A heat and clean machine

By setting up a constant pressure system and a pressure relief pipeline in the all-in-one heat and purification machine, combined with the adjustment of the power ratio of the cold water pump and the hot water pump, precise multi-temperature control and large flow output of hot water are achieved, solving the temperature control problems in the existing technology. Problems of inaccuracy and insufficient traffic extend device life and improve user experience.

CN118168142BActive Publication Date: 2024-10-01JOYOUNG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410578246.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-11
Publication Date
2024-10-01
Estimated Expiration
2044-05-11

AI Technical Summary

Technical Problem

Existing all-in-one heat purifiers cannot achieve precise multi-temperature control and large flow of hot water. Moreover, the temperature adjustment structure is complex, the installation space requirements are high, and assembly is difficult, making it difficult to achieve stepless temperature adjustment.

Method used

An all-in-one heat purifier including filter components, insulation components and heating elements is used. By setting up a constant pressure system, pressure relief pipelines and pressure reducing valves, stable control of water pressure and precise adjustment of flow rate are achieved, and the warm water in the insulation components is used. Mixing achieves precise control of different temperatures, and at the same time, dynamic adjustment of flow and temperature is achieved by adjusting the power ratio of the cold water pump and hot water pump.

Benefits of technology

It achieves precise control of multi-temperature and large flow output of hot water, extends the life of the filter element and booster pump, shortens the time users wait for hot water, saves installation space, and avoids the risk of water leakage caused by vibration of traditional pumps. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118168142B_ABST
    Figure CN118168142B_ABST
Patent Text Reader

Abstract

The present application discloses a heat and water purification machine, comprising: a filter assembly, a heat preservation assembly and a heating element, the water outlet of the heating element is respectively connected with the water inlet of the heat preservation assembly and the hot water outlet of the heat and water purification machine, the clean water outlet of the filter assembly and the water outlet of the heat preservation assembly are respectively connected with the water inlet of the heating element through a clean water pipeline and a heat preservation pipeline, and the clean water pipeline and the heat preservation pipeline converge at a first three-way node; the heat and water purification machine is also provided with a constant pressure system, and the constant pressure system includes a pressure relief pipeline and a pressure reducing valve; the water inlet end of the pressure relief pipeline and the clean water pipeline converge at a second three-way node, the second three-way node is located at the upstream end of the first three-way node, and the water outlet end of the pressure relief pipeline is connected to the upstream end of the booster pump; the pressure reducing valve is located between the first three-way node and the second three-way node, and the water outlet end of the pressure reducing valve forms a constant pressure water outlet. The present application realizes a large flow of hot water while ensuring precise control of multiple temperature levels.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of water purification technology, and in particular to an all-in-one water purification and heating machine. Background Art

[0002] With economic development and the improvement of living standards, consumers are paying more and more attention to healthy water use and drinking water, and their requirements for water use are getting higher and higher. As a water treatment device that can deeply filter and purify water according to water use requirements, water purifiers are recognized and favored by more and more consumers. At present, there is a water purifier and heat all-in-one machine on the market, which enables consumers to receive both normal temperature purified water and hot water at the same time, and gradually replaces the old water purifier with only water purification function.

[0003] The all-in-one heat and air purifier is usually equipped with a filter element, an instant heating element and other structures to realize the integration of filtering and heating functions. Although the instant heating element can boil water, if the user needs to take warm water, he needs to wait for the boiled water to cool down. The natural cooling of boiled water takes too long, which affects the user experience. At present, although there are all-in-one heat and air purifiers with temperature control functions, the temperature control structure is complex, the installation space requirements of the all-in-one heat and air purifier are high, the temperature control structure itself is difficult to assemble, and it is difficult to achieve stepless temperature control.

[0004] The patent specification with the announcement number CN211141689U discloses an integrated heating water purifier that is easy to control temperature. The general scheme is as follows: the output pipeline of the post-filter is connected to a pure water tank for storing filtered pure water; the pure water tank is connected to a first pure water output pipeline and a second pure water output pipeline for two parallel outputs, the first pure water output pipeline is directly connected to the water outlet, and the water outlet directly outputs pure water at room temperature, and the second pure water output pipeline is connected to a water outlet for heating the pure water at room temperature to boiling water. hot tank; the hot water output pipeline connected to the hot tank is connected in parallel with the first pure water output pipeline and then connected to the water outlet, and the hot water in the pipeline is discharged by the water outlet; the hot water output pipeline is also provided with a boiling water drain valve for controlling the hot water on and off of the pipeline, and the first pure water output pipeline is also provided with a normal temperature water drain valve for controlling the normal temperature water on and off of the pipeline, and the boiling water drain valve and the normal temperature water drain valve are used to control the outlet to discharge normal temperature water or boiling water, and the boiling water drain valve and the normal temperature water drain valve are controlled to open at the same time to supply mixed water of cold and hot water to the water outlet.

[0005] Although the above scheme can achieve mixing of water at different temperatures, it cannot control the flow of water at different temperatures, that is, it cannot achieve precise control of water temperature. Summary of the invention

[0006] The purpose of the present application is to provide an all-in-one hot water heater that can achieve a large flow of hot water while ensuring precise control of multiple temperature levels.

[0007] This application adopts the following technical solutions:

[0008] A heat and air cleaning machine, comprising:

[0009] Filter assembly, including filter element and booster pump;

[0010] A thermal insulation component having a water inlet and a water outlet;

[0011] A heating element, wherein the water outlet of the heating element is respectively connected to the water inlet of the insulation component and the hot water outlet of the heat and air purifier, the clean water outlet of the filter component and the water outlet of the insulation component are respectively connected to the water inlet of the heating element through a clean water pipeline and a heat preservation pipeline, and the clean water pipeline and the heat preservation pipeline converge at a first three-way node;

[0012] The integrated heat and water purification machine is also provided with a constant pressure system, which includes a pressure relief pipeline and a pressure reducing valve; the water inlet end of the pressure relief pipeline and the water purification pipeline converge at a second three-way node, the second three-way node is located at the upstream end of the first three-way node, and the water outlet end of the pressure relief pipeline is connected to the upstream end of the booster pump; the pressure reducing valve is located between the first three-way node and the second three-way node, and the water outlet end of the pressure reducing valve forms a constant pressure water outlet.

[0013] Since the hot water flow rate is significantly less than the amount of clean water produced during the instant heating process, there will be excess clean water, which will eventually be blocked in the pipeline, causing the pressure in front of the filter element membrane to increase, causing the filter element and booster pump to overload, seriously affecting the life of the filter element and booster pump. This solution can effectively return the excess clean water to the front of the booster pump by setting a pressure relief pipeline, effectively reducing the pressure in front of the filter element membrane, greatly reducing the load on the filter element and booster pump, protecting the filter element and booster pump, and extending their life.

[0014] At the same time, a pressure reducing valve is installed on the water purification pipeline to reduce the water pressure entering the pressure reducing valve to a certain value, thereby achieving a pressure stabilization effect and facilitating the precise adjustment of subsequent flow rates. By mixing with the warm water in the insulation component, precise control of different temperatures can be achieved. At the same time, with the existence of the insulation component, users can quickly obtain warm water by mixing water, which also reduces the time it takes to heat hot water and shortens the waiting time for users to use hot water.

[0015] Preferably, a cold water pump is provided on the clean water pipeline between the water outlet of the pressure reducing valve and the first three-way node; a hot water pump is provided on the insulation pipeline; the water intake temperature of the hot water outlet is T, and the temperature of the insulation water in the insulation pipeline is T 保 , the clean water temperature in the clean water pipeline is T0, T0≤T 保 .

[0016] In this solution, the pressure reducing valve and the cold water pump can cooperate to achieve different water flow rates. By adjusting the voltage of the cold water pump, the flow rate can be adjusted. By adjusting the voltage, the flow rate can be adjusted from 0.3L / min to 1.5L / min, so as to meet the flow requirements of instant heating bodies at different temperature levels from 35℃ to 100℃. The cold water pump is specifically a double-check pump, which means that it can also achieve positive shutoff when it stops working. In addition, the pressure reducing valve can reduce the water inlet pressure to a certain value, achieve a pressure stabilization effect, and avoid the reduction of the life of the cold water pump due to insufficient pressure resistance.

[0017] Preferably, when T0<T<T 保 When the cold water pump and the hot water pump are turned on at a set power ratio according to the water intake temperature T; or, the hot water pump is turned off, and according to the water intake temperature T, the cold water pump and the instant heating body are turned on at a set power.

[0018] In this solution, since the water intake temperature is not high, the cold water pump and the hot water pump can be directly turned on according to the set power ratio to mix water. In this case, there is no need to turn on the instant heating body. The power ratio of the cold water pump and the hot water pump is determined according to the water intake temperature T. Specifically, when the water intake temperature T is closer to the purified water temperature T0, the power ratio of the cold water pump to the hot water pump is relatively large, that is, the cold water pump is mainly used at this time. When the water intake temperature T is closer to the temperature of the insulation water T 保 At this time, the power ratio of the cold water pump to the hot water pump is relatively small, that is, the hot water pump is mainly working at this time.

[0019] Preferably, when T ≥ T 保 When, according to the water intake temperature T, the instant heating body is turned on at full power, the cold water pump is turned off, and the hot water pump is turned on at the set power to ensure that hot water flows out at the maximum flow rate.

[0020] In this scheme, since the water intake temperature T exceeds the temperature of the insulation water T 保 Therefore, the warm water in the insulation component can be directly heated. At this time, the cold water pump does not need to participate in the work. At the same time, the instant heating body is turned on at full power, ensuring the maximum flow rate of hot (boiling) water, and greatly shortening the waiting time for users to use hot water.

[0021] Preferably, a flow meter is further provided between the first three-way node and the water inlet of the instant heating body; when T ≥ T 保 In the water outlet state, if the accumulated water outlet time t of the flow meter is greater than the set value, the cold water pump is turned on and the working power of the hot water pump is reduced. The power of the cold water pump is adjusted according to the water intake temperature T and the purified water temperature T0.

[0022] In this solution, when the cumulative water outlet time t is greater than the set value, that is, the warm water in the insulation component is almost drained, it is necessary to appropriately lower the working power of the hot water pump, and at the same time adjust the power of the cold water pump according to the water intake temperature T and the clean water temperature T0. Specifically, when the difference between the water intake temperature T and the clean water temperature T0 is large, the power of the cold water pump is appropriately lowered to reduce the flow rate. When the difference between the water intake temperature T and the clean water temperature T0 is small, the power of the cold water pump is appropriately increased to increase the flow rate.

[0023] Preferably, the constant pressure system further comprises a reflux valve arranged on the pressure relief pipeline; the heat and air purification integrated machine further comprises a water inlet valve arranged at the upstream end of the filter assembly, and the water outlet end of the pressure relief pipeline is connected between the water inlet valve and the booster pump.

[0024] In this solution, the reflux valve is specifically a one-way valve, which prevents raw water from directly entering the cold water pipeline from the pressure relief pipeline.

[0025] Preferably, when the purified water outlet flow rate of the filter assembly is greater than the water outlet flow rate of the water outlet end of the pressure reducing valve, the reflux valve and the water inlet valve are opened simultaneously.

[0026] In this solution, when the flow rate of purified water is greater than the flow rate of the outlet end of the pressure reducing valve, that is, pressure build-up occurs in the pipeline, the reflux valve is opened synchronously at this time to complete synchronous pressure relief, effectively reduce the pressure in front of the filter element membrane, greatly reduce the load on the filter element and the booster pump, protect the filter element and the booster pump, and extend their service life.

[0027] Preferably, the air conditioner and heat all-in-one machine is provided with an integrated water circuit seat, the integrated water circuit seat is provided with a mixing water chamber connected to the water inlet of the heating element, the insulation component is connected to the mixing water chamber through the hot water pump, and the water outlet end of the pressure reducing valve is connected to the mixing water chamber through the cold water pump.

[0028] In this solution, a mixing chamber is set in the integrated water channel seat. Normal temperature water and hot water are mixed in the mixing chamber in the integrated water channel seat in advance before entering the mixing pipeline, which shortens the warm water mixing time and shortens the waiting time for users to use water.

[0029] Preferably, the pipeline section of the clean water pipeline provided with a cold water pump and the pipeline section of the insulation pipeline provided with a hot water pump are both integrated in the integrated water circuit seat, and the cold water pump and the hot water pump are arranged on the integrated water circuit seat.

[0030] This solution integrates the cold water pump, hot water pump and integrated waterway seat into one, making the whole modular and miniaturized, saving the installation space, facilitating the subsequent installation, and improving the compactness of the whole machine structure. At the same time, the pipe section of the water purification pipeline with the cold water pump and the pipe section of the insulation pipeline with the hot water pump are also integrated into the integrated waterway seat, which replaces the traditional way of connecting the pipes before and after the pump, with a higher degree of integration, avoiding the risk of water leakage caused by the traditional inlet and outlet pipes being easy to move due to pump vibration.

[0031] Preferably, the water outlet of the heating element is connected to the hot water inlet of the heat and water purification unit through a hot water outlet pipe, and a hot water valve is provided on the hot water outlet pipe, and / or the water outlet of the heating element is connected to the water inlet of the insulation component through a water supply pipe, and a water supply valve is provided on the water supply pipe.

[0032] Since the heating element generates bubbles, residual heat, buffering and other problems after heating, some water will still flow out after the water is turned off. Therefore, this solution can avoid the faucet dripping after the water is turned off after a long time of water discharge by setting a hot water valve at the rear end of the heating element.

[0033] Compared with the prior art, this application has at least the following beneficial effects:

[0034] (1) By setting up a constant pressure system including a pressure relief pipeline and a pressure reducing valve, the water pressure entering the pressure reducing valve can be reduced to a certain value, achieving a pressure stabilization effect, facilitating the precise adjustment of the subsequent flow rate, and then mixing it with the warm water in the insulation component to achieve precise control of different temperatures; at the same time, the pressure relief pipeline is used to return excess clean water to the front of the booster pump, effectively reducing the pressure in front of the filter element membrane, greatly reducing the load on the filter element and the booster pump, protecting the filter element and the booster pump, and extending their service life.

[0035] (2) The filtered room temperature water and the hot water in the thermal insulation component can be mixed in the water mixing chamber to form warm water, so as to quickly obtain warm water. The water in the thermal insulation component can also be directly heated, which greatly shortens the waiting time for users to get hot (boiling) water.

[0036] (3) The cold water pipeline and the hot water pipeline are connected to the mixing chamber through the integrated water channel seat, where the cold water pump and the hot water pump are installed on the integrated water channel seat, making the cold water pump, the hot water pump and the integrated water channel seat modular as a whole, saving the installation space occupied and facilitating subsequent installation. In addition, this integration method replaces the traditional method of connecting pipes before and after the pump, avoiding the risk of water leakage caused by the traditional inlet and outlet pipes being easy to move due to pump vibration. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 This is a schematic diagram of the waterway structure for this application;

[0038] Figure 2A cross-sectional view of the assembly structure diagram of the integrated water channel seat and the cold water pump and the hot water pump;

[0039] In the figure: 1. Booster pump; 2. Filter element; 3. Insulation tank; 4. Instant heating element; 5. Pressure reducing valve; 6. Cold water pump; 7. Hot water pump; 8. Reflux valve; 9. Inlet valve; 10. Integrated waterway seat; 101. Mixing chamber; 11. Hot water valve; 12. Water supply valve; 13. Post-filter element;

[0040] 100, water purification pipeline; 200, thermal insulation pipeline; 300, pressure relief pipeline; 400, hot water outlet pipeline; 500, water supply pipeline. DETAILED DESCRIPTION

[0041] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0042] A heat and clean machine, such as Figure 1 As shown, it includes a filter component, a heat preservation component and a heating element. Among them, the filter component includes a booster pump 1 and a filter element 2. A pre-filter element can be added upstream of the filter element 2 and a post-filter element 13 can be added downstream as needed. The filter element 2 specifically adopts a reverse osmosis filter element, and the post-filter element 13 specifically adopts a post-carbon filter element. The heat preservation component specifically adopts a heat preservation tank 3 with a water inlet and a water outlet. The heating element specifically adopts an instant heating body 4.

[0043] The water outlet of the heating body 4 is respectively connected to the water inlet of the thermal insulation tank 3 and the hot water outlet of the heat and water purification machine. The purified water outlet of the filter assembly and the water outlet of the thermal insulation tank 3 are respectively connected to the water inlet of the heating body 4 through the purified water pipeline 100 and the thermal insulation pipeline 200. The purified water pipeline 100 and the thermal insulation pipeline 200 converge at the first three-way node.

[0044] In the present application, the raw water is passed through the filtering component to produce purified water. The specific process is that the raw water enters the booster pump 1, is pressurized, and then enters the reverse osmosis filter element for filtration, and then passes through the post-carbon filter element for re-filtration to obtain purified water. The purified water production process will not be repeated later.

[0045] In the present application, the clean water outlet of the filter assembly is connected to the water inlet of the instant heating body 4 through the clean water pipeline 100, and the water outlet of the instant heating body 4 is connected to the water inlet of the thermal insulation tank 3, so a water replenishment water path for the thermal insulation tank 3 is formed. Specifically, the clean water flows into the thermal insulation tank 3 through the clean water pipeline 100 and the instant heating body 4 to complete the water replenishment. At the same time, the water outlet of the thermal insulation tank 3 is connected to the water inlet of the instant heating body 4 through the thermal insulation pipeline 200, that is, a circulating heating water path is formed. Specifically, the water in the thermal insulation tank 3 flows back to the thermal insulation tank 3 after being heated by the thermal insulation pipeline 200 and the instant heating body 4.

[0046] In this embodiment, an NTC is provided at the bottom of the thermal insulation tank 3 for detecting the water temperature in the thermal insulation tank 3. When the detected water temperature is within a certain range, water replenishment is stopped, and when it exceeds the range, water replenishment is started. The temperature range can be set according to actual needs. In this embodiment, the temperature range of the thermal insulation tank 3 is 65°C-80°C. When the water temperature of the water stored in the thermal insulation tank 3 is lower than 65°C, the water in the thermal insulation tank 3 will start to circulate and heat until the water temperature of the thermal insulation tank 3 is heated to 80°C and then continues to keep warm.

[0047] Since the present application designs the thermal insulation tank 3, the user can mix water by opening the water purification pipeline 100 and the thermal insulation pipeline 200 at the same time to quickly obtain warm water, or directly heat the warm water in the thermal insulation tank 3, greatly shortening the waiting time for the user to obtain hot (boiling) water.

[0048] The integrated water purification and heat machine of the present application is also provided with a constant pressure system, which includes a pressure relief pipeline 300 and a pressure reducing valve 5; the water inlet end of the pressure relief pipeline 300 and the water purification pipeline 100 converge at the second three-way node, the second three-way node is located at the upstream end of the first three-way node, and the water outlet end of the pressure relief pipeline 300 is connected to the upstream end of the boosting pump 1; the pressure reducing valve 5 is located between the first three-way node and the second three-way node, and the water outlet end of the pressure reducing valve 5 forms a constant pressure water outlet.

[0049] Since the hot water flow rate is significantly less than the amount of clean water produced during the instant heating process, there will be excess clean water, which will eventually be blocked in the clean water pipeline 100, causing the pressure before the filter element 2 membrane to increase, causing the filter element 2 and the booster pump 1 to work overloaded, seriously affecting the life of the filter element 2 and the booster pump 1. This solution can effectively return the excess clean water to the front of the booster pump 1 by setting a pressure relief pipeline 300, effectively reducing the pressure before the filter element 2 membrane, greatly reducing the load of the filter element 2 and the booster pump 1, protecting the filter element 2 and the booster pump 1, and extending their life.

[0050] At the same time, a pressure reducing valve 5 is arranged on the water purification pipeline 100, which can reduce the water pressure entering the pressure reducing valve 5 to a certain value, thereby achieving a pressure stabilizing effect and facilitating precise adjustment of subsequent flow rates, and then mixing with the warm water in the thermal insulation tank 3 to achieve precise temperature control.

[0051] In this embodiment, a cold water pump 6 is arranged between the outlet end of the pressure reducing valve 5 and the first three-way node on the water purification pipeline 100; a hot water pump 7 is arranged on the insulation pipeline 200, that is, the cold water pump 6 is used as the power output of the purified water, and the hot water pump 7 is used as the power output of the warm water in the insulation tank 3. It is only necessary to control the power of the cold water pump 6 and the hot water pump 7 to achieve the precise flow output of cold water and insulation water. In addition, the pressure reducing valve 5 cooperates with the cold water pump 6 to achieve different water flow rates, and the flow rate can be adjusted by adjusting the voltage of the cold water pump 6. By adjusting the voltage, the flow rate can be adjusted from 0.3L / min-1.5L / min, so as to meet the flow rate requirements of the instant heating body from 35℃-100℃. The cold water pump 6 of this application is specifically a double check pump, that is, it can also achieve forward cutoff when it stops working. At the same time, the pressure reducing valve 5 can reduce the water inlet pressure to a certain value, achieve a voltage stabilizing effect, and avoid the life of the cold water pump 6 due to insufficient pressure resistance.

[0052] In the present application, when producing water of different temperatures, the power of the cold water pump 6, the hot water pump 7 and the instant heating body 4 needs to be adjusted according to the actual situation. The power adjustment of the cold water pump 6, the hot water pump 7 and the instant heating body 4 when producing water of different temperatures will be explained one by one below.

[0053] Set the water intake temperature of the hot water outlet to T, and the temperature of the insulation water in the insulation pipe 200 to T 保 , the purified water temperature in the purified water pipeline 100 is T0, at this time T0≤T 保 .

[0054] When T0<T<T 保 When the water intake temperature T is used, the cold water pump 6 and the hot water pump 7 are turned on at a set power ratio; or, the hot water pump 7 is turned off, and according to the water intake temperature T, the cold water pump 6 and the instant heating body 4 are turned on at a set power.

[0055] At the above water intake temperature, since the water intake temperature is not high, the cold water pump 6 and the hot water pump 7 can be directly turned on according to the set power ratio to mix water. In this case, there is no need to turn on the instant heating body. The power ratio of the cold water pump and the hot water pump is determined according to the water intake temperature T. Specifically, when the water intake temperature T is closer to the purified water temperature T0, the power ratio of the cold water pump 6 to the hot water pump 7 is relatively large, that is, the cold water pump 6 is mainly used at this time. When the water intake temperature T is closer to the temperature of the insulation water T 保 At this time, the power ratio of the cold water pump 6 to the hot water pump 7 is relatively small, that is, the hot water pump 7 is mainly working at this time.

[0056] It should be noted that the above-mentioned water mixing method is an ideal state. In actual operation, a temperature slightly lower than the water intake temperature T is obtained through the water mixing operation, and then the instant heating body 4 is used for temperature compensation, and finally the water outlet with a precise temperature is achieved. Under the above-mentioned water intake temperature, the cold water pump 6 and the instant heating body 4 can also be used alone to achieve precise temperature water outlet. Specifically, the hot water pump 7 is turned off, and the instant heating body 4 is directly used for instant hot water outlet.

[0057] Taking 60℃-74℃ hot water as an example, the clean water in the clean water pipeline 100 is mixed with the warm water in the heat preservation tank 3, and then the temperature is compensated to the required temperature by the NTC detection of the water inlet of the instant heating body 4. The outlet water temperature is determined by the NTC detection of the water outlet of the instant heating body 4. The excess clean water in the clean water pipeline 100 flows back to the front end of the booster pump 1 through the pressure relief pipeline 300 to reduce the pressure before the membrane.

[0058] At the same time, taking 35℃-59℃ hot water as an example, the hot water pump 7 is turned off, and the cold water pump 6 draws the clean water in the clean water pipeline 100 into the instant heating body 4, and the instant heating body 4 performs temperature compensation on it. The excess clean water in the clean water pipeline 100 flows back to the front end of the boosting pump 1 through the pressure relief pipeline 300, thereby reducing the pressure in front of the membrane.

[0059] When T ≥ T 保 When the water intake temperature T is reached, the heat body 4 is turned on at full power, the cold water pump 6 is turned off, and the hot water pump 7 is turned on at the set power to ensure that the hot water flows out at the maximum flow rate.

[0060] At the above water intake temperature, since the water intake temperature T exceeds the temperature of the insulation water T 保 Therefore, the warm water flowing into the insulation pipeline 200 can be directly heated. At this time, the cold water pump 6 does not need to participate in the work. At the same time, the heating body 4 is turned on at full power, ensuring the maximum flow rate of hot (boiling) water, and greatly shortening the waiting time for users to use hot water.

[0061] Taking hot water at 81°C-100°C as an example, the hot water pump 7 pumps the hot water in the heat preservation tank 3 into the instant heating body 4 for compensatory heating. Since the cold water pump 6 does not work at this time, the pressure relief pipeline 300 does not relieve pressure.

[0062] Since the amount of water in the heat preservation tank 3 is limited, the amount of water in the heat preservation tank 3 needs to be monitored. In this embodiment, a flow meter is also provided between the first three-way node and the water inlet of the instant heating body 4; when T≥T 保 In the water outlet state, if the accumulated water outlet time t of the flow meter is greater than the set value, the cold water pump 6 is turned on and the working power of the hot water pump 7 is reduced. The power of the cold water pump 6 is adjusted according to the water intake temperature T and the purified water temperature T0.

[0063] Under the above water intake temperature and water intake amount, when the cumulative water discharge time t is greater than the set value, that is, the warm water in the heat preservation tank 3 is close to being emptied, the above time setting value can be adjusted according to the specific situation, for example, the time setting value can correspond to the low water level of the heat preservation tank 3. At this time, it is necessary to appropriately lower the working power of the hot water pump 7, and adjust the power of the cold water pump 6 according to the water intake temperature T and the purified water temperature T0. Specifically, when the difference between the water intake temperature T and the purified water temperature T0 is large, the power of the cold water pump 6 is appropriately lowered to reduce the flow rate, and the power of the instant heating body 4 can also be appropriately increased to prevent the flow rate from being too low. When the difference between the water intake temperature T and the purified water temperature T0 is small, the power of the cold water pump 6 is appropriately increased to increase the flow rate, and the power of the instant heating body 4 can also be simultaneously increased to achieve a higher flow rate.

[0064] When the water level in the insulation tank 3 is about to reach the low water level, the 35-100℃ hot water output can also be directly heated and discharged mainly through the instant heating body 4, and the excess clean water in the clean water pipeline 100 flows back to the front end of the booster pump 1 through the pressure relief pipeline 300, thereby reducing the pressure before the membrane.

[0065] In the present application, the constant pressure system further includes a reflux valve 8 disposed on the pressure relief pipeline 300; the heat and water purification integrated machine further includes a water inlet valve 9 disposed at the upstream end of the filter assembly, and the water outlet end of the pressure relief pipeline 300 is connected to the water inlet valve 9 and the booster pump 1. The reflux valve 8 is specifically a one-way valve to prevent raw water from directly entering the water purification pipeline 100 from the pressure relief pipeline 300.

[0066] During the water intake process, when the purified water outflow rate of the filter assembly is greater than the outflow rate of the water outlet of the pressure reducing valve 5, the reflux valve 8 and the water inlet valve 9 are opened at the same time. When the purified water outflow rate is greater than the outflow rate of the water outlet of the pressure reducing valve 5, that is, the pipeline is under pressure, the reflux valve 8 is opened synchronously at this time, and the synchronous pressure relief can be completed, which effectively reduces the pressure before the membrane of the filter element 2, greatly reduces the load of the filter element 2 and the booster pump 1, and protects the filter element 2 and the booster pump 1, and prolongs their service life.

[0067] In this embodiment, the air conditioner and heat all-in-one machine is provided with an integrated water circuit seat 10, which is provided with a mixing water chamber 101 connected to the water inlet of the instant heating body 4, the thermal insulation tank 3 is connected to the mixing water chamber 101 through the hot water pump 7, and the water outlet end of the pressure reducing valve 5 is connected to the mixing water chamber 101 through the cold water pump 6.

[0068] By setting a mixing chamber 101 in the integrated water channel seat 10, normal temperature water and hot water are mixed in the mixing chamber 101 in the integrated water channel seat 10 before entering the mixing pipeline, which shortens the warm water mixing time and shortens the waiting time for users to use water.

[0069] Furthermore, the pipeline section of the clean water pipeline 100 provided with the cold water pump 6 and the pipeline section of the insulation pipeline 200 provided with the hot water pump 7 are both integrated in the integrated waterway seat 10, and the cold water pump 6 and the hot water pump 7 are arranged on the integrated waterway seat 10.

[0070] By integrating the cold water pump 6, the hot water pump 7 and the integrated waterway seat 10 into one, the whole is modularized and miniaturized, which saves the installation space, facilitates the subsequent installation, and improves the compactness of the whole machine structure. At the same time, the pipe section of the water purification pipeline 100 provided with the cold water pump 6 and the pipe section of the insulation pipeline 200 provided with the hot water pump 7 are also integrated into the integrated waterway seat 10, which replaces the traditional way of connecting the pipes before and after the pump, with a higher degree of integration, avoiding the risk of water leakage caused by the easy movement of the inlet and outlet pipes due to the vibration of the pump.

[0071] In the present application, the water outlet of the heating body 4 is connected to the hot water inlet of the heat and water purifier through a hot water outlet pipe 400, and a hot water valve 11 is provided on the hot water outlet pipe 400. The water outlet of the heating body 4 is connected to the water inlet of the thermal insulation tank 3 through a water replenishment pipe 500, and a water replenishment valve 12 is provided on the water replenishment pipe 500.

[0072] Since the heating body 4 generates bubbles, residual heat, buffering and other problems after heating, some water will still flow out after the water is turned off. Therefore, this embodiment arranges a hot water valve 11 at the rear end of the heating body 4 to avoid the faucet dripping after the water is turned off after a long time of water flow.

[0073] Although the embodiments of the present application have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the appended claims and their equivalents.

Claims

1. A heat and air purifier. include: Filter assembly, including filter element and booster pump; A thermal insulation component having a water inlet and a water outlet; A heating element, wherein the water outlet of the heating element is connected to either the water inlet of the insulation component or the hot water outlet of the heat and water purifier, the clean water outlet of the filter component and the water outlet of the insulation component are connected to the water inlet of the heating element through a clean water pipeline and a heat preservation pipeline respectively, and the clean water pipeline and the heat preservation pipeline converge at a first three-way node; The feature is that: the heat and water purification machine is also provided with a constant pressure system, which includes a pressure relief pipeline and a pressure reducing valve; the water inlet end of the pressure relief pipeline and the water purification pipeline converge at a second three-way node, the second three-way node is located at the upstream end of the first three-way node, and the water outlet end of the pressure relief pipeline is connected to the upstream end of the booster pump; the pressure reducing valve is located between the first three-way node and the second three-way node, and the water outlet end of the pressure reducing valve forms a constant pressure water outlet; A cold water pump is provided on the clean water pipeline between the water outlet of the pressure reducing valve and the first three-way node; a hot water pump is provided on the insulation pipeline; the water intake temperature of the hot water outlet is T, and the temperature of the insulation water in the insulation pipeline is T 保 ; A flow meter is also provided between the first three-way node and the water inlet of the heating element; when T ≥ T 保 In the water outlet state, if the accumulated water outlet time t of the flow meter is greater than the set value, the cold water pump is turned on and the working power of the hot water pump is reduced. The power of the cold water pump is determined according to the water intake temperature T and the purified water temperature T 0 Adjustment.

2. The heat and air conditioning machine according to claim 1, Features: The clean water temperature in the clean water pipeline is T 0 , T 0 ≤T 保 .

3. The heat and air conditioning machine according to claim 2, Features: When T 0 <T<T 保 When the water intake temperature T is on, the cold water pump and the hot water pump are turned on at a set power ratio; or, the hot water pump is turned off, and according to the water intake temperature T, the cold water pump and the heating element are turned on at a set power.

4. The heat and air conditioning machine according to claim 2, Features: When T ≥ T 保 When, according to the water intake temperature T, the heating element is turned on at full power, the cold water pump is turned off, and the hot water pump is turned on at the set power to ensure that hot water flows out at the maximum flow rate.

5. The heat and air conditioning machine according to any one of claims 1 to 4, Features: The constant pressure system also includes a reflux valve arranged on the pressure relief pipeline; the heat and air purifier also includes a water inlet valve arranged at the upstream end of the filter assembly, and the water outlet end of the pressure relief pipeline is connected between the water inlet valve and the booster pump.

6. The heat and air conditioning machine according to claim 5, Features: When the purified water outlet flow rate of the filter assembly is greater than the water outlet flow rate of the water outlet end of the pressure reducing valve, the reflux valve and the water inlet valve are opened simultaneously.

7. The heat and air conditioning machine according to claim 1, Features: The air conditioner and heat all-in-one machine is provided with an integrated water circuit seat, and the integrated water circuit seat is provided with a mixing water chamber connected to the water inlet of the heating element, the insulation component is connected to the mixing water chamber through the hot water pump, and the water outlet end of the pressure reducing valve is connected to the mixing water chamber through the cold water pump.

8. The heat and air conditioning machine according to claim 7, Features: The pipeline section of the clean water pipeline provided with a cold water pump and the pipeline section of the insulation pipeline provided with a hot water pump are both integrated in the integrated waterway seat, and the cold water pump and the hot water pump are arranged on the integrated waterway seat.

9. The heat and air conditioning machine according to claim 1, Features: The water outlet of the heating element is connected to the hot water inlet of the heat and water purification unit through a hot water outlet pipe, and a hot water valve is provided on the hot water outlet pipe, and / or the water outlet of the heating element is connected to the water inlet of the insulation component through a water supply pipe, and a water supply valve is provided on the water supply pipe.