Shallow overburden riverbed high-strength hard rock pilot hole steel pipe piles and construction methods
By using an integral guide frame and various construction techniques in the shallow overburden riverbed hard rock geological conditions, the problem of steel pipe pile driving was solved, achieving efficient and stable steel pipe pile construction and improving construction quality and safety.
Patent Information
- Application Number
- CN202311872019.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2043-12-29
AI Technical Summary
In shallow overburden riverbeds with hard rock geology, steel pipe piles are difficult to drive, resulting in slow construction progress and poor stability, which existing technologies cannot effectively solve.
The system employs an integrated guide frame, steel casing, impact-drilled steel pipe pile sand-filled anchoring system, implanted I-beam grouting anchoring system, impact-drilled steel pipe pile tip reinforcement structure, and prefabricated enlarged foundation connection system for steel cofferdam. Through the combined use of these components, the precise positioning and stabilization of the steel pipe piles are achieved.
This improved the construction accuracy and efficiency of steel pipe piles, enhanced their stability and bearing capacity, and ensured construction quality and safety.
Smart Images

Figure CN117822583B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of bridge engineering, and in particular relates to a high-strength hard rock borehole steel pipe pile with shallow overburden and its construction method. Background Technology
[0002] Steel trestle bridges, as a crucial mode of transportation in underwater bridge construction, bear the heavy responsibility of directly transporting large and heavy equipment and materials to the pier caps. Therefore, they require high load-bearing capacity and safety stability, and are essential for ensuring the overall progress of the bridge project. Steel pipe piles are the most widely used type of trestle bridge support. However, in adverse geological conditions such as shallow overburden riverbeds with hard rock, conventional methods of driving piles directly into the hard bedrock are difficult, resulting in challenging pile driving and poor stability, thus impacting construction progress.
[0003] In view of this, in view of the shortcomings of previous construction of steel pipe piles in high-strength hard rock strata, there is an urgent need for a new construction method of pilot-hole steel pipe piles in shallow overburden riverbeds to improve construction efficiency, enhance construction quality, and ensure safe and reliable construction quality. Summary of the Invention
[0004] The purpose of this invention is to overcome the shortcomings of the prior art and provide a high-strength hard rock borehole steel pipe pile with shallow overburden riverbed and a construction method thereof.
[0005] This type of shallow-covered riverbed high-strength hard rock pilot-hole steel pipe pile includes an integral guide frame, steel casing, impact pilot-hole steel pipe pile sand-filled anchoring system, implanted I-beam grouting anchoring system, impact pilot-hole steel pipe pile tip reinforcement structure, steel cofferdam prefabricated enlarged foundation connection system, and steel casing fixed positioning guide frame.
[0006] The steel casing is inserted into the riverbed through an integral guide frame, and the steel pipe pile is inserted into the riverbed along the inner wall of the steel casing; the impact-drilled steel pipe pile sand-filled anchoring system is set at the bottom of the integral guide frame, including a sliding track, and a hopper is slidably connected below the sliding track for bottom anchoring after impact drilling;
[0007] The grouting anchoring system for the embedded I-beams is located inside the steel pipe piles, and the pile tip reinforcement structure for the impact-driven pre-drilled steel pipe piles is located at the bottom of the steel pipe piles; the prefabricated enlarged foundation connection system for the steel cofferdam includes the steel cofferdam, which is located on the riverbed around the bottom of the steel pipe piles.
[0008] Preferably, the integral guide frame includes reinforcing connecting steel, vertical steel, diagonal steel, horizontal steel, a steel pipe pile annular positioning ring, connecting fasteners, and a walking platform. The vertical steel, diagonal steel, and horizontal steel are connected to the steel trestle to form the integral guide frame. The reinforcing connecting steel connects the steel trestle to the integral guide frame. The steel pipe pile annular positioning ring and the walking platform plate are set within a rectangular frame composed of horizontal steel. One end of the connecting fastener is fixed to the steel pipe pile annular positioning ring, and the other end is fixed to the walking platform plate.
[0009] Preferably, the impact-drilled steel pipe pile sand-filled anchoring system includes a steel rope, lifting lugs, casters, caster fixing components, a sliding rail, a hopper connector, and a hopper. The lifting lugs are mounted on the steel casing. One end of the steel rope is fixed to the integral guide frame, and the other end is fixed to the lifting lugs. The sliding rail is located at the lower part of the integral guide frame. The casters are mounted on the sliding rail via caster fixing components, and the hopper is connected to the casters via hopper connectors.
[0010] Preferably, the implanted I-beam grouting anchoring system includes a borehole, an I-beam, a grouting hole, and a rubber plug. The borehole is located inside the steel pipe pile, the I-beam and the grouting hole are located inside the borehole, and the rubber plug is located on the borehole.
[0011] Preferably, the pile tip reinforcement structure of the impact-driven borehole steel pipe pile includes a welded fixing ring plate, an end fixing block, a reinforcing triangular rib plate, and drill teeth. The welded fixing ring plate is set at the bottom of the steel pipe pile through the end fixing block, the reinforcing triangular rib plate is set on the welded fixing ring plate, and the drill teeth are set on the reinforcing triangular rib plate.
[0012] Preferably, the prefabricated enlarged foundation connection system of the steel cofferdam includes a transverse steel mold, a lateral steel mold, connecting bolts, connecting bolt holes, a top steel mold, a waterproof gasket, concrete, pile holes, and external backfill soil. The transverse steel mold, the lateral steel mold, and the top steel mold constitute the steel cofferdam. The connecting bolt holes are located on the lateral steel mold. The waterproof gasket is fixed to the lateral steel mold by the connecting bolts. The concrete is poured inside the steel cofferdam, and the external backfill soil is outside the steel cofferdam. The pile holes are located on the top steel mold.
[0013] Preferably, the steel casing fixing and positioning guide frame includes a lug sliding groove, a sliding lug, and a sliding groove reinforcing connecting block. The lug sliding groove is fixed inside the steel casing by the sliding groove reinforcing connecting block, and the sliding lug is set on the steel pipe pile.
[0014] Preferably, the riverbed includes a hard rock layer and an overburden layer, with a water surface line above the riverbed. The hard rock layer and the overburden layer are below the water surface line, and the overburden layer is on top of the hard rock layer.
[0015] The construction method for this type of high-strength hard rock pilot-hole steel pipe pile in shallow overburden riverbed includes the following steps:
[0016] Step 1: Construct an integral guide frame. A steel trestle bridge is set up above the integral guide frame, and a steel pipe pile annular positioning ring and a walking platform plate are set inside the integral guide frame.
[0017] Step 2, Steel casing construction: The steel casing is lowered using an integral guide frame;
[0018] Step 3, Impact Hole Formation: A sliding rail is set at the bottom of the integral guide frame, and the hopper is below the sliding rail. After the impact hole is formed, the bottom anchoring construction is carried out.
[0019] Step 4, Steel Pipe Pile Construction: An impact-guided steel pipe pile tip reinforcement structure is set at the bottom of the steel pipe pile. The steel pipe pile is driven by a pile driver. A grouting pipe is inserted into the steel pipe pile through a drill hole, and cement grout is injected into the hole.
[0020] Step Six: Construction of Steel Cofferdam: Remove the steel casing and construct the steel cofferdam at the bottom of the steel pipe piles to form a prefabricated enlarged foundation connection system for the steel cofferdam.
[0021] The beneficial effects of this invention are:
[0022] 1) The construction of the integrated guide frame positioning control technology and the steel casing fixed positioning guide frame technology has improved the construction accuracy and efficiency of steel casing and steel pipe pile, respectively. The operation is simple and the construction quality is guaranteed.
[0023] 2) The construction was carried out using the impact-driven pre-drilled steel pipe pile sand-filled anchoring construction technology and the prefabricated enlarged foundation connection technology of steel cofferdam. Grouting was performed inside the steel pipe piles, and a prefabricated enlarged foundation connection system of steel cofferdam was set at the bottom of the steel pipe piles, which improved the stability of the steel pipe piles and the construction efficiency.
[0024] 3) The construction adopts an embedded I-beam grouting anchoring system, which effectively solves the problem that steel pipe piles in hard rock of shallow overburden riverbed cannot be driven to the design depth. The construction is simple, the pile quality is good, and the foundation bearing capacity is guaranteed.
[0025] 4) By applying the pile tip reinforcement technology of impact-driven pre-drilled steel pipe piles, drill teeth are set at the bottom of the steel pipe piles, which effectively solves the problem of difficult pile driving in high-strength hard rock strata. On-site installation is convenient and pile driving efficiency is improved. Attached Figure Description
[0026] Figure 1 This is a schematic diagram of the structure of the present invention;
[0027] Figure 2 This is a front view of the integral guide frame structure;
[0028] Figure 3This is a top view of the integrated guide frame structure;
[0029] Figure 4 This is a schematic diagram of the sand-filled anchorage system structure for impact-driven pre-hole steel pipe piles;
[0030] Figure 5 This is a top view of the grouting anchorage system structure for the implanted I-beams;
[0031] Figure 6 This is a front view of the reinforcement structure for the tip of an impact-driven pre-hole steel pipe pile;
[0032] Figure 7 This is a top view of the reinforcement structure for the tip of an impact-drilled steel pipe pile;
[0033] Figure 8 This is a front view of the prefabricated enlarged foundation connection system of the steel cofferdam;
[0034] Figure 9 This is a top view of the prefabricated enlarged foundation connection system of the steel cofferdam;
[0035] Figure 10 This is a front view of the steel casing fixing and positioning guide frame structure;
[0036] Figure 11 This is a top view of the steel casing fixed positioning guide frame structure.
[0037] In the diagram: 1-Hard rock layer, 2-Overburden layer, 3-Water surface line, 4-Steel pipe pile, 5-Steel trestle, 6-Integral guide frame, 7-Steel rope, 8-Lifting lug, 9-Steel casing, 10-Concrete, 11-Steel cofferdam, 12-I-beam, 13-Reinforcing connecting steel, 14-Vertical steel, 15-Diagonal steel, 16-Horizontal steel, 17-Steel pipe pile ring positioning ring, 18-Connecting fastener, 19-Walking platform plate, 20-Wheel caster, 21-Wheel caster fastener, 22-Sliding track. 23-Hopper connector, 24-Hopper, 25-Drill hole, 26-I-beam, 27-Grouting hole, 28-Rubber plug, 29-Welded fixing ring plate, 30-End fixing block, 31-Reinforcing triangular rib plate, 32-Drill teeth, 33-Transverse steel mold, 34-Side steel mold, 35-Connecting bolt, 36-Connecting bolt hole, 37-Top steel mold, 38-Waterproof washer, 39-External backfill soil, 40-Pile hole, 41-Ear plate sliding groove, 42-Sliding ear plate, 43-Sliding groove reinforcing connecting block. Detailed Implementation
[0038] The present invention will be further described below with reference to embodiments. The description of the embodiments below is only for the purpose of helping to understand the present invention. It should be noted that those skilled in the art can make several modifications to the present invention without departing from the principle of the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.
[0039] Example 1
[0040] As one example, such as Figures 1 to 11 As shown, this type of high-strength hard rock pilot-hole steel pipe pile in shallow overburden riverbed includes an integral guide frame 6, a steel casing 9, a sand-filled anchoring system for impact pilot-hole steel pipe piles, a grouting anchoring system for embedded I-beams, a pile tip reinforcement structure for impact pilot-hole steel pipe piles, a prefabricated enlarged foundation connection system for steel cofferdams, and a steel casing fixed positioning guide frame.
[0041] The steel casing 9 is inserted into the riverbed through the integral guide frame 6, and the steel pipe pile 4 is inserted into the riverbed along the inner wall of the steel casing 9; the impact-drilled steel pipe pile sand-filled anchoring system is set at the bottom of the integral guide frame 6, including a sliding rail 22, and a hopper 24 is slidably connected below the sliding rail 22 for bottom anchoring after impact drilling;
[0042] The grouting anchoring system for the embedded I-beam is located inside the steel pipe pile 4, and the pile tip reinforcement structure for the impact-driven pre-drilled steel pipe pile is located at the bottom of the steel pipe pile 4; the prefabricated enlarged foundation connection system for the steel cofferdam includes the steel cofferdam 11, which surrounds the bottom of the steel pipe pile 4 and is located on the riverbed.
[0043] The integral guide frame includes reinforcing connecting steel 13, vertical steel 14, diagonal steel 15, horizontal steel 16, steel pipe pile annular positioning ring 17, connecting fastener 18, and walking platform 19. The vertical steel 14, diagonal steel 15, and horizontal steel 16 are connected to the steel trestle 5 to form an integral guide frame 6. The reinforcing connecting steel 13 connects the steel trestle 5 and the integral guide frame 6. The steel pipe pile annular positioning ring 17 and the walking platform plate 19 are set within a rectangular frame formed by the horizontal steel 16. One end of the connecting fastener 18 is fixed to the steel pipe pile annular positioning ring 17, and the other end is fixed to the walking platform plate 19.
[0044] The impact-drilled steel pipe pile sand-filled anchoring system includes a steel rope 7, lifting lugs 8, a steel casing 9, a caster wheel 20, a caster wheel fixing component 21, a sliding track 22, a hopper connector 23, and a hopper 24. The lifting lugs 8 are installed on the steel casing 9. One end of the steel rope 7 is fixed to the transverse steel section 16, and the other end is fixed to the lifting lugs 8. The sliding track 22 is installed at the lower part of the transverse steel section 16. The caster wheel 20 is installed on the sliding track 22 through the caster wheel fixing component 21. The hopper 24 is connected to the caster wheel 20 through the hopper connector 23.
[0045] The implanted I-beam grouting anchoring system includes a borehole 25, an I-beam 26, a grouting hole 27, and a rubber plug 28. The borehole 25 is located inside the steel pipe pile 4, the I-beam 26 and the grouting hole 27 are located inside the borehole 25, and the rubber plug 28 is located on the borehole 25.
[0046] The pile tip reinforcement structure of the impact-driven borehole steel pipe pile includes a welded fixing ring plate 29, an end fixing block 30, a reinforcing triangular rib plate 31, and a drill tooth 32. The welded fixing ring plate 29 is set at the bottom of the steel pipe pile 4 through the end fixing block 30, the reinforcing triangular rib plate 31 is set on the welded fixing ring plate 29, and the drill tooth 32 is set on the reinforcing triangular rib plate 31.
[0047] The prefabricated enlarged foundation connection system of the steel cofferdam includes a transverse steel mold 33, a lateral steel mold 34, connecting bolts 35, connecting bolt holes 36, a top steel mold 37, a waterproof gasket 38, external backfill soil 39, pile holes 40, and external backfill soil 41. The transverse steel mold 33, the lateral steel mold 34, and the top steel mold 37 form the steel cofferdam 11. The connecting bolt holes 36 are located on the lateral steel mold 34. The waterproof gasket 38 is fixed to the lateral steel mold 33 by the connecting bolts 35. The concrete 10 is inside the steel cofferdam 11, the external backfill soil 39 is outside the steel cofferdam 11, and the pile holes 40 are located on the top steel mold 37.
[0048] The steel casing fixing and positioning guide frame includes a lug sliding groove 41, a sliding lug 42, and a sliding groove reinforcing connecting block 43. The lug sliding groove 41 is fixed to the steel casing 9 through the sliding groove reinforcing connecting block 43, and the sliding lug 42 is set on the steel pipe pile 4.
[0049] The riverbed includes a hard rock layer 1 and a cover layer 2. A water surface line 3 exists above the riverbed. The hard rock layer 1 and the cover layer 2 are below the water surface line 3, and the cover layer 2 is above the hard rock layer 1.
[0050] Example 2
[0051] As another embodiment, the construction method of the high-strength hard rock pilot-hole steel pipe piles in shallow overburden riverbeds in Embodiment 1 includes the following steps:
[0052] Step 1: Implement on-site traffic control, ensure construction equipment is in place, inspect and accept construction materials entering the site, and conduct technical briefings.
[0053] Installation of the integral guide frame: The vertical steel 14, the diagonal steel 15, and the horizontal steel 16 are connected to the steel trestle 5 to form the integral guide frame 6. The reinforcing connecting steel 13 connects the steel trestle 5 and the integral guide frame 6. The steel pipe pile annular positioning ring 17 and the walking platform plate 19 are set in the rectangular frame formed by the horizontal steel 16. One end of the connecting fastener 18 is fixed to the steel pipe pile annular positioning ring 17, and the other end is fixed to the walking platform plate 19.
[0054] Step 2, Steel casing construction: Install ear plate sliding grooves 41 on the steel casing. The ear plate sliding grooves 41 are fixed to the steel casing 9 through sliding groove reinforcing connecting blocks 43. The steel casing 9 is then lowered using an integral guide frame.
[0055] Step 3, Impact Hole Construction: The lifting lug 8 is set on the steel casing 9, one end of the steel rope 7 is fixed to the transverse steel 16, and the other end is fixed to the lifting lug 8. The sliding rail 22 is set at the lower part of the transverse steel 16, and the universal wheel 20 is set on the sliding rail 22 through the universal wheel fixing part 21. The hopper 24 is connected to the universal wheel 20 through the hopper connector 23. After the impact hole is formed, sand and gravel concrete is put into the hopper for bottom anchoring construction.
[0056] Step 4, Steel Pipe Pile Construction: Movable ear plates 42 are installed on both sides of the steel pipe pile. Welded fixed ring plates 29 are installed at the bottom of the steel pipe pile 4 through end fixing blocks 30. Reinforcing triangular ribs 31 are installed on the welded fixed ring plates 29. Drill teeth 32 are installed on the reinforcing triangular ribs 31. The steel pipe pile 4 is driven by a pile driver. Holes 25 are drilled in the steel pipe pile 4 to embed I-beams 26. After the I-beams 26 are installed, grouting pipes are inserted through grouting holes 27. Rubber plugs 28 are installed at the top of the holes. Cement grout is injected into the holes through the grouting pipes.
[0057] Step 5, Steel Cofferdam Construction: Remove the steel casing 9. The transverse steel formwork 33, the lateral steel formwork 34, and the top steel formwork 37 form the steel cofferdam 11. The connecting bolt holes 36 are set on the lateral steel formwork 34. The waterproof gasket 38 is fixed to the lateral steel formwork 33 by the connecting bolts 35. Concrete 10 is poured inside the steel cofferdam 11. Backfill soil 39 is placed outside the steel cofferdam 11. Pile holes 40 are set on the top steel formwork 37. The piles are installed and spliced at the bottom.
[0058] After construction is completed and inspected, the equipment and machinery are dismantled and removed from the site.
[0059] It should be noted that the parts in this embodiment that are the same as or similar to those in Embodiment 1 can be referred to each other, and will not be repeated in this application.
[0060] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. The same or similar parts between the various embodiments can be referred to each other.
Claims
1. A type of high-strength hard rock borehole steel pipe pile for shallow overburden riverbeds, characterized in that, It includes an integral guide frame, steel casing, impact-drilled steel pipe pile sand-filled anchoring system, implanted I-beam grouting anchoring system, impact-drilled steel pipe pile tip reinforcement structure, steel cofferdam prefabricated enlarged foundation connection system, and steel casing fixed positioning guide frame; The steel casing is inserted into the riverbed through an integral guide frame, and the steel pipe pile is inserted into the riverbed along the inner wall of the steel casing; the impact-drilled steel pipe pile sand-filled anchoring system is set at the bottom of the integral guide frame, including a sliding track, and a hopper is slidably connected below the sliding track for bottom anchoring after impact drilling; The grouting anchoring system for the embedded I-beam is set inside the steel pipe pile, and the pile tip reinforcement structure for the impact-drilled steel pipe pile is set at the bottom end of the steel pipe pile; the prefabricated enlarged foundation connection system of the steel cofferdam includes the steel cofferdam, which is set around the bottom of the steel pipe pile on the riverbed. The impact-drilled steel pipe pile sand-filled anchoring system includes a steel rope, lifting lugs, casters, caster fixing components, a sliding rail, a hopper connector, and a hopper. The lifting lugs are installed on the steel casing. One end of the steel rope is fixed to the integral guide frame, and the other end is fixed to the lifting lugs. The sliding rail is installed at the lower part of the integral guide frame. The casters are installed on the sliding rail through caster fixing components. The hopper is connected to the casters through a hopper connector. The pile tip reinforcement structure of the impact-driven borehole steel pipe pile includes a welded fixing ring plate, an end fixing block, a reinforcing triangular rib plate, and drill teeth. The welded fixing ring plate is set at the bottom of the steel pipe pile through the end fixing block, and the reinforcing triangular rib plate is set on the welded fixing ring plate. The drill teeth are set on the reinforcing triangular rib plate. The prefabricated enlarged foundation connection system of the steel cofferdam includes a transverse steel mold, a lateral steel mold, connecting bolts, connecting bolt holes, a top steel mold, a waterproof gasket, concrete, pile holes, and external backfill soil. The transverse steel mold, lateral steel mold, and top steel mold constitute the steel cofferdam. The connecting bolt holes are located on the lateral steel mold. The waterproof gasket is fixed to the lateral steel mold by the connecting bolts. The concrete is poured inside the steel cofferdam, and the external backfill soil is outside the steel cofferdam. The pile holes are located on the top steel mold. The steel casing fixing and positioning guide frame includes a lug sliding groove, a sliding lug, and a sliding groove reinforcing connecting block. The lug sliding groove is fixed inside the steel casing through the sliding groove reinforcing connecting block, and the sliding lug is set on the steel pipe pile. The implanted I-beam grouting anchoring system includes a borehole, an I-beam, a grouting hole, and a rubber plug. The borehole is located inside the steel pipe pile, the I-beam and the grouting hole are located inside the borehole, and the rubber plug is located on the borehole.
2. The shallow overburden riverbed high-strength hard rock pilot-hole steel pipe pile according to claim 1, characterized in that, The integral guide frame includes reinforcing connecting steel, vertical steel, diagonal steel, horizontal steel, a steel pipe pile annular positioning ring, connecting fasteners, and a walking platform. The vertical steel, diagonal steel, and horizontal steel are connected to the steel trestle to form the integral guide frame. The reinforcing connecting steel connects the steel trestle to the integral guide frame. The steel pipe pile annular positioning ring and the walking platform plate are set within a rectangular frame composed of horizontal steel. One end of the connecting fastener is fixed to the steel pipe pile annular positioning ring, and the other end is fixed to the walking platform plate.
3. The shallow overburden riverbed high-strength hard rock pilot-hole steel pipe pile according to claim 1, characterized in that, The riverbed consists of a hard rock layer and an overburden layer. A water level line exists above the riverbed. The hard rock layer and the overburden layer are below the water level line, and the overburden layer is above the hard rock layer.
4. The construction method of high-strength hard rock pilot-hole steel pipe piles in shallow overburden riverbeds as described in any one of claims 1 to 3, characterized in that, Includes the following steps: Step 1: Construct an integral guide frame. A steel trestle bridge is set up above the integral guide frame, and a steel pipe pile annular positioning ring and a walking platform plate are set inside the integral guide frame. Step 2, Steel casing construction: The steel casing is lowered using an integral guide frame; Step 3, Impact Hole Formation: A sliding rail is set at the bottom of the integral guide frame, and the hopper is below the sliding rail. After the impact hole is formed, the bottom anchoring construction is carried out. Step 4, Steel Pipe Pile Construction: An impact-guided steel pipe pile tip reinforcement structure is set at the bottom of the steel pipe pile. The steel pipe pile is driven by a pile driver. A grouting pipe is inserted into the steel pipe pile through a drill hole, and cement grout is injected into the hole. Step 5: Construction of steel casing cofferdam: Remove the steel casing and construct the steel casing cofferdam at the bottom of the steel pipe piles to form a prefabricated enlarged foundation connection system for the steel casing cofferdam.
Citation Information
Patent Citations
Construction device and construction method for steel casings applicable to shallow coverage layer, deepwater area, high flow speed and inclined sock surface
CN107034884A
Oblique section steel trestle construction combination reinforcement mode and construction technology
CN108103939A
Steel pipe pile automatic position adjusting system and using method thereof
CN116516958A