A room-and-pillar stope pillar recovery structure and method

By erecting a filling structure in the goaf and using medium-deep hole blasting technology, the problems of large engineering volume and poor stability in pillar recovery in the room-and-pillar stope were solved, and fast, safe and efficient pillar recovery and environmental management were achieved.

CN117684972BActive Publication Date: 2024-10-18JCHX MINE ENG INST CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311723245.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-14
Publication Date
2024-10-18
Estimated Expiration
2043-12-14

AI Technical Summary

Technical Problem

The existing room-and-pillar mine pillar recovery method has problems such as large amount of new mining work, long stope preparation time, low recovery efficiency, and poor safety and environmental management effects.

Method used

Use the goaf area with multiple ore pillars to set up filling retaining walls, top pillar walls and bottom pillar walls to fill the filling body, and carry out ventilation and transportation through the upper wall return air tunnel and the lower wall air inlet tunnel, and set up electric rake tunnels and chisel tunnels. In rock tunnels, medium and deep hole blasting technology is used to return to the mining pillar to reduce mining ground pressure and the instability of mining and cutting projects.

Benefits of technology

It achieves fast, safe and efficient pillar recovery, reduces the amount of new mining projects, ensures the balance of mining ground pressure and the stability of mining and cutting projects, and improves the pillar recovery rate and environmental governance effects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117684972B_ABST
    Figure CN117684972B_ABST
Patent Text Reader

Abstract

The invention relates to a room-and-pillar method mining field pillar recovery structure and method. The room-and-pillar method mining field pillar recovery structure comprises a goaf with multiple pillars, wherein filling retaining walls are respectively set between two adjacent pillars in two rows of pillars at the edges of two opposite sides in the goaf, and the edges of the other two opposite sides in the goaf are respectively provided with a top pillar wall and a bottom pillar wall; the goaf between the filling retaining walls, the top pillar wall and the bottom pillar wall is filled with a filling body; an upper plate return air tunnel and a plurality of return air skylights are arranged in the top pillar wall, and a lower plate air intake tunnel and a plurality of electric rake chambers are arranged in the bottom pillar wall; the upper plate return air tunnel is extended and arranged along the extension direction of the top pillar wall, and the lower plate air intake tunnel is extended and arranged along the extension direction of the bottom pillar wall; an electric rake road is arranged in the surrounding rock of the lower plate of the filling body, and an electric rake road is arranged on one side of each row of pillars between the filling retaining walls, and the two ends of each electric rake road are respectively connected with the corresponding return air skylight and the electric rake chamber; and a plurality of rock drilling tunnels are arranged on each electric rake road.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Pillar mining method for gentle dip thin ores

    CN103967493A

  • Method for recovering top pillars and middle pillars in bottom-pillar-free shallow-hole shrinkage subsequent filling mining method

    CN115163074A