Risk population analysis method and system for tailings dam breach accidents
Through satellite remote sensing images and dam breach simulation analysis, the risk areas and crowd portraits of tailings dam breach accidents are determined, which solves the problem of insufficient accuracy and efficiency of risk crowd prediction in the existing technology, and achieves a more accurate and efficient risk assessment. and emergency management.
Patent Information
- Application Number
- CN202410066399.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-01-17
AI Technical Summary
In the prediction and emergency management of tailings dam breach accidents, the existing technology lacks accuracy and efficiency in predicting the range of risk groups, resulting in high uncertainty in the impact of the accident.
By collecting satellite remote sensing images for feature screening, a tailings pond location set is generated and a recognition model is trained, and basic information is combined to conduct dam break simulation analysis, identify risk areas and generate portraits of risk groups, and then carry out risk prediction analysis and emergency management.
It improves the accuracy and efficiency of predicting the range of risk groups in tailings dam breach accidents and ensures more scientific emergency management and emergency plan formulation.
Smart Images

Figure CN117893015B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of environmental risk assessment, and in particular to a method and system for analyzing risk groups of people in a tailings dam breach accident. Background Art
[0002] Tailings dam breach is one of the major accidents in mine safety production. It has a wide impact range and serious harm. Once it occurs, it will have a serious impact on the health and life safety of local residents. Therefore, in order to reduce its harm to society, environment and humans, we need to predict possible dam breach accidents and formulate emergency plans in advance. However, at present, we mainly rely on manual inspections and prediction methods based on limited data in the prediction and emergency management of tailings dam breach accidents, which leads to the technical problems of insufficient accuracy and efficiency in the existing technology in predicting the range of risk groups affected by accidents. Summary of the invention
[0003] This application effectively solves the technical problems of insufficient accuracy and efficiency in predicting the range of risk groups affected by accidents in the prior art by providing a method and system for analyzing risk groups for tailings dam breach accidents, thereby achieving the technical effect of improving the accuracy and efficiency of predictions.
[0004] The present application provides a method and system for analyzing risk groups for tailings dam breach accidents. The technical solution is as follows:
[0005] In a first aspect, an embodiment of the present application provides a method for analyzing risk groups for tailings dam breach accidents, the method comprising:
[0006] By collecting satellite remote sensing images in the target area for feature screening, a target tailings pond location set is generated;
[0007] A tailings pond identification model is obtained by training according to the target tailings pond location set;
[0008] Traversing the target area based on the tailings pond identification model, performing dam break simulation analysis in combination with basic information of the target tailings pond, and determining N risk areas, where N is an integer greater than 1;
[0009] Delineate the disaster-affected area according to the N risk areas and generate a profile of the risk population;
[0010] Based on the risk population portrait, risk prediction analysis of the target tailings pond is carried out, and emergency management is carried out according to the analysis results.
[0011] In a second aspect, an embodiment of the present application provides a risk population analysis system for tailings dam breach accidents, the system comprising:
[0012] A target tailings pond location set generation module, the target tailings pond location set generation module is used to generate a target tailings pond location set by collecting satellite remote sensing images in the target area for feature screening;
[0013] A tailings pond identification model acquisition module, the tailings pond identification model acquisition module is used to obtain a tailings pond identification model according to the target tailings pond location set training;
[0014] A risk area determination module, the risk area determination module is used to traverse the target area based on the tailings pond identification model, perform dam break simulation analysis in combination with basic information of the target tailings pond, and determine N risk areas, where N is an integer greater than 1;
[0015] A risk population portrait generation module, the risk population portrait generation module is used to define the disaster-affected area according to the N risk areas and generate a risk population portrait;
[0016] An emergency management module is used to perform risk prediction analysis on a target tailings pond based on the risk population portrait and to perform emergency management according to the analysis results.
[0017] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
[0018] This application collects satellite remote sensing images in the target area for feature screening, generates a target tailings pond location set, then trains a tailings pond identification model based on the target tailings pond location set, and then traverses the target area based on the tailings pond identification model, performs dam break simulation analysis in combination with the basic information of the target tailings pond, and determines N risk areas, where N is an integer greater than 1, and then delineates the affected area based on the N risk areas, generates a risk population portrait, and then performs risk prediction analysis on the target tailings pond based on the risk population portrait, and performs emergency management based on the analysis results. It effectively solves the technical problems of insufficient accuracy and efficiency in predicting the range of risk populations affected by accidents in the prior art, and achieves the technical effect of improving the accuracy and efficiency of prediction. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0020] Figure 1 A schematic diagram of a process flow of a method for analyzing risk groups for tailings dam breach accidents provided in an embodiment of the present application;
[0021] Figure 2 A schematic diagram of the structure of a risk group analysis system for tailings dam breach accidents provided in an embodiment of the present application.
[0022] Explanation of the accompanying drawings: target tailings pond location set generation module 1, tailings pond identification model acquisition module 2, risk area determination module 3, risk population portrait generation module 4, emergency management module 5. DETAILED DESCRIPTION
[0023] The present application provides a method and system for analyzing risk groups for tailings dam breach accidents, aiming to solve the technical problems in the prior art of insufficient accuracy and efficiency in predicting the range of risk groups affected by accidents.
[0024] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0025] It should be noted that the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or modules that are not explicitly listed or inherent to these processes, methods, products or devices.
[0026] Embodiment 1
[0027] like Figure 1 As shown, the present invention provides a method for analyzing risk groups for tailings dam breach accidents, which is used to improve the accuracy and efficiency of prediction, and the method includes:
[0028] Collect satellite remote sensing images in the target area, which refers to a specific area where tailings pond risk assessment is required, including multiple tailings ponds and surrounding areas that may be affected by tailings dam breaches. The remote sensing image data sent by the satellite is received through the data acquisition equipment. These images have high resolution, large coverage and multi-spectral characteristics. After the image data is collected, various features in the remote sensing image are extracted and analyzed, including texture, shape, color, etc. Through feature screening, the location set where the tailings pond may exist is identified, thereby generating a target tailings pond location set. For example, tailings ponds usually have specific shapes and sizes, and will have specific impacts on the surrounding environment. These can be identified through feature analysis of remote sensing images, so that the location of the tailings pond can be determined.
[0029] The generated target tailings pond location set includes the location information of the tailings pond and other related features, such as terrain features, geomorphic features, land use types, etc., which describe the characteristics of the tailings pond and the surrounding environment. Features related to the tailings pond are extracted from the target tailings pond location set, such as features describing the shape and size of the tailings pond (area, perimeter, etc.), features describing the surrounding environment of the tailings pond (terrain height difference, vegetation coverage, etc.), etc. These extracted features are used to train and establish a tailings pond identification model. Use algorithms such as support vector machines, random forests or neural networks to input the prepared training data set into the algorithm for training. During the training process, the algorithm learns and optimizes according to the input data, and finally establishes a model that can be used to identify the tailings pond, that is, the tailings pond identification model.
[0030] The trained tailings pond identification model is used to traverse the target area. By inputting the satellite remote sensing image or other data source to be checked, the model automatically identifies the possible location of the tailings pond in the image. After the location of the tailings pond is determined, the basic information of the target tailings pond is collected through official data acquisition, on-site investigation, etc., including the design parameters of the tailings pond, historical dam break records, current storage capacity and dam height. Combined with the basic information of the target tailings pond and the results output by the tailings pond identification model, a dam break simulation analysis is performed, that is, through certain mathematical models and methods (hydraulic models, numerical simulations, etc.), the process of tailings dam break is simulated to predict the development trend of water flow after dam break and the areas that may be affected. Through dam break simulation analysis (analysis of dam break flow, water flow velocity, affected terrain and landforms, etc.), the areas that may be affected after the tailings dam break are determined. These areas are risk areas. The minimum number of risk areas is 2. The number of risk areas N can be set differently according to the target to be protected and the available resources. For example, if a more accurate prediction of risk is required, N can be set to a larger value to obtain more risk areas.
[0031] After the risk area is determined, the disaster scope of each area is further determined based on factors such as the topography, landforms, river diversion, road damage, and the speed and direction of the dam breach water flow in the risk area. The disaster scope refers to the area that is directly affected by the tailings dam breach and requires emergency rescue. Based on the disaster scope and other relevant information, a risk population portrait is generated. The risk population portrait is a detailed description of the population that may be affected by the tailings dam breach, including the distribution, characteristics, needs, etc. of the population.
[0032] Based on the risk population portrait, data analysis tools and methods are used for in-depth mining. The situation of the risk population is intuitively understood by generating heat maps and population distribution maps of risk areas. According to the risk population portrait and data analysis results, risk prediction analysis is carried out. By analyzing the dam break flow, water flow velocity, affected terrain and landforms, population distribution, building conditions, etc., the risks and impacts that the target tailings pond may cause to the surrounding areas after the dam break are evaluated. Through risk prediction analysis, the risk level and impact range of each risk area are obtained. According to the results of risk prediction analysis, corresponding emergency plans are formulated, including rescue measures, evacuation routes and resettlement point settings for different risk areas. The technical effect of improving the accuracy and efficiency of prediction is achieved.
[0033] In a preferred implementation manner provided in the embodiment of the present application, a tailings pond identification model is obtained by training according to the target tailings pond location set, and the method includes:
[0034] For each tailings pond location in the target tailings pond location set, its change information is obtained through tailings pond monitoring data, including changes in the shape of the tailings pond, changes in the stacking condition, changes in the surrounding environment, etc., and a tailings pond change information set is constructed by matching the change information of each tailings pond location.
[0035] Based on the target tailings pond location set, multiple target features are extracted therefrom, including the shape, size, color, texture, etc. of the tailings pond, which describe the characteristics and morphology of each tailings pond.
[0036] A regional coordinate system is constructed based on the target area characteristics and the multiple target characteristics. The target area characteristics include the geographical characteristics of the target area (geographical location, topography, rivers, lakes and other natural geographical features), climatic conditions (rainfall, wind speed, temperature, etc.), geological conditions (rock type, geological structure, soil properties, etc.), surrounding environment (buildings, roads, population distribution, etc.), etc. The regional coordinate system is constructed by the target area characteristics and multiple target characteristics to provide an accurate geographical location and spatial reference for each tailings pond, so that the relevant data of the tailings pond can be better organized and processed.
[0037] The tailings pond change information set is synchronized to the regional coordinate system, and the tailings pond is identified using a machine learning algorithm to generate multiple point data. These point data represent the exact position of each tailings pond in the regional coordinate system and reflect the changes in the tailings pond, such as how many new tailings ponds have appeared in the target area or which tailings ponds have disappeared in the target area.
[0038] The tailings pond identification model is updated through multiple point data, including adjusting the model's parameters, improving the optimization algorithm, etc., so that the updated model can better identify new tailings ponds and predict their change trends, thereby improving the accuracy and generalization of the model. This preferred implementation achieves the technical effect of improving the accuracy of tailings pond identification by obtaining accurate tailings pond location and change information, and training and updating the model based on these data.
[0039] In another preferred implementation provided by the embodiment of the present application, the tailings pond change information set is synchronized to the regional coordinate system to identify the tailings pond and generate multiple point data, and the method includes:
[0040] The tailings pond change information set is synchronized to the regional coordinate system, and the changes of each tailings pond are marked. The marking method can be pixel-level marking based on image processing technology, or more sophisticated geometric shape matching. Through this process, a set containing the change point information of each tailings pond is generated, namely the tailings pond change point set.
[0041] Based on satellite remote sensing images, image processing and machine learning methods are used to identify and classify the change point sets of tailings ponds, including image preprocessing (such as denoising, enhancement, etc.), feature extraction, model training and classification. Through this process, multiple change data are generated, each of which represents the change of a tailings pond, such as changes in range, depth, capacity, and materials in the pond.
[0042] The identified multiple change data are matched and added with the multiple point data generated previously, and the multiple change data are added to the corresponding multiple point data by adopting a matching method based on the timestamp, geographic location and other information of the data. This preferred implementation method obtains the tailings pond change data through the recognition and analysis of satellite remote sensing images. Satellite remote sensing images can cover a large area, realize the synchronous monitoring and data analysis of multiple tailings ponds, and provide comprehensive tailings pond change information, so as to obtain data with high accuracy and reliability, and achieve the technical effect of improving data accuracy.
[0043] In another preferred implementation provided by the embodiment of the present application, the target area is traversed based on the tailings pond identification model, and a dam break simulation analysis is performed in combination with basic information of the target tailings pond to determine N risk areas. The method includes:
[0044] Use the trained tailings pond identification model to analyze all data in the target area. The model traverses all pixels or data points in the target area to identify the location, shape, size, color and other features of the tailings pond, and outputs multiple tailings pond identification information.
[0045] Basic information about the target tailings pond can be obtained by consulting professionals or conducting on-site surveys, including the topography, storage capacity, type of material in the pond (viscosity or fluidity), dam height, storage capacity, accumulation status, affected area, and other information of each tailings pond. This information is the basis for assessing the risk status of each tailings pond.
[0046] Based on the obtained identification information of the multiple tailings ponds and the basic information of the target tailings pond, fluid dynamics simulation is performed to simulate the process of tailings pond dam breach. In this process, detailed information of each tailings pond (such as the height of the dam body, the strength of the material, etc.) and other geographic information of the target area (such as terrain, rivers, etc.) are input into the fluid dynamics model. The model simulates the dam breach event based on this information and generates dam breach simulation information. The dam breach simulation information describes the actual situation of the dam breach, such as the direction and speed of the water flow and the possible affected range.
[0047] The simulated dam break information is compared and matched with the terrain, buildings and other information of the target area to determine which places may be affected by the tailings dam break. According to the matching results, N risk areas in the target area are determined. The N risk areas are areas that may be affected by the tailings dam break and need special attention and management. This preferred implementation method can accurately predict the possible impact range and degree of the tailings dam break by using fluid dynamics simulation, which can provide a basis for providing scientific and accurate emergency management and risk management strategies, achieving the technical effect of improving the scientificity and accuracy of decision-making.
[0048] In another preferred implementation provided in the embodiment of the present application, the disaster-affected area is delineated according to the N risk areas, and a risk population portrait is generated, and the method includes:
[0049] The telecommunication base station data in the target area is used to match the N risk areas. The telecommunication base station can provide information about population distribution and flow, such as the signal coverage of the base station, the number of users, call records, etc. By matching the telecommunication base station data and the risk areas, the population density data of each risk area can be determined.
[0050] The population density data includes the population distribution of different genders, different age groups, and different occupations. By analyzing and processing the population density data, corresponding risk population information is generated. The risk population information includes population size, age distribution, occupational characteristics, etc. For example, some areas have a larger elderly population, some areas have a larger young population, some areas have a larger elderly population, the elderly population in some areas is mainly retired people, and the youth population is mainly students, etc.
[0051] The risk avoidance capacity analysis is conducted based on the information of the risk groups, including the assessment of each group's risk tolerance, emergency response capacity and other factors. For example, the risk avoidance capacity of the 10-60-year-old group is more sensitive to age composition, while the risk avoidance capacity of the group over 60 is lower and not sensitive to age changes. Gender factors have differences in physical strength at different ages, etc. Based on these analysis results, the disaster-affected area is delineated, that is, which areas may be affected by the tailings dam breach.
[0052] Extract information about the risk population within the disaster-affected area, analyze and profile this information, and generate a risk population profile, including population size, gender distribution, age distribution, occupational characteristics, place of residence, communication status, health status, etc. Through the profile, we can understand the age distribution, gender distribution, geographic distribution, etc. of the group in need of assistance, so that we can prepare emergency medical services in advance, assist the rescue team to accurately locate the risk population in an emergency, and get in touch with the potential risk population more quickly. This preferred implementation method can understand the characteristics and distribution of the risk population within the disaster-affected area by matching the risk area with telecommunications base station data and determining the regional population density data, so as to help better formulate emergency management and risk management strategies for different risk areas, and achieve the technical effect of improving the scientificity and accuracy of decision-making.
[0053] In another preferred embodiment provided in the examples of the present application, the method comprises:
[0054] Risk assessment is performed using risk population portraits and basic information of the target tailings pond. The risk population portrait provides the characteristics and distribution of risk populations within the disaster-affected area. The basic information of the target tailings pond includes dam height, storage capacity, accumulation status, etc. By comprehensively analyzing these factors, risk assessment can be performed on each risk area to determine the risk level of each area. Each risk level represents a specific risk level, such as high, medium, and low, and these risk levels are used to describe the risk status of each risk area.
[0055] The N risk levels corresponding to the N risk areas are matched with the target tailings pond, and the risk level of the target tailings pond is determined based on the specific situation of the target tailings pond and the information and risk avoidance capabilities of the risk population within the disaster-stricken area. For example, among the N risk areas corresponding to the target tailings pond, more than half of the risk levels are high risk, then for the tailings pond, the output target risk level is high risk.
[0056] According to the target risk level of the target tailings pond, a multi-dimensional risk prediction analysis is performed on the target tailings pond, including dam break accident possibility analysis, dam break accident intensity analysis, risk exposure analysis, etc. For example, by analyzing the aging of the dam structure, natural disasters (such as earthquakes and floods), human errors (such as operating errors and improper maintenance), etc., the possibility of dam break caused by these factors is evaluated; through simulation experiments, the flow, speed, and impact range of the dam break flood are analyzed to evaluate the possible dam break intensity; through risk exposure analysis, it is understood which individuals or groups are most likely to be affected by the risk of the tailings pond, etc. Through multi-dimensional analysis, the analysis results of the risk prediction of the target tailings pond are generated, including the probability and intensity of dam break accidents, the possible impact range and degree, and the risk exposure groups that need to be paid attention to. This preferred implementation method can accurately determine the risk level of the target tailings pond by matching the risk level of the risk area with the target tailings pond, and through multi-dimensional risk prediction analysis, the risk factors of the tailings pond are comprehensively considered, and specific risk prediction analysis results are provided, thereby providing valuable reference basis for decision makers, achieving the technical effect of improving the scientificity and accuracy of decision-making.
[0057] Embodiment 2
[0058] Based on the same inventive concept as the risk group analysis method for tailings dam breach accidents in the aforementioned embodiment, Figure 2 As shown, the present application provides a risk population analysis system for tailings dam breach accidents, and the system and method embodiments in the present application embodiments are based on the same inventive concept. The system includes:
[0059] A target tailings pond location set generation module 1, wherein the target tailings pond location set generation module 1 is used to generate a target tailings pond location set by collecting satellite remote sensing images within a target area for feature screening;
[0060] A tailings pond identification model acquisition module 2, wherein the tailings pond identification model acquisition module 2 is used to obtain a tailings pond identification model according to the target tailings pond location set training;
[0061] A risk area determination module 3, the risk area determination module 3 is used to traverse the target area based on the tailings pond identification model, perform dam break simulation analysis in combination with basic information of the target tailings pond, and determine N risk areas, where N is an integer greater than 1;
[0062] A risk population portrait generation module 4, wherein the risk population portrait generation module 4 is used to define the disaster-affected area according to the N risk areas and generate a risk population portrait;
[0063] The emergency management module 5 is used to perform risk prediction analysis on the target tailings pond based on the risk population portrait and perform emergency management according to the analysis results.
[0064] Furthermore, the tailings pond identification model acquisition module 2 is used to execute the following method:
[0065] Matching tailings pond change information to each tailings pond location in the target tailings pond location set to obtain a tailings pond change information set;
[0066] Extracting a plurality of target features based on the target tailings pond location set;
[0067] Constructing a regional coordinate system based on the target region feature and the multiple target features;
[0068] Synchronizing the tailings pond change information set to the regional coordinate system to identify the tailings pond and generate multiple point data;
[0069] Update the tailings pond identification model through multiple point data.
[0070] Furthermore, the tailings pond identification model acquisition module 2 is used to execute the following method:
[0071] Synchronize the tailings pond change information set to the regional coordinate system for identification, and generate a tailings pond change point set;
[0072] Identify the tailings pond change point set based on satellite remote sensing images to generate multiple change data;
[0073] The plurality of change data are matched and added to the plurality of point data.
[0074] Furthermore, the risk area determination module 3 is used to perform the following method:
[0075] Traversing the target area through the tailings pond identification model to generate multiple tailings pond identification information;
[0076] Obtain basic information of the target tailings pond;
[0077] Performing fluid dynamics simulation based on the identification information of the plurality of tailings ponds and the basic information of the target tailings pond to determine dam break simulation information;
[0078] The dam break simulation information is traversed to match the target area and generate the N risk areas.
[0079] Furthermore, the risk population portrait generation module 4 is used to execute the following method:
[0080] Using telecommunication base station data in the target area to match the N risk areas, determine regional population density data;
[0081] generating risk population information based on population density data of the area;
[0082] Conduct risk avoidance capacity analysis based on the risk population information, and define the disaster-affected area based on the risk avoidance capacity;
[0083] The information of the risk population within the disaster-stricken area is extracted to generate a portrait of the risk population.
[0084] Furthermore, the emergency management module 5 is used to execute the following method:
[0085] Perform risk assessment based on the risk population profile and the basic information of the target tailings pond to generate multiple risk levels;
[0086] Matching the target tailings pond according to the multiple risk levels, and outputting the target risk level;
[0087] Based on the target risk level, a multi-dimensional risk prediction analysis is performed on the target tailings pond to generate an analysis result of the risk prediction of the target tailings pond.
[0088] It should be noted that the above-mentioned sequence of the embodiments of the present application is only for description and does not represent the advantages and disadvantages of the embodiments. And the above-mentioned specific embodiments of this specification are described. Other embodiments are within the scope of this application. In some cases, the actions or steps recorded in this application can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the process depicted in the accompanying drawings does not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0089] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.
[0090] This specification and drawings are merely exemplary illustrations of the present application and are deemed to cover any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, a person skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.
Claims
1. A method for analyzing risk groups for tailings dam breach accidents, characterized in that: The method comprises: By collecting satellite remote sensing images in the target area for feature screening, a target tailings pond location set is generated; A tailings pond identification model is obtained by training according to the target tailings pond location set; Traversing the target area based on the tailings pond identification model, performing dam break simulation analysis in combination with basic information of the target tailings pond, and determining N risk areas, where N is an integer greater than 1; Delineate the disaster-affected area according to the N risk areas and generate a profile of the risk population; Conduct risk prediction analysis on the target tailings pond based on the risk population portrait, and conduct emergency management according to the analysis results; The tailings pond identification model is obtained by training the target tailings pond location set, and the method includes: Matching tailings pond change information to each tailings pond location in the target tailings pond location set to obtain a tailings pond change information set; Extracting a plurality of target features based on the target tailings pond location set; Constructing a regional coordinate system based on the target region feature and the multiple target features; Synchronizing the tailings pond change information set to the regional coordinate system to identify the tailings pond and generate multiple point data; Update the tailings pond identification model through multiple point data.
2. The method according to claim 1, characterized in that The tailings pond change information set is synchronized to the regional coordinate system to identify the tailings pond and generate multiple point data, the method comprising: Synchronize the tailings pond change information set to the regional coordinate system for identification, and generate a tailings pond change point set; Identify the tailings pond change point set based on satellite remote sensing images to generate multiple change data; The plurality of change data are matched and added to the plurality of point data.
3. The method according to claim 1, characterized in that Based on the tailings pond identification model, the target area is traversed, and the dam break simulation analysis is performed in combination with the basic information of the target tailings pond to determine N risk areas. The method includes: Traversing the target area through the tailings pond identification model to generate multiple tailings pond identification information; Obtain basic information of the target tailings pond; Performing fluid dynamics simulation based on the identification information of the plurality of tailings ponds and the basic information of the target tailings pond to determine dam break simulation information; The dam break simulation information is traversed to match the target area and generate the N risk areas.
4. The method according to claim 1, characterized in that Delineating the disaster-affected area according to the N risk areas and generating a risk population portrait includes: Using telecommunication base station data in the target area to match the N risk areas, determine regional population density data; generating risk population information based on population density data of the area; Conduct risk avoidance capacity analysis based on the risk population information, and define the disaster-affected area based on the risk avoidance capacity; The information of the risk population within the disaster-stricken area is extracted to generate a portrait of the risk population.
5. The method according to claim 1, characterized in that Methods include: Perform risk assessment based on the risk population profile and the basic information of the target tailings pond to generate multiple risk levels; Matching the target tailings pond according to the multiple risk levels, and outputting the target risk level; Based on the target risk level, a multi-dimensional risk prediction analysis is performed on the target tailings pond to generate an analysis result of the risk prediction of the target tailings pond.
6. A risk population analysis system for tailings dam breach accidents, characterized in that: The system comprises: A target tailings pond location set generation module, wherein the target tailings pond location set generation module is used to generate a target tailings pond location set by collecting satellite remote sensing images within the target area for feature screening; A tailings pond identification model acquisition module, the tailings pond identification model acquisition module is used to obtain a tailings pond identification model according to the target tailings pond location set training; A risk area determination module, the risk area determination module is used to traverse the target area based on the tailings pond identification model, perform dam break simulation analysis in combination with basic information of the target tailings pond, and determine N risk areas, where N is an integer greater than 1; A risk population portrait generation module, the risk population portrait generation module is used to define the disaster-affected area according to the N risk areas and generate a risk population portrait; An emergency management module, which is used to perform risk prediction analysis on the target tailings pond based on the risk population portrait and perform emergency management according to the analysis results; The tailings pond identification model acquisition module is used to execute the following method: Matching tailings pond change information to each tailings pond location in the target tailings pond location set to obtain a tailings pond change information set; Extracting a plurality of target features based on the target tailings pond location set; Constructing a regional coordinate system based on the target region feature and the multiple target features; Synchronizing the tailings pond change information set to the regional coordinate system to identify the tailings pond and generate multiple point data; Update the tailings pond identification model through multiple point data.
Citation Information
Patent Citations
Method and system for dynamically updating geographic space data based on remote sensing image
CN105551028A
Tailing pond risk evaluation method and management method for different benefit groups under extreme working conditions
CN110807569A
Tailing pond intelligent identification method and device
CN114882375A
Tailing pond dam break disaster risk avoiding and transferring scheme optimization method
CN115018244A
Tailing pond accident potential and risk evolution method and system
CN115035256A
