A method, device, computer equipment and storage medium for monitoring external water volume
By obtaining the liquid level and outlet flow data of the pump station, combining the liquid level-volume curve, and calculating the change curve of the incoming water volume of the pump station, the problem of low accuracy in monitoring the incoming water volume of the sewage lift pump station is solved, and the monitoring effect and simplicity are improved.
Patent Information
- Application Number
- CN202311864921.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2043-12-29
AI Technical Summary
In the prior art, the monitoring accuracy of the incoming water volume of sewage lifting pump stations is low, and the establishment of mathematical models is complex and it is difficult to obtain sufficient data samples, resulting in poor monitoring effects.
By obtaining the liquid level data and water outlet flow data of the pump station, combined with the pre-finished liquid level-volume curve, the total water storage volume and external water volume change curves of the pump station control area are calculated, and the actual data is used to improve monitoring accuracy and, if necessary, The water flow rate is calculated by pumping water, current and voltage data of the water pump, and the monitoring process is refined.
It realizes high accuracy monitoring of the change curve of the incoming water volume of the pump station, improves the monitoring effect, simplifies the data acquisition and calculation process, and reduces the monitoring complexity.
Smart Images

Figure CN118035719B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of drainage engineering, and in particular to a method, device, computer equipment and storage medium for monitoring external water volume. Background Art
[0002] The sewage lifting pump station is used to lift the sewage flowing in from the upstream of the pump station from the low-lying area to the height required by the subsequent sewage treatment system of the pump station to achieve gravity flow. Monitoring the changes in the amount of external water in the pump station is crucial for the effective operation and maintenance of the sewage treatment system.
[0003] In the related art, the amount of external water is estimated by measuring the water level of the pump station, or the amount of external water is calculated by establishing a mathematical model to obtain the amount of external water, and the amount of external water is obtained for monitoring. However, the accuracy of estimating the amount of external water by the water level of the pump station alone is low, and the mathematical model for obtaining the amount of external water is relatively complex and it is difficult to obtain sufficient data samples. Therefore, a simple and effective method for monitoring the amount of external water is urgently needed. Summary of the invention
[0004] In view of this, the present invention provides a method, device, computer equipment and storage medium for monitoring the amount of external water, so as to solve the problem of low accuracy and poor effect of monitoring the amount of external water.
[0005] In a first aspect, the present invention provides a method for monitoring external water volume, the method comprising: obtaining pump station liquid level data and pump station water outlet flow data; calculating the total water storage capacity of the pump station control area based on the pump station liquid level data and the pump station liquid level-volume curve; the liquid level-volume curve is a relationship curve between a pre-calculated pump station water level and the total water storage capacity of the pump station control area; the total water storage capacity of the pump station control area is the total water storage capacity of the catchment area and the pump station collection tank controlled by the pump station; calculating the pump station external water volume change curve based on the total water storage capacity of the pump station control area and the pump station water outlet flow data.
[0006] The above scheme collects the pump station liquid level data and the pump station water flow data, combines the pump station liquid level-volume curve, calculates the pump station external water volume change curve, and obtains the pump station external water volume change curve based on the actual collected data, which has high accuracy. After obtaining the pump station external water volume change curve, the pump station external water volume change monitoring can be carried out based on the pump station external water volume change curve. Since the pump station external water volume change curve has high accuracy, the effect of monitoring the pump station external water volume change is good.
[0007] In an optional embodiment, the step of obtaining the liquid level-volume curve includes: obtaining the pump station liquid level data and the pump station water outlet flow data at each time point within a target time period; the target time period is when the amount of external water in the pump station is the least, and the pump station water pump is used to pump water, so that the pump station liquid level is reduced from a first liquid level to a second liquid level. The time point-liquid level-flow curve is obtained based on the pump station liquid level data and the pump station water outlet flow data at each time point; the time point-liquid level-flow curve is integrated to obtain the liquid level-volume curve.
[0008] The above scheme selects the target time period and liquid level range, pumps water through the pump station water pump, records the data to obtain the time point-liquid level-flow curve, and then obtains the liquid level-volume curve based on the actual measurement data, which further improves the accuracy of obtaining the pump station external water volume change curve.
[0009] In an optional embodiment, the step of obtaining the pump station water outlet flow data at each time point includes: collecting the current data and voltage data of the pump station water pump at each time point; calculating the actual power of the pump station water pump at each time point based on the current data and voltage data of the pump station water pump at each time point; obtaining the pump station water outlet flow data at each time point according to the actual power of the pump station water pump at each time point and the power characteristic curve of the pump station water pump; the power characteristic curve of the pump station water pump is used to describe the power value of the pump station water pump at different pump station water outlet flow rates.
[0010] The above scheme shows how to calculate the pump station outlet flow rate based on the actual power of the pump station water pump and the power characteristic curve of the pump station water pump when the pump station outlet flow data cannot be directly measured by the flow meter, thereby further improving the accuracy of calculating the pump station external water volume change curve.
[0011] In an optional embodiment, the pump station external water volume change curve is calculated based on the total water storage capacity of the pump station control area and the pump station outlet flow data, including: respectively obtaining the derivative of the total water storage capacity of the pump station control area with respect to time at each time point of the day; adding the derivative of the total water storage capacity of the pump station control area with respect to time at each time point of the day and the pump station outlet flow data at the corresponding time point as the external water flow at the corresponding time point; generating a daily external water flow change curve based on the external water flow at each time point of the day; integrating the daily external water flow change curve to obtain the daily pump station external water volume change curve.
[0012] The above scheme defines how to calculate the change curve of the external water volume of the pumping station based on the total water storage capacity of the pumping station control area and the water discharge flow data of the pumping station, and refines the scheme.
[0013] In an optional embodiment, after calculating the pump station's external water volume change curve, it also includes: comparing the pump station's external water volume change curve with the pump station's benchmark dry day external water volume change curve to determine the pump station's external water volume change law; the pump station's benchmark dry day external water volume change curve is a pre-obtained pump station's external water volume change curve when the pump station's external water volume is the least.
[0014] The above scheme defines how to analyze the changing rules of the external water volume of the pumping station after obtaining the changing curve of the external water volume of the pumping station, and refines the scheme.
[0015] In an optional embodiment, the step of obtaining the pump station benchmark drought day external water volume change curve includes: selecting several data with the least external water volume from the historical pump station external water volume data, and taking several dates corresponding to the several data with the least external water volume as several benchmark drought days; performing waveform alignment processing on the pump station external water volume change curves corresponding to several benchmark drought days and obtaining the average waveform to obtain the pump station benchmark drought day external water volume change curve; the waveform alignment processing is to align the peaks and troughs of the pump station external water volume change curves corresponding to several benchmark drought days through time offset, interpolation or calculation of cross-correlation.
[0016] The above scheme defines how to obtain the pump station benchmark drought-related external water volume change curve. After obtaining the pump station benchmark drought-related external water volume change curve, it can be used as a benchmark for external water volume change analysis, further improving the effect of external water volume monitoring.
[0017] In an optional embodiment, before waveform alignment is performed on the pump station external water volume change curves corresponding to several benchmark drought days, the method further includes: denoising and smoothing the pump station external water volume change curves corresponding to each benchmark drought day; the denoising and smoothing include at least one of the following: respectively calculating the average value of each external water volume value of the pump station external water volume change curve in each window as the external water volume statistical value of the corresponding window; respectively calculating the median value of each external water volume value of the pump station external water volume change curve in each window as the external water volume statistical value of the corresponding window; respectively assigning weight values to each external water volume value of the pump station external water volume change curve in each window, and calculating the external water volume statistical value of the corresponding window according to the weight value of each external water volume value; performing wavelet transform processing on the pump station external water volume change curve to remove high-frequency noise.
[0018] The above scheme defines how to reduce noise and smooth the pump station external water volume change curve corresponding to each benchmark drought day, reduces the impact of interference data, improves the accuracy of obtaining the pump station benchmark drought day external water volume change curve, and thus improves the effect of external water volume monitoring.
[0019] In a second aspect, the present invention provides an external water volume monitoring device, the device comprising:
[0020] Data acquisition module, used to obtain pump station liquid level data and pump station water flow data;
[0021] The total water volume calculation module is used to calculate the total water storage volume of the pump station control area according to the pump station liquid level data and the pump station liquid level-volume curve; the liquid level-volume curve is a relationship curve between the pump station water level obtained in advance and the total water storage volume of the pump station control area; the total water storage volume of the pump station control area is the total water storage volume of the catchment area controlled by the pump station and the pump station sump;
[0022] The curve obtaining module is used to calculate the change curve of the external water volume of the pumping station according to the total water storage capacity of the pumping station control area and the water flow data of the pumping station.
[0023] In a third aspect, the present invention provides a computer device comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the external water volume monitoring method of the first aspect or any corresponding embodiment thereof by executing the computer instructions.
[0024] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the external water volume monitoring method of the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0026] Figure 1 is a flow chart of a method for monitoring external water volume according to an embodiment of the present invention;
[0027] Figure 2 is a flow chart of another external water monitoring method according to an embodiment of the present invention;
[0028] Figure 3 is a structural block diagram of an external water quantity monitoring device according to an embodiment of the present invention;
[0029] Figure 4 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0030] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0031] In municipal engineering, the sewage lifting pump station is a key component, which is used to lift the sewage flowing in from the upstream of the pump station from the low-lying area to the height required by the subsequent sewage treatment system of the pump station to achieve gravity flow. The external water of the pump station includes infiltration and inflow caused by rainfall, etc. Monitoring the changes in the amount of external water in the pump station is crucial for the effective operation and maintenance of the sewage treatment system. According to the changes in the amount of external water, it is possible to analyze whether the pipeline system is leaking, whether infiltration has occurred, etc., and the sewage discharge plan can be planned in advance according to the law of changes in the amount of external water. Due to the lack of flow monitoring equipment, it is impossible to directly measure the amount of external water.
[0032] In the related art, the amount of external water is estimated by measuring the water level of the pump station, or by establishing a mathematical model to calculate the amount of external water, and the estimated value of the external water is obtained for monitoring. However, the accuracy of estimating the amount of external water by the water level of the pump station is low, and the mathematical model for calculating the amount of external water is relatively complex and difficult to obtain sufficient data samples. Therefore, a simple and effective method for monitoring the amount of external water is urgently needed.
[0033] Therefore, an embodiment of the present invention provides a method for monitoring the amount of external water, which improves the monitoring effect of the amount of external water by calculating the change curve of the amount of external water in a pump station.
[0034] According to an embodiment of the present invention, an embodiment of a method for monitoring the amount of external water is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0035] In this embodiment, a method for monitoring the amount of external water is provided, which can be used in industrial computers, personal computers, etc. Figure 1 is a flow chart of a method for monitoring external water volume according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:
[0036] Step S101, obtaining pump station liquid level data and pump station water flow data.
[0037] Optionally, the pump station level data is measured by a level gauge.
[0038] Optionally, the pump station outlet flow data is measured by a pump station outlet flow meter. When the pump station outlet flow meter is not configured, the pump station outlet flow data can also be calculated based on the power characteristic curve of the pump station water pump.
[0039] Optionally, the pump station liquid level data and the pump station water flow data are measured at certain time intervals every day to obtain the changes in the pump station liquid level data and the pump station water flow data at various times of the day, as well as the changes in the pump station liquid level data and the pump station water flow data on different dates.
[0040] Step S102, calculating the total water storage capacity of the pump station control area based on the pump station liquid level data and the pump station liquid level-volume curve.
[0041] The liquid level-volume curve is a relationship curve between the pre-obtained pump station water level and the total water storage capacity of the pump station control area. Since the pump station liquid level data (i.e., the pump station water level) has been measured in step S101, the total water storage capacity of the pump station control area can be obtained by substituting the pump station liquid level data into the pump station liquid level-volume curve. The total water storage capacity of the pump station control area is the total water storage capacity of the catchment area controlled by the pump station and the pump station sump.
[0042] Step S103, calculating the change curve of the external water volume of the pumping station according to the total water storage volume of the pumping station control area and the water flow data of the pumping station.
[0043] After obtaining the pump station water flow data on different dates and times, the water output of the corresponding pump station can be calculated based on the pump station water flow data on different dates and times, and the pump station external water volume change curve can be obtained by combining the total water storage capacity of the corresponding pump station control area.
[0044] After obtaining the pump station's external water volume change curve, the changes in the pump station's external water volume can be analyzed based on the pump station's external water volume change curve to monitor the external water volume. The changing rules of the external water volume can also be summarized to plan the pump station's drainage plan.
[0045] The external water volume monitoring method provided in this embodiment collects the pump station liquid level data and the pump station water flow data, combines the pump station liquid level-volume curve, calculates the pump station external water volume change curve, and obtains the pump station external water volume change curve based on the actual collected data, with high accuracy. After obtaining the pump station external water volume change curve, the pump station external water volume change monitoring can be performed based on the pump station external water volume change curve. Since the pump station external water volume change curve has high accuracy, the effect of monitoring the pump station external water volume change is good.
[0046] In this embodiment, a method for monitoring the amount of external water is provided, which can be used in the above-mentioned mobile terminal, such as a mobile phone, a tablet computer, etc. Figure 2 is a flow chart of a method for monitoring external water volume according to an embodiment of the present invention. Figure 2As shown, the process includes the following steps:
[0047] Step S201, obtaining a liquid level-volume curve.
[0048] Specifically, the above step S201 includes:
[0049] Step S2011, obtaining the pump station liquid level data and pump station water flow data at each time point within the target time period.
[0050] The liquid level of the liquid level-volume curve refers to the liquid level of the pump station sump, and the volume refers to the total water storage in the pump station control area. The pump station controls a catchment area, and the total water storage in the pump station control area is the total water storage of the catchment area controlled by the pump station and the pump station sump, that is, the water stored in the entire catchment area and the sump controlled by the pump station. The catchment area includes various drainage pipe networks, etc. The liquid level-volume curve is obtained in order to obtain the total water storage of the catchment area and the pump station sump controlled by the pump station according to the measured liquid level of the pump station sump. It should be noted that the pump station liquid level data and pump station water flow data at each time point are instantaneous values. Correspondingly, the total water storage in the pump station control area calculated based on the pump station liquid level data is also the instantaneous value at the corresponding time point. The target time period is the time consumed by the pump station water pump to reduce the pump station liquid level from the first liquid level to the second liquid level when the external water volume of the pump station is the least. Optionally, select 2:00 a.m. to 4:00 a.m. on a dry day with no rainfall for at least the previous three days as the target time period. If there is no rainfall for at least the previous three days, the interference of rainwater is eliminated. 2:00 a.m. to 4:00 a.m. is the night rest period, and the amount of external water to the pump station is the least. Set the first liquid level as the highest water level of the pump station, and the second liquid level as the lowest water level of the pump station. The liquid level data of the pump station at each time point in the target time period is collected by a liquid level meter, and the water outlet flow data of the pump station at each time point in the target time period is collected by a water outlet flow meter. It should be noted that the liquid level data of the pump station is the liquid level data of the pump station sump. The pump station sump is a building connecting the diversion channel and the inlet pool. Its function is to reasonably connect the diversion channel and the inlet pool so that the water flows smoothly and evenly into the inlet pool, providing good water absorption conditions for the pump station water pump.
[0051] Optionally, when a water outlet flow meter is not configured, the water outlet flow data of the pump station can be obtained by following steps S1 to S3:
[0052] S1: Collect the current and voltage data of the pump station water pump at each time point.
[0053] The current and voltage data of the pump station water pump at each time point are collected through sensors or current and voltage monitoring equipment.
[0054] S2: Based on the current data and voltage data of the pump station water pump at each time point, calculate the actual power of the pump station water pump at each time point.
[0055] The actual power of the pump station water pump can be calculated by the following formula:
[0056]
[0057] Among them, P is the actual power of the pump station water pump, V is the voltage data of the pump station water pump, and I is the current data of the pump station water pump. Indicates that the pump station water pump uses a three-phase power supply. is the power factor, which can be adjusted according to actual conditions, for example, set to 0.8.
[0058] S3: According to the actual power of the pump station water pump at each time point and the power characteristic curve of the pump station water pump, the water outlet flow data of the pump station at each time point is obtained.
[0059] The power characteristic curve of the pump station water pump is used to describe the power value of the pump station water pump at different pump station water flow rates. The power characteristic curve of the pump station water pump can be obtained from the technical manual of the pump station water pump or the information provided by the manufacturer, and can be expressed as Q = F (P), where Q is the pump station water flow rate, P is the actual power of the pump station water pump, Q is the horizontal coordinate, and P is the vertical coordinate. According to the actual power of the pump station water pump at each time point, the corresponding pump station water flow rate data can be found from the power characteristic curve of the pump station water pump.
[0060] For example, the water level of the pump station is maintained at the highest water level, and the water pump with the largest flow rate is used to start pumping water at 2 a.m., and the pump station liquid level data and the water flow rate data of the pump station are recorded every minute until the water level of the pump station reaches the lowest water level. If there is no water flow meter, the water flow rate data of the pump station at each time point is calculated by the power characteristic curve of the pump station water pump.
[0061] Step S2012, based on the pump station liquid level data and pump station water flow data at each time point, obtain a time point-liquid level-flow curve.
[0062] By obtaining the pump station liquid level data at each time point and the water outlet flow data at each time point, the time point-liquid level-flow curve can be obtained.
[0063] Step S2013, integrating the time point-liquid level-flow curve to obtain a liquid level-volume curve.
[0064] By selecting each time period and integrating the time point-liquid level-flow curve, the corresponding relationship between the liquid level and volume in each time period can be obtained, and then the liquid level-volume curve can be obtained. Assuming that the minimum flow at night is the groundwater infiltration, when the amount of external water is the least, the liquid level-volume curve is relatively fixed.
[0065] Optionally, the liquid level-volume curve is re-obtained and updated regularly, for example, once every three months, to prevent new or abandoned drainage pipelines in the pump station from affecting the accuracy of the liquid level-volume curve.
[0066] Step S202, obtaining pump station liquid level data and pump station water flow data.
[0067] It should be noted that the purpose of obtaining the pump station liquid level data and the pump station water flow data in step S2011 is to obtain the liquid level-volume curve. The pump station liquid level data and the pump station water flow data for obtaining the liquid level-volume curve can be obtained again every few months. In this step, the pump station liquid level data and the pump station water flow data need to be obtained at certain time intervals every day, and the amount of external water in the pump station must be monitored every day. The method of obtaining the pump station liquid level data and the pump station water flow data is the same as that in the previous steps, and will not be repeated here.
[0068] Step S203, calculating the total water storage capacity of the pump station control area based on the pump station liquid level data and the pump station liquid level-volume curve.
[0069] The liquid level-volume curve is a pre-calculated relationship curve between the pump station water level and the total water storage capacity of the pump station control area. The calculation method is detailed in step S201 and will not be repeated here.
[0070] For details of step S203, see Figure 1 Step S102 of the illustrated embodiment will not be described in detail here.
[0071] Step S204, calculating the change curve of the external water volume of the pumping station according to the total water storage volume of the pumping station control area and the water flow data of the pumping station.
[0072] Specifically, the above step S204 includes:
[0073] Step S2041, respectively obtain the derivative of the total water storage capacity of the pump station control area with respect to time at each time point every day.
[0074] Based on the water balance principle, the external water flow can be calculated by the following formula:
[0075]
[0076] Among them, q is the external water flow, V is the total water storage capacity of the pump station control area calculated according to the liquid level-volume curve, Q is the water flow data of the pump station, t is the time, and the derivative of the total water storage capacity of the pump station control area with respect to time is
[0077] Step S2042, adding the derivative of the total water storage capacity of the pump station control area with respect to time at each time point every day and the water outflow data of the pump station at the corresponding time point as the external water flow at the corresponding time point.
[0078] Please refer to step S2041 for details, which will not be repeated here.
[0079] Step S2043, generating a daily external water flow change curve based on the external water flow at each time point every day.
[0080] After obtaining the external water flow at each time point of the day, a curve of the daily external water flow rate versus time can be generated.
[0081] Step S2044, integrating the daily external water flow change curve to obtain the daily pump station external water flow change curve.
[0082] The integral of flow over time is water volume. Select each time period of the day, integrate the daily external water flow change curve of each time period of the day, and then obtain the daily pump station external water volume change curve. It should be noted that the time range and time period selected between different dates are corresponding, for example, the time range of each day is 24 hours, and the time period is one hour.
[0083] Step S205, obtaining a baseline dry weather external water volume variation curve for the pump station.
[0084] Specifically, the above step S205 includes:
[0085] Step S2051, selecting a number of data with the least external water volume from the historical pump station external water volume data, and using a number of dates corresponding to the number of data with the least external water volume as a number of benchmark dry days.
[0086] When monitoring the amount of external water, the date with less external water can be selected as the benchmark to analyze whether the daily external water volume is appropriate, and then formulate a drainage plan. Optionally, the pump station benchmark dry day can be used as the benchmark. Several dates with the least external water volume can be used as several benchmark dry days. The number of benchmark dry days can be selected according to actual conditions, for example, the three days with the least external water volume can be selected as benchmark dry days.
[0087] Step S2052, performing noise reduction and smoothing processing on the pump station external water volume change curve corresponding to each benchmark dry day.
[0088] The pump station external water volume change curve corresponding to each selected benchmark dry day is called and denoised and smoothed. Random fluctuations or interference data can be removed by denoising and smoothing. The denoising and smoothing process includes at least one of the following, which can be selected according to actual conditions:
[0089] (1) Moving average, that is, the average value of each external water volume value in each window of the external water volume change curve of the pumping station is calculated as the external water volume statistical value of the corresponding window.
[0090] (2) Median filtering, that is, obtaining the median of each external water volume value in each window of the external water volume change curve of the pump station as the external water volume statistical value of the corresponding window.
[0091] (3) Weighted average, that is, assigning weight values to each external water volume value in each window of the external water volume change curve of the pump station, and calculating the external water volume statistics of the corresponding window according to the weight values of each external water volume value. The weight value can be selected according to the actual situation.
[0092] (4) Wavelet transform, that is, the change curve of the external water volume of the pumping station is processed by wavelet transform and decomposed into signals of different frequencies to remove high-frequency noise.
[0093] This window is a sliding window that displays the change curve of the external water volume of the pumping station. The size of the window can be adjusted according to the actual situation.
[0094] Optionally, each pump station's external water volume change curve is first converted into a pump station's external water volume hourly variation coefficient curve, and then noise reduction and smoothing are performed. The hourly variation coefficient refers to the ratio of the daily maximum hourly water supply to the daily average hourly water supply, and the pump station's external water volume hourly variation coefficient is the ratio of the daily maximum hourly external water volume to the daily average hourly external water volume.
[0095] Optionally, the change curve of the external water volume of the pump station after noise reduction and smoothing is visualized to check the effect of noise reduction and smoothing. Optionally, a chart or image is used to compare the original data and the processed data, and appropriate evaluation indicators can be set to quantify the effect of noise reduction and smoothing.
[0096] Step S2053, performing waveform alignment processing on the pump station external water volume change curves corresponding to several benchmark drought days and obtaining an average waveform to obtain the pump station benchmark drought day external water volume change curve.
[0097] The waveform alignment process is to align the peaks and troughs of the pump station external water volume change curves corresponding to several benchmark dry days through time offset, interpolation or calculation of cross-correlation.
[0098] Waveform alignment is a data processing technique that aims to align specific characteristic points (such as peaks and troughs) of multiple waveforms or time series on the time axis for comparison or analysis. The main goal of waveform alignment is to eliminate the time differences between different waveforms so that they are consistent in time for subsequent analysis and estimation.
[0099] Specifically, the peaks and troughs are extracted from the change curve of the external water volume of the pumping station corresponding to each benchmark dry day, and at least one of the following waveform alignment methods is selected for waveform alignment processing:
[0100] (1) Time offset: By adjusting the time axis offset of each base date, the peaks and troughs are aligned in time.
[0101] (2) Interpolation: Use an interpolation method, such as linear interpolation or spline interpolation, to resample the waveform so that the peaks and troughs correspond in time.
[0102] (3) Cross-correlation: By calculating the cross-correlation between different waveforms, the optimal time offset is found to align the peaks and troughs.
[0103] Furthermore, waveform merging is performed, and the peaks and troughs of the pump station external water volume change curves corresponding to each benchmark dry day are aligned in time and merged into a unified waveform, for example, the data points of the external water volume change curves of each pump station are averaged or weighted averaged at the corresponding time points for merging. The aligned waveform can be used as an estimate of the benchmark external water volume time-varying curve. By aligning the aligned curve with a known point of the benchmark external water volume, the benchmark external water volume time-varying curve can be obtained.
[0104] Furthermore, the root mean square error (RMSE) method is used to find the average waveform of the pump station external water volume change curve corresponding to several benchmark drought days under the minimum error, and the pump station benchmark drought day external water volume change curve is obtained as the benchmark external water volume change curve.
[0105] Step S206, comparing the pump station external water volume change curve with the pump station benchmark dry day external water volume change curve to determine the pump station external water volume change law.
[0106] The benchmark dry weather external water volume change curve of the pumping station is a pre-obtained pumping station external water volume change curve when the external water volume of the pumping station is the minimum. The obtaining process is detailed in step S205 and will not be repeated here.
[0107] After obtaining the pump station benchmark dry day external water volume change curve and the daily pump station external water volume change curve, the daily pump station external water volume change curve can be compared with the pump station benchmark dry day external water volume change curve to analyze the daily pump station external water volume change pattern.
[0108] Optionally, the waveform alignment method is used to align the daily pump station external water volume change curve with the pump station benchmark dry day external water volume change curve for comparison.
[0109] Optionally, several benchmark dry days are selected based on special dates, and the pump station benchmark dry day external water volume change curve corresponding to each special date is calculated, and the pump station benchmark dry day external water volume change curve corresponding to each special date is compared with the daily pump station external water volume change curve to further analyze the impact of special dates on external water volume. Special dates include weekdays, weekends, holidays, dates of major events, etc.
[0110] Based on the above analysis, we can discover possible problems with the pumping station according to the size and changes of daily external water volume, such as the severity of infiltration and inflow, whether there is centralized sewage discharge, etc., and then formulate a sewage discharge plan for the pumping station to improve the monitoring and treatment effects of external water volume.
[0111] The external water volume monitoring method provided in this embodiment collects the pump station liquid level data and the pump station water flow data, combines the pump station liquid level-volume curve, calculates the pump station external water volume change curve, and obtains the pump station external water volume change curve based on the actual collected data, with high accuracy. After obtaining the pump station external water volume change curve, the pump station external water volume change monitoring can be performed based on the pump station external water volume change curve. Since the pump station external water volume change curve has high accuracy, the effect of monitoring the pump station external water volume change is good.
[0112] In addition, the target time period and liquid level range are selected, water is pumped through the pump station pump, and the data is recorded to obtain the time point-liquid level-flow curve, and then the liquid level-volume curve based on the actual measurement data is obtained, which further improves the accuracy of the pump station external water volume change curve.
[0113] In addition, it defines how to obtain the pump station benchmark drought-day external water volume change curve. After the pump station benchmark drought-day external water volume change curve is obtained, it can be used as a benchmark for external water volume change analysis, further improving the effect of external water volume monitoring.
[0114] In this embodiment, an external water quantity monitoring device is also provided, which is used to implement the above-mentioned embodiments and preferred embodiments, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware of a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.
[0115] This embodiment provides an external water quantity monitoring device, such as Figure 3 As shown, including:
[0116] The data acquisition module 301 is used to acquire the pump station liquid level data and the pump station water flow data;
[0117] The total water volume calculation module 302 is used to calculate the total water storage volume of the pump station control area according to the pump station liquid level data and the pump station liquid level-volume curve; the liquid level-volume curve is a curve of the relationship between the pump station water level obtained in advance and the total water storage volume of the pump station control area; the total water storage volume of the pump station control area is the total water storage volume of the catchment area controlled by the pump station and the pump station sump;
[0118] The curve obtaining module 303 is used to calculate the change curve of the external water volume of the pumping station according to the total water storage volume of the pumping station control area and the water flow rate data of the pumping station.
[0119] In an optional embodiment, it also includes a liquid level-volume curve acquisition module, which is used to obtain the pump station liquid level data and the pump station water outlet flow data at each time point within a target time period; the target time period is when the amount of external water in the pump station is the least, and the pump station water pump is used to pump water, so that the pump station liquid level is reduced from the first liquid level to the second liquid level. The time point-liquid level-flow curve is obtained based on the pump station liquid level data and the pump station water outlet flow data at each time point; the time point-liquid level-flow curve is integrated to obtain the liquid level-volume curve.
[0120] In an optional embodiment, the data acquisition module is also used to: collect current data and voltage data of the pump station water pump at each time point; calculate the actual power of the pump station water pump at each time point based on the current data and voltage data of the pump station water pump at each time point; obtain the pump station water outlet flow data at each time point according to the actual power of the pump station water pump at each time point and the power characteristic curve of the pump station water pump; the power characteristic curve of the pump station water pump is used to describe the power value of the pump station water pump at different pump station water outlet flows.
[0121] In an optional embodiment, the curve obtaining module is also used to: obtain the derivative of the total water storage capacity of the pump station control area with respect to time at each time point every day; add the derivative of the total water storage capacity of the pump station control area with respect to time at each time point every day and the pump station outlet flow data at the corresponding time point as the external water flow at the corresponding time point; generate a daily external water flow change curve based on the external water flow at each time point every day; integrate the daily external water flow change curve to obtain the daily pump station external water volume change curve.
[0122] In an optional embodiment, it also includes a comparison module, which is used to compare the pump station's external water volume change curve with the pump station's benchmark dry day external water volume change curve to determine the pump station's external water volume change law; the pump station's benchmark dry day external water volume change curve is a pre-obtained pump station external water volume change curve when the pump station's external water volume is the least.
[0123] In an optional embodiment, it also includes a benchmark drought day external water volume change curve module, which is used to select several data with the least external water volume from the historical pump station external water volume data, and use several dates corresponding to the several data with the least external water volume as several benchmark drought days; waveform alignment is performed on the pump station external water volume change curves corresponding to the several benchmark drought days and the average waveform is obtained to obtain the pump station benchmark drought day external water volume change curve; the waveform alignment is to align the peaks and troughs of the pump station external water volume change curves corresponding to the several benchmark drought days through time offset, interpolation or calculation of cross-correlation.
[0124] In an optional embodiment, it also includes a noise reduction and smoothing module, which is used to perform noise reduction and smoothing on the pump station external water volume change curve corresponding to each benchmark dry day; the noise reduction and smoothing processing includes at least one of the following: respectively calculating the average value of each external water volume value in each window of the pump station external water volume change curve as the external water volume statistical value of the corresponding window; respectively calculating the median value of each external water volume value in each window of the pump station external water volume change curve as the external water volume statistical value of the corresponding window; respectively assigning weight values to each external water volume value of the pump station external water volume change curve in each window, and calculating the external water volume statistical value of the corresponding window according to the weight value of each external water volume value; performing wavelet transform processing on the pump station external water volume change curve to remove high-frequency noise.
[0125] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.
[0126] The external water volume monitoring device in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.
[0127] The embodiment of the present invention also provides a computer device having the above Figure 3 The external water volume monitoring device shown.
[0128] See also Figure 4 , Figure 4 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 4As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 4 A processor 10 is taken as an example.
[0129] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.
[0130] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.
[0131] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0132] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.
[0133] The computer device also includes an input device 30 and an output device 40. The processor 10, the memory 20, the input device 30 and the output device 40 may be connected via a bus or other means. Figure 4 The example of connecting through bus is taken in the following.
[0134] The input device 30 can receive input digital or character information, and generate key signal input related to the user settings and function control of the computer device, such as a touch screen, a keypad, a mouse, a track pad, a touch pad, an indicator bar, one or more mouse buttons, a trackball, a joystick, etc. The output device 40 may include a display device, an auxiliary lighting device (e.g., an LED) and a tactile feedback device (e.g., a vibration motor), etc. The above-mentioned display device includes but is not limited to a liquid crystal display, a light emitting diode, a display and a plasma display. In some optional embodiments, the display device can be a touch screen.
[0135] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.
[0136] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A method for monitoring external water volume, characterized in that: The method comprises: Obtain pump station liquid level data and pump station water flow data; The total water storage capacity of the pump station control area is calculated based on the pump station liquid level data and the pump station liquid level-volume curve; the liquid level-volume curve is a relationship curve between the pump station water level obtained in advance and the total water storage capacity of the pump station control area; the total water storage capacity of the pump station control area is the total water storage capacity of the catchment area controlled by the pump station and the pump station sump; According to the total water storage capacity of the pump station control area and the water outflow data of the pump station, the change curve of the external water volume of the pump station is calculated; The step of obtaining the liquid level-volume curve comprises: Acquire the pump station liquid level data and pump station water flow data at each time point within the target time period; the target time period is when the amount of external water in the pump station is the least, and the pump station water pump is used to pump water, so that the pump station liquid level is reduced from a first liquid level to a second liquid level. The pump station liquid level data at each time point within the target time period is collected by a liquid level meter, and the pump station water flow data at each time point within the target time period is collected by a water flow meter; Based on the pump station liquid level data and pump station water flow data at each time point, a time point-liquid level-flow curve is obtained; Integrating the time point-liquid level-flow curve to obtain a liquid level-volume curve; When the water outflow meter is not configured, the steps to obtain the water outflow data of the pump station at each time point include: Collect current and voltage data of pumps in pumping stations at various time points; Based on the current data and voltage data of the pump station water pump at each time point, calculate the actual power of the pump station water pump at each time point; According to the actual power of the pump station water pump at each time point and the power characteristic curve of the pump station water pump, the water flow rate data of the pump station at each time point is obtained; the power characteristic curve of the pump station water pump is used to describe the power value of the pump station water pump at different pump station water flow rates; According to the total water storage capacity of the pump station control area and the water flow data of the pump station, the change curve of the external water volume of the pump station is calculated, including: Calculate the time derivative of the total water storage capacity in the pump station control area at each time point every day; The derivative of the total water storage capacity of the pump station control area at each time point of the day and the water outflow data of the pump station at the corresponding time point are added together to obtain the external water flow at the corresponding time point; Based on the external water flow at each time point of the day, generate a daily external water flow change curve; Integrate the daily external water flow change curve to obtain the daily pump station external water flow change curve; After calculating the change curve of external water volume of the pumping station, it also includes: The pump station external water volume change curve is compared with the pump station benchmark dry day external water volume change curve to determine the change law of the pump station external water volume; the pump station benchmark dry day external water volume change curve is the pump station external water volume change curve obtained in advance when the pump station external water volume is the minimum; The step of obtaining the reference dry day external water volume variation curve of the pump station comprises: Select several data with the least external water volume from the historical pump station external water volume data, and use several dates corresponding to the several data with the least external water volume as several benchmark dry days; The pumping station external water volume change curves corresponding to several benchmark drought days are waveform aligned and the average waveform is obtained to obtain the pumping station benchmark drought day external water volume change curve; the waveform alignment processing is to align the peaks and troughs of the pumping station external water volume change curves corresponding to several benchmark drought days through time offset, interpolation or calculation of cross correlation.
2. The method according to claim 1, characterized in that Before waveform alignment processing is performed on the pump station external water volume change curves corresponding to a number of benchmark dry days, the method further includes: The noise reduction and smoothing processing are respectively performed on the pump station external water volume change curve corresponding to each benchmark dry day; the noise reduction and smoothing processing includes at least one of the following: The average value of each external water volume value in each window of the external water volume variation curve of the pump station is obtained respectively as the external water volume statistical value of the corresponding window; The median of each external water volume value of the pump station external water volume variation curve in each window is obtained respectively as the external water volume statistical value of the corresponding window; Assign weight values to each external water volume value in each window of the external water volume change curve of the pump station, and obtain the external water volume statistics of the corresponding window according to the weight values of each external water volume value; The change curve of external water volume of the pumping station is processed by wavelet transform to remove high-frequency noise.
3. An external water volume monitoring device, characterized in that: The device comprises: Data acquisition module, used to obtain pump station liquid level data and pump station water flow data; The total water volume calculation module is used to calculate the total water storage volume of the pump station control area according to the pump station liquid level data and the pump station liquid level-volume curve; the liquid level-volume curve is a relationship curve between the pump station water level obtained in advance and the total water storage volume of the pump station control area; the total water storage volume of the pump station control area is the total water storage volume of the catchment area controlled by the pump station and the pump station sump; The curve obtaining module is used to calculate the change curve of the external water volume of the pump station according to the total water storage volume of the pump station control area and the water flow data of the pump station; The device also includes a liquid level-volume curve obtaining module, which is used to: Acquire the pump station liquid level data and pump station water flow data at each time point within the target time period; the target time period is when the amount of external water in the pump station is the least, and the pump station water pump is used to pump water, so that the pump station liquid level is reduced from a first liquid level to a second liquid level. The pump station liquid level data at each time point within the target time period is collected by a liquid level meter, and the pump station water flow data at each time point within the target time period is collected by a water flow meter; Based on the pump station liquid level data and pump station water flow data at each time point, a time point-liquid level-flow curve is obtained; Integrating the time point-liquid level-flow curve to obtain a liquid level-volume curve; When the water flow meter is not configured, the device further includes a water flow acquisition module for: Collect current and voltage data of pumps in pumping stations at various time points; Based on the current data and voltage data of the pump station water pump at each time point, calculate the actual power of the pump station water pump at each time point; According to the actual power of the pump station water pump at each time point and the power characteristic curve of the pump station water pump, the water flow rate data of the pump station at each time point is obtained; the power characteristic curve of the pump station water pump is used to describe the power value of the pump station water pump at different pump station water flow rates; The curve obtaining module is also used for: Calculate the time derivative of the total water storage capacity in the pump station control area at each time point every day; The derivative of the total water storage capacity of the pump station control area at each time point of the day and the water outflow data of the pump station at the corresponding time point are added together to obtain the external water flow at the corresponding time point; Based on the external water flow at each time point of the day, generate a daily external water flow change curve; Integrate the daily external water flow change curve to obtain the daily pump station external water flow change curve; The device also includes a rule determination module, which is used to: After the pump station external water volume change curve is calculated, the pump station external water volume change curve is compared with the pump station benchmark dry day external water volume change curve to determine the change law of the pump station external water volume; the pump station benchmark dry day external water volume change curve is the pump station external water volume change curve obtained in advance when the pump station external water volume is the minimum; The device also includes a reference dry day external water volume change obtaining module, which is used for: Select several data with the least external water volume from the historical pump station external water volume data, and use several dates corresponding to the several data with the least external water volume as several benchmark dry days; The pumping station external water volume change curves corresponding to several benchmark drought days are waveform aligned and the average waveform is obtained to obtain the pumping station benchmark drought day external water volume change curve; the waveform alignment processing is to align the peaks and troughs of the pumping station external water volume change curves corresponding to several benchmark drought days through time offset, interpolation or calculation of cross correlation.
4. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the external water volume monitoring method according to claim 1 or 2 by executing the computer instructions.
5. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the external water volume monitoring method described in claim 1 or 2.
Citation Information
Patent Citations
Rapid prediction method and system for rainstorm submerging of power transmission and transformation equipment of power grid
CN115841171A
Method and device for determining waterlogging prevention and control scheme, equipment and storage medium
CN117010208A
System and method for controlling a pump station
EP3267039A1