A suspension system for concrete pump pipes in steel structure buildings and its usage method

By using H-beams and rubber-tired suspension systems to suspend concrete pump pipes in steel structure buildings, the problems of reduced floor load-bearing capacity and vibration load caused by suspended concrete pump pipes were solved, achieving efficient concrete pouring results.

CN117803184BActive Publication Date: 2026-11-17NINGBO CONSTR ENG GROUP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202311801530.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2026-11-17
Estimated Expiration
2043-12-26

AI Technical Summary

Technical Problem

In steel structure buildings, the suspension system of concrete pump pipes leads to a decrease in the load-bearing capacity of the floor slab and the generation of concrete cracks, and the vibration load of pumping operations affects the concrete strength.

Method used

H-beams are used as supports, combined with rubber wheel sets and X-shaped clamps. The concrete pump pipes are suspended by connecting the rubber wheel sets and X-shaped clamps, avoiding the use of support frames. The rubber wheel sets and H-beams form a guide rail system, reducing the impact of vibration and load on the floor slab.

Benefits of technology

It improves the quality of concrete pouring, reduces lateral displacement and load impact of floor slabs, increases pouring efficiency, has a simple and easy-to-disassemble structure, adapts to position adjustment, and enhances concrete pumping efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117803184B_ABST
    Figure CN117803184B_ABST
Patent Text Reader

Abstract

This invention discloses a suspension system for concrete pump pipes in steel structure buildings, comprising an H-shaped steel beam, a concrete pump pipe, rubber-tired rollers, and an X-shaped clamp. Two sets of rubber-tired rollers are provided, positioned on the lower flange of the H-shaped steel beam. The rubber-tired rollers are connected to the X-shaped clamp via a connecting steel plate. The concrete pump pipe is positioned below the X-shaped clamp. This invention fully utilizes the cross-sectional characteristics of the upper beams in steel structure buildings, using the lower flange and web of the H-shaped steel beam as supports to suspend the traditional concrete pump pipe at a certain height above the floor slab for pumping operations. This eliminates the need for pump pipe supports and concrete placing booms on the floor slab. Self-weight and vibration loads do not act on the floor slab or reinforcing steel, effectively controlling the floor slab flatness and reinforcing steel position, thus improving the quality of concrete pouring. The system has a simple structure, is easy to disassemble and adjust, and allows the pump pipe to be retracted as concrete is poured, improving the efficiency of concrete pouring operations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of concrete pouring technology, specifically to a suspension system and method for using a concrete pump pipe for steel structure buildings. Background Technology

[0002] When pouring concrete for floor slabs in steel structure buildings, horizontal pump pipes need to be installed on the floor slabs, and sometimes even concrete placing booms need to be installed.

[0003] During operation, the horizontal pump pipe is placed on a support frame, which, along with the concrete placing boom, is mounted on the floor slab. Under the load of the concrete placing boom, the horizontal pump pipe, and the self-weight of the concrete, the reinforcing steel in the load-bearing areas will experience displacement and deflection. When the negative reinforcement sinks, the effective height of the slab section decreases, reducing the floor slab's load-bearing capacity. Furthermore, the vibration load generated by the pumping operation will be transmitted to the floor slab and reinforcing steel, causing cracks and reduced strength in the initially set concrete under external loads. Therefore, we propose a concrete pump pipe suspension system and its application method for steel structure buildings. Summary of the Invention

[0004] The purpose of this invention is to provide a suspension system for concrete pump pipes in steel structure buildings and a method for using the system, in order to solve the problems mentioned in the background art.

[0005] To achieve the above objectives, the present invention provides the following technical solution: a suspension system for a concrete pump pipe in a steel structure building and its usage method, comprising an H-shaped steel beam, a concrete pump pipe, a rubber wheel assembly, and an X-shaped clamp. The rubber wheel assembly is provided in two sets, which are placed on the lower flange of the H-shaped steel beam. The rubber wheel assembly is connected to the X-shaped clamp via a connecting steel plate. The connecting steel plate is rigidly connected to the upper lever arm of the X-shaped clamp. The concrete pump pipe is disposed below the X-shaped clamp.

[0006] Furthermore, the rubber wheel assembly includes a rubber wheel, a connecting steel plate, a rubber wheel axle pin, and connecting rods. The connecting steel plate has a reserved hole, and the rubber wheel axle pin passes through the reserved hole between the rubber wheel and the connecting steel plate. Four sets of connecting rods are provided on the inner side of the connecting steel plate.

[0007] Furthermore, the connecting rod is provided with a connecting hole, and a roller is provided between every two connecting rods. The roller is passed through the connecting hole on the connecting rod by a roller axle pin, and the roller is in contact with the web of the H-beam.

[0008] Furthermore, the X-shaped clamp includes a steel plate, bolts, shackles, and a steel chain. The steel plate is configured in two sets, and the steel plate is fixedly connected to a connecting steel plate. The two sets of steel plates are rotatably connected by bolts. Shackle holes are provided at the bottom of both sets of steel plates, and shackles are provided inside the shackle holes. Steel chains are connected inside the two sets of shackles.

[0009] Furthermore, the steel chain is connected to the concrete pump pipe using a double-sleeve knot method.

[0010] A method for using a suspension system for a concrete pump pipe in a steel structure building, comprising the following steps:

[0011] Step 1: Install two sets of suspension systems at one end of the H-beam;

[0012] Step 2: On the H-beam and on one side of the suspension system, multiple sets of steel plates, bolts, shackles and steel chains are fixedly installed. The steel plates are directly fixed to the H-beam, and steel pump pipes are fixedly installed on the steel chains of the fixed steel plates, bolts, shackles and steel chains. Soft concrete pump pipes are installed on the suspension system. Then, the multiple sets of steel pump pipes and the soft concrete pump pipe at the front end are connected to each other.

[0013] Step 3: Then, suspend the softer concrete pump pipe on the sliding suspension system steel chain, connect the steel pump pipe and the concrete pump pipe, turn on the concrete pump to start pumping, and use the softer concrete pump pipe at the front end to adjust the discharge range.

[0014] Compared with the prior art, the present invention has the following beneficial effects: The present invention makes full use of the cross-sectional characteristics of the upper beam of the steel structure building, using the lower flange and web of the H-shaped steel beam as a support, and suspending the traditional concrete pump pipe at a certain height on the floor slab for pumping operations. This avoids the lower formwork being subjected to horizontal impact loads and vibration loads caused by pumping, reduces the lateral displacement of the formwork caused by the support, eliminates the need to set up pump pipe supports and concrete placing machines on the floor slab, and the self-weight and vibration loads do not act on the floor slab and reinforcing bars. The flatness of the floor slab and the position of the reinforcing bars are effectively controlled, and the quality of concrete pouring is improved. The system has a simple structure and is easy to disassemble and adjust. During the concrete pouring operation, the pump pipe is retracted as it is poured, which improves the efficiency of concrete pouring operations. Attached Figure Description

[0015] Figure 1 This is a schematic diagram of the front view structure of the present invention;

[0016] Figure 2 This is a side view structural diagram of the present invention;

[0017] Figure 3 This is a three-dimensional structural schematic diagram of the present invention;

[0018] Figure 4 This is a side view of the installation structure of the present invention.

[0019] In the diagram: 1 H-beam, 2 roller pin, 3 rubber wheel, 4 connecting steel plate, 5 rubber wheel pin, 6 steel plate, 7 bolt, 8 shackle, 9 roller, 10 connecting rod, 11 steel chain, 12 concrete pump pipe. Detailed Implementation

[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0021] Example 1:

[0022] Please see Figures 1-4 The present invention provides a technical solution: a suspension system for a concrete pump pipe in a steel structure building, comprising an H-shaped steel beam 1, a concrete pump pipe 12, a rubber wheel assembly, and an X-shaped clamp. The rubber wheel assembly is provided in two sets, which are placed on the lower flange of the H-shaped steel beam 1. The rubber wheel assembly and the X-shaped clamp are connected by a connecting steel plate 4. The connecting steel plate 4 is rigidly connected to the upper lever arm of the X-shaped clamp. The concrete pump pipe 12 is arranged below the X-shaped clamp.

[0023] This system fully utilizes the cross-sectional characteristics of the H-beam 1 in steel structure buildings, using the lower flange and web of the H-beam 1 as supports to suspend the traditional concrete pump pipe 12 at a certain height on the ground for pumping operations; and the rubber wheel assembly combined with the H-beam 1 forms a rubber wheel guide rail system. This pumping method is easy to disassemble and adjust in position. Compared with the traditional supports erected on the floor slab, there is no need to tie and disassemble the concrete pump pipe 12 to the support frame and reinforcing steel, reducing construction steps and greatly improving concrete pumping efficiency.

[0024] Please see Figure 1 , Figure 2 and Figure 3 The rubber wheel assembly includes a rubber wheel 3, a connecting steel plate 4, a rubber wheel axle pin 5, and a connecting rod 10. The connecting steel plate 4 has a reserved hole. The rubber wheel axle pin 5 passes through the rubber wheel 3 and the reserved hole on the connecting steel plate 4. Four sets of connecting rods 10 are provided on the inner side of the connecting steel plate 4. The connecting rods 10 have connecting holes. A roller 9 is provided between every two connecting rods 10. The roller 9 is passed through the connecting hole on the connecting rod 10 by a roller axle pin 2. The roller 9 is in contact with the web of the H-shaped steel beam 1.

[0025] Two sets of rubber wheels are placed on the lower flange of the steel beam 1, and the rollers 9 are attached to the web of the steel beam 1. At this time, the rubber wheels and the steel beam 1 form a guide rail system. The rubber wheels can slide horizontally relative to the steel beam 1. When the rubber wheel pin 5 is tightened, the horizontal movement can be restricted, so that the rubber wheels are in a relatively stationary state relative to the steel beam 1. Rollers 9 are arranged between every two connecting rods 10 to reduce the friction between the rubber wheels and the web of the steel beam 1. The rollers 9 are connected by roller pins 2 passing through the holes of the connecting rods 10.

[0026] Please see Figure 1 and Figure 2 The X-shaped clamp includes a steel plate 6, bolts 7, shackles 8, and a steel chain 11. The steel plate 6 is configured in two sets, and the steel plate 6 is fixedly connected to the connecting steel plate 4. The two sets of steel plates 6 are rotatably connected by bolts 7. Shackle holes are opened at the bottom of both sets of steel plates 6, and shackles 8 are installed inside the shackle holes. The steel chain 11 is connected inside the two sets of shackles 8. The length and arrangement of the steel chain 11 can be selected and adjusted according to actual needs. The steel chain 11 is connected to the concrete pump pipe 12 by a double-knot method. The double-knot method is easy to tie and disassemble, and has high safety.

[0027] The X-shaped clamp is formed by hinged bolts 7 through pre-drilled holes in the middle of two steel plates 6. The lever structure formed by the bolts 7 as the rotation axis can convert the self-weight load of the lower pump pipe 12 into the clamping force of the upper clamping arm of the steel plate 6. The lower ends of the two steel plates 6 are provided with shackle holes. Shackles 8 are fastened into the shackle holes for connection. The steel chain 11 is connected to the shackles 8. The steel chain 11 is then used to suspend the horizontal pump pipe 12 by a double-sleeve rope method. The upper ends of the two steel plates 6 are made of straight hook-type clamping arms. The clamping arms are rigidly connected to the outer connecting steel plate 4 of the rubber wheel assembly to transmit the clamping force and the lower self-weight load, so that the rubber wheel assembly and the H-shaped steel beam 1 fit better and avoid slippage.

[0028] When using this device to suspend the concrete pump pipe 12, firstly, press the lower end arm of the X-shaped clamp steel plate 6 inward. The upper end arm of the steel plate 6 will be displaced accordingly, and the two pairs of rubber wheel sets connected to the upper end arm of the steel plate 6 will open outward to a suitable size. Place the two pairs of rubber wheel sets at the lower flange of the steel beam 1 respectively, and pull the lower end arm of the X-shaped clamp steel plate 6 outward to press the roller 9 tightly against the web of the H-shaped steel beam 1. At this time, this device and the H-shaped steel beam 1 form a rubber wheel guide rail system. After adjusting the suspension position, tighten the rubber wheel axle pin 5 to fix this device. Select and adjust the length of the steel chain 11 connected to the shackle 8 according to actual needs, and suspend the concrete pump pipe 12.

[0029] Example 2:

[0030] Please see Figure 1 , Figure 2 , Figure 3 and Figure 4A method for using a suspension system for a concrete pump pipe in a steel structure building, the method comprising the following steps:

[0031] Step 1: Install two sets of suspension systems at one end of H-beam 1;

[0032] Step 2: On the H-beam 1 and on one side of the suspension system, multiple sets of steel plates 6, bolts 7, shackles 8 and steel chains 11 are fixedly installed. The steel plates 6 are directly fixedly installed on the H-beam 1, and steel pump pipes are fixedly installed on the steel chains 11 of the fixedly installed steel plates 6, bolts 7, shackles 8 and steel chains 11. A softer concrete pump pipe 12 is installed on the suspension system. Then, the multiple sets of steel pump pipes and the front softer concrete pump pipe 12 are connected to each other.

[0033] Step 3: Then, suspend the relatively soft concrete pump pipe 12 on the sliding suspension system steel chain 11, connect the steel pump pipe and the concrete pump pipe 12, turn on the concrete pump to start pumping, and use the relatively soft concrete pump pipe 12 at the front end to adjust the discharge range.

[0034] Step 4: After the front end floor slab is poured, stop the concrete pumping. As needed, disassemble the steel pump pipe at the rear of the movable section's suspension system, as well as the fixed installation steel plate 6, bolts 7, shackles 8, and steel chain 11. Push the rubber wheel assembly backward to make it slide along the H-shaped steel beam 1. Use the softer concrete pump pipe 12 at the front end to adjust the pouring range. Repeat the above steps until the floor slab of the entire pumping route is poured. Then, start a new route to pour the floor slab.

[0035] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A suspension system for a concrete pump pipe of a steel structure building, comprising a H-shaped steel beam (1), a concrete pump pipe (12), a rubber wheel set and an X-shaped clamp, characterized in that: The rubber wheel assembly is provided in two sets, and the two sets of rubber wheel assemblies are placed on the lower flange of the H-shaped steel beam (1). The rubber wheel assembly is connected to the X-shaped clamp through a connecting steel plate (4). The connecting steel plate (4) is rigidly connected to the upper lever arm of the X-shaped clamp. A concrete pump pipe (12) is provided below the X-shaped clamp. The rubber wheel assembly includes a rubber wheel (3), a connecting steel plate (4), a rubber wheel axle pin (5), and a connecting rod (10). The connecting steel plate (4) has a reserved hole. The rubber wheel axle pin (5) passes through the rubber wheel (3) and the reserved hole on the connecting steel plate (4). Four sets of connecting rods (10) are provided on the inner side of the connecting steel plate (4). The connecting rod (10) has a connecting hole, and a roller (9) is provided between every two connecting rods (10). The roller (9) is passed through the connecting hole on the connecting rod (10) by a roller pin (2). The roller (9) is in contact with the web of the H-beam (1). The X-shaped clamp includes a steel plate (6), bolts (7), shackles (8) and a steel chain (11). The steel plate (6) is configured in two sets. The steel plate (6) is fixedly connected to the connecting steel plate (4). The two sets of steel plates (6) are rotatably connected by bolts (7). The bottom of the two sets of steel plates (6) is provided with shackle holes. Shackles (8) are provided inside the shackle holes. The steel chain (11) is connected inside the two sets of shackles (8). The steel chain (11) and the concrete pump pipe (12) are connected by a double-sleeve knot method; A method of using a suspension system for a concrete pump pipe of a steel structure building, characterized in that: The method of using the suspension system for concrete pump pipes in a steel structure building includes the following steps: Step 1: Install two sets of movable suspension systems at one end of the H-beam (1); Step 2: On the H-beam (1) and on one side of the suspension system, a number of steel plates (6), bolts (7), shackles (8) and steel chains (11) are fixedly installed. The steel plates (6) are directly fixedly installed on the H-beam (1), and steel pump pipes are fixedly installed on the steel chains (11) of the fixedly installed steel plates (6), bolts (7), shackles (8) and steel chains (11). A soft concrete pump pipe (12) is installed on the suspension system. Then, the multiple steel pump pipes and the soft concrete pump pipe (12) at the front end are connected to each other. Step 3: Then, suspend the softer concrete pump pipe (12) on the sliding suspension system steel chain (11), connect the steel pump pipe and the concrete pump pipe (12) to each other, turn on the concrete pump to start pumping, and use the softer concrete pump pipe (12) at the front end to adjust the discharge range.

Citation Information

Patent Citations

  • Mounting structure of tunnel lining pump pipe

    CN209603102U

  • Cast steel pipe hoisting clamp

    CN212503634U

  • I-shaped steel sliding groove lifting device for manual hole digging piles between two railway business lines

    CN218507417U