A method for submersible reconnection of a dynamic flexible riser and a PLET.

By reserving rigging during the laying of the dynamic flexible riser and using lifting rigging to transfer the riser end to the PLET position, combined with the operation of divers, the complex reconnection problem between the dynamic flexible riser and the PLET in deep water environment was solved, thereby reducing the construction difficulty and risk.

CN117628271BActive Publication Date: 2026-11-17SHENZHEN OFFSHORE OIL ENG UNDERWATER TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202311730520.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-15
Publication Date
2026-11-17
Estimated Expiration
2043-12-15

AI Technical Summary

Technical Problem

In deep-water environments, the underwater reconnection operation of dynamic flexible risers and PLETs is complex and risky, and existing technologies cannot guarantee the safety of saturation divers and construction efficiency.

Method used

When laying dynamic flexible risers, rigging is pre-installed on the risers, and the riser end is transferred to the position above the PLET by lifting the rigging. Combined with the operation of divers, the assembly and testing are completed, which reduces the difficulty of construction and reduces the risk.

Benefits of technology

By pre-installing rigging and coordinating operations with divers, the construction difficulty was reduced, construction risks were decreased, and the safety and efficiency of the operation were improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117628271B_ABST
    Figure CN117628271B_ABST
Patent Text Reader

Abstract

This invention discloses a method for underwater reconnection of a dynamic flexible riser to a PLET (Plane-Based Electric Threshold), comprising the following steps: placing a counterweight at the end of the dynamic flexible riser on the seabed; completing the connection and arrangement of the reconnection rigging, and transferring the end of the dynamic flexible riser from the counterweight rigging to the lifting rigging; connecting the rigging to the pre-installed rigging on the top lug of the PLET; transmitting the limiting force of the dynamic flexible riser to the pre-installed rigging; and using multiple sets of hand-operated hoists installed on the top of the PLET to pull the end of the dynamic flexible riser to the top flange of the PLET and tighten the bolts, thus completing the overall reconnection of the dynamic flexible riser to the PLET. This invention reduces construction difficulty and risks by pre-installing reconnection rigging on the riser during its installation, transferring the end of the dynamic flexible riser to the reconnection point above the PLET, and completing the assembly and subsequent correlation testing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of marine engineering technology, and in particular to a method for underwater reconnection of a dynamic flexible riser and a PLET. Background Technology

[0002] Currently, in marine engineering technology, dynamic flexible risers are generally used to connect the upper FPSO and the underwater PLET. The underwater dynamic riser reconnection to the PLET by saturation divers plays a crucial role in connection work in deep-water environments. Since the PLET is an important component of a subsea connection system, it also faces difficulties such as complex operation and high risks. Therefore, it is of great significance to ensure the safe underwater reconnection of the PLET by saturation divers. Summary of the Invention

[0003] The purpose of this invention is to provide a method for underwater reconnection of a dynamic flexible riser and a PLET. By pre-installing reconnection rigging on the riser during the laying of the dynamic flexible riser, the end of the dynamic flexible riser is transferred to the reconnection position above the PLET and the assembly and subsequent correlation tests are completed, which reduces the construction difficulty and reduces the construction risk.

[0004] To achieve the objective of this invention, a method for submersible reconnection of a dynamic flexible riser to a PLET is provided, comprising the following steps: S1. Before the dynamic flexible riser is reconnected, the counterweight at the end of the dynamic flexible riser is wetted and stored on the seabed. S2. The crane on the work vessel assists the saturation diver in completing the connection and arrangement of the reconnection rigging, and transfers the end of the dynamic flexible riser from the counterweight rigging to the lifting rigging. The lifting rigging slowly pulls the end of the dynamic flexible riser to the top of the PLET. S3. The diver connects the rigging to the pre-installed rigging on the top lug of the PLET and the dynamic flexible riser. S4. Slowly release the lifting sling to transmit the limiting force of the dynamic flexible riser to the reserved sling; S5. Remove the lifting sling and dismantle and recycle the tractor head connected to the lifting sling, in preparation for the reconnection of the dynamic flexible riser flange; S6. Using multiple sets of hand chain hoists installed on the top of the PLET, slowly pull the end of the dynamic flexible riser to the top flange of the PLET and tighten the bolts. After completion, remove the hand chain hoists. S7. Divers remove the relevant rigging, and a crane assists in retrieving the counterweight and related rigging to the deck of the work vessel, completing the overall reconnection of the dynamic flexible riser to PLET.

[0005] As a preferred technical solution of the present invention, in step S2, one end of the lifting sling is connected to the end of the dynamic flexible riser, and the other end of the lifting sling passes through the top lug of the PLET and is connected to a power source. The power source pulls the lifting sling, and the lifting sling slowly pulls the end of the dynamic flexible riser to the top of the PLET after being subjected to force.

[0006] As a preferred embodiment of the present invention, the power source is a floating bag and / or a crane lifting wire rope.

[0007] As a preferred technical solution of the present invention, in step S3, after completing the connection of the PLET top lifting lug and the reserved rigging on the dynamic flexible riser, the rigging connection point of the counterweight block is transferred from the end of the dynamic flexible riser to the spare safety rigging on the side of the dynamic flexible riser.

[0008] As a preferred technical solution of the present invention, in step S5, the diver installs a float bag on the blind flange of the PLET, the diver removes the blind flange and retrieves it; the diver removes the towing head of the dynamic flexible riser, installs a float bag on the towing head, and the diver removes the towing head and retrieves it.

[0009] As a preferred technical solution of the present invention, in step S6, the diver installs the hand-operated hoist to the bolt hole of the end flange of the dynamic flexible riser. The diver adjusts the hand-operated hoist to assemble the flange of the dynamic flexible riser and the PLET. When the flange of the dynamic flexible riser and the PLET are about to overlap, a positioning steel rod is inserted, the flange assembly is adjusted, and bolts are inserted. The saturation diver tightens the bolts according to the design requirements. After completion, the hand-operated hoist is removed.

[0010] As a preferred technical solution of the present invention, the design requirements for bolt fastening include: installing a bolt tensioner, applying pressure to 10% of the tension, checking whether the tension head is activated or leaking, and gradually applying pressure from 25%, 50%, and 75% to 100% of the tension according to the tensioning procedure, recording the values, and completing the back pressure test.

[0011] Compared with the prior art, the present invention provides a submersible reconnection method for a dynamic flexible riser and a PLET, which has the following advantages: This invention reduces construction difficulty and risks by pre-installing reconnection rigging on the riser during the laying of the dynamic flexible riser, transferring the end of the dynamic flexible riser to the reconnection position above the PLET, and completing the assembly and subsequent correlation testing. Attached Figure Description

[0012] Figure 1 This is a schematic diagram of the process of this invention; Figure 2This is a schematic diagram of the dynamic flexible riser wet storage of the present invention; Figure 3 This is a schematic diagram of the lifting cable traction dynamic flexible riser of the present invention; Figure 4 This is a schematic diagram of the dynamic flexible riser and PLET flange assembly of the present invention; Figure 5 This is a schematic diagram of the operation of the hand chain hoist of the present invention.

[0013] 1 is a dynamic flexible riser, 2 is a counterweight, 3 is a lifting sling, 4 is a PLET, 5 is a reserved sling, 6 is a hand chain hoist, and 7 is a spare safety sling. Detailed Implementation

[0014] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0015] Please see Figures 1-5 This invention provides a method for submersible reconnection of a dynamic flexible riser and a PLET, comprising the following steps: S1. Before the dynamic flexible riser 1 is reconnected, the end of the dynamic flexible riser 1 is connected to the counterweight 2 and stored wet on the seabed. S2. The crane on the work vessel assists the saturation diver in completing the connection and arrangement of the reconnection rigging, and transfers the end of the dynamic flexible riser 1 from the counterweight rigging to the lifting rigging 3. The lifting rigging 3 slowly pulls the end of the dynamic flexible riser 1 to the top of the PLET4. S3. The diver connects the rigging to the pre-installed rigging 5 on the top lug of the PLET4 and the dynamic flexible riser 1. S4. Slowly release the lifting sling 3 to transmit the limiting force of the dynamic flexible riser 1 to the reserved sling 5; S5. Remove the lifting sling 3 and remove and recycle the tractor head connected to the lifting sling 3 to prepare for the flange reconnection operation of the dynamic flexible riser 1. S6. Using multiple sets of hand chain hoists 6 installed on the top of the PLET4, slowly pull the end of the dynamic flexible riser 1 to the top flange of the PLET4 and tighten the bolts. After completion, remove the hand chain hoists. S7. Divers remove the relevant rigging, and a crane assists in retrieving the counterweight 2 and the relevant rigging to the deck of the work vessel, completing the overall reconnection of the dynamic flexible riser to PLET.

[0016] In one embodiment of the present invention, in step S2, one end of the lifting sling 3 is connected to the end of the dynamic flexible riser 1, and the other end of the lifting sling 3 passes through the top lug of the PLET4 and is connected to a power source. The power source pulls the lifting sling 3, and after the lifting sling 3 is subjected to force, it slowly pulls the end of the dynamic flexible riser 1 to the top of the PLET4.

[0017] In one embodiment of the present invention, the power source is a float and / or a crane lifting wire rope.

[0018] In one embodiment of the present invention, in step S3, after the connection between the top lug of the PLET4 and the reserved rigging 5 on the dynamic flexible riser 1 is completed, the rigging connection point of the counterweight 2 is transferred from the end of the dynamic flexible riser 1 to the spare safety rigging 7 on the side of the dynamic flexible riser 1.

[0019] In one embodiment of the present invention, in step S5, the diver installs a float bag on the top flange blind plate of the PLET4, the diver removes the blind plate and retrieves it; the diver removes the towing head of the dynamic flexible riser 1, installs a float bag on the towing head, and the diver removes the towing head and retrieves it.

[0020] In one embodiment of the present invention, in step S6, the diver installs the hand chain hoist 6 into the bolt hole of the end flange of the dynamic flexible riser 1. The diver adjusts the hand chain hoist 6 to assemble the flanges of the dynamic flexible riser 1 and the PLET4. When the flanges of the dynamic flexible riser 1 and the PLET4 are about to overlap, a positioning steel rod is inserted, the flange assembly is adjusted, and bolts are inserted. The saturation diver tightens the bolts according to the design requirements. After completion, the hand chain hoist 6 is removed.

[0021] In one embodiment of the present invention, the design requirements for bolt fastening include: installing a bolt tensioner, applying pressure to 10% of the tension, checking whether the tension head is activated or leaking, and gradually applying pressure from 25%, 50%, and 75% to 100% of the tension according to the tensioning procedure, recording the values, and completing the back pressure test.

[0022] The above are merely preferred embodiments of the present invention, but the scope of protection of the present invention is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the scope of the technology disclosed in the present invention, based on the technical solution and inventive concept of the present invention, should be covered within the scope of protection of the present invention.

Claims

1. A method for submersible reconnection of a dynamic flexible riser and a PLET, characterized in that, Includes the following steps: S1. Before the dynamic flexible riser (1) is reconnected, the end of the dynamic flexible riser (1) is connected to the counterweight (2) and stored wet on the seabed. S2. The crane on the work vessel assists the saturation diver in completing the connection and arrangement of the reconnection rigging, and transfers the end of the dynamic flexible riser (1) from the counterweight rigging to the lifting rigging (3). The lifting rigging (3) slowly pulls the end of the dynamic flexible riser (1) to the top of the PLET (4). S3. The diver connects the rigging to the pre-installed rigging (5) on the top lug of the PLET (4) and the dynamic flexible riser (1); S4. Slowly release the lifting sling (3) to transmit the limiting force of the dynamic flexible riser (1) to the reserved sling (5). S5. Remove the lifting sling (3) and remove and recycle the tractor connected to the lifting sling (3) to prepare for the flange reconnection operation of the dynamic flexible riser (1); S6. Using multiple sets of hand chain hoists (6) set on the top of the PLET (4), slowly pull the end of the dynamic flexible riser (1) to the top flange of the PLET (4) and tighten the bolts. After completion, remove the hand chain hoists. S7. Divers remove the relevant rigging, and a crane assists in retrieving the counterweight (2) and related rigging to the deck of the work vessel, completing the dynamic flexible riser. The entire PLEET reconnection process is underway.

2. The submersible reconnection method between a dynamic flexible riser and a PLET according to claim 1, characterized in that: In step S2, one end of the lifting sling (3) is connected to the end of the dynamic flexible riser (1), and the other end of the lifting sling (3) passes through the top lug of the PLET (4) and is connected to a power source. The power source pulls the lifting sling (3), and after the lifting sling (3) is under force, it slowly pulls the end of the dynamic flexible riser (1) to the top of the PLET (4).

3. The submersible reconnection method between a dynamic flexible riser and a PLET according to claim 2, characterized in that: The power source is a floating bag and / or a crane lifting wire rope.

4. The submersible reconnection method between a dynamic flexible riser and a PLET according to claim 1, characterized in that: In step S3, after completing the connection between the top lug of the PLET (4) and the reserved rigging (5) on the dynamic flexible riser (1), the rigging connection point of the counterweight (2) is transferred from the end of the dynamic flexible riser (1) to the spare safety rigging (7) on the side of the dynamic flexible riser (1).

5. The submersible reconnection method between a dynamic flexible riser and a PLET according to claim 1, characterized in that: In step S5, the diver installs a float bag on the top flange blind plate of the PLET (4), removes the blind plate and retrieves it; the diver removes the towing head of the dynamic flexible riser (1), installs a float bag on the towing head, removes the towing head and retrieves it.

6. The submersible reconnection method between a dynamic flexible riser and a PLET according to claim 1, characterized in that: In step S6, the diver installs the hand-operated hoist (6) into the bolt holes of the end flange of the dynamic flexible riser (1), and the diver adjusts... The hand chain hoist (6) is used to assemble the flanges of the dynamic flexible riser (1) and the PLET (4). When the flanges of the dynamic flexible riser (1) and the PLET (4) are about to overlap, a positioning steel rod is inserted, the flange assembly is adjusted, and bolts are inserted. The saturated diver tightens the bolts according to the design requirements. After completion, the hand chain hoist (6) is removed.

7. A method for submersible reconnection of a dynamic flexible riser and a PLET according to claim 6, characterized in that: The design requirements for bolt tightening include: installing a bolt tensioner, applying pressure to 10% of the tensile pressure, checking whether the tension head is activated or leaking, and gradually increasing the pressure from 25%, 50%, and 75% to 100% of the tensile pressure according to the tensioning procedure, recording the values, and completing the back pressure test.