An intelligent control system and method for electric bicycle central control
By setting up sensors in electric bicycles and selecting appropriate computing equipment for decision-making calculations, the problem of insufficient real-time performance and data processing capabilities of the central control system of electric bicycles is solved, and the real-time performance and user experience of intelligent control of electric bicycles are improved.
Patent Information
- Application Number
- CN202311818965.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2043-12-27
AI Technical Summary
The existing electric bicycle central control intelligent control system has shortcomings in real-time performance and data processing capabilities, especially because the low-energy consumption and low-bandwidth Internet of Things communication technology cannot meet the needs of intelligent decision-making with high real-time requirements and large amounts of data.
An electric bicycle central control intelligent control system is designed. It obtains internal and external sensing data by setting up sensors on the electric bicycle, and selects appropriate computing equipment for decision-making calculations based on the amount of sensing data and real-time requirements, including the intelligent central control itself and its Communication-connected external computing devices, such as cloud computing servers or high-speed devices, to improve the real-time nature of decision-making control.
It effectively improves the real-time nature of the central intelligent control of electric bicycles, and can dynamically select computing devices according to the needs of different decision-making events, ensuring the timeliness and accuracy of decision-making results, and enhancing the safety and comfort of users' riding.
Smart Images

Figure CN117872820B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of intelligent control technology, and in particular to an intelligent control system and method for a central control of an electric bicycle. Background Art
[0002] With the development of semiconductor technology, artificial intelligence technology, cloud computing technology and Internet of Things technology, more and more objects and equipment around people have entered the field of intelligent control from traditional control methods, becoming intelligent devices with perception, thinking and autonomous decision-making. Electric bicycles are one of them. The central control system of electric bicycles is the core of electric bicycles to achieve intelligent control. Based on the data about the electric bicycle itself or its surrounding environment obtained by various sensing devices such as motion sensors and visual sensors installed on the electric bicycles, the intelligent central control performs various analyses and decisions to optimize the riding and use experience of electric bicycles. Compared with traditional electric bicycles, the convenience of control, riding comfort and safety have been greatly improved. However, due to the limitations of the electric bicycle's own structure, it is difficult to give electric bicycles powerful computing and storage capabilities. At the same time, considering that they are often placed in outdoor places, this approach is not conducive to the property and data security of users. Although the computing and storage capabilities of the intelligent central control can be expanded with the help of cloud computing and cloud storage, common IoT communication technologies such as NB-IoT or Lora technology use low-energy and low-bandwidth communication methods, which can only be used for some routine processing based on small amounts of data and have relatively obvious delays. They are not suitable for intelligent decision-making that has high real-time requirements and relies on large amounts of data. Summary of the invention
[0003] Based on the above problems, the present invention proposes an electric bicycle central control intelligent control system and method, which can effectively improve the real-time performance of the electric bicycle central control intelligent control.
[0004] In view of this, the first aspect of the present invention proposes an electric bicycle central control intelligent control system, including sensors for acquiring internal and external perception data of the electric bicycle and an intelligent central control for executing intelligent decisions based on the internal and external perception data, the internal and external perception data including the status data of the electric bicycle itself and the environmental data outside the electric bicycle collected by the sensors arranged on the electric bicycle, the electric bicycle central control intelligent control system also includes an external computing device communicatively connected to the intelligent central control for providing computing power expansion and storage capacity expansion for the intelligent central control, the intelligent central control is configured to generate a decision event queue corresponding to the internal and external perception data, and select a computing device for executing decision calculations according to the amount of perception data on which the decision event depends and its real-time requirements, and execute decision control operations corresponding to the decision event according to the decision results of the computing device.
[0005] The second aspect of the present invention provides an electric bicycle central control intelligent control method, which is applied to the electric bicycle central control intelligent control system described in the first aspect of the present invention, and the method comprises:
[0006] Determine the amount of sensory data that decision events rely on and their real-time requirements;
[0007] Selecting a computing device for decision-making calculation according to the amount of the perception data and the real-time requirement, the computing device comprising an intelligent central control of the electric bicycle and an external computing device in communication with the intelligent central control;
[0008] When the selected computing device is an external device, sending a decision computing request for the decision event and the perception data on which the decision event depends to the selected external device;
[0009] Receiving a decision calculation result calculated by the external computing device based on the perception data;
[0010] A decision control operation corresponding to the decision event is generated and executed according to the decision calculation result.
[0011] Preferably, before the step of determining the amount of perception data and the real-time requirement on which the decision event depends, the method further includes:
[0012] Acquire internal and external perception data of the electric bicycle, wherein the internal and external perception data include status data of the electric bicycle itself and environmental data outside the electric bicycle acquired by sensors disposed on the electric bicycle;
[0013] Generate a decision event queue corresponding to the internal and external perception data;
[0014] Sequentially execute the steps of the above-mentioned electric bicycle central control intelligent control method for each decision event in the decision event queue, from determining the amount of perception data and its real-time requirements on which the decision event depends to generating and executing the decision control operation corresponding to the decision event according to the decision calculation result.
[0015] Preferably, before the step of acquiring the internal and external sensing data of the electric bicycle, the method further includes:
[0016] establishing a communication connection with an external computing device;
[0017] Obtain pre-configured internal and external sensing data collection cycles;
[0018] The decision-making mode of the electric bicycle is determined according to the connection status of the connected external device and the internal and external perception data collection cycle.
[0019] Preferably, the step of determining the decision mode of the electric bicycle according to the connection status of the connected external device and the internal and external sensing data collection cycle specifically includes:
[0020] Get the preset collection cycle threshold;
[0021] Determine whether the internal and external sensing data collection period is greater than the collection period threshold;
[0022] When the internal and external perception data collection period is greater than the collection period threshold, the intelligent central control is configured as a normal operation mode, and in the normal operation mode, the intelligent central control does not intervene in the processing of mechanical control decision events.
[0023] Preferably, after the step of judging whether the internal and external sensing data collection period is greater than the collection period threshold, the method further includes:
[0024] When the internal and external perception data collection period is less than or equal to the collection period threshold, obtaining the type of the external computing device connected to the intelligent central control;
[0025] Determine whether the external computing devices connected to the smart central control include high-speed devices;
[0026] When the external computing devices connected to the intelligent central control do not include high-speed devices, the intelligent central control is configured as a first intelligent control mode, in which the intelligent central control intervenes in the processing of low real-time decision events.
[0027] Preferably, after the step of determining whether the external computing devices connected to the intelligent central control include high-speed devices, the method further includes:
[0028] When the external computing devices connected to the intelligent central control include high-speed devices, the intelligent central control is configured to a second intelligent control mode, in which the intelligent central control is involved in the processing of high-real-time decision events;
[0029] In the second intelligent control mode, the step of selecting a computing device for decision-making calculation according to the amount of perception data and the real-time requirement specifically includes:
[0030] Get pre-configured data volume threshold and real-time threshold;
[0031] Determining whether the real-time level of the decision event is less than the real-time threshold;
[0032] When the real-time level of the decision event is less than the real-time threshold, a cloud computing server is selected as a computing device for decision computing.
[0033] Preferably, after the step of determining whether the real-time level of the decision event is less than the real-time threshold, the method further includes:
[0034] When the real-time level of the decision event is greater than the real-time threshold, determining whether the amount of perception data is less than the data amount threshold;
[0035] When the amount of the sensed data is less than the data amount threshold, selecting the intelligent central control itself as a computing device for decision-making calculation;
[0036] When the amount of perceived data is greater than the data amount threshold, a high-speed device among the external computing devices connected to the intelligent central control is selected as a computing device for decision-making calculation.
[0037] Preferably, the step of sending the decision calculation request of the decision event and the perception data on which the decision event depends to the selected external device specifically includes:
[0038] Sending a decision calculation request of the decision event to the selected external device, the decision calculation request including the amount of perception data on which the decision event depends and its real-time requirement;
[0039] receiving an evaluation result returned by the external device on whether the state of the external device meets the real-time requirement of the decision event;
[0040] When the evaluation result is that the state of the external device meets the real-time requirement of the decision event, the perception data on which the decision event depends is sent to the external device.
[0041] Preferably, the step of generating and executing a decision control operation corresponding to the decision event according to the decision calculation result specifically includes:
[0042] Generate a decision control operation instruction and its control parameters according to the decision calculation result, wherein the decision control operation is a control instruction or a control instruction sequence consisting of multiple control instructions, and the control parameters include the execution time and / or duration of each control instruction;
[0043] The corresponding control operation instructions are executed sequentially according to the control parameters to control the corresponding electronic system of the electric bicycle to perform corresponding operations.
[0044] The present invention proposes an intelligent control system and method for an electric bicycle central control. By setting sensors for acquiring internal and external perception data of an electric bicycle and an intelligent central control for executing intelligent decisions based on the internal and external perception data, the internal and external perception data include status data of the electric bicycle itself and environmental data outside the electric bicycle collected by sensors set on the electric bicycle. The electric bicycle central control intelligent control system also includes an external computing device that is communicatively connected to the intelligent central control and is used to provide computing power expansion and storage capacity expansion for the intelligent central control. The intelligent central control is configured to generate a decision event queue corresponding to the internal and external perception data and select a computing device for executing decision calculations based on the amount of perception data relied on by the decision event and its real-time requirements, and execute decision control operations corresponding to the decision event based on the decision results of the computing device, which can effectively improve the real-time performance of the intelligent control of the electric bicycle central control. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 It is a schematic diagram of an electric bicycle central control intelligent control system provided by one embodiment of the present invention;
[0046] Figure 2 It is a flow chart of an electric bicycle central control intelligent control method provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0047] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0048] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.
[0049] In the description of the present invention, the term "multiple" refers to two or more. Unless otherwise clearly defined, the orientation or positional relationship indicated by the terms "upper", "lower", etc. is based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation of the present invention. The terms "connection", "installation", "fixation", etc. should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first", "second", etc. can explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, the meaning of "multiple" is two or more.
[0050] In the description of this specification, the description of the terms "one embodiment", "some implementations", "specific embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0051] An electric bicycle central control intelligent control system and method provided according to some embodiments of the present invention will be described below with reference to the accompanying drawings.
[0052] like Figure 1 As shown, the first aspect of the present invention proposes an electric bicycle central control intelligent control system, including sensors for acquiring internal and external perception data of the electric bicycle and an intelligent central control for executing intelligent decisions based on the internal and external perception data, the internal and external perception data include the status data of the electric bicycle itself and the environmental data outside the electric bicycle collected by the sensors arranged on the electric bicycle, the electric bicycle central control intelligent control system also includes an external computing device communicatively connected to the intelligent central control for providing computing power expansion and storage capacity expansion for the intelligent central control, the intelligent central control is configured to generate a decision event queue corresponding to the internal and external perception data and select a computing device for executing decision calculations according to the amount of perception data relied on by the decision event and its real-time requirements, and execute a decision control operation corresponding to the decision event according to the decision result of the computing device.
[0053] Specifically, the intelligent central control is a driving computer installed on the electric bicycle, connected to each electronic system on the electric bicycle, and used to monitor and / or control each electronic system on the electric bicycle. The electronic system referred to here includes but is not limited to a power supply system that provides power energy on the electric bicycle, a drive system that provides driving force for the electric bicycle through a drive motor, a braking system that provides braking ability, a sensor system that monitors the state of the electric bicycle or the state of the environment, a speed control system that provides vehicle speed control ability, a balance control system that controls vehicle stability, a positioning system that provides position information, a locking system that locks the electric bicycle by physical or electronic means, and an input-output system for realizing the control of the driving computer and information input and output, etc. The input-output system can be composed of one or more of an LCD (Liquid Crystal Display) display panel, a touch panel, and physical buttons.
[0054] The electric bicycle is provided with various sensors for obtaining internal and external perception data of the electric bicycle, and these internal and external perception data are the basis for the electric bicycle to realize intelligent control. These sensors include but are not limited to one or more of acceleration sensors, gyroscopes, infrared sensors, ultrasonic sensors and image sensors. Furthermore, the sensor also includes a touch sensor such as a touch panel provided on the intelligent central control, and the perception data includes the operation perception data of the user input received by the intelligent central control through the touch sensor.
[0055] The external computing device refers to an external device that is connected to the intelligent central control and has certain computing and storage capabilities, and can provide computing and storage capacity expansion for the intelligent central control. In the technical solutions of some embodiments of the present invention, the external computing device includes a cloud computing server connected to the intelligent central control through a cellular Internet of Things such as NB-IoT (Narrow Band Internet of Things), LoRa (Long Range Radio), 5G and other communication networks, and a portable intelligent computing device such as a smart phone, a tablet computer, a laptop computer, etc. connected to the intelligent central control through a short-range communication technology. The short-range communication technology includes Bluetooth communication technology or WiFi (Wireless Fidelity) communication technology, etc. It should be known that the intelligent central control itself is also a kind of computing device. When selecting a computing device for performing decision-making calculations, the intelligent central control itself is also used as one of the optional computing devices. The so-called providing computing capacity expansion for the intelligent central control means that the intelligent central control can complete part or all of the computing processes required for the decision through an external computing device during the intelligent decision-making process, and perform the control operation of the electric bicycle according to the calculation results of the external computing device. Similarly, the so-called provision of storage capacity expansion for the intelligent central control means that other data than real-time perception data that the intelligent central control relies on to execute intelligent decisions are stored through external computing devices. These data include historical perception data, map data, and AI (Artificial Intelligence) model data, etc.
[0056] like Figure 2 As shown, the second aspect of the present invention proposes an electric bicycle central control intelligent control method, which is applied to the electric bicycle central control intelligent control system described in the first aspect of the present invention, and the method includes:
[0057] Determine the amount of sensory data that decision events rely on and their real-time requirements;
[0058] Selecting a computing device for decision-making calculation according to the amount of the perception data and the real-time requirement, the computing device comprising an intelligent central control of the electric bicycle and an external computing device in communication with the intelligent central control;
[0059] When the selected computing device is an external device, sending a decision computing request for the decision event and the perception data on which the decision event depends to the selected external device;
[0060] Receiving a decision calculation result calculated by the external computing device based on the perception data;
[0061] A decision control operation corresponding to the decision event is generated and executed according to the decision calculation result.
[0062] Specifically, the decision event is generated based on one or more of the internal and external perception data of the electric bicycle. At each moment, there may be 0 to multiple decision events that need to be decided, and several decision events constitute the decision event queue. The decision events include, but are not limited to, power assist control decision events for adjusting the output power of the motor, balance control decision events for controlling the wheel speed difference to maintain the balance and stability of the vehicle body, brake control decision events for controlling the brake switch of the electric bicycle according to the driving risk assessment results, power control decision events for controlling the power switch, and lock control decision events for controlling the lock switch, etc.
[0063] The amount of perception data that a decision event relies on refers to the amount of perception data collected by sensors installed on the electric bicycle that is needed in the decision calculation process when the intelligent central control makes a decision for a decision event. For example, for a power-assisted control decision event, the perception data it relies on includes the real-time output power of the motor collected by the internal power monitoring circuit and the acceleration data collected by the acceleration sensor. The real-time speed and acceleration of the electric bicycle and the road conditions reflected by the vibration of the electric bicycle can be obtained through the acceleration data, so that the output power control of the motor is intelligently decided based on the real-time output power of the motor, the real-time speed of the electric bicycle, the real-time acceleration and the road conditions, so the amount of perception data that the power-assisted control decision event relies on is relatively small. For another example, for a braking control decision event, the perception data it relies on includes the environmental images collected by the image sensor within a period of time, the acceleration data collected by the acceleration sensor, so that based on the environmental image data and the real-time speed and acceleration of the electric bicycle, the braking switch of the electric bicycle is intelligently decided on whether to brake and the braking intensity, so the amount of perception data that the braking control decision event relies on is relatively large.
[0064] The real-time requirement of a decision event refers to the timeliness of the event that requires a decision. According to the time range corresponding to the timeliness of the decision event, the real-time requirement of the decision event can be divided into different real-time levels. The higher the real-time level of the decision event, the shorter its timeliness, that is, the smart central control needs to make a decision in a shorter time. On the contrary, the lower the real-time level of the decision event, the longer its timeliness, that is, the smart central control can have more time to complete the decision analysis. For example, braking control is closely related to the user's riding safety. The higher the sensitivity of braking control and the shorter the decision time, the more it can ensure the user's riding safety. Therefore, the real-time requirement of the braking control decision event should be configured to the highest level. For another example, although the navigation path is affected by many external factors, and these external factors change dynamically over time, the changes in these external factors are often slow-changing factors, that is, the best riding route generally does not change very frequently, and even if the external factors change rapidly and cause the best riding route to change frequently, frequent switching of the best riding route will cause discomfort to the user. Therefore, the real-time requirement of the navigation route decision event can be configured to a lower level. Of course, it is also possible to not divide the real-time levels, but directly use the length of time to express the real-time requirements of decision events. For example, the real-time requirement of a decision event is 10 milliseconds, which means that the decision event needs to complete the calculation and obtain the decision result within 10 milliseconds.
[0065] Preferably, before the step of determining the amount of perception data and the real-time requirement on which the decision event depends, the method further includes:
[0066] Acquire internal and external perception data of the electric bicycle, wherein the internal and external perception data include status data of the electric bicycle itself and environmental data outside the electric bicycle acquired by sensors disposed on the electric bicycle;
[0067] Generate a decision event queue corresponding to the internal and external perception data;
[0068] Sequentially execute the steps of the above-mentioned electric bicycle central control intelligent control method for each decision event in the decision event queue, from determining the amount of perception data and its real-time requirements on which the decision event depends to generating and executing the decision control operation corresponding to the decision event according to the decision calculation result.
[0069] Specifically, in the above-mentioned electric bicycle central control intelligent control method, before the step of obtaining the internal and external perception data of the electric bicycle, it also includes configuring the internal and external perception data collection cycle. The intelligent central control of the electric bicycle collects the status data of the electric bicycle itself and the environmental data outside the electric bicycle through the sensors set on the electric bicycle according to the internal and external perception data collection cycle, so that the intelligent central control of the electric bicycle performs the steps of generating a decision event queue corresponding to the internal and external perception data and sequentially performing subsequent processing on each decision event in the decision event queue in each internal and external perception data collection cycle. The internal and external perception data collection cycle can be configured according to the user's real-time requirements for intelligent control. When the user does not want the intelligent central control to frequently intervene in the operation and control of the electric bicycle, it can be configured to a larger value, such as collecting internal and external perception data every 5 minutes or every 10 minutes, and intelligently correcting the driving parameters of the electric bicycle based on these internal and external perception data, or sending reminders to the user based on these internal and external perception data.
[0070] Preferably, before the step of acquiring the internal and external sensing data of the electric bicycle, the method further includes:
[0071] establishing a communication connection with an external computing device;
[0072] Obtain pre-configured internal and external sensing data collection cycles;
[0073] The decision-making mode of the electric bicycle is determined according to the connection status of the connected external device and the internal and external perception data collection cycle.
[0074] According to the connection method between the external computing device and the intelligent central control, the external computing device can be divided into a long connection device and a short connection device. The long connection device refers to a device that has been maintaining a communication connection since the electric bicycle leaves the factory. For example, the electric bicycle is integrated with a non-detachable Internet of Things communication card and Internet of Things communication module for maintaining a low-power communication connection with a cloud computing server. It is independently powered by a power supply system and is not affected by the opening or closing of the electric bicycle's driving system. The driving system includes the electric bicycle's intelligent central control and its drive system for providing travel capabilities. The short connection device refers to an external computing device that is disconnected after the electric bicycle's driving system is turned off and needs to re-establish the connection after the electric bicycle's driving system is started. The connection status of the external device includes whether an external computing device is connected and, if there is an external computing device, the type of external computing device connected.
[0075] According to the communication standard used for the communication connection between the external computing device and the smart central control, the external computing device can be divided into low-speed devices and high-speed devices. In this classification method, the cloud computing server connected to the smart central control is classified as a low-bandwidth device. Although the cloud computing server has powerful computing power and storage space expansion capabilities that can be regarded as unlimited, considering the communication power consumption of long connections, the smart central control and the cloud computing server usually adopt low-bandwidth Internet of Things communication standards such as NB-IoT or LoRa. In contrast, smartphones or other general or dedicated terminals that use high-speed Bluetooth or WiFi direct connection technology to connect to the smart central control have higher-speed data transmission capabilities.
[0076] In the technical solution of the present invention, the decision event is usually triggered by the internal and external perception data of the electric bicycle, that is, the status data of the electric bicycle and the environmental status data of its surroundings, such as triggering the decision event of the body balance control according to the vibration or sway data of the body detected by the sensor, or triggering the decision event of the riding speed control according to the environmental sound, light or image data detected by the sensor. In the technical solutions of some embodiments of the present invention, the correspondence between the perception data and the decision event can be pre-configured and stored in the intelligent central control, so that the intelligent central control can automatically trigger the decision event in real time according to the changes in the perception data to generate a decision event queue. In the technical solutions of other embodiments of the present invention, when there is a high-speed device in the external device connected to the intelligent central control, the intelligent central control transmits each perception data to the high-speed device in real time, and the high-speed device stores a pre-trained decision event generation model based on a neural network model or a random forest model, and the high-speed device inputs the perception data into the decision event generation model to generate a corresponding decision event queue.
[0077] Preferably, the step of determining the decision mode of the electric bicycle according to the connection status of the connected external device and the internal and external sensing data collection cycle specifically includes:
[0078] Get the preset collection cycle threshold;
[0079] Determine whether the internal and external sensing data collection period is greater than the collection period threshold;
[0080] When the internal and external perception data collection period is greater than the collection period threshold, the intelligent central control is configured as a normal operation mode, and in the normal operation mode, the intelligent central control does not intervene in the processing of mechanical control decision events.
[0081] Specifically, the mechanical control decision event refers to a decision event involving the operation of the mechanical system of the electric bicycle, and the mechanical system includes the drive system, brake system, steering system, and speed control system of the electric bicycle. Correspondingly, the decision event also includes non-mechanical control decision events, which include information decision events such as navigation path decision events and warning information decision events, and also control decision events such as screen brightness control decision events and light brightness control decision events. Therefore, in the normal operation mode, the intelligent central control will not intervene in the control of the mechanical system of the electric bicycle, and the mechanical system operations such as acceleration, braking, and steering are completely completed manually by the user.
[0082] Preferably, after the step of judging whether the internal and external sensing data collection period is greater than the collection period threshold, the method further includes:
[0083] When the internal and external perception data collection period is less than or equal to the collection period threshold, obtaining the type of the external computing device connected to the intelligent central control;
[0084] Determine whether the external computing devices connected to the smart central control include high-speed devices;
[0085] When the external computing devices connected to the intelligent central control do not include high-speed devices, the intelligent central control is configured as a first intelligent control mode, in which the intelligent central control intervenes in the processing of low real-time decision events.
[0086] In the technical solution of the above implementation, when the external computing devices connected to the intelligent central control do not include high-speed devices, the intelligent central control does not have the ability to process high-real-time decision events, and can only intervene in the processing of low-real-time decision events. When the external computing devices connected to the intelligent central control include high-speed devices, the intelligent central control expands the processing capability of high-real-time decision events through the high-speed devices, and can intervene in the processing of both high-real-time decision events and low-real-time decision events.
[0087] In the technical solutions of some embodiments of the present invention, before the step of determining the decision mode of the electric bicycle according to the connection status of the connected external device and the internal and external sensing data collection cycle, it also includes:
[0088] Configure the real-time level corresponding to each decision event;
[0089] The real-time level is divided into a low real-time level and a high real-time level according to a preset real-time threshold.
[0090] Correspondingly, a decision event with a low real-time level is a low real-time decision event, and a decision event with a high real-time level is a high real-time decision event.
[0091] Preferably, after the step of determining whether the external computing devices connected to the intelligent central control include high-speed devices, the method further includes:
[0092] When the external computing devices connected to the intelligent central control include high-speed devices, the intelligent central control is configured to a second intelligent control mode, in which the intelligent central control is involved in the processing of high-real-time decision events;
[0093] In the second intelligent control mode, the step of selecting a computing device for decision-making calculation according to the amount of perception data and the real-time requirement specifically includes:
[0094] Get pre-configured data volume threshold and real-time threshold;
[0095] Determining whether the real-time level of the decision event is less than the real-time threshold;
[0096] When the real-time level of the decision event is less than the real-time threshold, a cloud computing server is selected as a computing device for decision computing.
[0097] In the technical solution of this implementation, the real-time threshold is expressed as a numerical value corresponding to the real-time level. It should be known that the size of the real-time level is inversely proportional to the duration corresponding to the real-time requirement, that is, the longer the time that the decision event can accept to calculate the decision result, the lower its real-time level, and vice versa. For example, a decision event with a real-time requirement of 10 milliseconds should have a higher real-time level than a decision event with a real-time requirement of 1 minute. In the above implementation, the decision events with real-time requirements lower than the real-time threshold are handed over to the cloud computing server for calculation. Since the cloud computing server has powerful computing power and data storage capacity, it can perform more complex calculations and analysis, and can store a large amount of pre-processed basic data such as map data or AI model data, so that the intelligent control of electric bicycles by the intelligent central control can have more diverse implementation methods.
[0098] Preferably, after the step of determining whether the real-time level of the decision event is less than the real-time threshold, the method further includes:
[0099] When the real-time level of the decision event is greater than the real-time threshold, determining whether the amount of perception data is less than the data amount threshold;
[0100] When the amount of the sensed data is less than the data amount threshold, selecting the intelligent central control itself as a computing device for decision-making calculation;
[0101] When the amount of perceived data is greater than the data amount threshold, a high-speed device among the external computing devices connected to the intelligent central control is selected as a computing device for decision-making calculation.
[0102] Since the intelligent central control itself also has certain computing capabilities, and the functions and structure of the electric bicycle itself are relatively simple, it requires fewer control and computing programs to be executed by the intelligent central control. Therefore, a small amount of decision-making events with small perception data volume and high real-time requirements can be handed over to the intelligent central control itself for calculation. As for decision-making events with large amounts of perception data, they often involve more complex calculations. In order to reduce the computing and storage burden of the intelligent central control, they are processed by high-speed devices with high-speed data transmission channels with the intelligent central control. In the technical solution of the present invention, the intelligent central control is an internal computing device, and other computing devices connected to the intelligent central control for expanding the computing power of the intelligent central control are external computing devices.
[0103] Preferably, the step of sending the decision calculation request of the decision event and the perception data on which the decision event depends to the selected external device specifically includes:
[0104] Sending a decision calculation request of the decision event to the selected external device, the decision calculation request including the amount of perception data on which the decision event depends and its real-time requirement;
[0105] receiving an evaluation result returned by the external device on whether the state of the external device meets the real-time requirement of the decision event;
[0106] When the evaluation result is that the state of the external device meets the real-time requirement of the decision event, the perception data on which the decision event depends is sent to the external device.
[0107] In the technical solution of the above implementation, after the step of receiving the evaluation result returned by the external device on whether the state of the external device meets the real-time requirement of the decision event, it also includes:
[0108] When the evaluation result is that the state of the external device does not meet the real-time requirement of the decision event, the decision task of the decision event is terminated.
[0109] After receiving the decision calculation request sent by the intelligent central control, the external device evaluates whether the real-time requirement of the decision event is met, specifically including:
[0110] Obtaining the network bandwidth and bandwidth occupancy of the communication connection between the external device and the intelligent central control;
[0111] Acquire the current load condition of the external device, wherein the load condition includes the processor resources occupied by the process of the external device currently executing the computing task;
[0112] Calculating the transmission time of the perception data according to the amount of perception data, the network bandwidth and its occupancy;
[0113] Evaluate the computing time required for the decision computing corresponding to the decision computing request according to the amount of the sensed data and the current load of the external device;
[0114] Determining whether the state of the external device meets the real-time requirement for processing the decision event according to the transmission time and the calculation time;
[0115] An evaluation result of whether the state of the external device meets the real-time requirement for processing the decision event is returned to the intelligent central control.
[0116] Taking the decision event as an obstacle avoidance event as an example, the perception data on which the decision event depends include environmental image data within a period of time and the speed and acceleration data of the electric bicycle. After receiving the perception data on which the decision event depends sent by the intelligent central control, the external device also includes:
[0117] Performing obstacle recognition on the environmental image data;
[0118] Calculating the relative distance and relative speed between the electric bicycle and the obstacle;
[0119] Assessing the collision risk between the electric bicycle and the obstacle according to the relative distance and the relative speed;
[0120] The collision risk assessment result is returned to the intelligent central control, and the collision risk assessment result includes the collision probability and the predicted collision time.
[0121] Preferably, the step of generating and executing a decision control operation corresponding to the decision event according to the decision calculation result specifically includes:
[0122] Generate a decision control operation instruction and its control parameters according to the decision calculation result, wherein the decision control operation is a control instruction or a control instruction sequence consisting of multiple control instructions, and the control parameters include the execution time and / or duration of each control instruction;
[0123] The corresponding control operation instructions are executed sequentially according to the control parameters to control the corresponding electronic system of the electric bicycle to perform corresponding operations.
[0124] Still taking the above obstacle avoidance event as an example, the decision calculation result is a collision risk assessment result, and the intelligent central control outputs a decision control operation instruction and its control parameters according to the collision risk assessment result. In this embodiment, the decision control operation instruction includes an output power control instruction of the drive motor and / or an emergency braking instruction.
[0125] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0126] According to the embodiments of the present invention as described above, these embodiments do not describe all the details in detail, nor do they limit the invention to the specific embodiments described. Obviously, many modifications and changes can be made based on the above description. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can make good use of the present invention and the modified use based on the present invention. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. An electric bicycle central control intelligent control system, characterized in that: It includes sensors for acquiring internal and external perception data of an electric bicycle and an intelligent central control for executing intelligent decisions according to the internal and external perception data, wherein the internal and external perception data include the status data of the electric bicycle itself and the environmental data outside the electric bicycle acquired by sensors arranged on the electric bicycle, and the electric bicycle central control intelligent control system also includes an external computing device that is communicatively connected to the intelligent central control and is used to provide computing power expansion and storage capacity expansion for the intelligent central control, and the intelligent central control is configured to generate a decision event queue corresponding to the internal and external perception data and select a computing device for executing decision calculation according to the amount of perception data on which the decision event depends and its real-time requirements, and execute a decision control operation corresponding to the decision event according to the decision result of the computing device; The intelligent central control selects computing devices for executing decision calculations according to the amount of perception data relied upon by the decision event and its real-time requirements, including: Get pre-configured data volume threshold and real-time threshold; Determining whether the real-time level of the decision event is less than the real-time threshold; When the real-time level of the decision event is less than the real-time threshold, selecting a cloud computing server as a computing device for decision computing; After the step of determining whether the real-time level of the decision event is less than the real-time threshold, the method further includes: When the real-time level of the decision event is greater than the real-time threshold, determining whether the amount of perception data is less than the data amount threshold; When the amount of the sensed data is less than the data amount threshold, selecting the intelligent central control itself as a computing device for decision-making calculation; When the amount of perceived data is greater than the data amount threshold, a high-speed device among the external computing devices connected to the intelligent central control is selected as a computing device for decision-making calculation.
2. An electric bicycle central control intelligent control method, applied to the electric bicycle central control intelligent control system according to claim 1, characterized in that: include: Determine the amount of sensory data that decision events rely on and their real-time requirements; Selecting a computing device for decision-making calculation according to the amount of the perception data and the real-time requirement, the computing device comprising an intelligent central control of the electric bicycle and an external computing device in communication with the intelligent central control; When the selected computing device is an external computing device, sending a decision computing request for the decision event and the perception data on which the decision event depends to the selected external computing device; Receiving a decision calculation result calculated by the external computing device based on the perception data; Generate and execute a decision control operation corresponding to the decision event according to the decision calculation result; The step of selecting a computing device for decision-making calculation according to the amount of perception data and the real-time requirement specifically includes: Get pre-configured data volume threshold and real-time threshold; Determining whether the real-time level of the decision event is less than the real-time threshold; When the real-time level of the decision event is less than the real-time threshold, selecting a cloud computing server as a computing device for decision computing; After the step of determining whether the real-time level of the decision event is less than the real-time threshold, the method further includes: When the real-time level of the decision event is greater than the real-time threshold, determining whether the amount of perception data is less than the data amount threshold; When the amount of the sensed data is less than the data amount threshold, selecting the intelligent central control itself as a computing device for decision-making calculation; When the amount of perceived data is greater than the data amount threshold, a high-speed device among the external computing devices connected to the intelligent central control is selected as a computing device for decision-making calculation.
3. The electric bicycle central control intelligent control method according to claim 2, characterized in that: Before determining the amount of sensory data that decision events rely on and its real-time requirements, it also includes: Acquire internal and external perception data of the electric bicycle, wherein the internal and external perception data include status data of the electric bicycle itself and environmental data outside the electric bicycle acquired by sensors disposed on the electric bicycle; Generate a decision event queue corresponding to the internal and external perception data; The steps from determining the amount of perception data on which the decision event depends and its real-time requirements to generating and executing a decision control operation corresponding to the decision event according to the decision calculation result are sequentially executed for each decision event in the decision event queue.
4. The electric bicycle central control intelligent control method according to claim 3, characterized in that: Before the step of obtaining the internal and external perception data of the electric bicycle, it also includes: establishing a communication connection with an external computing device; Obtain pre-configured internal and external sensing data collection cycles; The decision-making mode of the electric bicycle is determined according to the connection status of the connected external computing device and the internal and external perception data collection cycle.
5. The electric bicycle central control intelligent control method according to claim 4, characterized in that: The step of determining the decision mode of the electric bicycle according to the connection status of the connected external computing device and the internal and external perception data collection cycle specifically includes: Get the preset collection cycle threshold; Determine whether the internal and external sensing data collection period is greater than the collection period threshold; When the internal and external perception data collection period is greater than the collection period threshold, the intelligent central control is configured as a normal operation mode, and in the normal operation mode, the intelligent central control does not intervene in the processing of mechanical control decision events.
6. The electric bicycle central control intelligent control method according to claim 5, characterized in that: After the step of determining whether the internal and external sensing data collection period is greater than the collection period threshold, the method further includes: When the internal and external perception data collection period is less than or equal to the collection period threshold, obtaining the type of the external computing device connected to the intelligent central control; Determine whether the external computing devices connected to the smart central control include high-speed devices; When the external computing devices connected to the intelligent central control do not include high-speed devices, the intelligent central control is configured to a first intelligent control mode, in which the intelligent central control intervenes in the processing of low real-time decision events; When the external computing devices connected to the intelligent central control include high-speed devices, the intelligent central control is configured as a second intelligent control mode, in which the intelligent central control is involved in the processing of high-real-time decision-making events.
7. The electric bicycle central control intelligent control method according to claim 2, characterized in that: The step of sending the decision computing request of the decision event and the perception data on which the decision event depends to the selected external computing device specifically includes: Sending a decision computing request of the decision event to the selected external computing device, the decision computing request including the amount of perception data on which the decision event depends and its real-time requirement; receiving an evaluation result returned by the external computing device on whether the state of the external computing device meets the real-time requirement of the decision event; When the evaluation result is that the state of the external computing device meets the real-time requirement of the decision event, the perception data on which the decision event depends is sent to the external computing device.
8. The electric bicycle central control intelligent control method according to claim 2, characterized in that: The steps of generating and executing a decision control operation corresponding to the decision event according to the decision calculation result specifically include: Generate a decision control operation instruction and its control parameters according to the decision calculation result, wherein the decision control operation is a control instruction or a control instruction sequence consisting of multiple control instructions, and the control parameters include the execution time and / or duration of each control instruction; The corresponding control operation instructions are executed sequentially according to the control parameters to control the corresponding electronic system of the electric bicycle to perform corresponding operations.
