Performance test device for vane pump production

By designing a performance testing device for vane pump production, the problems of high cost and single-time test limitations of traditional test methods are solved, and simultaneous testing of multiple vane pumps is realized, reducing costs and improving testing efficiency.

CN118008775BActive Publication Date: 2024-12-24江苏湖润泵业科技有限公司
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202311810985.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2024-12-24
Estimated Expiration
2043-12-27

AI Technical Summary

Technical Problem

The traditional vane pump performance testing method has high construction and maintenance costs, and a single test can only test one vane pump, which limits the development of the manufacturer.

Method used

A performance testing device for the production of vane pumps was designed, including test bench, test tank, test bearing plate, smart valve, motor and conduit, and the test oil circuit and fixation of the vane pump were completed in two steps to achieve multi-dimensional Test the same time as a vane pump.

Benefits of technology

The purpose of batch testing of the vane pump is achieved, the testing cost is reduced, the testing efficiency is improved, the traditional sampling and testing method is replaced, and the advantages of low cost, simplicity in operation and high testing accuracy are provided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118008775B_ABST
    Figure CN118008775B_ABST
Patent Text Reader

Abstract

The invention discloses a performance testing device for vane pump production, and relates to the technical field of vane pump testing, comprising a test bench, wherein the top of the test bench is an unshielded surface, a test slot is arranged in the middle area of ​​the top of the test bench, a plurality of test bearing plates are fixedly installed on the top surface of the test slot, an oil inlet hole and an oil outlet hole are arranged on each test bearing plate, a second motor is arranged between the oil inlet hole and the oil outlet hole, a controller is arranged in the second motor, a second intelligent valve is arranged in the oil inlet hole, a third intelligent valve is arranged in the oil outlet hole, and there is no direct connection between the oil inlet hole, the oil outlet hole and the second motor, and the vane pump is installed in two steps to complete the installation of the vane pump test oil circuit and the fixation of the vane pump, and a vane pump is installed on each test bearing plate. The advantage of this test bench is that a plurality of vane pumps can be tested at the same time, and the overall test of the vane pump can be realized, thereby replacing the sampling detection method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of vane pump testing, in particular to a performance testing device for vane pump production. Background Art

[0002] The vane pump is a pump in which the vanes in the rotor slots are in contact with the pump housing (stator ring), and the sucked liquid is pressed from the oil inlet side to the oil discharge side. At present, the performance test of the vane pump is mainly carried out using a test bench and test instruments, but these traditional test methods have some problems. First, the construction and maintenance costs of the test bench are high, requiring a lot of investment and human resources. Secondly, the manufacture and maintenance of the test instrument also require high costs and technical levels. A single test can only test one vane pump, which limits the development of vane pump manufacturers. Therefore, a new performance test device for vane pump production is needed to solve the problems existing in traditional test methods. Summary of the invention

[0003] The object of the present invention is to provide a performance testing device for vane pump production to solve the problems raised in the above-mentioned background technology.

[0004] In order to solve the above technical problems, the present invention provides the following technical solutions: a performance testing device for vane pump production, comprising a test bench, the top of the test bench is an unshielded surface, a test slot is arranged in the middle area of ​​the top of the test bench, and a plurality of test bearing plates are fixedly installed on the top surface of the test slot, each test bearing plate is provided with an oil inlet hole and an oil outlet hole, a motor 2 is arranged between the oil inlet hole and the oil outlet hole, a controller is arranged in the motor 2, an intelligent valve 2 is arranged in the oil inlet hole, and an intelligent valve 3 is arranged in the oil outlet hole, and there is no direct connection relationship between the oil inlet hole, the oil outlet hole and the motor 2.

[0005] According to the above technical solution, a baffle is respectively provided on both sides of the test slot, and a plurality of test boxes are fixed on the top of each baffle, and each of the test boxes matches with the test supporting plate arranged side by side therewith, and a lifting plate is provided on the top of the test box, and a display screen is fixedly installed on the surface of the lifting plate facing the test supporting plate, and the oil volume value is displayed on the display screen, and a connecting hole 1 is provided on the side wall of the test box facing the test supporting plate, and a thread is provided on the outer side wall of the connecting hole 1, and the thread is used to tighten the pipeline.

[0006] According to the above technical solution, a plurality of conduits 1 are fixedly installed on the outer wall of the baffle, a plurality of holes and grooves are penetrated on the side wall of the baffle, three slide rails are arranged on the inner wall of each hole and groove, the end of conduit 1 is connected to conduit 2, the connection part between conduit 2 and conduit 1 is configured to be telescopic, a sliding sleeve is arranged on the outer wall of conduit 2, the sliding sleeve is embedded in the hole and groove, and the sliding sleeve and the three slide rails are all slidably connected, the movement of conduit 2 is driven by controlling the movement of the sliding sleeve, and conduit 1 is divided into a left group of conduits 1 and a right group of conduits 1 with the test bearing plate as the boundary.

[0007] According to the above technical solution, the end of the second conduit is arranged in an arc shape, and the second connecting hole is arranged in the middle position of the arc-shaped side wall.

[0008] According to the above technical solution, storage box one and storage box two are respectively arranged on both sides of the test bench, storage box one is close to the left group of catheter one, and storage box two is close to the right group of catheter one, and a number of catheters three and four are respectively arranged on the side wall of storage box one facing the test carrier plate from top to bottom, and a number of catheters five and six are respectively arranged on the side wall of storage box two facing the test carrier plate from top to bottom.

[0009] According to the above technical solution, the conduit 3 is connected to the conduit 1 sealing pipe of the left group of conduit 1, and both conduit 3 and conduit 1 are metal pipes, and a reinforcing plate 1 is installed at the connection between conduit 3 and conduit 1;

[0010] The conduit five is connected to the conduit one sealing pipe of the right group of conduit one, and both conduit five and conduit one are metal pipes, and a reinforcing plate two is installed at the connection between conduit five and conduit one.

[0011] According to the above technical solution, the conduit 4 is connected to the oil inlet sealing pipeline, and the conduit 6 is connected to the oil outlet sealing pipeline.

[0012] According to the above technical solution, pump one is arranged at the connection between the conduit three and the storage box one, pump two is arranged at the connection between the conduit four and the storage box one, pump three is arranged at the connection between the conduit five and the storage box two, and pump four is arranged at the connection between the conduit six and the storage box two.

[0013] According to the above technical solution, a connection hole three is set at the top of the conduit two, a hose is detachably connected between the connection hole three and the connection hole one, and a three-way valve is set at the connection between the hose and the connection hole one, and the oil flow between the conduit two, the hose and the test box is controlled by the three-way valve.

[0014] According to the above technical solution, a vane pump is arranged on the test bearing plate, and a test hole 1 and a test hole 2 are arranged on the bottom of the vane pump, the test hole 1 is sealed and connected to the oil inlet hole, and the test hole 2 is sealed and connected to the oil outlet hole;

[0015] A test hole three and a test hole four are respectively arranged on both sides of the vane pump, and both the test hole three and the test hole four are matched with the connection hole two.

[0016] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention completes the installation of the test oil circuit of the vane pump and the fixation of the vane pump by installing the vane pump in two steps. A vane pump is installed on each test bearing plate. The advantage of this test bench is that it can test multiple vane pumps at the same time, and can realize the overall test of the vane pump, replacing the sampling detection method.

[0017] The vane pump is tested in two steps. The first step of the vane pump test is to detect whether the test holes 1 and 2 on the vane pump are flowing oil normally, and also to detect whether the rotor in the vane pump is running normally. If this test step fails, there is no need to perform the second step test. The second step of the vane pump test is to detect whether the test holes 3 and 4 on the vane pump are flowing oil normally, and also to detect whether the oil discharge volume of the vane pump is accurate. Due to the different ways of using the test holes, the two connected test holes are tested on one device for passage detection, and the oil discharge volume of the vane pump is tested at the same time, so as to achieve the purpose of batch testing of vane pumps. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0019] Figure 1 It is a schematic diagram of the overall top view structure of the present invention;

[0020] Figure 2 It is a schematic diagram of the overall three-dimensional structure of the present invention;

[0021] Figure 3 It is a schematic diagram of the overall front structure of the present invention;

[0022] Figure 4 The present invention Figure 2 A magnified schematic diagram of the middle A area;

[0023] Figure 5 It is a schematic diagram of the structure of the test bearing plate of the present invention;

[0024] Figure 6 Schematic diagram of the connection structure between the catheter 2 and the catheter 1 of the present invention, wherein the shaded portion is a retractable area;

[0025] Figure 7 is a schematic diagram of the catheter 2 and the sliding sleeve of the present invention;

[0026] Figure 8It is a schematic diagram of the connection between the oil inlet and storage box 1, and the oil outlet and storage box 2 of the present invention;

[0027] Fig. 9 It is a front structural schematic diagram of the vane pump of the present invention;

[0028] Fig.10 It is a schematic diagram of the back structure of the vane pump of the present invention;

[0029] Fig.11 It is a schematic diagram of the explosion structure of the vane pump of the present invention;

[0030] In the figure: 1, test bench; 11, vane pump; 12, test hole 1; 13, test hole 2; 14, test hole 3; 15, test hole 4;

[0031] 2. Test slot; 21. Test bearing plate; 22. Oil inlet hole; 23. Oil outlet hole; 24. Motor 2; 25. Controller; 26. Smart valve 2; 27. Smart valve 3;

[0032] 3. Baffle; 31. Test box; 32. Lifting plate; 33. Display screen; 34. Connection hole 1;

[0033] 4. Conduit 1; 41. Hole groove; 42. Slide rail; 43. Conduit 2; 44. Slide sleeve; 45. Connection hole 2; 46. Connection hole 3;

[0034] 5. Storage box 1; 51. Conduit 3; 52. Conduit 4; 53. Reinforcement plate 1;

[0035] 6. Storage box 2; 61. Conduit 5; 62. Conduit 6; 63. Reinforcement plate 2. DETAILED DESCRIPTION

[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] See also Figure 1-11The present invention provides a technical solution: a performance test device for vane pump production, including a test bench 1, which is made of sturdy and durable materials, has high stability and reliability, and can ensure the stable operation of the vane pump 11. The top of the test bench 1 is an unshielded surface, and a test slot 2 is arranged in the middle area of ​​the top of the test bench 1. A plurality of test bearing plates 21 are fixedly installed on the top surface of the test slot 2, and an oil inlet hole 22 and an oil outlet hole 23 are arranged on each test bearing plate 21. A motor 24 is arranged between the oil inlet hole 22 and the oil outlet hole 23, and a controller 25 is arranged in the motor 24. The function of the controller 25 is to control the start and stop of the motor 24, and an intelligent valve 26 is arranged in the oil inlet hole 22, and an intelligent valve 3 27 is arranged in the oil outlet hole 23. There is no direct connection between the oil inlet hole 22, the oil outlet hole 23 and the motor 24.

[0038] A baffle 3 is respectively arranged on both sides of the test slot 2, and a plurality of test boxes 31 are fixed on the top of each baffle 3, and each test box 31 matches the test supporting plate 21 arranged side by side therewith. A lifting plate 32 is arranged on the top of the test box 31, and a display screen 33 is fixedly installed on the surface of the lifting plate 32 facing the test supporting plate 21, and the oil volume value is displayed on the display screen 33. A connecting hole 34 is arranged on the side wall of the test box 31 facing the test supporting plate 21, and a thread is arranged on the outer wall of the connecting hole 34, and this thread is used to tighten the pipeline.

[0039] A plurality of conduits 1 4 are fixedly installed on the outer wall of the baffle 3, a plurality of holes 41 are set through the side wall of the baffle 3, three slide rails 42 are set on the inner wall of each hole 41, the end of the conduit 1 4 is connected to the conduit 2 43, the connection part of the conduit 2 43 and the conduit 1 4 is set to be telescopic, a sliding sleeve 44 is set on the outer wall of the conduit 2 43, the sliding sleeve 44 is embedded in the hole 41, and the sliding sleeve 44 and the three slide rails 42 are all slidably connected, and the movement of the conduit 2 43 is driven by controlling the movement of the sliding sleeve 44, and the conduit 1 4 is bounded by the test bearing plate 21 It is divided into a left group of conduit one and a right group of conduit one. The sleeve 44 is electrically connected to the motor one, and the motor one controls the sleeve 44 to slide on the slide rail 42. The sleeve 44 drives the conduit two 43 to move. When the conduit two 43 moves toward the direction of the vane pump 11, the telescopic conduit part at its end extends, and when the conduit two 43 moves in the opposite direction of the vane pump 11, the telescopic conduit part at its end shortens, which does not affect the connection of the conduit two 43, nor does it affect the connectivity between the conduit two 43 and the conduit one 4. The telescopic conduit part at its end is a hose, but the conduit two 43 is a metal tube.

[0040] The end of the second conduit 43 is arranged in an arc shape, a second connecting hole 45 is arranged in the middle position of the arc-shaped side wall, and a first intelligent valve is arranged in the second connecting hole 45 .

[0041] Storage box one 5 and storage box two 6 are respectively arranged on both sides of the test bench 1. Storage box one 5 is close to the left group of catheter one, and storage box two 6 is close to the right group of catheter one. A plurality of catheters three 51 and catheter four 52 are respectively arranged on the side wall of storage box one 5 facing the test carrier plate 21 from top to bottom, and a plurality of catheters five 61 and catheter six 62 are respectively arranged on the side wall of storage box two 6 facing the test carrier plate 21 from top to bottom.

[0042] The conduit 3 51 is connected to the conduit 1 4 of the left group of conduits 1 through a sealed pipeline, and both the conduit 3 51 and the conduit 1 4 are metal pipes, and a reinforcing plate 1 53 is installed at the connection between the conduit 3 51 and the conduit 1 4;

[0043] The catheter five 61 is connected to the catheter one 4 of the right group of catheter one by a sealed pipeline, and both the catheter five 61 and the catheter one 4 are metal tubes. A reinforcement plate two 63 is installed at the connection between the catheter five 61 and the catheter one 4. Due to the long length of the catheter, the reinforcement plate is also set to improve the stability of the catheter.

[0044] The conduit four 52 is connected to the oil inlet hole 22 through a sealed pipeline, and the conduit six 62 is connected to the oil outlet hole 23 through a sealed pipeline.

[0045] Pump one is set at the connection between conduit three 51 and storage box one 5, pump two is set at the connection between conduit four 52 and storage box one 5, pump three is set at the connection between conduit five 61 and storage box two 6, and pump four is set at the connection between conduit six 62 and storage box two 6.

[0046] A connection hole 3 46 is provided at the top of the second conduit 43, and a hose is detachably connected between the connection hole 3 46 and the connection hole 1 34, and a three-way valve is provided at the connection between the hose and the connection hole 1 34, through which the oil flows between the second conduit 43, the hose and the test box 31.

[0047] A vane pump 11 is arranged on the test bearing plate 21, and a test hole 12 and a test hole 2 13 are arranged at the bottom of the vane pump 11. The test hole 12 is sealed and connected to the oil inlet hole 22, and the test hole 2 13 is sealed and connected to the oil outlet hole 23. A test hole 3 14 and a test hole 4 15 are respectively arranged on both sides of the vane pump 11, and both the test hole 3 14 and the test hole 4 15 are matched with the connection hole 2 45.

[0048] In the first embodiment, the vane pump 11 is taken out and placed in sequence according to the setting order of the test bearing plate 21. One vane pump 11 is placed on one test bearing plate 21. When placing the vane pump 11, it is necessary to align the test hole 12 at the bottom of the vane pump 11 with the oil inlet hole 22 on the test bearing plate 21, and align the test hole 2 13 at the bottom of the vane pump 11 with the oil outlet hole 23 on the test bearing plate 21. Before aligning the test holes, a pre-designed sealing ring is placed on the test hole. The function of the sealing ring is to prevent oil leakage when testing the vane pump 11. Since the shape of the test hole 12 and the oil inlet hole 22 fits, and the shape of the test hole 2 13 and the oil outlet hole 23 fits, the installation between the vane pump 11 and the test bearing plate 21 fits, and the first step of installing the vane pump 11 is completed;

[0049] After completing the first step of installing the vane pump 11, the test hole three 14 is aligned with one of the connection holes two 45, and the test hole four 15 is aligned with another of the connection holes two 45. The sleeve 44 drives the conduit two 43 to move toward the vane pump 11 until the arc-shaped area of ​​the conduit two 43 contacts the test hole three 14 and the test hole four 15. Then the connection hole two 45 is docked with the test hole three 14 and the test hole four 15 respectively. A matching sealing ring is also provided at the connection hole two 45, so that the connection between the connection hole two 45 and the test hole three 14 and the test hole four 15 is stronger. At the same time, since the conduit two 43 is a metal pipe, the vane pump 11 can also be clamped through its arc-shaped area, completing the second step of installing the vane pump 11.

[0050] The vane pump 11 is installed in two steps to complete the installation of the test oil circuit of the vane pump 11 and the fixing of the vane pump 11. A vane pump 11 is installed on each test carrier plate 21. The advantage of this test bench 1 is that multiple vane pumps 11 can be tested at the same time, and the overall test of the vane pump 11 can be realized, replacing the sampling detection method.

[0051] The output end of the second motor 24 needs to be connected to the rotor in the vane pump 11 when the vane pump 11 is installed.

[0052] In the second embodiment, when the vane pump 11 is tested, the intelligent valve 1 is closed, the intelligent valve 2 26 and the intelligent valve 3 27 are opened, and the pump 2 is opened. The oil in the storage box 1 5 is pumped into the conduit 4 52 through the pump 2, and enters the oil inlet hole 22 through the conduit 4 52, and then enters the vane pump 11 through the test hole 12 connected to the oil inlet hole 22. As the rotor in the vane pump 11 rotates, the oil is discharged through the test hole 2 13, and is discharged into the conduit 6 62 through the oil outlet hole 23, and finally enters the storage box 2 6 through the conduit 6 62. Since the oil pumped by the pump 2 has high pressure, the oil can directly enter the vane pump 11. A liquid level detector is set in each of the storage box 1 5 and the storage box 2 6. When the liquid level detector in the storage box 2 6 detects that oil has entered, it indicates that the rotor oil guide function of the vane pump 11 is good, and the first step of testing the vane pump 11 is completed.

[0053] Open the smart valve 1, close the smart valve 26 and the smart valve 3 27, open the three-way valve near the storage box 2 6, so that the hose can operate to connect the test box 31 with the conduit 2 43, turn on the pump 1, and pump the oil in the storage box 1 5 into the conduit 3 51 through the pump 1, and then enter the connecting hole 2 45 through the conduit 3 51 and the conduit 2 43, and then enter the vane pump 11 through the connecting hole 2 45 and the test hole 3 14, and the oil is discharged to the test hole 4 15 through the rotor movement of the vane pump 11 itself , the oil is discharged into the hose through the test hole 415, and finally the oil enters the test box 31 until the test box 31 is full of oil. The oil storage value can be checked on the display screen 33. In this process, the output time H of the oil from the storage box 15 to the test box 31 is recorded, including the set oil volume V that can be contained in the test box 31. If the output time exceeds H during the process of filling the test box 31, it means that the oil discharge amount of the vane pump 11 is lower than the qualified value, and the vane pump 11 is judged to be unqualified. If the test box is filled, the output time exceeds H. During the test of 31, if the output duration is lower than H, it means that the oil discharge of the vane pump 11 is higher than the qualified value, and the vane pump 11 is judged to be unqualified. There is a numerical deviation in the H value. If the output duration is H during the process of filling the test box 31, it means that the oil discharge of the vane pump 11 is qualified, and the vane pump 11 is judged to be qualified. The H value recorded in the actual process only needs to be within the numerical deviation range. The worker adjusts the oil discharge of the unqualified vane pump 11 according to the H recorded in the test box 31 to ensure that the oil discharge of each vane pump 11 is accurate. During the test, the problems of each unqualified vane pump 11 are recorded. The worker only needs to make adjustments according to the recorded data. After the test of the vane pump 11 is completed, the three-way valve is adjusted so that the conduit 2 43 is also connected to the storage box 2 6. The oil in the test box 31 flows down through the hose and then enters the storage box 2 6 through the conduit 2 43. The liquid level detector in the storage box 2 6 detects that oil has entered, which means that the rotor oil guide function of the vane pump 11 is good, and the second step of testing the vane pump 11 is completed.

[0054] The first step of testing the vane pump 11 is to detect whether the test holes 12 and 13 on the vane pump 11 are flowing oil normally, and also to detect whether the rotor in the vane pump 11 is operating normally. If this test step fails, there is no need to perform the second step of testing. The second step of testing the vane pump 11 is to detect whether the test holes 3 14 and 15 on the vane pump 11 are flowing oil normally, and also to detect whether the oil discharge volume of the vane pump 11 is accurate. Due to the different ways of using the test holes, a passage detection test is performed on the two connected test holes on one device, and the oil discharge volume of the vane pump 11 is tested at the same time, so as to achieve the purpose of batch testing of the vane pump 11.

[0055] The sensors used in the test process are all advanced sensors, which ensure the accuracy and reliability of the test data. The data processing system of the test bench 1 has powerful data processing and analysis functions, which can monitor the performance of the vane pump 11 in real time and provide corresponding reports and suggestions. The test device of the present invention has the advantages of low cost, easy operation and high test accuracy, and has important practical application value.

[0056] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0057] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A performance test device for a vane pump production, comprising a test bench (1), characterized in that: The top of the test bench (1) is an unshielded surface. A test slot (2) is arranged in the middle area of ​​the top of the test bench (1). A plurality of test bearing plates (21) are fixedly mounted on the top surface of the test slot (2). Each test bearing plate (21) is provided with an oil inlet hole (22) and an oil outlet hole (23). A second motor (24) is arranged between the oil inlet hole (22) and the oil outlet hole (23). A controller (25) is arranged in the second motor (24). A second intelligent valve (26) is arranged in the oil inlet hole (22). A third intelligent valve (27) is arranged in the oil outlet hole (23). There is no direct connection between the oil inlet hole (22), the oil outlet hole (23) and the second motor (24). A baffle (3) is provided on each side of the test slot (2), and a plurality of test boxes (31) are fixed on the top of each baffle (3), and each of the test boxes (31) matches the test bearing plate (21) arranged side by side therewith. A lifting plate (32) is provided on the top of the test box (31), and a display screen (33) is fixedly installed on the surface of the lifting plate (32) facing the test bearing plate (21), and the display screen (33) displays the oil volume value. A connecting hole (34) is provided on the side wall of the test box (31) facing the test bearing plate (21), and a thread is provided on the outer side wall of the connecting hole (34), and the thread is used to tighten the pipeline; A plurality of conduits (4) are fixedly mounted on the outer wall of the baffle (3); a plurality of holes (41) are arranged through the side wall of the baffle (3); three slide rails (42) are arranged on the inner wall of each hole (41); the end of the conduit (4) is connected to the conduit (43); the connection between the conduit (43) and the conduit (4) is partially configured to be telescopic; a sliding sleeve (44) is arranged on the outer wall of the conduit (43); the sliding sleeve (44) is embedded in the hole (41); and the sliding sleeve (44) and the three slide rails (42) are all slidably connected; the movement of the conduit (43) is driven by controlling the movement of the sliding sleeve (44); the conduit (4) is divided into a left conduit group and a right conduit group with the test bearing plate (21) as the boundary; The end of the second conduit (43) is arranged in an arc shape, and a second connecting hole (45) is arranged in the middle of the arc-shaped side wall; Storage box one (5) and storage box two (6) are respectively arranged on both sides of the test bench (1), wherein the storage box one (5) is close to the left group of conduits one, and the storage box two (6) is close to the right group of conduits one, and a plurality of conduits three (51) and a plurality of conduits four (52) are respectively arranged on the side wall of the storage box one (5) facing the test carrier plate (21) from top to bottom, and a plurality of conduits five (61) and a plurality of conduits six (62) are respectively arranged on the side wall of the storage box two (6) facing the test carrier plate (21) from top to bottom.

2. The performance testing device for vane pump production according to claim 1, characterized in that: The conduit three (51) is connected to the conduit one (4) of the left group of conduits one by a sealed pipeline, and both the conduit three (51) and the conduit one (4) are metal pipes, and a reinforcing plate one (53) is installed at the connection between the conduit three (51) and the conduit one (4); The conduit five (61) is connected to the conduit one (4) of the right group of conduits one through a sealed pipeline, and both the conduit five (61) and the conduit one (4) are metal pipes. A reinforcing plate two (63) is installed at the connection between the conduit five (61) and the conduit one (4).

3. The performance testing device for vane pump production according to claim 2, characterized in that: The conduit four (52) is connected to the oil inlet hole (22) through a sealed pipeline, and the conduit six (62) is connected to the oil outlet hole (23) through a sealed pipeline.

4. The performance testing device for vane pump production according to claim 3, characterized in that: A pump 1 is arranged at the connection between the conduit 3 (51) and the storage box 1 (5), a pump 2 is arranged at the connection between the conduit 4 (52) and the storage box 1 (5), a pump 3 is arranged at the connection between the conduit 5 (61) and the storage box 2 (6), and a pump 4 is arranged at the connection between the conduit 6 (62) and the storage box 2 (6).

5. The performance testing device for vane pump production according to claim 4, characterized in that: A connection hole three (46) is provided at the top of the second conduit (43), a hose is detachably connected between the third connection hole (46) and the first connection hole (34), and a three-way valve is provided at the connection between the hose and the first connection hole (34), through which the oil flows between the second conduit (43), the hose and the test box (31).

6. The performance testing device for vane pump production according to claim 5, characterized in that: A vane pump (11) is arranged on the test bearing plate (21), and a test hole 1 (12) and a test hole 2 (13) are arranged at the bottom of the vane pump (11), the test hole 1 (12) is sealedly connected to the oil inlet hole (22), and the test hole 2 (13) is sealedly connected to the oil outlet hole (23); A test hole three (14) and a test hole four (15) are respectively arranged on both sides of the vane pump (11), and the test hole three (14) and the test hole four (15) are both matched with the connection hole two (45).

Citation Information

Patent Citations

  • Gear pump testboard

    CN219299496U