushing box body, the sound insulation cotton has good sound insulation effect, and the sound insulation cotton can filter and reduce noise generated in the crushing box body during the transfer process, and reduce noise pollution generated by crushed stone materials in the crushing box body. BRIEF DESCRIPTION OF DRAWINGS

[0021] The above description is only a summary of the technical scheme of the present application. In order to make the technical means of the present application clearer and to enable the present application to be implemented according to the content of the description, the following will describe the preferred embodiments of the present application in detail with reference to the drawings.

[0022] Figure 1 It is a structure diagram of the carrying supporting plate of the present application.

[0023] Figure 2 It is a structure diagram of the crushing box body of the present application.

[0024] Figure 3 It is a structure diagram of the sound insulation cotton of the present application.

[0025] Figure 4 It is a structure diagram of the transmission rotating rod of the present application.

[0026] Figure 5 It is a structure diagram of the second crushing blade of the present application.

[0027] Figure 6 It is a structure diagram of the first crushing blade of the present application.

[0028] Figure 7 It is a structure diagram of the back-shaped rod of the present application.

[0029] Legend: 1, carrying supporting plate; 11, shockproof foam plate; 12, roller; 13, damping pad; 14, side vertical rod; 15, pushing rod; 2, crushing box body; 21, annular mounting groove; 22, sound insulation cotton; 23, box cover; 24, mounting round hole; 25, first motor; 3, transmission rotating rod; 31, first receiving groove; 32, first sliding groove; 33, second receiving groove; 34, second sliding groove; 5, rectangular mounting plate; 51, second motor; 52, limiting rod; 53, threaded rod; 6, movable push plate; 61, threaded groove; 62, limiting sliding groove; 63, back-shaped rod; 64, first pushing rod; 65, second pushing rod; 66, connecting plate; 7, second rotating rod; 71, second crushing blade; 72, first L-shaped side rod; 73, first rectangular notch; 8, first rotating rod; 81, first crushing blade; 82, second L-shaped side rod; 83, second rectangular notch. DETAILED DESCRIPTION

[0030] In the description of the present application, it needs to be understood that the terms "center", "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation of the present application.

[0031] In addition, the terms "first", "second" are only for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the technical features indicated. Therefore, the features defined with "first", "second" can explicitly or implicitly include one or more of the features. In the description of the present application, unless otherwise stated, the meaning of "a plurality of" is two or more. In the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounting", "connecting", "connecting" should be understood in a broad sense, for example, it can be fixedly connected, or it can be detachably connected, or integrally connected; it can be mechanically connected, or it can be electrically connected; it can be directly connected, or it can be indirectly connected through an intermediate medium, or it can be the communication between two elements. For those skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.

[0032] The embodiment of the present application provides a material handling device for tunnel construction with a stone crushing function, which effectively solves the technical problem that the existing crushing blade is relatively single, the larger blade can crush larger stones but not completely crush smaller stones, the smaller blade can completely crush but may be severely worn out when crushing large stones, and even the crushing force is not enough, thereby having certain limitations. The device is provided with two kinds of crushing blades, i.e. the second crushing blade 71 and the first crushing blade 81. The second crushing blade 71 is used to crush larger stone materials in the preliminary crushing, and the first crushing blade 81 is used to further crush smaller stone materials after the larger stone materials are crushed, so that the stone materials of different sizes are crushed in a targeted manner, and the material crushing is ensured to be complete.

[0033] Embodiment

[0034] As Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , and Figure 7As shown, the technical scheme in the embodiment of the application effectively solves the technical problem that the existing crushing blade is relatively single, a larger blade can crush larger stones but not completely crush smaller stones, a smaller blade can completely crush but may be severely worn or even not enough crushing force when crushing large stones, thereby having certain limitations, and the general idea is as follows: a material carrying device with a stone crushing function for tunnel construction, comprising a carrying base plate 1 and a crushing box body 2, the crushing box body 2 is provided with a driving mechanism for conveniently crushing the material, the crushing box body 2 is provided with an adjusting mechanism for conveniently adjusting the driving mechanism, the carrying base plate 1 is provided with a protection mechanism for conveniently crushing the material, the driving mechanism comprises a box cover 23 and a first motor 25, the box cover 23 is movably sleeved and installed at the upper end of the crushing box body 2, when the user transports the stone material in the tunnel, the user can first open the box cover 23, place the stone material in the crushing box body 2, cover the crushing box body 2 after the placement is completed, and complete the placement of the stone material, the user can push the pushing rod 15 to drive the rollers 12 on the carrying base plate 1 to move, so as to carry the material in the crushing box body 2;

[0035] The upper end of the box cover 23 is provided with an installation circular hole 24, the first motor 25 is fixedly installed on the inner side wall of the installation circular hole 24, the output end of the first motor 25 is fixedly installed with a transmission rotating rod 3, the lower end of the carrying base plate 1 is fixedly installed with a roller 12, the upper end of the carrying base plate 1 is fixedly installed with a shockproof foam plate 11, the upper end of the shockproof foam plate 11 is fixedly installed with two side edge vertical rods 14, the two side edge vertical rods 14 are further fixedly installed with a pushing rod 15, the adjusting mechanism comprises a rectangular mounting plate 5, a movable push plate 6, a second rotating rod 7 and a first rotating rod 8, the lower segment of the inner side wall of the transmission rotating rod 3 is fixedly installed with the rectangular mounting plate 5, the upper end of the rectangular mounting plate 5 is fixedly installed with a second motor 51, the output end of the second motor 51 is fixedly installed with a threaded rod 53, the movable push plate 6 is slidably installed on the inner side wall of the transmission rotating rod 3, the upper end of the movable push plate 6 is provided with a threaded groove 61, while carrying, the user can crush the stone material in the crushing box body 2, when initially crushing, there are more large stone materials in the crushing box body 2, the user can select the second crushing blade 71 on the crushing box body 2 to crush the stone material, the user can start the second motor 51 through an infrared remote control device, the second motor 51 is started to drive the threaded rod 53 to rotate, the threaded rod 53 rotates to drive the movable push plate 6 to move upward through the threaded groove 61;

[0036] The upper end of the movable push plate 6 is also provided with two limiting sliding grooves 62, the upper end of the rectangular mounting plate 5 is fixedly provided with two limiting rods 52, the two limiting rods 52 are slidingly installed on the inner side walls of the two limiting sliding grooves 62, the upper end of the movable push plate 6 is provided with at least two U-shaped rods 63, at least two connecting plates 66 are fixedly installed between every two U-shaped rods 63, the lower end two U-shaped rods 63 are fixedly installed on the two side ends of the movable push plate 6, the inner side walls of the U-shaped rods 63 are fixedly provided with second push rods 65, the upward movement of the movable push plate 6 drives the two side U-shaped rods 63 to move upward, the upward movement of each U-shaped rod 63 also drives each first push rod 64 and second push rod 65 to move upward, the upward movement of the first push rod 64 drives the first L-shaped side rod 72 to rotate through the first rectangular slot 73;

[0037] The inner side wall of each of the L-shaped rods 63 is fixedly provided with a first push rod 64, each of the first push rods 64 is located below each of the second push rods 65, the number of the second rotating rods 7 is at least two, the circumferential end of each of the second rotating rods 7 is fixedly provided with a second crushing blade 71, the side end of each of the second rotating rods 7 is fixedly provided with a first L-shaped side rod 72, the side end of each of the first L-shaped side rods 72 is provided with a first rectangular notch 73, each of the first push rods 64 is slidingly installed in the inner side wall of the first rectangular notch 73, the number of the first rotating rods 8 is at least two, the side end of each of the first rotating rods 8 is fixedly provided with at least two first crushing blades 81, the side end of each of the first rotating rods 8 is fixedly provided with a second L-shaped side rod 82, each of the second push rods 65 is slidingly installed in the inner side wall of the second rectangular notch 83, the two side ends of the transmission rotating rod 3 are provided with a second receiving groove 33, the end of the inner side wall of each of the second receiving grooves 33 is provided with a second sliding groove 34, the two side ends of the transmission rotating rod 3 are also provided with a first receiving groove 31, the side end of each of the first receiving grooves 31 is also provided with a first sliding groove 32, each of the second rotating rods 7 is rotatably installed in the inner side wall of the second receiving groove 33, each of the first rotating rods 8 is rotatably installed in the inner side wall of the first receiving groove 31, the first L-shaped side rod 72 drives the second crushing blade 71 to rotate, at this time, each of the second crushing blades 71 gradually rotates away from the inner side wall of the second receiving groove 33, when the second push rod 65 moves upward, it drives the second L-shaped side rod 82 to rotate through the second rectangular notch 83, the second L-shaped side rod 82 drives the first crushing blade 81 to rotate, at this time, each of the first crushing blades 81 gradually rotates into the inner side wall of the first receiving groove 31, the adjustment of the first crushing blade 81 and the second crushing blade 71 is completed, the user can turn off the second motor 51, at this time, the user can start the first motor 25 to drive the transmission rotating rod 3 to rotate, the transmission rotating rod 3 rotates to drive each of the second crushing blades 71 outside the transmission rotating rod 3 to crush large pieces of stone materials, after the crushing of the large pieces of stone materials is completed, the user can further crush the small pieces of stone materials, at this time, the user can start the second motor 51 again to drive the threaded rod 53 to rotate in the opposite direction, so as to drive the movable push plate 6 to move downward, and then drive the second push rod 65 and the first push rod 64 to move downward, so that the second crushing blade 71 gradually rotates and is collected in the inner side wall of the second receiving groove 33, the first crushing blade 81 gradually rotates away from the inner side wall of the first receiving groove 31, the first motor 25 is started to drive the first crushing blade 81 on the transmission rotating rod 3 to further crush the small pieces of stone materials, to ensure that the crushing is completed;

[0038] The protection mechanism comprises the damping pad 13 and the soundproof cotton 22, a plurality of damping pads 13 are arranged at the lower end of the crushing box 2 when the material is crushed, which has a good protection and buffering effect on the crushing box 2, avoids the rigid contact between the crushing box 2 and the carrying pallet 1, and the large vibration generated during crushing damages the crushing box 2 and the carrying pallet 1,

[0039] The soundproof cotton 22 is arranged in the annular mounting groove 21 in the crushing box 2 and the shockproof foam plate 11, the inner side wall of each annular mounting groove 21 is fixedly installed with the soundproof cotton 22, the shockproof foam plate 11 is arranged on the carrying pallet 1, the user is less affected by the vibration of the crushing box 2 when pushing the crushing box 2 for transfer, and the soundproof cotton 22 is arranged in the annular mounting groove 21 in the crushing box 2, the soundproof cotton 22 has a good soundproof effect, and the noise pollution generated by the crushed stone material in the crushing box 2 is reduced during the transfer process.

[0040] In view of the problems in the prior art, the application provides a material carrying device for tunnel construction with a stone crushing function, the device is provided with two kinds of crushing blades, i.e., the second crushing blade 71 and the first crushing blade 81, the second crushing blade 71 is used to crush large pieces of stone material during preliminary crushing, and the first crushing blade 81 is used to further crush small pieces of stone material after the large pieces of stone material are crushed, so that different stone materials are crushed in a targeted manner to ensure complete crushing of the materials.

[0041] Working principle:

[0042] In the first step, the user can open the box cover 23 when carrying the stone material, put the stone material into the crushing box 2, and cover the box cover 23, start the first motor 25 when it is necessary to crush the stone material, the first motor 25 drives the transmission rotating rod 3 to rotate, the transmission rotating rod 3 drives the first crushing blade 81 or the second crushing blade 71 on the transmission rotating rod 3 to crush the stone material, the second crushing blade 71 is used to crush large pieces of stone material, and the first crushing blade 81 is used to crush small pieces of stone material, and the crushed materials can be discharged through the discharge pipeline on the crushing box 2 after crushing is completed.

[0043] Second, in the process of crushing the gravel material put into the carrying pallet 1, there are large and small pieces of gravel material. In the preliminary crushing, the second crushing blade 71 can be used to crush the large pieces of gravel material. When the second crushing blade 71 is used to crush the gravel material, the user can start the second motor 51, which drives the threaded rod 53 to rotate, and the threaded rod 53 drives the movable push plate 6 to move up through the threaded groove 61. The movable push plate 6 moves up to drive the two sides of the L-shaped rod 63 to move up, and the L-shaped rod 63 moves up to drive each first push rod 64 and second push rod 65 to move up. When the first push rod 64 moves up, the first push rod 64 slides in the first rectangular notch 73, and at this time the first push rod 64 drives the first L-shaped side rod 72 to rotate through the first rectangular notch 73. The first L-shaped side rod 72 rotates to drive the second crushing blade 71 to rotate around the second rotating rod 7, and the second crushing blade 71 rotates to gradually move away from the inner side wall of the second storage slot 33. When each second crushing blade 71 rotates completely away from the inner side wall of the second storage slot 33, the adjustment is completed, and the user can start the first motor 25 to drive the second crushing blade 71 on the transmission rotating rod 3 to crush the gravel material.

[0044] The second crushing blade 71 is a whole blade with a large volume and high rigidity, which has better crushing force when crushing large pieces of gravel, and can meet the rigid demand for crushing large pieces of gravel material.

[0045] In the third step, after the preliminary crushing of the second crushing blade 71, the second crushing blade 71 may not completely crush some small pieces of gravel material due to its large volume. At this time, the user can use the first crushing blade 81 to crush, and the user can start the second motor 51 to drive the threaded rod 53 to rotate in the opposite direction, thereby driving the movable push plate 6 to move down, and the movable push plate 6 drives the first push rod 64 and the second push rod 65 on the L-shaped rod 63 to move down. The second push rod 65 moves down to drive the second L-shaped side rod 82 to rotate through the second rectangular notch 83, and the second L-shaped side rod 82 rotates to drive the first crushing blade 81 on the first rotating rod 8 to rotate and gradually move away from the inner side wall of the second storage slot 33. When the first crushing blade 81 rotates completely away from the inner side wall of the first storage slot 31, the adjustment is completed, and the user can start the first motor 25 to drive the first crushing blade 81 on the transmission rotating rod 3 to crush the gravel material.

[0046] The first crushing blade 81 is a combination of multiple blades, which can ensure complete crushing of small pieces of gravel material and meet the demand for complete crushing of small pieces of gravel material.

[0047] Fourthly, when the blade is switched, the second push rod 65 and the first push rod 64 are simultaneously moved up or down by the back-shaped rod 63, and the second crushing blade 71 and the first crushing blade 81 are simultaneously rotated when the second push rod 65 and the first push rod 64 are moved, so that the first crushing blade 81 is rotated and stored in the inner side wall of the first storage groove 31 by the movement of the second push rod 65 when the second crushing blade 71 is gradually rotated away from the inner side wall of the second storage groove 33, and the second crushing blade 71 is rotated and stored in the inner side wall of the second storage groove 33 by the movement of the first push rod 64 when the first crushing blade 81 is gradually rotated away from the inner side wall of the first storage groove 31.

[0048] By the alternate use of the first crushing blade 81 and the second crushing blade 71, the first crushing blade 81 is stored in the second storage groove 33 using the second crushing blade 71, and the second crushing blade 71 is stored in the first storage groove 31 using the first crushing blade 81, so that the first crushing blade 81 or the second crushing blade 71 can be stored in the first storage groove 31 or the second storage groove 33, respectively, when they are not used, avoiding contact with the stone and wear, and prolonging the service life.

[0049] Fifthly, a plurality of damping pads 13 are arranged at the lower end of the crushing box 2, which has a good protective buffering effect on the crushing box 2, avoids rigid contact between the crushing box 2 and the carrying pallet 1, and causes damage to the crushing box 2 and the carrying pallet 1 due to the large vibration generated during crushing, and a shock-absorbing foam plate 11 is arranged on the carrying pallet 1, so that the user is less affected by the vibration of the crushing box 2 when pushing the crushing box 2 for transfer, and the device is provided with soundproof cotton 22 in the annular mounting groove 21 in the crushing box 2, which has a good soundproof effect and reduces the noise pollution generated by the crushed stone materials in the crushing box 2 during the transfer process.

[0050] In the description of the present specification, the description of the terms "one embodiment", "example", "specific example" and the like means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In the present specification, the illustrative description of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0051] It is apparent that the application can be carried out by other embodiments that do not depart from the spirit or essential characteristics thereof. Thus, the embodiments disclosed in this specification are to be considered in all respects as illustrative and not restrictive, and all changes coming within the meaning and equivalency range of the application are intended to be embraced therein.

Claims

1. A material handling device for tunnel construction with a rock breaking function, comprising a handling pallet (1) and a breaking box (2), characterized in that, The crushing box (2) is provided with a driving mechanism for facilitating the crushing of materials, and the crushing box (2) is provided with an adjusting mechanism for facilitating the adjustment of the driving mechanism, and the carrying support plate (1) is provided with a protection mechanism for facilitating the crushing of materials; the driving mechanism comprises a box cover (23) and a first motor (25), and the box cover (23) is movably sleeved and installed at the upper end of the crushing box (2); the upper end of the box cover (23) is provided with an installation circular hole (24); the first motor (25) is fixedly installed on the inner side wall of the installation circular hole (24); the output end of the first motor (25) is fixedly installed with a transmission rotating rod (3); the adjusting mechanism comprises a rectangular mounting plate (5), a movable push plate (6), a second rotating rod (7) and a first rotating rod (8); the lower section of the inner side wall of the transmission rotating rod (3) is fixedly installed with the rectangular mounting plate (5); the upper end of the rectangular mounting plate (5) is fixedly installed with a second motor (51); the output end of the second motor (51) is fixedly installed with a threaded rod (53); The movable push plate (6) is slidably installed on the inner side wall of the transmission rotating rod (3); the upper end of the movable push plate (6) is provided with a threaded groove (61); the upper end of the movable push plate (6) is also provided with two limiting sliding grooves (62); the upper end of the rectangular mounting plate (5) is fixedly installed with two limiting rods (52), and the two limiting rods (52) are slidably installed on the inner side walls of the two limiting sliding grooves (62); The upper end of the movable push plate (6) is provided with at least two L-shaped rods (63); at least two connecting plates (66) are fixedly installed between every two L-shaped rods (63); the lower two L-shaped rods (63) are fixedly installed on the two side ends of the movable push plate (6); the inner side wall of each L-shaped rod (63) is fixedly installed with a second push rod (65); The inner side wall of each L-shaped rod (63) is fixedly installed with a first push rod (64); each first push rod (64) is located below each second push rod (65); the number of the second rotating rod (7) is at least two, and the circumferential end of each second rotating rod (7) is fixedly installed with a second crushing blade (71); The side end of each second rotating rod (7) is fixedly installed with a first L-shaped side rod (72); the side end of each first L-shaped side rod (72) is provided with a first rectangular notch (73); each first push rod (64) is slidably installed on the inner side wall of the first rectangular notch (73); The number of the first rotating rod (8) is at least two, and the side end of each first rotating rod (8) is fixedly installed with at least two first crushing blades (81); the side end of each first rotating rod (8) is fixedly installed with a second L-shaped side rod (82); each second push rod (65) is slidably installed on the inner side wall of the second rectangular notch (83); the two side ends of the transmission rotating rod (3) are provided with a second storage groove (33), and the end of the inner side wall of each second storage groove (33) is provided with a second sliding groove (34); The two side end portions of the transmission rotating rod (3) are also provided with a first receiving groove (31); the side end portion of each first receiving groove (31) is also provided with a first sliding groove (32); each second rotating rod (7) is rotatably installed on the inner side wall of the second receiving groove (33), and each first rotating rod (8) is rotatably installed on the inner side wall of the first receiving groove (31).

2. The material handling device for tunnel construction with rock breaking function according to claim 1, characterized in that: The lower end portion of the carrying supporting plate (1) is fixedly provided with a roller (12); The upper end portion of the carrying supporting plate (1) is fixedly provided with a shockproof foam plate (11); The upper end portion of the shockproof foam plate (11) is fixedly provided with two side vertical rods (14); The two side vertical rods (14) are also fixedly provided with a pushing rod (15) therebetween.

3. The material handling device for tunnel construction with rock breaking function according to claim 1, characterized in that: The protection mechanism comprises a damping pad (13) and sound insulation cotton (22); At least two sound insulation cottons (22) are fixedly arranged between the crushing box (2) and the shockproof foam plate (11); The upper end portion of each crushing box (2) is provided with an annular mounting groove (21); The inner side wall of each annular mounting groove (21) is fixedly provided with sound insulation cotton (22).