An experimental device simulating the influence of groundwater on the stability of compressed gas energy storage in coal mine tunnels
By designing an experimental device that simulates the influence of groundwater on the stability of compressed gas energy storage in coal mine tunnels, including the gas storage chamber, gas supply system and surrounding rock pressure monitoring system, the research on the stability of the gas storage composite structure under the influence of groundwater in the existing technology is solved. To solve the lack of problems, we have realized the multi-working condition real simulation and parameter design research on compressed air energy storage in the underground space of coal mine tunnels.
Patent Information
- Application Number
- CN202311580483.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-23
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-11-23
AI Technical Summary
When using physical models to conduct compressed air energy storage research, there are few studies on the impact of groundwater on the composite structure stability of compressed air gas storage in underground coal mines, and there is a lack of effective experimental devices for real simulation.
An experimental device was designed to simulate the impact of groundwater on the stability of compressed gas energy storage in coal mine tunnels, including a gas storage chamber, a gas supply system, a groundwater simulation system, a surrounding rock pressure monitoring system, and a gas storage stress and strain monitoring system. Through these systems, Real-time collection and analysis of pressure, strain, displacement and temperature of the gas storage composite structure under different working conditions.
This device can be closer to the actual working conditions, realize the real simulation of the multi-working condition dynamic whole process of compressed air energy storage in the underground space of Guantui Coal Mine, and provide technical support for the parameter design and operating condition research of the gas storage composite structure. .
Smart Images

Figure CN117589493B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of compressed air energy storage, and in particular to an experimental device for simulating the influence of groundwater on the stability of compressed air energy storage in a coal mine tunnel. Background Art
[0002] The underground space of coal mines that have been closed and withdrawn in China is huge. How to use the underground space of a large number of coal mines to carry out compressed air energy storage is of great strategic significance for the transformation and upgrading of China's coal mining enterprises that have withdrawn, as well as the coordinated use of the rich above-ground and underground space resources in the closed and withdrawn mining areas. However, at present, a considerable part of the underground space of the closed and withdrawn coal mines has the characteristics of shallow burial depth (low ground stress), weak surrounding rock (low strength), abundant groundwater and complex storage conditions. Therefore, the stability of the composite structure of the gas storage chamber under the above environmental conditions is the key to the success or failure of the use of compressed air energy storage in the underground space of the closed and withdrawn coal mines.
[0003] At present, domestic and foreign scholars have conducted relevant research using salt caverns, hard rock chambers and aquifers as energy storage sites. Theoretical analysis and numerical simulation methods are mainly used for the stability analysis of the composite structure of the gas storage chamber, while there are few studies on compressed air energy storage using physical models. The physical model experiment is mainly based on the principle of similarity, equipped with similar materials that conform to the actual formation rock mass, and then based on the developed physical model test system, compressed air tests under different working conditions are carried out. Its most important feature is that it can simulate the actual conditions of gas storage and discharge as much as possible, and can observe the experimental phenomena vividly and intuitively, and obtain data conveniently and reliably. Through the compressed air test results obtained under different working conditions, the relevant theories can be verified and improved, and the basis for verification and parameter selection can be provided for the numerical analysis results.
[0004] In view of the current research on compressed air energy storage using physical model test systems, especially the current situation where there are few physical model test studies on the impact of groundwater on the stability of the composite structure of compressed air energy storage gas storage reservoirs in underground spaces of coal mines, the present invention provides an experimental simulation device that takes into account the impact of groundwater on the stability of the composite structure of compressed air energy storage gas storage reservoirs in underground spaces of coal mines. Summary of the invention
[0005] The purpose of the present invention is to provide an experimental device for simulating the influence of groundwater on the stability of compressed gas energy storage in coal mine tunnels, so as to solve the problems existing in the prior art.
[0006] To achieve the above object, the present invention provides the following solution: The present invention provides an experimental device for simulating the influence of groundwater on the stability of compressed gas energy storage in coal mine tunnels, comprising:
[0007] A gas storage chamber, wherein the cross-sectional shape of the gas storage chamber is circular, sealing panels are respectively provided at both ends of the gas storage chamber, and a rubber water stop is provided between the sealing panels and the gas storage chamber, and the outer side of the gas storage chamber is a cast surrounding rock layer, and the cross-sectional shape of the surrounding rock layer is rectangular;
[0008] An air supply system, wherein the air supply system is connected to the inner chamber of the gas storage chamber through one of the sealing enclosures, and an exhaust hole is provided on the other sealing enclosure;
[0009] A groundwater simulation system, wherein the groundwater simulation system is arranged on the surrounding rock layer, and the groundwater simulation system comprises a water supply system and a drainage system;
[0010] A surrounding rock pressure monitoring system, wherein the surrounding rock pressure monitoring system is arranged on the surrounding rock layer;
[0011] A gas storage reservoir stress and strain monitoring system, wherein the gas storage reservoir stress and strain monitoring system is arranged on the outer wall of the gas storage chamber, and the gas storage reservoir stress and strain monitoring system is used to detect the strain variation of the gas storage chamber along the radial direction and the axial direction;
[0012] A confining pressure system is used to apply pressure along a radial line direction to the gas storage chamber.
[0013] According to the experimental device for simulating the influence of groundwater on the stability of compressed gas energy storage in coal mine tunnels provided by the present invention, the gas storage chamber includes a steel sealing layer, a sliding layer and a reinforced concrete lining layer arranged in sequence from the inside to the outside, the surrounding rock layer is arranged on the outside of the reinforced concrete lining layer, and the sealing panels are respectively arranged at both ends of the steel sealing layer.
[0014] According to the experimental device for simulating the influence of groundwater on the stability of compressed gas energy storage in coal mine tunnels provided by the present invention, the gas supply system includes a high-pressure air pump, a gas transmission hole is opened on the sealing enclosure, the output end of the high-pressure air pump is connected to a gas transmission gun barrel, the gas transmission gun barrel passes through the gas transmission hole and is connected to the inner cavity of the steel sealing layer, and the gas transmission gun barrel is provided with an air pressure regulating head and a gun barrel valve.
[0015] According to the experimental device for simulating the influence of groundwater on the stability of compressed air energy storage in coal mine tunnels provided by the present invention, the water supply system includes a water reservoir, a plurality of through holes are opened on the surrounding rock layer along the axial direction, a water supply pipe is arranged in the through holes, a drainage hole is opened on the side wall of the water supply pipe, a water pump is installed on the water reservoir, a multi-valve switch is installed at the output end of the water pump, the valve ports of the multi-valve switch are arranged in a one-to-one correspondence with the plurality of the water supply pipes, the water inlet end of the water pump is connected with the water reservoir through a pumping pipe, a water inlet valve is installed on the pumping pipe, and a water pressure gauge and a flow meter are arranged between the multi-valve switch and the water supply pipe.
[0016] According to the experimental device for simulating the influence of groundwater on the stability of compressed gas energy storage in coal mine tunnels provided by the present invention, the drainage system includes an annular permeable blind pipe and a longitudinal permeable blind pipe, the annular permeable blind pipe and the longitudinal permeable blind pipe, the longitudinal permeable blind pipe is arranged on the annular permeable blind pipe, and the annular permeable blind pipe is arranged on the outer wall of the reinforced concrete lining layer.
[0017] According to the experimental device for simulating the influence of groundwater on the stability of compressed gas energy storage in coal mine tunnels provided by the present invention, the surrounding rock pressure monitoring system includes a distributed optical fiber arranged in the surrounding rock layer, one end of the distributed optical fiber is connected to a light source, and the other end is connected to an optical fiber demodulator;
[0018] The surrounding rock pressure monitoring system further comprises a plurality of soil pressure boxes, wherein the soil pressure boxes are arranged in the surrounding rock layer and connected to the static strain gauges.
[0019] According to the experimental device for simulating the influence of groundwater on the stability of compressed gas energy storage in coal mine tunnels provided by the present invention, the stress and strain monitoring system of the gas storage reservoir includes a plurality of rows of sensor groups arranged at equal intervals in the circumferential direction of the outer wall of the reinforced concrete lining layer, each row of the sensor groups includes a plurality of strain sensors arranged at equal intervals along the axial direction of the surrounding rock layer, and the plurality of strain sensors are connected by wires, one end of the wires is connected to the static strain gauge.
[0020] According to the experimental device for simulating the influence of groundwater on the stability of compressed gas energy storage in coal mine tunnels provided by the present invention, a temperature and humidity sensor and an imaging system are installed in the steel sealing layer. The imaging system includes a micro camera, and the output end of the micro camera is connected to the camera port of the imaging device.
[0021] The present invention discloses the following technical effects:
[0022] The model provided by the present invention is closer to the actual and systematic working conditions of compressed air energy storage in the underground space of Guantui Coal Mine as a whole. By providing a groundwater simulation system, a surrounding rock pressure monitoring system, a gas storage reservoir stress-strain monitoring system, and a gas supply system, real-time collection and analysis of multiple parameters of pressure, strain, displacement, temperature, and humidity of the composite structure of the gas storage chamber under the influence of groundwater are realized. At the same time, by changing the working conditions such as the proportion of similar materials, the value and rate of filling and discharging pressure, the type of lining, and the filling and discharging cycle, a true simulation of the multi-working conditions and dynamic whole process of compressed air energy storage in the underground space of the shafts and lanes of Guantui Coal Mine is realized, providing equipment and technical support for the research on the stress-deformation characteristics and parameter design of the composite structure of the gas storage chamber under various operating conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 It is a schematic diagram of the structure of the present invention;
[0025] Figure 2 It is a schematic diagram of the radial section structure of the gas storage chamber of the present invention;
[0026] Figure 3 It is a structural schematic diagram of the multi-valve switch of the present invention;
[0027] Figure 4 It is a structural schematic diagram of the stress and strain monitoring system of the gas storage reservoir of the present invention;
[0028] Figure 5 It is a structural schematic diagram of a gas storage chamber displacement monitoring system of the present invention;
[0029] Figure 6 It is a structural schematic diagram of the surrounding rock pressure monitoring system of the present invention;
[0030] Figure 7 It is a structural schematic diagram of the gas delivery gun barrel of the present invention;
[0031] Figure 8 It is a structural schematic diagram of the confining pressure loading system in the present invention.
[0032] Among them, 1. Gas storage chamber; 2. Steel sealing layer; 3. Sliding layer; 4. Reinforced concrete lining layer; 5. Surrounding rock layer; 6. Rubber water stop; 7. Sealing enclosure; 8. Water reservoir; 9. Water inlet valve; 10. Water pump; 11. Multi-valve switch; 12. Water supply pipeline; 13. Water pressure gauge; 14. Flow meter; 15. Annular permeable blind pipe; 16. Longitudinal permeable blind pipe; 17. Strain sensor; 18. Static strain gauge; 19. Resistive strain gauge; 20. Strain gauge; 21. Distributed optical fiber; 22. Light source; 23. Optical fiber demodulator; 24. Earth pressure box; 25. Temperature and humidity sensor; 26. High-pressure air pump; 27. Gas transmission gun barrel; 28. Air pressure regulating head; 29. Gun barrel valve; 30. Ground stress simulation loading system. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0035] Reference Figure 1-8 The present invention provides an experimental device for simulating the influence of groundwater on the stability of compressed gas energy storage in coal mine tunnels, comprising:
[0036] A gas storage chamber 1, wherein the cross-sectional shape of the gas storage chamber 1 is circular, sealing panels 7 are respectively provided at both ends of the gas storage chamber 1, and a rubber water stop 6 is provided between the sealing panels 7 and the gas storage chamber 1, and the outer side of the gas storage chamber 1 is a cast surrounding rock layer 5, and the cross-sectional shape of the surrounding rock layer 5 is rectangular;
[0037] An air supply system, wherein the air supply system is connected to the inner chamber of the gas storage chamber 1 through one of the sealing enclosures 7, and an exhaust hole is provided on the other sealing enclosure 7;
[0038] A groundwater simulation system, wherein the groundwater simulation system is arranged on the surrounding rock layer 5, and the groundwater simulation system includes a water supply system and a drainage system;
[0039] A surrounding rock pressure monitoring system, wherein the surrounding rock pressure monitoring system is arranged on the surrounding rock layer 5;
[0040] A gas storage reservoir stress and strain monitoring system, wherein the gas storage reservoir stress and strain monitoring system is arranged on the outer wall of the gas storage reservoir chamber 1, and the gas storage reservoir stress and strain monitoring system is used to detect the stress and strain changes of the gas storage reservoir chamber 1 along the radial direction and the axial direction;
[0041] A confining pressure system is used to apply pressure simulating the initial ground stress of the surrounding rock of the coal mine to the gas storage chamber 1.
[0042] The model provided by the present invention is closer to the actual and systematic working conditions of compressed air energy storage in the underground space of Guantui Coal Mine as a whole. The two ends of the length direction of the gas storage chamber 1 are sealed enclosures 7 respectively. By providing a groundwater simulation system, a surrounding rock pressure monitoring system, a gas storage stress-strain monitoring system, and a gas supply system, real-time collection and analysis of multiple parameters of pressure, strain, displacement, temperature, and humidity of the composite structure of the gas storage chamber 1 under the influence of groundwater are realized. At the same time, by changing the proportion of similar materials, the value and rate of filling and discharging pressure, the type of lining, and the filling and discharging cycle and other working conditions, a true simulation of the multi-working conditions and dynamic whole process of compressed air energy storage in the underground space of the shafts and lanes of Guantui Coal Mine is realized, providing equipment and technical support for the research on the stress-deformation characteristics and parameter design of the composite structure of the gas storage chamber 1 under various operating conditions.
[0043] According to a further optimization scheme, the gas storage chamber 1 includes a steel sealing layer 2, a sliding layer 3 and a reinforced concrete lining layer 4 which are arranged in sequence from the inside to the outside, the surrounding rock layer 5 is arranged on the outside of the reinforced concrete lining layer 4, and the sealing panels 7 are respectively arranged at both ends of the steel sealing layer 2.
[0044] In order to achieve a more realistic simulation of the composite structure of the gas storage reservoir, the surrounding rock layer 5 is soft rock and muddy sandstone that are suitable for shallow buried closed mines, and is cast by fixing with a formwork; holes are reserved when casting the reinforced concrete lining layer 4, and it is connected to the surrounding rock layer 5 by anchor rods; the sliding layer 3 is made of asphalt injection, which is used to adjust the contact gap between the lining and the steel sealing layer 2. The steel sealing layer 2 is the innermost part of the gas storage chamber 1, and plays the role of sealing the air and bearing the tensile stress caused by high pressure gas storage; the role of the sliding layer 3 is to prevent the steel sealing layer 2 from deforming due to excessive pressure in the gas storage chamber 1 when air is injected, and the contact between the sealing layer and the lining layer is gap-free and uneven, resulting in deformation and damage of the steel sealing layer 2, or when the air is released, the pressure in the reservoir decreases, causing the steel sealing layer 2 to be damaged.
[0045] In a further optimized solution, the air supply system includes a high-pressure air pump 26, a gas delivery through hole is provided on the sealing enclosure 7, the output end of the high-pressure air pump 26 is connected to a gas delivery gun barrel 27, the gas delivery gun barrel 27 passes through the gas delivery through hole and communicates with the inner cavity of the steel sealing layer 2, and the gas delivery gun barrel 27 is provided with a gas pressure regulating head 28 and a gun barrel valve 29. In order to achieve the regulation of the compressed air pressure and input amount, the gas delivery gun barrel 27 is provided with a gas pressure regulating head 28 and a gun barrel valve 29.
[0046] A further optimization scheme is that the water supply system includes a water reservoir 8, a plurality of through holes are opened on the surrounding rock layer 5 along the axial direction, a water supply pipe 12 is arranged in the through hole, a drainage hole is opened on the side wall of the water supply pipe 12, a water pump 10 is installed on the water reservoir 8, a multi-valve switch 11 is installed at the output end of the water pump 10, the valve ports of the multi-valve switch 11 are arranged one-to-one corresponding to the plurality of water supply pipes 12, the water inlet end of the water pump 10 is connected with the water reservoir 8 through a pumping pipe, a water inlet valve 9 is installed on the pumping pipe, and a water pressure gauge 13 and a flow meter 14 are arranged between the multi-valve switch 11 and the water supply pipe 12.
[0047] A further optimized solution is that the drainage system includes an annular permeable blind pipe 15 and a longitudinal permeable blind pipe 16, wherein the annular permeable blind pipe 15 and the longitudinal permeable blind pipe 16 are arranged on the annular permeable blind pipe 15, and the annular permeable blind pipe 15 is arranged on the outer wall of the reinforced concrete lining layer 4.
[0048] According to a further optimized solution, the surrounding rock pressure monitoring system includes a distributed optical fiber 21 disposed in the surrounding rock layer 5, one end of the distributed optical fiber 21 is connected to a light source 22, and the other end is connected to an optical fiber demodulator 23;
[0049] The surrounding rock pressure monitoring system further includes a plurality of soil pressure boxes 24 . The soil pressure boxes 24 are arranged in the surrounding rock layer 5 , and the soil pressure boxes 24 are connected to the static strain gauges 18 .
[0050] A further optimized solution is that the gas storage reservoir stress strain monitoring system includes a plurality of rows of sensor groups arranged at equal intervals on the circumference of the outer wall of the reinforced concrete lining layer 4, each row of the sensor group includes a plurality of strain sensors 17 arranged at equal intervals along the axial direction of the surrounding rock layer 5, and the plurality of strain sensors 17 are connected by wires, one end of the wires is connected to the static strain gauge 18.
[0051] According to a further optimization scheme, a temperature and humidity sensor 25 and an imaging system are installed in the steel sealing layer 2. The imaging system includes a micro camera, and the output end of the micro camera is connected to the camera port of the imaging device.
[0052] In order to achieve a more comprehensive observation of the internal situation of the composite structure of the gas storage chamber 1, three holes are drilled on the gas storage chamber 1 for placing micro cameras, one of which is located at the highest point of the arc surface on the upper end of the shell of the gas storage chamber 1, and the other two are located at the waist on both sides of the length direction of the gas storage chamber 1.
[0053] According to a further optimization scheme, a resistance strain gauge 19 is attached to the reinforced concrete lining layer 4 at one end of the gas storage chamber 1, and the resistance strain gauge 19 is connected to the strain gauge 20 through a wire;
[0054] Specific implementation steps:
[0055] S1. Build a physical model equipment to simulate the impact of groundwater on the operation of the compressed air energy storage system in the underground space of abandoned coal mines. In order to meet the size requirements of the ground stress simulation loading system 30 (large true triaxial loading model test platform), the gas storage chamber 1 is designed to be 0.6 meters long and the cross-section is a square with a side length of 1.2 meters; connect the high-pressure air pump 26 and the gas delivery gun barrel 27; the water supply pipeline 12 is designed to be 1.0 meters long, and each water supply pipeline 12 is simultaneously connected to a multi-valve switch 11 and is independently controlled by it;
[0056] S2, the exhaust through hole on the rear end sealing panel 7 of the gas storage chamber 1 is blocked, the gas supply through hole on the front end sealing panel 7 of the gas storage chamber 1 is opened, the barrel valve 29 is opened to input compressed air into the gas storage, and the air pressure value of the air pressure regulating head 28 of the air supply gun barrel 27 is set in advance. When the air pressure displayed on the air pressure regulating head 28 reaches the requirement, the high-pressure air pump 26 is turned off, and the barrel valve 29 is closed;
[0057] S3. In the compressed air energy storage model test, first, a large true triaxial loading model test platform is used to load the model with confining pressure (simulating initial ground stress conditions), and then the water inlet valve 9 is opened, and the water pressure and flow are adjusted by the water pump 10. The water supply pipe 12 can realize water supply in different directions; the drainage pipe can realize drainage / non-drainage test; then the light source 22 is turned on, and as the ground stress loading is applied, the distributed optical fiber 21 and the earth pressure box 24 sense the force signal of the composite structure of the gas storage reservoir, realizing the simulation of the initial conditions of the compressed air energy storage reservoir in the underground space of the coal mine under the influence of groundwater;
[0058] S4. At the same time, under the influence of a certain confining pressure and groundwater, the high-pressure air pump 26 inputs compressed air into the gas storage chamber 1. During the gas transmission process, as the internal pressure of the gas storage chamber 1 changes, the strain sensor 17 on the external surface of the gas storage chamber 1 generates a certain strain, and the strain size of the monitoring channel of different strain sensors 17 in the stress strain monitoring system is observed; then the exhaust through hole on the rear end sealing enclosure 7 is opened to discharge air, and the air in the gas storage chamber 1 is observed to change in the strain reading as the pressure in the gas storage chamber 1 decreases;
[0059] S5. At the same time, under the influence of a certain confining pressure and groundwater, the strain of the resistance strain gauge 19 attached to the reinforced concrete lining layer 4 changes with the increase or decrease of the pressure in the gas storage chamber 1. The strain change of the reinforced concrete lining layer 4 is converted into the change of resistance, and then the displacement change of the reinforced concrete lining layer 4 is obtained through data amplification, processing and analysis;
[0060] S6. At the same time, under a certain confining pressure and the influence of groundwater, the in-hole imaging system uses the in-hole camera to clearly capture the response of the composite structure of the gas storage chamber 1 when the internal pressure increases or decreases, and then displays the changes inside the surrounding rock through the in-hole imager.
[0061] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0062] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. An experimental device for simulating the influence of groundwater on the stability of compressed gas energy storage in coal mine tunnels, characterized in that: include: A gas storage chamber (1), wherein the cross-sectional shape of the gas storage chamber (1) is circular, sealing panels (7) are respectively arranged at both ends of the gas storage chamber (1), and a rubber water stop (6) is arranged between the sealing panels (7) and the gas storage chamber (1), and the outer side of the gas storage chamber (1) is a cast surrounding rock layer (5), and in order to adapt to the ground stress simulation loading test platform, the cross-sectional shape of the surrounding rock layer (5) is rectangular; An air supply system, the air supply system is connected to the inner chamber of the gas storage chamber (1) through one of the sealing enclosures (7), and an exhaust hole is provided on the other sealing enclosure (7); A groundwater simulation system, the groundwater simulation system being arranged on the surrounding rock layer (5), the groundwater simulation system comprising a water supply system and a drainage system; A surrounding rock pressure monitoring system, wherein the surrounding rock pressure monitoring system is arranged on the surrounding rock layer (5); A gas storage reservoir stress and strain monitoring system, the gas storage reservoir stress and strain monitoring system being arranged on the outer wall of the gas storage reservoir chamber (1), the gas storage reservoir stress and strain monitoring system being used to detect the strain variation of the gas storage reservoir chamber (1) along the radial direction and the axial direction; A confining pressure system, the confining pressure system being used to apply pressure simulating the initial ground stress of the surrounding rock of the coal mine to the gas storage chamber (1); The gas storage chamber (1) comprises a steel sealing layer (2), a sliding layer (3) and a reinforced concrete lining layer (4) which are arranged in sequence from the inside to the outside, the surrounding rock layer (5) is arranged outside the reinforced concrete lining layer (4), and the sealing panels (7) are respectively arranged at both ends of the steel sealing layer (2); the water supply system comprises a water reservoir (8), a plurality of through holes are opened on the surrounding rock layer (5) along the axial direction, a water supply pipe (12) is arranged in the through holes, a drainage hole is opened on the side wall of the water supply pipe (12), a water pump (10) is installed on the water reservoir (8), and a multi-valve switch (12) is installed at the output end of the water pump (10) 1), the valve ports of the multi-valve switch (11) are arranged in one-to-one correspondence with the plurality of water supply pipes (12), the water inlet end of the water pump (10) is connected to the water reservoir (8) through a water pumping pipe, the water inlet valve (9) is installed on the water pumping pipe, and a water pressure gauge (13) and a flow meter (14) are arranged between the multi-valve switch (11) and the water supply pipe (12); the drainage system comprises an annular permeable blind pipe (15) and a longitudinal permeable blind pipe (16), the longitudinal permeable blind pipe (16) is arranged on the annular permeable blind pipe (15), and the annular permeable blind pipe (15) is arranged on the outer wall of the reinforced concrete lining layer (4).
2. The experimental device for simulating the influence of groundwater on the stability of compressed gas energy storage in coal mine tunnels according to claim 1, characterized in that: The gas supply system comprises a high-pressure gas pump (26). A gas delivery through hole is provided on the sealing enclosure (7). The output end of the high-pressure gas pump (26) is connected to a gas delivery gun barrel (27). The gas delivery gun barrel (27) passes through the gas delivery through hole and is in communication with the inner cavity of the steel sealing layer (2). The gas delivery gun barrel (27) is provided with a gas pressure regulating head (28) and a gun barrel valve (29).
3. The experimental device for simulating the effect of groundwater on the stability of compressed gas energy storage in coal mine tunnels according to claim 1, characterized in that: The surrounding rock pressure monitoring system comprises a distributed optical fiber (21) arranged in the surrounding rock layer (5), one end of the distributed optical fiber (21) is connected to a light source (22), and the other end is connected to an optical fiber demodulator (23); The surrounding rock pressure monitoring system further comprises a plurality of earth pressure boxes (24), wherein the earth pressure boxes (24) are arranged in the surrounding rock layer (5), and the earth pressure boxes (24) are connected to the static strain gauge (18).
4. The experimental device for simulating the effect of groundwater on the stability of compressed gas energy storage in coal mine tunnels according to claim 3, characterized in that: The gas storage reservoir stress and strain monitoring system comprises a plurality of rows of sensor groups arranged at equal intervals in the circumferential direction of the outer wall of the reinforced concrete lining layer (4), each row of the sensor groups comprises a plurality of strain sensors (17) arranged at equal intervals along the axial direction of the surrounding rock layer (5), the plurality of strain sensors (17) being connected to each other via a wire, one end of the wire being connected to the static strain gauge (18).
5. The experimental device for simulating the effect of groundwater on the stability of compressed gas energy storage in coal mine tunnels according to claim 1, characterized in that: A temperature and humidity sensor (25) and an imaging system are installed in the steel sealing layer (2). The imaging system comprises a micro camera, and the output end of the micro camera is connected to the camera port of the imaging device.
