A predictive maintenance data collection method and system for petrochemical industry
By obtaining equipment information in the petrochemical industry area, determining the amount of collection resources and planning the collection plan, the data collection process of petrochemical equipment is optimized, and the problem of low data collection efficiency caused by the large number of instruments and wide area is solved, achieving more efficient resource utilization and maintenance plans.
Patent Information
- Application Number
- CN202410181572.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-18
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-02-18
AI Technical Summary
In petrochemical equipment, due to the large number of instruments and a wide coverage area, data collection time and inefficient efficiency, it is difficult for the existing technology to effectively solve this problem.
By obtaining equipment information in the petrochemical industry area, determine the new data volume and resource consumption of each instrument and equipment, plan multiple data collection plans, calculate the collection efficiency, and select the optimal collection plan based on the collection efficiency and resource consumption information. , optimize the data acquisition process.
It improves the efficiency and resource utilization of data collection, shortens the acquisition time, and improves the planning and prediction capabilities of petrochemical equipment maintenance.
Smart Images

Figure CN118013419B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data collection, and in particular to a predictive maintenance data collection method and system for petrochemical industry. Background Art
[0002] Petrochemical equipment is one of the core assets of petrochemical enterprises, and its normal operation is crucial to the production efficiency and safety of the enterprise. In order to ensure the efficient and stable operation of the equipment and extend the service life of the equipment, effective planning and predictive maintenance are essential. Therefore, it is necessary to collect data regularly from the instruments in the area where the petrochemical plant is located. However, there are certain problems in this process. Due to the large number of instruments, the wide coverage area of the instruments, and the complex instrument data, it is often necessary to collect data multiple times in the same cycle, which makes the overall data collection work time-consuming and inefficient. Summary of the invention
[0003] In order to solve the above technical problems, the present application provides a predictive maintenance data collection method and system for petrochemical industry.
[0004] The first purpose of this application is to provide a predictive maintenance data collection method for petrochemical industry.
[0005] The above-mentioned application objective 1 of the present application is achieved through the following technical solutions:
[0006] A predictive maintenance data collection method for petrochemical industry, comprising:
[0007] Obtaining equipment information of instruments and equipment in a preset petrochemical industry area; the equipment information includes equipment type information, equipment quantity information and equipment historical data collection information;
[0008] Determine the newly added data volume information of each of the instruments and equipment according to the equipment information;
[0009] Determine the amount of resource consumption information collected based on the amount of new data added by the device;
[0010] Determine a plurality of preset data collection schemes according to the collected resource consumption information and a preset collection scheme planning model;
[0011] Calculating the collection efficiency of each of the preset data collection schemes;
[0012] According to the collection efficiency and the collection resource consumption information, each of the preset data collection schemes is selected to obtain a regional equipment data collection scheme.
[0013] In a preferred example, the present application may be further configured as follows: determining the device newly added data volume information of each of the instrument devices according to the device information includes:
[0014] Obtaining the park information of the preset petrochemical industry area, and determining the equipment park information of each instrument and equipment according to the park information;
[0015] Determine the device usage information according to the park information and device type information of the device;
[0016] The newly added data volume information of each of the instruments and equipment is determined according to the equipment usage information and the equipment historical data collection information.
[0017] In a preferred example, the present application may be further configured as follows: determining the amount of collected resource consumption information according to the amount of new data added by the device includes:
[0018] Determine the total amount of new data in each park according to the new data amount information of the device and the number of devices;
[0019] Determine the amount of data to be collected for each park based on the preset data resource confidence and the total amount of new data in the park;
[0020] The total amount of regional collected data is obtained according to the amount of data to be collected in each park;
[0021] The information on the amount of resources consumed is determined based on the total amount of data collected in the area.
[0022] In a preferred example, the present application may be further configured as follows: determining the amount of collected resource consumption information according to the total amount of collected data in the area includes:
[0023] Determining a collection capacity value according to the total amount of data collected in the area;
[0024] The acquisition consumption resource amount information is determined according to the acquisition capability value and a preset acquisition capability resource conversion rule.
[0025] In a preferred example, the present application may be further configured as follows: calculating the collection efficiency of each of the preset data collection schemes includes:
[0026] Determine periodic collection frequency information and periodic collection coverage area information according to the preset data collection scheme;
[0027] Determine the periodic single collection evaluation information according to the periodic collection number information and the periodic collection coverage area information;
[0028] Determine a first data collection sub-efficiency value according to the periodic collection number information;
[0029] Determine the number of covered instruments and the update amount of covered instrument data according to the periodically collected coverage area information;
[0030] Determine a second data acquisition sub-efficiency value according to the coverage instrument quantity information and the coverage instrument data update amount information;
[0031] Determine a third data collection sub-efficiency value according to the periodic single collection evaluation information;
[0032] The collection efficiency of each of the preset data collection schemes is obtained according to the first data collection sub-efficiency value, the second data collection sub-efficiency value, the third data collection sub-efficiency value and a predetermined efficiency calculation formula.
[0033] In a preferred example, the present application may be further configured as follows: determining the periodic single acquisition evaluation information according to the periodic acquisition number information and the periodic acquisition coverage area information includes:
[0034] Determine periodic single coverage area information according to the periodic collection coverage area information;
[0035] Determine periodic single coverage instrument information according to the periodic single coverage area information;
[0036] Determine the periodic single data collection comparison information according to the periodic single coverage area information and the periodic single coverage instrument information;
[0037] The periodic single collection evaluation information is determined according to the periodic single data collection comparison information.
[0038] In a preferred example, the present application may be further configured as follows: the regional equipment data collection scheme is obtained by selecting each of the preset data collection schemes according to the collection efficiency and the collection consumption resource amount information, including:
[0039] Determine a resource efficiency ratio value according to the collection efficiency and the collection consumption resource amount information;
[0040] Obtaining a selection score for each preset data collection scheme according to the resource efficiency ratio value and a preset selection calculation formula;
[0041] A regional equipment data collection plan is determined according to the selection score.
[0042] The second purpose of this application is to provide a predictive maintenance data acquisition system for petrochemical industry.
[0043] The second application objective of the present application is achieved through the following technical solutions:
[0044] A predictive maintenance data acquisition system for petrochemical industry, comprising:
[0045] An acquisition module is used to acquire equipment information of instruments and equipment in a preset petrochemical industry area; the equipment information includes equipment type information, equipment quantity information and equipment historical data collection information;
[0046] A processing module, used to determine the amount of newly added data of each of the instruments and equipment according to the equipment information;
[0047] A determination module, used to determine the amount of collected resource consumption information according to the amount of new data added by the device;
[0048] A planning module, used to determine a plurality of preset data collection schemes according to the collected resource consumption information and a preset collection scheme planning model;
[0049] A calculation module, used to calculate the collection efficiency of each of the preset data collection schemes;
[0050] A selection module is used to select a regional equipment data collection plan from each of the preset data collection plans according to the collection efficiency and the collection consumption resource information.
[0051] The third purpose of this application is to provide a terminal.
[0052] The third application objective of this application is achieved through the following technical solutions:
[0053] A terminal comprises a memory and a processor, wherein the memory stores computer program instructions of the above-mentioned predictive maintenance data collection method for petrochemical industry which can be loaded and executed by the processor.
[0054] The fourth object of this application is to provide a computer medium capable of storing corresponding programs.
[0055] The fourth application objective of this application is achieved through the following technical solutions:
[0056] A computer-readable storage medium stores a computer program that can be loaded by a processor and execute any of the above-mentioned predictive maintenance data collection methods for petrochemical industry. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] Figure 1 It is a flow chart of a predictive maintenance data collection method for petrochemical industry in an embodiment of the present application.
[0058] Figure 2 It is a structural schematic diagram of a predictive maintenance data acquisition system for petrochemical industry in an embodiment of the present application.
[0059] Explanation of the accompanying drawings: 1. Acquisition module; 2. Processing module; 3. Determination module; 4. Planning module; 5. Calculation module; 6. Selection module. DETAILED DESCRIPTION
[0060] This specific embodiment is merely an explanation of the present application and is not a limitation of the present application. After reading this specification, those skilled in the art may make modifications to the present embodiment without any creative contribution as needed. However, as long as it is within the scope of the claims of the present application, it shall be protected by the Patent Law.
[0061] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0062] The embodiments of the present application are further described in detail below in conjunction with the drawings in the specification.
[0063] The present application provides a predictive maintenance data collection method for petrochemical industry, and the main process of the method is described as follows.
[0064] like Figure 1 As shown:
[0065] Step S101: Acquire equipment information of instruments and equipment in a preset petrochemical industry area; the equipment information includes equipment type information, equipment quantity information and equipment historical data collection information.
[0066] Step S102: Determine the device newly added data volume information of each of the instruments and devices according to the device information.
[0067] Specifically, determining the amount of equipment data added for each of the instruments and equipment based on the equipment information includes: obtaining the park information of the preset petrochemical industry area, and determining the park information to which each instrument and equipment belongs based on the park information; determining equipment usage information based on the equipment park information and equipment type information; and determining the amount of equipment data added for each of the instruments and equipment based on the equipment usage information and equipment historical data collection information.
[0068] It is understandable that within a petrochemical plant park, the park is divided into multiple areas, each area is responsible for different parts, and the uses of the instruments within it are also different; therefore, after determining the purpose of the instrument, combined with the historical data collection information of the instrument, the specific circumstances of the last data collection of the instrument can be understood, and then the amount of new data for each instrument and equipment after the last data collection can be determined.
[0069] Step S103: Determine the amount of resource consumption to be collected based on the amount of new data added by the device.
[0070] In an embodiment of the present application, determining the information on the amount of resources consumed by collection based on the information on the amount of new data added by the device includes: determining the total amount of new data in each park based on the information on the amount of new data added by the device and the device quantity information; determining the amount of data to be collected in each park based on a preset data resource confidence level and the total amount of new data in the park; obtaining the total amount of regional collected data based on the amount of data to be collected in each park; and determining the information on the amount of resources consumed by collection based on the total amount of regional collected data.
[0071] Among them, determining the information on the amount of resources consumed by collection according to the total amount of data collected in the area includes: determining a collection capacity value according to the total amount of data collected in the area; and determining the information on the amount of resources consumed by collection according to the collection capacity value and a preset collection capacity resource conversion rule.
[0072] After determining the amount of new data added to the equipment, the amount of data that should be collected in the current cycle can be determined; the amount of data to be collected in each park can be determined based on the preset data resource confidence; the preset data resource confidence here is a pre-set fixed parameter; the preset data resource confidence means that for the total amount of new data added to the equipment in each park, when collecting data from the equipment in the current cycle, if a certain proportion of the data collection amount can be met, it can be regarded as completing the data collection work; and this proportion is determined by the predictive nature of the maintenance data, and in this embodiment, it is set as a pre-set fixed parameter, and it can be directly substituted into the formula for calculation; in the above process, after the total amount of regional collected data is obtained, the collection capacity value needs to be determined according to the total amount of regional collected data; and the collection capacity value here is used to reflect the quantitative standard of the collection plan, and the quantitative index reflected by the collection capacity value is how much data can be collected, so it is necessary to ensure that the collection capacity value can cover and exceed the total amount of data collected in the region; and the preset collection capacity resource conversion rule refers to the rule for converting the two quantitative indicators of the collection capacity value and the collection consumption resource amount. In this embodiment, the conversion rule is guaranteed by setting a fixed parameter.
[0073] Specifically, the calculation formula is as follows:
[0074] ;
[0075] Among them, A represents the amount of new data added by the equipment, K represents the number of equipment; i takes the value of 1-n, which represents the first to nth types of equipment, j takes the value of 1=m, which represents the first park to the nth park; P represents the preset data resource confidence; therefore, it can be seen that the result calculated by the formula in the above brackets represents the total amount of regional collected data; Q>100%, Q represents the pre-adjustable ratio value, indicating that the collection capacity value can cover and exceed the total amount of regional collected data; in this embodiment, it is recognized that 1 unit of capacity value can be equivalent to 1 unit of data volume; L represents the conversion parameter for converting the collection capacity value and the collection consumption resource amount, and Z represents the collection consumption resource amount.
[0076] Step S104: determining a plurality of preset data collection schemes according to the collected resource consumption information and a preset collection scheme planning model.
[0077] It can be understood that in the embodiment of the present application, the construction of the preset collection scheme planning model is based on the historical data of historical collection schemes; the historical data is analyzed and sorted to determine the input as the amount of resources consumed for collection and the output as a preset collection scheme planning model for multiple collection schemes.
[0078] Step S105: Calculate the collection efficiency of each of the preset data collection schemes.
[0079] Specifically, calculating the collection efficiency of each of the preset data collection schemes includes: determining the periodic collection frequency information and the periodic collection coverage area information according to the preset data collection scheme; determining the periodic single collection evaluation information according to the periodic collection frequency information and the periodic collection coverage area information; determining the first data collection sub-efficiency value according to the periodic collection frequency information; determining the number of covered instruments and the covered instrument data update amount information according to the periodic collection coverage area information; determining the second data collection sub-efficiency value according to the number of covered instruments and the covered instrument data update amount information; determining the third data collection sub-efficiency value according to the periodic single collection evaluation information; and obtaining the collection efficiency of each of the preset data collection schemes according to the first data collection sub-efficiency value, the second data collection sub-efficiency value, the third data collection sub-efficiency value and a predetermined efficiency calculation formula.
[0080] Among them, determining the periodic single collection evaluation information according to the periodic collection number information and the periodic collection coverage area information includes: determining the periodic single coverage area information according to the periodic collection coverage area information; determining the periodic single coverage instrument information according to the periodic single coverage area information; determining the periodic single data collection comparison information according to the periodic single coverage area information and the periodic single coverage instrument information; and determining the periodic single collection evaluation information according to the periodic single data collection comparison information.
[0081] It can be understood that the preset data collection plan includes the number of times data collection needs to be performed in the current cycle, the area covered by each data collection execution, and the number of instruments, instrument types and instrument data update volume corresponding to the area; the instrument data update volume here refers to the amount of data added in the current cycle compared with the previous cycle; and the above information is all variables that will affect the collection efficiency; therefore, the first data collection sub-efficiency value is first determined based on the number of collections; and then the second data collection sub-efficiency value is determined based on the number of covered instruments and the covered instrument data update volume information; it can be understood that for the number of collections, the more collections, the lower the efficiency, and the fewer collections, the higher the efficiency; and the more instruments in the area covered by the collection and the more instrument data updates, the higher the efficiency; conversely, the lower the efficiency.
[0082] It should be noted that in the above process, additional efficiency judgments are required for the number of collections and the area covered by the collection; for the current cycle, the importance of the number of collections is self-evident; therefore, the evaluation of each collection is also essential; based on the single coverage area information and the covered instrument information, comparative judgments are made, the efficiency of each collection work is analyzed, and then the single collection evaluation information of the cycle is obtained; and then the third data collection sub-efficiency value is determined based on the single collection evaluation information of the cycle.
[0083] Step S106: Selecting each of the preset data collection schemes according to the collection efficiency and the collection resource consumption information to obtain a regional equipment data collection scheme.
[0084] Specifically, selecting each of the preset data collection schemes according to the collection efficiency and the collection consumed resource information to obtain a regional equipment data collection scheme includes: determining a resource efficiency ratio value according to the collection efficiency and the collection consumed resource information; obtaining a selection score for each of the preset data collection schemes according to the resource efficiency ratio value and a preset selection calculation formula; and determining the regional equipment data collection scheme according to the selection score.
[0085] It can be understood that the resource efficiency ratio value here represents the collection efficiency brought by the unit amount of resources consumed, and the higher this value is, the higher the value obtained in exchange for the cost of collecting and consuming resources.
[0086] The present application also provides a predictive maintenance data acquisition system for petrochemical industry, such as Figure 2As shown, a predictive maintenance data acquisition system for petrochemical industry includes, an acquisition module, used to acquire equipment information of instruments and equipment in a preset petrochemical industry area; the equipment information includes equipment type information, equipment quantity information and equipment historical data acquisition information; a processing module, used to determine the equipment new data volume information of each of the instruments and equipment according to the equipment information; a determination module, used to determine the collection consumption resource volume information according to the equipment new data volume information; a planning module, used to determine multiple preset data collection schemes according to the collection consumption resource volume information and a preset collection scheme planning model; a calculation module, used to calculate the collection efficiency of each of the preset data collection schemes; a selection module, used to select each of the preset data collection schemes according to the collection efficiency and the collection consumption resource volume information to obtain a regional equipment data collection scheme.
[0087] Among them, the processing module is further configured to obtain the park information of the preset petrochemical industry area, determine the park information of each instrument and equipment according to the park information; determine the equipment usage information according to the equipment park information and equipment type information; determine the equipment new data volume information of each instrument and equipment according to the equipment usage information and equipment historical data collection information; determine the total amount of park new data of each park according to the equipment new data volume information and the equipment quantity information; determine the amount of data to be collected in each park according to the preset data resource confidence and the total amount of park new data; obtain the total amount of regional collected data according to the amount of data to be collected in each park; and determine the collection consumption resource amount information according to the total amount of regional collected data.
[0088] The determination module is further configured to determine a collection capacity value according to the total amount of data collected in the area; and determine collection consumption resource amount information according to the collection capacity value and a preset collection capacity resource conversion rule.
[0089] The calculation module is further configured to determine the periodic acquisition frequency information and the periodic acquisition coverage area information according to the preset data acquisition scheme; determine the periodic single acquisition evaluation information according to the periodic acquisition frequency information and the periodic acquisition coverage area information; determine the first data acquisition sub-efficiency value according to the periodic acquisition frequency information; determine the number of covered instruments and the covered instrument data update amount information according to the periodic acquisition coverage area information; determine the second data acquisition sub-efficiency value according to the covered instrument number information and the covered instrument data update amount information; determine the third data acquisition sub-efficiency value according to the periodic single acquisition evaluation information; obtain the acquisition efficiency of each of the preset data acquisition schemes according to the first data acquisition sub-efficiency value, the second data acquisition sub-efficiency value, the third data acquisition sub-efficiency value and a predetermined efficiency calculation formula; determine the periodic single coverage area information according to the periodic acquisition coverage area information; determine the periodic single coverage instrument information according to the periodic single coverage area information; determine the periodic single data acquisition comparison information according to the periodic single coverage area information and the periodic single coverage instrument information; and determine the periodic single acquisition evaluation information according to the periodic single data acquisition comparison information.
[0090] The selection module is further configured to determine a resource efficiency ratio value according to the collection efficiency and the collection resource consumption information; obtain a selection score for each preset data collection scheme according to the resource efficiency ratio value and a preset selection calculation formula; and determine a regional equipment data collection scheme according to the selection score.
[0091] In order to better execute the program of the above method, the present application also provides a terminal, which includes a memory and a processor.
[0092] The memory may be used to store instructions, programs, codes, code sets or instruction sets. The memory may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function, and instructions for implementing the above-mentioned predictive maintenance data collection method for petrochemicals, etc.; the data storage area may store data involved in the above-mentioned predictive maintenance data collection method for petrochemicals, etc.
[0093] The processor may include one or more processing cores. The processor calls the data stored in the memory by running or executing the instructions, programs, code sets or instruction sets stored in the memory, performs various functions of the present application and processes data. The processor may be at least one of a special purpose integrated circuit, a digital signal processor, a digital signal processing device, a programmable logic device, a field programmable gate array, a central processing unit, a controller, a microcontroller and a microprocessor. It is understandable that for different devices, the electronic device used to implement the above-mentioned processor function can also be other, and the embodiments of the present application are not specifically limited.
[0094] The present application also provides a computer-readable storage medium, for example, including: a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes. The computer-readable storage medium stores a computer program that can be loaded by a processor and execute the above-mentioned predictive maintenance data collection method for petrochemical industry.
[0095] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of disclosure involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the aforementioned disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in the present application (but not limited to) by each other to form a technical solution.
Claims
1. A predictive maintenance data collection method for petrochemical industry, It is characterized in that include: Obtain equipment information of instruments and equipment in the preset petrochemical industry area; The device information includes device type information, device quantity information and device historical data collection information; Determine the newly added data volume information of each of the instruments and equipment according to the equipment information; Determine the amount of resource consumption information collected based on the amount of new data added by the device; Determine a plurality of preset data collection schemes according to the collected resource consumption information and a preset collection scheme planning model; Calculating the collection efficiency of each of the preset data collection schemes; According to the collection efficiency and the collection consumption resource information, each of the preset data collection schemes is selected to obtain a regional equipment data collection scheme; Determining the newly added data volume information of each of the instruments and equipment according to the equipment information includes obtaining the park information of the preset petrochemical industry area, and determining the equipment park information of each of the instruments and equipment according to the park information; Determine the device usage information according to the park information and device type information of the device; Determine the amount of new data for each of the equipment based on the equipment usage information and the equipment historical data collection information; determine the total amount of new data for each park based on the amount of new data and the equipment quantity information; Determine the amount of data to be collected in each park according to the preset data resource confidence and the total amount of new data in the park; obtain the total amount of regional collected data according to the amount of data to be collected in each park; Determine the amount of resource consumption information collected based on the total amount of data collected in the area; Calculating the collection efficiency of each of the preset data collection schemes includes: determining periodic collection frequency information and periodic collection coverage area information according to the preset data collection scheme; determining periodic single collection evaluation information according to the periodic collection frequency information and periodic collection coverage area information; determining a first data collection sub-efficiency value according to the periodic collection frequency information; determining the number of covered instruments and the amount of data update information of the covered instruments according to the periodic collection coverage area information; Determine the second data acquisition sub-efficiency value according to the number of covered instruments and the data update amount information of the covered instruments; determine the third data acquisition sub-efficiency value according to the periodic single acquisition evaluation information; Obtaining the collection efficiency of each of the preset data collection schemes according to the first data collection sub-efficiency value, the second data collection sub-efficiency value, the third data collection sub-efficiency value and a predetermined efficiency calculation formula; Determining the periodic single collection evaluation information according to the periodic collection number information and the periodic collection coverage area information includes: determining the periodic single coverage area information according to the periodic collection coverage area information; determining the periodic single coverage instrument information according to the periodic single coverage area information; determining the periodic single data collection comparison information according to the periodic single coverage area information and the periodic single coverage instrument information; and determining the periodic single collection evaluation information according to the periodic single data collection comparison information.
2. The predictive maintenance data collection method for petrochemical industry according to claim 1, It is characterized in that The selecting of each of the preset data collection schemes according to the collection efficiency and the collection consumption resource amount information to obtain a regional equipment data collection scheme comprises: Determine a resource efficiency ratio value according to the collection efficiency and the collection consumption resource amount information; Obtaining the selection score of each preset data collection scheme according to the resource efficiency ratio value and the preset selection calculation formula; A regional equipment data collection plan is determined according to the selection score.
3. A predictive maintenance data collection method system for petrochemical industry, It is characterized in that include: An acquisition module is used to acquire equipment information of instruments and equipment in a preset petrochemical industry area; The device information includes device type information, device quantity information and device historical data collection information; A processing module, used to determine the amount of newly added data of each of the instruments and equipment according to the equipment information; A determination module, used to determine the amount of collected resource consumption information according to the amount of new data added by the device; A planning module, used to determine a plurality of preset data collection schemes according to the collected resource consumption information and a preset collection scheme planning model; A calculation module, used to calculate the collection efficiency of each of the preset data collection schemes; A selection module, configured to select a regional equipment data collection scheme from each of the preset data collection schemes according to the collection efficiency and the collection consumption resource amount information; The system is further configured to determine the amount of newly added data of each of the instruments and equipment according to the equipment information, including obtaining the park information of the preset petrochemical industry area, and determining the equipment park information of each instrument and equipment according to the park information; Determine the device usage information according to the park information and device type information of the device; Determine the amount of new data for each of the equipment based on the equipment usage information and the equipment historical data collection information; determine the total amount of new data for each park based on the amount of new data and the equipment quantity information; Determine the amount of data to be collected in each park according to the preset data resource confidence and the total amount of new data in the park; obtain the total amount of regional collected data according to the amount of data to be collected in each park; Determine the amount of resource consumption information collected based on the total amount of data collected in the area; Calculating the collection efficiency of each of the preset data collection schemes includes: determining periodic collection frequency information and periodic collection coverage area information according to the preset data collection scheme; determining periodic single collection evaluation information according to the periodic collection frequency information and periodic collection coverage area information; determining a first data collection sub-efficiency value according to the periodic collection frequency information; determining the number of covered instruments and the amount of data update information of the covered instruments according to the periodic collection coverage area information; Determine the second data acquisition sub-efficiency value according to the number of covered instruments and the data update amount information of the covered instruments; determine the third data acquisition sub-efficiency value according to the periodic single acquisition evaluation information; Obtaining the collection efficiency of each of the preset data collection schemes according to the first data collection sub-efficiency value, the second data collection sub-efficiency value, the third data collection sub-efficiency value and a predetermined efficiency calculation formula; Determining the periodic single collection evaluation information according to the periodic collection number information and the periodic collection coverage area information includes: determining the periodic single coverage area information according to the periodic collection coverage area information; determining the periodic single coverage instrument information according to the periodic single coverage area information; determining the periodic single data collection comparison information according to the periodic single coverage area information and the periodic single coverage instrument information; and determining the periodic single collection evaluation information according to the periodic single data collection comparison information.
4. A terminal, It is characterized in that The method comprises a memory and a processor, wherein the memory stores computer program instructions which are loaded by the processor and execute the method according to any one of claims 1 to 2.
5. A computer-readable storage medium, It is characterized in that A computer program is stored which is loaded by a processor and executes the method according to any one of claims 1 to 2.