A geological disaster intelligent monitoring and early warning device and system method

CN117894142BInactive Publication Date: 2024-10-15SHANDONG PROVINCIAL GEOLOGICAL & MINERAL EXPLORATION & DEV BUREAU 801 HYDROGEOLOGY & ENG GEOLOGY BRIGADE (SHANDONG PROVINCIAL GEOLOGICAL & MINERAL ENG EXPLORATION INST)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410300940.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-15
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing intelligent monitoring and early warning equipment for geological disasters is not conducive to monitoring the formation in advance, resulting in delayed early warning.

Method used

An intelligent monitoring and early warning equipment for geological disasters is designed. It uses underground rods and inner rods to go deep into the stratum, and combines air bags, pressure sensors and vibration sensors. Through the expansion of the air bag and the electrical signal induction of the pressure sensor, it can timely monitor changes in the stratum and pass through The movable structure of the inner casing and the outer sleeve senses the movement of the formation plates to achieve early warning.

Benefits of technology

It achieves timely sensing and early warning of formation changes, avoids early warning delays, and improves the timeliness and accuracy of early warning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117894142B_ABST
    Figure CN117894142B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of geological disaster monitoring technology, and provides a geological disaster intelligent monitoring and early warning device and system method, including an underground rod, an inner rod is installed inside the surface of the underground rod, a docking rod is fixedly connected to the lower end of the inner rod, an arc hole is arranged on the surface of the inner rod, and an airbag is installed inside the arc hole. In the present application, an inner rod is arranged inside the underground rod, an airbag is arranged on the inner rod, and a pressure sensor is installed inside the airbag. On the one hand, the pressure sensor is protected by the airbag to avoid the situation of pre-triggering, which causes the monitoring accuracy to decrease. The airbag is installed inside the arc hole. After the inner rod penetrates into the formation, the airbag is squeezed by a pressure ring to change the expansion direction of the airbag. After the airbag expands horizontally, a certain space will be reserved between the formation and the pressure sensor. When the pressure in the formation changes, the airbag will be pushed and then touch the pressure plate, so that the pressure plate touches the pressure sensor under the pressure of the formation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of geological disaster monitoring, and in particular to an intelligent geological disaster monitoring and early warning device and system method. Background Art

[0002] Geological disasters are a common natural disaster in the environment, which can easily cause environmental damage and worse living environment. Geological disaster prevention and control is an important task directly related to economic and social development and the safety of people's lives and property. Geological disaster monitoring, prediction and early warning equipment can realize geological disaster monitoring and early warning work through structural settings, and ensure the safety of people's lives and property in a timely and effective manner.

[0003] For example, the publication number CN115862271B discloses an intelligent geological disaster monitoring and early warning instrument, which is equipped with a mountain, a rockfall interception piece, a point monitoring unit, a sonar monitoring unit, a rockfall monitoring unit, a road warning unit, a timing unit, a smoke alarm unit, and an interception door. The point monitoring unit includes a mountain nail, and the point monitoring unit is provided with a plurality of mountain nails. An iron ball assembly is installed on the mountain nail. The mountain is point-monitored by the point monitoring unit; the sonar monitoring unit is used to monitor and give early warning before a landslide and a mountain collapse; the rockfall monitoring unit includes a bracket four, and a vibration motion assembly is installed on the bracket four, and a rotating assembly is installed on the vibration motion assembly, and a switch assembly is installed on the rotating assembly. The rockfall monitoring unit is used to give early warning after a landslide and a mountain collapse.

[0004] The above-mentioned geological disaster early warning equipment uses sonar to detect mountain collapse and sets up rockfall units to provide early warning of landslides. However, before a geological disaster occurs, abnormal conditions will first appear in the underground strata. Only the landslide phenomenon is detected, which can easily cause delayed warnings. During use, the existing geological disaster early warning devices are not conducive to going deep into the strata to monitor and warn the strata. As a result, changes in the strata are reflected on the ground and the phenomenon occurs before it is monitored and warned, resulting in delayed warnings, which is not conducive to early warnings. Summary of the invention

[0005] The present invention proposes a geological disaster intelligent monitoring and early warning device and system method, which solves the problem that the existing geological disaster intelligent monitoring and early warning device is not conducive to pre-monitoring the strata, resulting in early warning delays.

[0006] The technical solution of the present invention is as follows:

[0007] An intelligent monitoring and early warning device for geological disasters, comprising an underground rod, an inner rod is installed inside the surface of the underground rod, a docking rod is fixedly connected to the lower end of the inner rod, an arc hole is provided on the surface of the inner rod, and an air bag is installed inside the arc hole, a groove is provided inside the inner rod, and a vertical rod is vertically inserted inside the groove, a pressure ring is fixedly connected to the lower end of the vertical rod, a mounting ring is provided inside the air bag, and a spring expansion groove is provided on the outer wall surface of the mounting ring, a tongue plate is connected inside the spring expansion groove, and a pressure sheet is installed at one end of the tongue plate, pressure sensors for pressure sensing are installed on the upper and lower sides of the spring expansion groove, and a signal line is electrically connected to the inner center of the mounting ring;

[0008] The surface of the docking rod is integrally connected with an inner sleeve, and the outer side of the inner sleeve is sleeved and installed with an outer sleeve, a fixing hole is opened on the surface of the inner sleeve, and an elastic umbrella bead is installed inside the fixing hole, a pressure sensor is installed on one side of the elastic umbrella bead, and the inner wall of the outer sleeve is fixedly connected with a needle rod corresponding to the fixing hole;

[0009] A pull ring is movably installed at the center of the inner rod, and a push rod is movably connected to the surface of the pull ring, a vibration sensor is movably installed at one end of the push rod away from the pull ring, a pull rope is movably inserted through the center line of the pull ring, and a fixed block is fixedly arranged on the surface of the pull rope, and a return spring is connected to the center bottom of the pull ring;

[0010] A slope buried plate is arranged on the outer side of the buried rod, and an entry hole is arranged on the surface of the slope buried plate, and a cutting sensing probe rod is inserted inside the entry hole, a monitoring signal control box is installed on the outer side of the upper end of the buried rod, and a humidity plug rod is installed on the left side of the buried rod.

[0011] As an embodiment of the present invention, a socket is opened on the surface wall of the buried rod, and a crank is arranged on the outside of the socket, a gear is movably connected to the inside of the socket, and a key slot is arranged on the center line of the gear, and a head cover is threadedly connected to the upper end of the buried rod.

[0012] As an implementation mode of the present invention, a rack is fixedly provided on the front wall of the inner rod, and a meshing structure is formed between the rack and the gear.

[0013] As an embodiment of the present invention, a drill bit is installed at the lower end of the docking rod, and a drill tooth is integrally connected to the surface of the drill bit.

[0014] As an embodiment of the present invention, the lower end of the slope embedded plate is movably connected to an open clamping plate, and the surface of the open clamping plate is provided with a torsion spring shaft for movable opening and closing.

[0015] As an embodiment of the present invention, a moisture box is embedded in the interior of the humidity plug rod, and a round box is installed on the outside of the humidity plug rod, a glass plate is integrated on the upper surface of the round box, a ventilation filter hole for communication is provided between the round box and the humidity plug rod, a moisture absorbing sheet is placed inside the moisture box, and capillary holes are provided on the lower end surface of the humidity plug rod.

[0016] As an embodiment of the present invention, open grooves are alternately arranged between adjacent sockets, and a folding rod is movably connected inside the open groove, a rotating shaft for rotation is arranged in the middle of the folding rod, a connecting spring is connected to the inner side of the folding rod, a threaded pressure rod is arranged on the upper end of the folding rod, and a threaded connection is formed between the threaded pressure rod and the buried rod.

[0017] As an implementation manner of the present invention, the inner sleeve is fixedly connected to the docking rod, and the outer sleeve is movably sleeved to the outer side of the inner sleeve.

[0018] A method for intelligent monitoring and early warning equipment for geological disasters, comprising the following steps:

[0019] S1: Dig below the slope surface, dig down to a depth that is consistent with the length of the buried rod. After the buried rod is buried underground, let the inner rod go deep into the ground and enter the stratum;

[0020] S2: Before the inner rod enters the ground, the pull rope is lifted upward, thereby pulling the push rod, and the vibration sensor at the lower end of the push rod is brought back to the inside of the buried rod. After the inner rod goes deep, the pull rope is released, and the push rod is brought back downward by using the reset elasticity of the reset spring. After being brought back, the inertia of the push rod pushes the vibration sensor outward, so that the vibration sensor can be close to the ground, thereby sensing the vibration of the ground;

[0021] S3: After the docking rod enters the stratum, it will be buried under the stratum. When the stratum plate moves, it will push the outer sleeve. There is a movable gap between the outer sleeve and the inner sleeve. Once the stratum plate moves, it will push the outer sleeve to move eccentrically. After the outer sleeve moves, the needle rod will be deeply inserted into the fixed hole. After deep insertion, it will push the elastic umbrella bead, and the elastic umbrella bead will retreat, and the pressure sensor will sense the pressure;

[0022] S4: At the same time, after the inner rod is installed, press the vertical rod downward, and the pressure ring at the lower end of the vertical rod will squeeze the airbag, and the vertically expanded airbag will become horizontally expanded. When the ground is abnormal, the ground will be squeezed and changed, and then squeeze the outer wall of the horizontally expanded airbag, and push the pressure plate. The pressure plate retreats with the tongue plate into the spring expansion groove, and then contacts the pressure sensor.

[0023] A system of intelligent monitoring and early warning equipment for geological disasters, wherein the monitoring signal control box includes an alarm module, a monitoring module, a signal transceiver module, a PLC instruction issuing module and a GPS positioning module, wherein the following steps are included:

[0024] S1: The monitoring module includes a pressure sensor, a pressure sensor and a vibration sensor, and the pressure sensor, the pressure sensor and the vibration sensor are connected to the alarm module;

[0025] S2: When the pressure sensor, pressure transducer and vibration sensor are triggered, the electrical signal is converted and transmitted to the signal transceiver module in the monitoring signal control box. The signal transceiver module receives and sends the signal, and the PLC instruction module allows the data calculation module to analyze and perform logical operations on the received signal;

[0026] S3: The alarm module sets the warning threshold and divides the danger level according to the data threshold calculated and analyzed. The highest level is the red light warning. The GPS positioning module will highlight and prompt the name and location of the geological disaster body and monitoring point that issued the warning.

[0027] The working principle and beneficial effects of the present invention are:

[0028] 1. An inner rod is set inside the buried rod, and an airbag is set on the inner rod. The pressure sensor is installed inside the airbag. On the one hand, the airbag is used to protect the pressure sensor to avoid pre-triggering, which causes a decrease in monitoring accuracy. The airbag is installed inside the arc hole. After the inner rod penetrates into the formation, the airbag is squeezed by a pressure ring to change the expansion direction of the airbag. After the airbag expands laterally, a certain space will be reserved between the formation and the pressure sensor. When the pressure in the formation changes, the airbag will be pushed and then touch the pressure plate, so that the pressure plate touches the pressure sensor under the squeezing of the formation, and the formation is monitored and sensed by the electrical signal of the pressure sensor. In this way, by allowing the inner rod to penetrate into the formation, the formation can be monitored and sensed, the formation changes can be sensed in advance, and early warning feedback can be given in time to avoid early warning delays.

[0029] 2. An inner sleeve and an outer sleeve are provided on the docking rod. The diameter of the inner sleeve is smaller than that of the docking rod, and the docking rod is fixedly connected. The diameter of the outer sleeve is consistent with that of the docking rod, but it is sleeved on the outside of the inner sleeve. When the stratum plate moves, it will push the docking rod inserted into the underground. After the outer sleeve is compressed, it will be close to the outer wall of the inner sleeve. When the needle rod is inserted into the fixed hole, it will push the elastic umbrella bead, and the elastic umbrella bead retreats. Then the pressure sensor is used to sense the pressure and monitor the underground plate in advance. When the underground plate moves, the probability of geological disasters increases, and early warning is given to avoid the problem of untimely warning and increase the timeliness and accuracy of the warning.

[0030] 3. The inner rod is buried deep in the stratum. After the inner rod goes deep into the stratum, the reset elasticity of the reset spring is used to bring the push rod back downward. After being brought back, the inertia of the push rod will push the vibration sensor outward, so that the vibration sensor can be close to the stratum, thereby sensing the vibration of the stratum, which is conducive to pre-sensing the underground vibration situation. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0032] Figure 1 This is a schematic diagram of the overall disassembly structure of a geological disaster intelligent monitoring and early warning device of the present invention;

[0033] Figure 2 It is a schematic diagram of the internal cross-sectional structure of the open groove of the present invention;

[0034] Figure 3 It is a cross-sectional structural schematic diagram of the humidity plug rod and the humidity box of the present invention;

[0035] Figure 4 It is a schematic diagram of the connection structure of the pull ring and the vibration sensor of the present invention;

[0036] Figure 5 It is a schematic diagram of the inner rod structure of the present invention;

[0037] Figure 6 The present invention Figure 5 The enlarged structural diagram at A in the middle;

[0038] Figure 7 It is a schematic cross-sectional structural diagram of the inner rod of the present invention;

[0039] Figure 8 It is a schematic cross-sectional structural diagram of the airbag of the present invention;

[0040] Fig. 9 It is a schematic diagram of the docking rod structure of the present invention;

[0041] Fig.10 yes Fig. 9 Schematic diagram of the structure at point B in the middle.

[0042] Figure numerals: 1, buried rod; 2, jack; 3, open slot; 301, folding rod; 302, rotating shaft; 303, connecting spring; 304, threaded pressure rod; 4, crank; 5, head cover; 6, monitoring signal control box; 7, slope buried plate; 8, open splint; 9, torsion spring shaft; 10, entry hole; 11, cutting induction probe rod; 12, humidity plug rod; 1201, moisture box; 1202, round box; 1203, glass plate; 1204, ventilation filter hole; 1205, moisture absorption sheet; 1206, capillary; 13, inner rod; 1301, arc hole; 1302, groove; 1303, air bag; 13 04, pressure ring; 1305, vertical rod; 1306, spring expansion slot; 1307, tongue plate; 1308, pressure sheet; 1309, pressure sensor; 1310, signal line; 1311, mounting ring; 14, docking rod; 1401, inner sleeve; 1402, fixing hole; 1403, outer sleeve; 1404, needle rod; 1405, elastic umbrella bead; 1406, pressure sensor; 15, drill teeth; 16, drill bit; 17, pull ring; 18, push rod; 19, vibration sensor; 20, pull rope; 21, fixing block; 22, reset spring; 23, rack; 24, gear; 25, key slot. DETAILED DESCRIPTION

[0043] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0044] like Figure 1-Figure 10 As shown, an intelligent monitoring and early warning device for geological disasters includes an underground rod 1, open slots 3 are staggered between adjacent sockets 2, and a folding rod 301 is movably connected inside the open slot 3, a rotating shaft 302 for rotation is arranged in the middle of the folding rod 301, a connecting spring 303 is connected to the inner side of the folding rod 301, a threaded pressure rod 304 is arranged on the upper end of the folding rod 301, and a threaded connection is formed between the threaded pressure rod 304 and the underground rod 1;

[0045] Specifically, after the underground rod 1 is buried underground and the installation of the underground rod 1 is completed, the threaded connection between the threaded pressure rod 304 and the underground rod 1 is utilized, and the threaded pressure rod 304 is pushed downward to squeeze the folding rod 301, so that the folding rod 301 is folded outward from the middle, and then the folding rod 301 is unfolded, thereby increasing the contact area of ​​the underground rod 1 in the ground and improving the installation stability of the underground rod 1.

[0046] The surface wall of the buried rod 1 is provided with a socket 2, and a crank 4 is provided on the outside of the socket 2, a gear 24 is movably connected to the inside of the socket 2, and a key groove 25 is provided on the center line of the gear 24, a head cover 5 is threadedly connected to the upper end of the buried rod 1, an inner rod 13 is installed inside the surface of the buried rod 1, a rack 23 is fixedly provided on the front wall of the inner rod 13, and a meshing structure is formed between the rack 23 and the gear 24, the lower end of the inner rod 13 is fixedly connected to a docking rod 14, a drill bit 16 is installed at the lower end of the docking rod 14, and a drill tooth 15 is integrally connected to the surface of the drill bit 16;

[0047] Specifically, the crank 4 is inserted from the socket 2, the crank 4 is inserted into the key slot 25, and connected to the gear 24. The crank 4 will drive the gear 24 to rotate. By utilizing the meshing structure between the gear 24 and the rack 23, the crank 4 is rotated to move the inner rod 13 deeper into the ground, so that the inner rod 13 can enter the underground stratum. The drill bit 16 and the drill teeth 15 installed at the lower end of the docking rod 14 will help the inner rod 13 enter the ground.

[0048] A monitoring signal control box 6 is installed on the outer side of the upper end of the buried rod 1, an arc hole 1301 is provided on the surface of the inner rod 13, and an air bag 1303 is installed inside the arc hole 1301, a groove 1302 is provided inside the inner rod 13, and a vertical rod 1305 is vertically inserted inside the groove 1302, and a pressure ring 1304 is fixedly connected to the lower end of the vertical rod 1305, a mounting ring 1311 is provided inside the air bag 1303, and a spring expansion groove 1306 is opened on the outer wall surface of the mounting ring 1311, a tongue plate 1307 is connected inside the spring expansion groove 1306, and a pressing sheet 1308 is installed at one end of the tongue plate 1307, pressure sensors 1309 for pressure sensing are installed on the upper and lower sides of the spring expansion groove 1306, and the inner center of the mounting ring 1311 is electrically connected to a signal line 1310;

[0049] Specifically, the inner rod 13 enters the underground stratum and presses the vertical rod 1305 downward. The lower end of the vertical rod 1305 is fixedly connected to the pressure ring 1304. The vertical rod 1305 is pressed downward, so that the pressure ring 1304 at the lower end of the vertical rod 1305 will squeeze the airbag 1303, and the vertically expanded airbag 1303 set in the arc hole 1301 will become horizontally expanded. When the stratum is abnormal, the stratum will undergo squeezing changes, and then squeeze the outer wall of the horizontally expanded airbag 1303. During the squeezing process, the inner wall of the airbag 1303 shrinks and sinks, and pushes against the pressure plate 1308. The pressure plate 1308 retreats with the tongue plate 1307 into the spring expansion groove 1306, and then contacts the pressure sensor 1309. The pressure electrical signal of the pressure sensor 1309 will be transmitted to the monitoring signal control box 6.

[0050] The surface of the docking rod 14 is integrally connected with an inner sleeve 1401, and the outer side of the inner sleeve 1401 is sleeved with an outer sleeve 1403, a fixing hole 1402 is opened on the surface of the inner sleeve 1401, and an elastic umbrella bead 1405 is installed inside the fixing hole 1402, and a pressure sensor 1406 is installed on one side of the elastic umbrella bead 1405, and the inner wall of the outer sleeve 1403 is fixedly connected with a needle rod 1404 corresponding to the fixing hole 1402, the inner sleeve 1401 and the docking rod 14 are fixedly connected, and the outer sleeve 1403 is movably sleeved with the outer side of the inner sleeve 1401;

[0051] A pull ring 17 is movably installed at the center of the inner rod 13, and a push rod 18 is movably connected to the surface of the pull ring 17, and a vibration sensor 19 is movably installed at one end of the push rod 18 away from the pull ring 17, a pull rope 20 is movably inserted through the center line of the pull ring 17, and a fixing block 21 is fixedly arranged on the surface of the pull rope 20, and a return spring 22 is connected to the center bottom of the pull ring 17;

[0052] Specifically, after the underground rod 1 is buried underground and before the inner rod 13 enters the stratum, the upper end of the pull rope 20 is pulled to lift the pull rope 20 upward, and the upper end of the push rod 18 and the pull ring 17 are movably connected, and the lower end of the push rod 18 and the vibration sensor 19 are rotatably connected. When the push rod 18 is pulled upward, the vibration sensor 19 at the lower end of the push rod 18 is brought back to the interior of the underground rod 1. After the inner rod 13 penetrates deeper, the pull rope 20 is released, and the push rod 18 is brought back downward by utilizing the reset elasticity of the reset spring 22. After being brought back, the inertia of the push rod 18 will push the vibration sensor 19 outward, so that the vibration sensor 19 can be close to the stratum, thereby sensing the vibration of the stratum.

[0053] The outer side of the buried rod 1 is provided with a slope buried plate 7, and the surface of the slope buried plate 7 is provided with an entry hole 10, and the inside of the entry hole 10 is interspersed with an insertion sensing probe 11, and the lower end of the slope buried plate 7 is movably connected with an open clamping plate 8, and the surface of the open clamping plate 8 is provided with a torsion spring shaft 9 for movable opening and closing;

[0054] Specifically, the buried rod 1 is installed below the slope, and the slope buried plate 7 is clamped and installed on the outside of the buried rod 1 using the open clamp 8. The slope buried plate 7 is rotated and adjusted so that the slope buried plate 7 can fit the inclination angle of the slope. The cutting sensing probe 11 is inserted from the entry hole 10 so that the cutting sensing probe 11 can be inserted into the stratum of the slope. A vibration sensing sensor is installed on the cutting sensing probe 11. When a landslide occurs, the slope stratum will vibrate and other changes will occur, and the cutting sensing probe 11 can be used for monitoring and early warning.

[0055] A humidity plug rod 12 is installed on the left side of the buried rod 1, a moisture box 1201 is embedded in the humidity plug rod 12, and a round box 1202 is installed on the outside of the humidity plug rod 12, a glass plate 1203 is integrated on the upper surface of the round box 1202, and a ventilation filter hole 1204 for communication is provided between the round box 1202 and the humidity plug rod 12, a moisture absorbing sheet 1205 is arranged inside the moisture box 1201, and a capillary pore 1206 is provided on the lower end surface of the humidity plug rod 12;

[0056] Specifically, the humidity plug 12 is inserted down on one side of the buried rod 1, and the humidity return phenomenon in the stratum is utilized. Before a geological disaster occurs, under the influence of groundwater, the humidity and moisture of the stratum will increase, and the moisture will enter the interior of the humidity plug 12 through the capillary 1206, and be absorbed by the moisture absorbing sheet 1205 inside the moisture box 1201. The moisture absorbing sheet 1205 is made of moisture absorbing material, and a layered silicate mineral is arranged on the surface to improve the moisture absorption effect. When the moisture humidity reaches the absorption critical point of the moisture absorbing sheet 1205, the moisture will continue to return upward, and the wet moisture will enter the interior of the round box 1202 through the ventilation filter hole 1204, and will form water droplets on the glass plate 1203. The heavier the moisture, the denser the water droplets on the glass plate 1203, and the humidity changes of the stratum can be directly observed.

[0057] A method for intelligent monitoring and early warning equipment for geological disasters, comprising the following steps:

[0058] S1: excavate at a position below the slope surface, dig down to a depth consistent with the length of the buried rod 1, bury the buried rod 1 underground, and then let the inner rod 13 go deep into the ground and enter the stratum;

[0059] S2: Before the inner rod 13 enters the ground, the pull rope 20 is lifted upward, thereby pulling the push rod 18, and the vibration sensor 19 at the lower end of the push rod 18 is brought back to the inside of the buried rod 1. After the inner rod 13 goes deep, the pull rope 20 is released, and the push rod 18 is brought back downward by using the reset elasticity of the reset spring 22. After being brought back, the inertia of the push rod 18 pushes the vibration sensor 19 outward, so that the vibration sensor 19 can be close to the ground, thereby sensing the vibration of the ground;

[0060] S3: After the docking rod 14 enters the stratum, it will be buried under the stratum. When the stratum plate moves, it will push the outer sleeve 1403. There is a movable gap between the outer sleeve 1403 and the inner sleeve 1401. Once the stratum plate moves, it pushes the outer sleeve 1403 to move eccentrically. After the outer sleeve 1403 moves, the needle rod 1404 will be deeply inserted into the fixing hole 1402. After the deep insertion, it will push the elastic umbrella bead 1405, and the elastic umbrella bead 1405 will retreat, and the pressure sensor 1406 will sense the pressure;

[0061] S4: At the same time, after the inner rod 13 is installed, the vertical rod 1305 is pressed downward, and the pressure ring 1304 at the lower end of the vertical rod 1305 will squeeze the airbag 1303, and the vertically expanded airbag 1303 will become horizontally expanded. When the formation is abnormal, the formation will undergo squeezing changes, and then squeeze the outer wall of the horizontally expanded airbag 1303, and push it to the pressure plate 1308. The pressure plate 1308 retreats with the tongue plate 1307 into the spring expansion groove 1306, and then contacts the pressure sensor 1309.

[0062] A system of intelligent monitoring and early warning equipment for geological disasters, wherein the monitoring signal control box 6 includes an alarm module, a monitoring module, a signal transceiver module, a PLC instruction issuing module and a GPS positioning module, wherein the following steps are included:

[0063] S1: The monitoring module includes a pressure sensor 1406, a pressure sensor 1309 and a vibration sensor 19, and the pressure sensor 1406, the pressure sensor 1309 and the vibration sensor 19 are connected to the alarm module;

[0064] S2: When the pressure sensor 1406, the pressure sensor 1309 and the vibration sensor 19 are triggered, the electrical signals are converted and transmitted to the signal transceiver module in the monitoring signal control box 6. The signal transceiver module receives and sends the signals, and the PLC instruction issuing module allows the data calculation module to analyze and perform logical operations on the received signals;

[0065] S3: The alarm module sets the warning threshold and divides the danger level according to the data threshold calculated and analyzed. The highest level is the red light warning. The GPS positioning module will highlight and prompt the name and location of the geological disaster body and monitoring point that issued the warning.

[0066] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An intelligent geological disaster monitoring and early warning device, comprising an underground pole (1), It is characterized in that An inner rod (13) is installed inside the surface of the buried rod (1), the lower end of the inner rod (13) is fixedly connected to a docking rod (14), the surface of the inner rod (13) is provided with an arc hole (1301), and an air bag (1303) is installed inside the arc hole (1301), the inner rod (13) is provided with a groove (1302), and a vertical rod (1305) is vertically inserted inside the groove (1302), the lower end of the vertical rod (1305) is fixedly connected to a pressure ring (1304), and the air bag A mounting ring (1311) is arranged inside (1303), and a spring expansion groove (1306) is opened on the outer wall surface of the mounting ring (1311), a tongue plate (1307) is connected inside the spring expansion groove (1306), and a pressing plate (1308) is installed at one end of the tongue plate (1307), pressure sensors (1309) for pressure sensing are installed on the upper and lower sides of the spring expansion groove (1306), and a signal line (1310) is electrically connected to the inner center of the mounting ring (1311); The surface of the docking rod (14) is integrally connected with an inner sleeve (1401), and an outer sleeve (1403) is sleeved and mounted on the outer side of the inner sleeve (1401); a fixing hole (1402) is provided on the surface of the inner sleeve (1401), and an elastic umbrella bead (1405) is mounted inside the fixing hole (1402); a pressure sensor (1406) is mounted on one side of the elastic umbrella bead (1405), and a needle rod (1404) corresponding to the fixing hole (1402) is fixedly connected to the inner wall of the outer sleeve (1403); A pull ring (17) is movably mounted at the center of the inner rod (13), and a push rod (18) is movably connected to the surface of the pull ring (17), a vibration sensor (19) is movably mounted on one end of the push rod (18) away from the pull ring (17), a pull rope (20) is movably inserted through the center line of the pull ring (17), and a fixing block (21) is fixedly arranged on the surface of the pull rope (20), and a return spring (22) is connected to the center bottom of the pull ring (17); A slope buried plate (7) is arranged on the outside of the buried rod (1), and an entry hole (10) is arranged on the surface of the slope buried plate (7), a cutting sensing probe (11) is inserted into the inside of the entry hole (10), a monitoring signal control box (6) is installed on the outside of the upper end of the buried rod (1), and a humidity plug rod (12) is installed on the left side of the buried rod (1).

2. According to claim 1, a geological disaster intelligent monitoring and early warning device, It is characterized in that The surface wall of the buried rod (1) is provided with an insertion hole (2), and a crank (4) is arranged outside the insertion hole (2). A gear (24) is movably connected to the inside of the insertion hole (2), and a key slot (25) is arranged on the center line of the gear (24). The upper end of the buried rod (1) is threadedly connected to a head cover (5).

3. According to claim 1, a geological disaster intelligent monitoring and early warning device, It is characterized in that A rack (23) is fixedly provided on the front wall of the inner rod (13), and a meshing structure is formed between the rack (23) and the gear (24).

4. According to claim 1, a geological disaster intelligent monitoring and early warning device, It is characterized in that A drill bit (16) is installed at the lower end of the docking rod (14), and a drill tooth (15) is integrally connected to the surface of the drill bit (16).

5. According to claim 1, a geological disaster intelligent monitoring and early warning device, It is characterized in that The lower end of the slope embedded plate (7) is movably connected to an open clamping plate (8), and a torsion spring shaft (9) for movable opening and closing is provided on the surface of the open clamping plate (8).

6. According to claim 1, a geological disaster intelligent monitoring and early warning device, It is characterized in that A moisture box (1201) is embedded in the interior of the humidity plug rod (12), and a round box (1202) is installed on the outside of the humidity plug rod (12); a glass plate (1203) is integrally installed on the upper surface of the round box (1202); a ventilation filter hole (1204) for communication is provided between the round box (1202) and the humidity plug rod (12); a moisture absorbing sheet (1205) is arranged inside the moisture box (1201), and capillary holes (1206) are provided on the lower end surface of the humidity plug rod (12).

7. According to claim 2, a geological disaster intelligent monitoring and early warning device, It is characterized in that Open slots (3) are arranged alternately between adjacent insertion holes (2), and a folding rod (301) is movably connected inside the open slot (3), a rotating shaft (302) for rotation is arranged in the middle of the folding rod (301), a connecting spring (303) is connected to the inner side of the folding rod (301), and a threaded pressure rod (304) is arranged at the upper end of the folding rod (301), and a threaded connection is formed between the threaded pressure rod (304) and the buried rod (1).

8. According to claim 1, a geological disaster intelligent monitoring and early warning device, It is characterized in that The inner sleeve (1401) and the docking rod (14) are fixedly connected, and the outer sleeve (1403) is movably sleeved on the outer side of the inner sleeve (1401).

9. A method for using the intelligent geological disaster monitoring and early warning device according to claim 1, Features: The following steps are involved: S1: excavating at a position below the slope surface, digging downward to a depth that is consistent with the length of the buried rod (1), burying the buried rod (1) underground, and allowing the inner rod (13) to penetrate deep into the ground and into the stratum; S2: Before the inner rod (13) enters the ground, the pull rope (20) is lifted upward, thereby pulling the push rod (18) to bring the vibration sensor (19) at the lower end of the push rod (18) back into the buried rod (1). After the inner rod (13) penetrates deeply, the pull rope (20) is released, and the push rod (18) is brought back downward by utilizing the return elasticity of the return spring (22). After being brought back, the inertia of the push rod (18) pushes the vibration sensor (19) outward, so that the vibration sensor (19) can be close to the ground, thereby sensing the vibration of the ground. S3: After the docking rod (14) enters the stratum, it will be buried under the stratum. When the stratum plate moves, it will push the outer sleeve (1403). There is a movable gap between the outer sleeve (1403) and the inner sleeve (1401). Once the stratum plate moves, it pushes the outer sleeve (1403) to move eccentrically. After the outer sleeve (1403) moves, the needle rod (1404) will be deeply inserted into the fixing hole (1402). After the deep insertion, it will push the elastic umbrella bead (1405), and the elastic umbrella bead (1405) will retreat, and the pressure sensor (1406) will sense the pressure; S4: At the same time, after the inner rod (13) is installed, the vertical rod (1305) is pressed downward, and the pressure ring (1304) at the lower end of the vertical rod (1305) squeezes the airbag (1303), and the vertically expanded airbag (1303) becomes horizontally expanded. When the ground layer is abnormal, the ground layer will undergo compression changes, and then squeeze the outer wall of the horizontally expanded airbag (1303), and push it to the pressing plate (1308). The pressing plate (1308) moves back with the tongue plate (1307) into the spring expansion groove (1306), and then contacts the pressure sensor (1309).

10. A system using the intelligent monitoring and early warning device for geological disasters as described in claim 1, It is characterized in that The monitoring signal control box (6) comprises an alarm module, a monitoring module, a signal transceiver module, a PLC instruction issuing module and a GPS positioning module, and includes the following steps: S1: The monitoring module includes a pressure sensor (1406), a pressure sensor (1309) and a vibration sensor (19), and the pressure sensor (1406), the pressure sensor (1309) and the vibration sensor (19) are connected to the alarm module; S2: When the pressure sensor (1406), the pressure sensor (1309) and the vibration sensor (19) are triggered, the electrical signals are converted and transmitted to the signal transceiver module in the monitoring signal control box (6). The signal transceiver module receives and sends the signals, and the PLC instruction issuing module allows the data calculation module to analyze and perform logical operations on the received signals; S3: The alarm module sets the warning threshold and divides the danger level according to the data threshold calculated and analyzed. The highest level is the red light warning. The GPS positioning module will highlight and prompt the name and location of the geological disaster body and monitoring point that issued the warning.