A method and sealing device for preventing and controlling outburst at working face in underground coal mine

By setting up a sealed device in front of the coal mine excavation work face to adjust the gas pressure and ground stress, the problem of prevention and control of coal and gas outbursts is solved, safe and efficient coal mining is achieved, and prominent accidents and blind spots are avoided.

CN117868984BActive Publication Date: 2024-11-29CHINA UNIV OF PETROLEUM (EAST CHINA)
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410219216.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2024-11-29
Estimated Expiration
2044-02-28

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively prevent and control coal and gas outbursts, especially in the case of poor connectivity of coal seam structure and gas migration channels, which leads to low gas extraction efficiency and inaccurate prediction, forming a blind spot for prominent prediction, increasing coal mine safety risks. .

Method used

By setting up a sealing device in front of the excavation working face, measuring the gas pressure and radial stress of the coal body, establishing a sealed chamber and filling it with inert gas, adjusting the gas pressure to balance the gas pressure and ground stress, hindering the damage of the coal body, and thus preventing protrusions. The device includes a frame, airbag bag and a fixing mechanism, which can be quickly installed and removed and has impact resistance.

Benefits of technology

Effectively hinder the development of the prominent fertilization process, eliminate local gas abnormal zones, avoid prominent accidents, simplify gas management operations, improve safety and economic benefits, and extend the service life of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117868984B_ABST
    Figure CN117868984B_ABST
Patent Text Reader

Abstract

The present invention records a method for preventing and controlling coal mine underground excavation working face outburst, including the following steps: S1, obtaining the coal body gas pressure and coal body radial stress in front of the excavation working face; S2, setting a closed device to form a closed chamber with the coal body in front; S3, respectively setting an air inlet, an electronic pressure gauge and an exhaust port on the closed device; the air inlet is used to fill the closed chamber with inert protective gas and maintain the set air pressure value in the closed chamber; the electronic pressure gauge is used to display the gas pressure value inside the closed chamber in real time; the exhaust port is used to connect a negative pressure device to discharge the gas inside the closed chamber; S4, after blasting or comprehensive excavation, the gas in the closed chamber is extracted by the negative pressure device; S5, the closed device is removed to start the coal falling cleaning operation. The method recorded in the present invention can eliminate the blank extraction zone and outburst prediction blind area caused by substandard extraction, and avoid outburst accidents triggered by incorrect judgment of outburst danger in local areas.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of coal mine safety and prevention of outbursts, and in particular to a method and a sealing device for preventing and controlling outbursts in an underground coal mine excavation working face. Background Art

[0002] Coal and gas outburst disasters restrict the safe mining of coal mines with their long-term, complex and repetitive nature. The continuous occurrence of outburst accidents in recent years also shows that the prevention and control of outburst disasters has entered a bottleneck period. Many public reports on outburst accidents have shown that due to the development of local structures in coal seams, the coal bodies near the structures have low mechanical strength and poor connectivity of gas migration channels, which can easily lead to low gas extraction efficiency, substandard extraction, or the formation of extraction blank zones, which in turn evolve into blind spots for coal and gas outburst prediction. At present, in view of the development characteristics of coal seams, there are no better prevention and control methods except for supplementary gas extraction measures. The inability to predict or inaccurately predict the danger of outbursts has become a technical bottleneck for the prevention and control of coal and gas outbursts.

[0003] At present, the research on the mechanism of coal and gas outburst shows that outburst is the result of the combined effect of ground stress, gas pressure and mechanical strength of coal body, and the quantitative relationship between gas pressure and residual stress of coal body at the excavation working face is crucial for coal body destruction and inducing outburst. Therefore, according to the mechanical conditions met at different stages in the outburst incubation process, artificial intervention and imposing measures to hinder the development of key stages in the outburst incubation process are the key technical core of outburst prevention and control work.

[0004] Existing studies have pointed out that when a certain quantitative relationship is met between the coal body gas pressure and the ground stress at the excavation working face during the process of outburst incubation, the coal body will be destroyed on a large scale, thereby promoting the occurrence of outburst. Based on this, by setting up a certain enclosed space behind the excavation working face to increase the gas pressure in the enclosed space, and then balancing the quantitative relationship between the coal body gas pressure and the ground stress at the working face, further destruction of the coal body can be hindered, and the role of curbing outbursts can be played accordingly. In addition, although similar inventions have been made regarding the sealing device for the excavation tunnel, previous devices were only used to extract local gas such as the upper corner, or to temporarily seal the underground space to prevent people from entering by mistake. The requirements for quickly increasing the gas pressure in the enclosed space are difficult to meet, and they do not have a high ability to resist pressure shocks. For this reason, it is urgent to develop a method for preventing and controlling outbursts at the excavation working face to fill the gap in the existing technology. Summary of the invention

[0005] In order to solve the above problems existing in the prior art, the present invention provides a method and a sealing device for preventing and controlling coal mine underground excavation working face outburst.

[0006] The technical solution of the present invention is:

[0007] A method for preventing and controlling coal mine underground excavation working face outburst, comprising the following steps:

[0008] S1, measure and obtain the coal gas pressure and coal radial stress in front of the underground excavation working face;

[0009] S2, setting a sealing device, which forms a sealed chamber with the coal body in front of the excavation working face;

[0010] S3, an air inlet, an electronic pressure gauge and an exhaust port are respectively provided on the closed device; the air inlet is used to connect to the charging device, and is used to charge the closed chamber with inert protective gas, and maintain the set air pressure value in the closed chamber; the electronic pressure gauge is used to display the gas pressure value inside the closed chamber in real time; the exhaust port is used to connect to the negative pressure device, and is used to discharge the gas inside the closed chamber;

[0011] S4, after blasting or comprehensive excavation operation, the gas in the closed chamber is extracted through the negative pressure device;

[0012] S5, remove the sealing device and start cleaning the fallen coal.

[0013] Furthermore, in step S1, the coal body gas pressure is the maximum residual gas pressure in the coal seam area where the excavation working face is located, and its calculation formula is:

[0014]

[0015] In the formula,

[0016] p is the coal seam gas pressure, MPa;

[0017] Q is the gas content of coal seam, m 3 / t;

[0018] α is the gas content coefficient of coal seam, m 3 / (t·MPa 1 / 2 ).

[0019] Furthermore, in step S1, the calculation formula of the radial stress of the coal body is:

[0020]

[0021] In the formula,

[0022] σ rp is the radial stress on the gas-containing coal body in the plastic zone in front of the working face, MPa;

[0023] is the internal friction angle of the coal body, °;

[0024] r is the distance between the coal body and the working face, m;

[0025] r0 is the equivalent circle radius of the working surface, m.

[0026] Furthermore, the sealing device is ≤10m away from the excavation working face.

[0027] Furthermore, before installing the sealing device, grooves with a depth of ≧10 cm are cut on the coal walls and the bottom plate of the tunnel on both sides to allow the edges of the sealing device to be embedded in the grooves.

[0028] Furthermore, the calculation formula for setting the air pressure value inside the closed chamber is:

[0029]

[0030] In the formula,

[0031] p0 is the gas pressure in the closed chamber, MPa;

[0032] p s is the gas pressure in the coal body, MPa;

[0033] σ r is the radial stress on the coal body, MPa;

[0034] K IC is the fracture toughness of coal, MN / m 3 / 2 ;

[0035] π is the ratio of circumference to diameter, and its value is 3.1415;

[0036] a is the radius of coal crack, m.

[0037] Furthermore, in step S4, after the blasting or comprehensive excavation operation, the setting of extracting the gas in the closed chamber through the negative pressure device is: a. if the coal comprehensive mining continues to advance and the closed device does not need to be removed, the gas pressure in the closed chamber should be ≧p0; b. if the closed device needs to be removed, the gas pressure in the closed chamber shall be reduced to the ambient atmospheric pressure before the removal operation.

[0038] A closed device for preventing and controlling coal mine underground excavation working faces from collapsing, the closed device comprising a frame, an airbag bag and a fixing mechanism; the frame comprising two oppositely arranged columns and an arch frame installed at the upper ends of the columns, the frame being arranged to fit the side walls and top plate of the tunnel; the airbag bag is used to seal the tunnel after being inflated, and fixing rings are evenly distributed along the diagonal on its surface; the fixing mechanism is fixedly connected to the frame and is used to fix the airbag bag.

[0039] Furthermore, the fixing mechanism includes a fixing net, a fixing column, bolts and a double-headed threaded connecting rod; the fixing net is installed inside the frame, and a hook is provided on its surface for installing and fixing the airbag bag; the fixing column is arranged on the column, and an internally threaded bolt is provided on its end face; the two ends of the double-headed threaded connecting rod are respectively installed in the relative internally threaded bolts.

[0040] Furthermore, the fixing rings are evenly distributed along the diagonal on the surface of the airbag bag.

[0041] Furthermore, the method for using the sealing device comprises the following steps:

[0042] a. Install the frame inside the tunnel, and make sure that the fixed columns are facing away from the mining face; check and confirm that the columns and arch frames are embedded in the inner wall and roof of the tunnel respectively, and fix them with anchor rods;

[0043] b. Install the fixed net on the inner side of the frame;

[0044] c. Take out the airbag bag and unfold it. Use the fixing ring on the airbag bag to quickly install it on the fixing net;

[0045] d. Insert both ends of the double-threaded connecting rod into the bolts respectively and tighten them to complete the installation, thereby fixing the airbag bag inside the fixing mechanism.

[0046] The beneficial effects of the present invention are:

[0047] 1. The method described in the present invention can hinder the development of the key stage of the outburst incubation process through human intervention and measures, and can eliminate the outburst danger area due to the local gas abnormal zone. At the same time, it can also be used as a key gas control technology for future unmanned working face mining, without the need for pre-extraction of coal seam gas, and normal and safe excavation. In particular, it can eliminate the outburst prediction blind area formed by substandard extraction or the formation of extraction blank zone, and thus avoid outburst accidents triggered by incorrect judgment of outburst danger in local areas.

[0048] 2. The method described in the present invention is easy to operate and can greatly shorten the time and workload of prominent prevention and control operations such as gas control at the excavation working face, and has significant economic and social benefits.

[0049] 3. The sealing device recorded in the present invention can be firmly clamped and fixed inside the fixing mechanism after the airbag bag is inflated, so as to avoid shaking and swinging of the airbag bag caused by mining impact, and further avoid poor sealing effect or failure, thereby completing the purpose of sealing the tunnel. The fixed net is arranged inside the closed chamber, facing the mining working face, and can play an effective impact resistance role during blasting or comprehensive excavation operations, and can avoid damage to the airbag bag caused by the impact of coal dust and gravel, thereby extending the service life of the airbag bag. When the sealing device needs to be removed after the blasting or comprehensive excavation operation is completed, the double-headed threaded connecting rod and the hook setting of the airbag bag can both achieve the effect of quickly removing the sealing device and improve the working efficiency in the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 : A schematic diagram of the control method in an exemplary embodiment of the present invention;

[0051] Figure 2 : Schematic diagram of the structure of the sealing device in an exemplary embodiment of the present invention (1);

[0052] Figure 3 : Schematic diagram of the structure of the sealing device in an exemplary embodiment of the present invention (2);

[0053] Figure 4 : Schematic diagram of the frame structure of the closed device in an exemplary embodiment of the present invention.

[0054] Explanation of symbols

[0055] 1-coal body, 2-excavation working face, 3-sealed device, 4-gas extraction hole, 5-electronic pressure gauge, 6-gas injection port, 7-tunnel;

[0056] 31-column, 32-arch frame, 33-anchor rod, 34-fixing net, 35-fixing column, 36-bolt, 37-hook. DETAILED DESCRIPTION

[0057] The present invention is described in detail below by way of embodiments in conjunction with the accompanying drawings.

[0058] The invention records a method for preventing and controlling coal mine underground excavation working face outburst, which specifically comprises the following steps.

[0059] S1, obtain the coal gas pressure and coal radial stress in front of the underground excavation working face.

[0060] As a preferred method:

[0061] 1. The coal body gas pressure is set to the original gas pressure of the coal seam area where the excavation working face is located, or to the residual maximum gas pressure.

[0062] The calculation method is:

[0063] a. Determined on site by direct determination method, see standard AQ / T1047-2007 for the determination method;

[0064] b. Obtained indirectly by the following formula:

[0065]

[0066] In the formula,

[0067] p is the coal seam gas pressure, MPa;

[0068] Q is the gas content of coal seam, m 3 / t;

[0069] α is the gas content coefficient of coal seam, m 3 / (t·MPa 1 / 2 ).

[0070] 2. The radial stress of the coal body is the ground stress after unloading along the excavation direction, and its calculation formula is:

[0071]

[0072] In the formula,

[0073] σ rp is the radial stress on the gas-containing coal body in the plastic zone in front of the working face, MPa;

[0074] is the internal friction angle of the coal body, °;

[0075] r is the distance between the coal body and the working face, m;

[0076] r0 is the equivalent circle radius of the working surface, m.

[0077] S2, a sealing device is arranged in the tunnel, and the sealing device and the coal body in front of the excavation working face form a closed chamber.

[0078] As preferred:

[0079] 1. The relative distance between the enclosed device and the excavation working face is ≤10m.

[0080] 2. To achieve better sealing and supporting effects, perform pre-installation settings through the following steps before installing the sealing device:

[0081] a. Cut grooves ≥ 10 cm deep on the coal walls and floor of the roadway on both sides;

[0082] b. The edge of the sealing device is embedded in the groove;

[0083] c. Use anchor rods to fix the sealing device to the coal wall and the tunnel roof;

[0084] d. Use expansion agents, such as polyurethane, to further seal the joints between the sealing device and the coal rock mass.

[0085] S3, an air inlet, an electronic pressure gauge and an exhaust port are respectively arranged on the closed device.

[0086] The gas inlet is used to connect the gas charging device to charge the closed chamber with inert protective gas, such as N2, and to obtain a set gas pressure value in the chamber;

[0087] The electronic pressure gauge is used to display the gas pressure value inside the closed chamber in real time, which is convenient for controlling and adjusting the inflation operation;

[0088] The exhaust port is used to connect a negative pressure device to discharge the gas inside a closed chamber after operations such as coal blasting and comprehensive excavation.

[0089] In order to obtain better operability, the air inlet is arranged at the upper end of the closed device, close to the top plate of the tunnel; the exhaust port is arranged at the lower end of the closed device, close to the bottom plate of the tunnel.

[0090] In this step, the calculation formula for setting the air pressure value inside the closed chamber is:

[0091]

[0092] In the formula,

[0093] p0 is the gas pressure in the closed chamber, MPa;

[0094] p s is the gas pressure in the coal body, MPa;

[0095] σ r is the radial stress on the coal body, MPa;

[0096] K IC is the fracture toughness of coal, MN / m 3 / 2 ;

[0097] π is the ratio of circumference to diameter, and its value is 3.1415;

[0098] a is the radius of coal crack, m.

[0099] S4, after blasting or comprehensive excavation operation, the gas in the closed chamber is extracted through the negative pressure device and discharged into the gas extraction pipeline.

[0100] If personnel are required to enter a closed chamber to carry out operations during the comprehensive excavation process, they should carry oxygen supply equipment such as oxygen cylinders.

[0101] The gas in the closed chamber is extracted by a negative pressure device as a preferred embodiment:

[0102] a. If the coal mining continues to advance and the closed device does not need to be removed, the gas pressure in the closed chamber should be ≧p0, where p0 is the set pressure value in the closed chamber in step S3;

[0103] b. If the sealed device needs to be removed, the gas pressure in the sealed chamber should be reduced to no less than the ambient atmospheric pressure before the removal operation.

[0104] S5, remove the sealing device and start cleaning the fallen coal.

[0105] In this embodiment,

[0106] In order to obtain better sealing and supporting effects, and to be able to conveniently complete the disassembly and assembly operations, the present invention also records a sealing device, which includes a frame, an airbag bag and a fixing mechanism.

[0107] frame

[0108] The frame includes two oppositely arranged columns and an arch frame installed on the upper ends of the columns. The columns are arranged to fit the side walls of the tunnel and are partially embedded in the preset side wall grooves; the arch frame is arranged to fit the tunnel roof and is partially embedded in the preset tunnel roof grooves.

[0109] The dimensions of the columns and arches match the internal dimensions of the tunnel and are preferably made of channel steel to obtain better mechanical strength.

[0110] Furthermore, the columns and the arch frames are fixedly connected to the side walls and the roof of the tunnel through anchor rods.

[0111] Airbag

[0112] The airbag is made of elastic material, such as rubber, and is used to expand after being inflated to seal the tunnel. The shape and size of the airbag matches the frame setting, and ≧10 fixing rings are evenly distributed along the diagonal on its surface.

[0113] The airbag bag is provided with a plurality of air inlet holes, for example ≧4, and can be quickly inflated by connecting to an inflation device.

[0114] The fixing mechanism comprises a fixing net, a fixing column, a bolt and a double-headed threaded connecting rod.

[0115] The fixing net is made of a steel wire mesh and is installed inside the frame for installing and fixing the airbag bag.

[0116] The fixing net is preferably set to a mesh size of 3cm*3cm, and hooks that match the airbag bag fixing rings are set along the diagonal line for installing and fixing the airbag bag.

[0117] The fixing posts are vertically arranged on the upright posts of the frame, preferably arranged at intervals of 10-15 cm. The height of the fixing posts can be set according to the thickness of the inflated air bag used.

[0118] The bolt is installed on the end surface of the fixing column and is provided with an internal thread.

[0119] Both ends of the double-threaded connecting rod are respectively installed in opposite bolts.

[0120] The sealed device is also provided with an air inlet, an electronic pressure gauge and an exhaust port, wherein the air inlet and the exhaust port can be set by methods commonly used in the technical field, such as drilling holes on the columns or arches of the frame and welding the air inlet pipe or the air outlet pipe for setting.

[0121] The following is a detailed description of the method of using the sealing device, which includes the following steps:

[0122] a. Install the frame inside the tunnel, and make sure that the fixed columns are facing away from the mining face; check and confirm that the columns and arch frames are embedded in the inner wall and roof of the tunnel respectively, and fix them with anchor rods;

[0123] b. Install the fixed net on the inner side of the frame;

[0124] c. Take out the airbag bag and unfold it. Use the fixing ring on the airbag bag to quickly install it on the fixing net;

[0125] d. Insert both ends of the double-threaded connecting rod into the bolts respectively and tighten them to complete the installation, thereby fixing the airbag bag inside the fixing mechanism.

[0126] Through the above-mentioned sealing device, the airbag bag can be firmly clamped and fixed inside the fixing mechanism after being inflated, avoiding shaking and swinging of the airbag bag caused by mining impact, thereby avoiding poor sealing effect or failure, thereby completing the purpose of sealing the tunnel.

[0127] The fixed net is set inside the closed chamber and faces the mining working face. It can play an effective impact-resistant role during blasting or comprehensive excavation operations, and can prevent the airbag bag from being damaged by the impact of coal dust and gravel, thereby extending the service life of the airbag bag.

[0128] When the enclosed device needs to be removed after completing the blasting or comprehensive excavation operation, the double-headed threaded connecting rod and the hook setting of the airbag bag can both achieve the effect of quickly removing the enclosed device and improve the working efficiency in the tunnel.

[0129] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.

Claims

1. A method for preventing and controlling coal mine underground excavation working face outburst, characterized in that: The following steps are involved: S1, obtain the coal gas pressure and coal radial stress in front of the underground excavation working face; The coal body gas pressure is the maximum residual gas pressure in the coal seam area where the excavation working face is located, and its calculation formula is: In the formula, p is the coal seam gas pressure, MPa; Q is the gas content of coal seam, m 3 / t; α is the gas content coefficient of coal seam, m 3 / (t·MPa 1 / 2 ); The calculation formula of the radial stress of the coal body is: In the formula, σ rp is the radial stress on the gas-containing coal body in the plastic zone in front of the working face, MPa; is the internal friction angle of the coal body, °; r is the distance between the coal body and the working face, m; r0 is the equivalent circle radius of the working surface, m; S2, setting a sealing device, wherein the sealing device and the coal body in front of the excavation working face form a sealed chamber; S3, an air inlet, an electronic pressure gauge and an exhaust port are respectively arranged on the closed device; the air inlet is used to connect to a charging device, and is used to charge the closed chamber with an inert protective gas, and to maintain a set air pressure value in the closed chamber; the electronic pressure gauge is used to display the gas pressure value inside the closed chamber in real time; the exhaust port is used to connect to a negative pressure device, and is used to discharge the gas inside the closed chamber; The calculation formula for setting the air pressure value inside the closed chamber is: In the formula, p0 is the gas pressure in the closed chamber, MPa; p s is the gas pressure in the coal body, MPa; σ r is the radial stress on the coal body, MPa; K IC is the fracture toughness of coal, MN / m 3 / 2 ; π is the ratio of the circumference of a circle, and its value is 3.1415; a is the crack radius of the coal body, m; S4, after the blasting or comprehensive excavation operation, extracting the gas in the closed chamber through a negative pressure device; S5, dismantle the sealing device and start the operation of cleaning the fallen coal.

2. A method for preventing and controlling coal mine underground excavation working face outburst according to claim 1, characterized in that: The sealing device is ≤10m away from the excavation working face.

3. A method for preventing and controlling coal mine underground excavation working face outburst according to claim 1, characterized in that: Before installing the sealing device, grooves ≧10 cm deep are cut on the coal walls and the bottom plate of the tunnel on both sides to allow the edges of the sealing device to be embedded in the grooves.

4. A method for preventing and controlling coal mine underground excavation working face outburst according to claim 1, characterized in that: In step S4, after the blasting or comprehensive excavation operation, the setting for extracting the gas in the closed chamber through the negative pressure device is: a. if the coal comprehensive mining continues to advance and the closed device does not need to be removed, the gas pressure in the closed chamber should be ≧p0; b. if the closed device needs to be removed, the gas pressure in the closed chamber shall be reduced to the ambient atmospheric pressure before the removal operation.

5. The closed device for preventing and controlling outbursts in underground coal mine excavation working faces of the method for preventing and controlling outbursts in underground coal mine excavation working faces according to claim 1, characterized in that: The sealing device includes a frame, an airbag bag and a fixing mechanism; The frame includes two oppositely arranged columns and an arch frame installed on the upper ends of the columns, and the frame is arranged to fit the side walls and the top plate of the tunnel; The airbag bag is used to seal the tunnel after being inflated, and fixing rings are evenly arranged on its surface along the diagonal line; The fixing mechanism is fixedly connected to the frame and is used to fix the airbag; The fixing mechanism comprises a fixing net, a fixing column, a bolt and a double-threaded connecting rod; The fixing net is installed inside the frame, and hooks are arranged on its surface for installing and fixing the airbag bag; The fixing column is arranged on the upright column, and an internal thread bolt is arranged on the end surface of the fixing column; Both ends of the double-threaded connecting rod are respectively installed in the opposite internally threaded bolts; The fixing rings are evenly distributed along the diagonal on the surface of the airbag bag.

6. A closed device for preventing and controlling outbursts in underground coal mine excavation working faces according to claim 5, characterized in that: The method for using the sealing device comprises the following steps: a. Install the frame inside the tunnel, and make sure that the fixed columns are facing away from the mining face; check and confirm that the columns and arch frames are embedded in the inner wall and roof of the tunnel respectively, and fix them with anchor rods; b. Install the fixed net on the inner side of the frame; c. Take out the airbag bag and unfold it. Use the fixing ring on the airbag bag to quickly install it on the fixing net; d. Insert both ends of the double-threaded connecting rod into the bolts respectively and tighten them to complete the installation, thereby fixing the airbag bag inside the fixing mechanism.

Citation Information

Patent Citations

  • Coal mine gob area sealing method

    CN104481588A

  • Near-goaf old working composite sealing wall and construction method thereof

    CN106837419A

  • Device and method for quickly sealing mine roof-cutting gob-side entry retaining goaf

    CN112746863A